Letter Sequence Request |
---|
TAC:ME9826, Missed Surveillance Requirements (Approved, Closed) |
|
|
|
---|
Category:Letter type:HNP
MONTHYEARHNP-18-050, Request to Extend Reactor Vessel Surveillance Capsule Report Submission Date2018-09-17017 September 2018 Request to Extend Reactor Vessel Surveillance Capsule Report Submission Date HNP-18-004, License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme2018-08-13013 August 2018 License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme HNP-18-035, Relief Request I3R-18, Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Lnservice Inspection Program for Containment, Third Ten-Year Interval2018-06-0404 June 2018 Relief Request I3R-18, Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Lnservice Inspection Program for Containment, Third Ten-Year Interval HNP-18-049, Submittal of 1 0 CFR 50.54(q) Evaluation Form of Changes to Procedure EMP-420, Emergency Program Maintenance, Revision 192018-05-0303 May 2018 Submittal of 1 0 CFR 50.54(q) Evaluation Form of Changes to Procedure EMP-420, Emergency Program Maintenance, Revision 19 HNP-18-023, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes2018-05-0202 May 2018 Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes HNP-18-042, Annual Environmental (Non-radiological) Operating Report2018-04-30030 April 2018 Annual Environmental (Non-radiological) Operating Report HNP-18-032, Annual Radiological Environmental Operating Report2018-04-25025 April 2018 Annual Radiological Environmental Operating Report HNP-18-031, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report HNP-18-047, Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval, Non-Proprietary Version of Calculation2018-04-20020 April 2018 Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval, Non-Proprietary Version of Calculation HNP-18-045, Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval2018-04-18018 April 2018 Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval HNP-18-044, Cycle 22 Core Operating Limits Report, Revision O2018-04-16016 April 2018 Cycle 22 Core Operating Limits Report, Revision O HNP-18-039, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2018-04-13013 April 2018 Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-18-021, Annual Report in Accordance with Technical Specification 6.9.1.22018-02-19019 February 2018 Annual Report in Accordance with Technical Specification 6.9.1.2 HNP-18-020, Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses2018-02-16016 February 2018 Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses HNP-18-019, Cycle 21 Core Operating Limits Report, Revision 12018-02-14014 February 2018 Cycle 21 Core Operating Limits Report, Revision 1 HNP-18-017, CFR 50.54(q) Evaluations2018-02-0505 February 2018 CFR 50.54(q) Evaluations HNP-18-001, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors.2018-02-0101 February 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors. HNP-18-002, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2018-01-22022 January 2018 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-18-003, Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses2018-01-18018 January 2018 Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses HNP-18-007, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis Penetrations2018-01-11011 January 2018 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis Penetrations HNP-18-006, Submittal of 14-Day Special Report for Accident Radiation Monitors2018-01-0404 January 2018 Submittal of 14-Day Special Report for Accident Radiation Monitors HNP-17-093, Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 32017-11-29029 November 2017 Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3 HNP-17-078, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2017-11-27027 November 2017 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-17-082, Response to Request for Additional Information Regarding License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Limit Detailed In..2017-10-30030 October 2017 Response to Request for Additional Information Regarding License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Limit Detailed In.. HNP-17-084, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements2017-10-30030 October 2017 Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements HNP-17-025, Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan2017-10-23023 October 2017 Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan HNP-17-072, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis2017-10-19019 October 2017 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis HNP-17-077, License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications2017-10-10010 October 2017 License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications HNP-17-076, Supplement to License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Duplicate Reporting Requirements.2017-10-0202 October 2017 Supplement to License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Duplicate Reporting Requirements. HNP-17-073, Supplemental Information for License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-09-14014 September 2017 Supplemental Information for License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-062, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-09-13013 September 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal HNP-17-061, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-07-20020 July 2017 Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-008, License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-06-28028 June 2017 License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-003, License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection2017-06-0505 June 2017 License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection HNP-17-040, Snubber Program Plan2017-06-0101 June 2017 Snubber Program Plan HNP-17-051, 10 CFR 50.54(q) Evaluation2017-05-24024 May 2017 10 CFR 50.54(q) Evaluation HNP-17-050, Transmittal of 10 CFR 50.54(q) Evaluation for Revision 21 to PEP-250, Activation and Operation of the Joint Information Center2017-05-24024 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation for Revision 21 to PEP-250, Activation and Operation of the Joint Information Center HNP-17-041, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete2017-05-22022 May 2017 Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Du HNP-17-033, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 112017-05-22022 May 2017 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11 HNP-17-049, Transmittal of 10 CFR 50.54(q) Evaluation and Revision 26 to PEP-110, Emergency Classification and Protective Action Recommendations.2017-05-18018 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation and Revision 26 to PEP-110, Emergency Classification and Protective Action Recommendations. HNP-17-047, 10 CFR 50.54(q) Evaluation2017-05-18018 May 2017 10 CFR 50.54(q) Evaluation HNP-17-048, Transmittal of 10 CFR 50.54(q) Evaluation and Revision 28 to PEP-230, Control Room Operations.2017-05-18018 May 2017 Transmittal of 10 CFR 50.54(q) Evaluation and Revision 28 to PEP-230, Control Room Operations. HNP-17-046, 10 CFR 50.54(q) Evaluation2017-05-18018 May 2017 10 CFR 50.54(q) Evaluation HNP-17-024, Annual Environmental (Nonradiological) Operating Report2017-04-28028 April 2017 Annual Environmental (Nonradiological) Operating Report HNP-17-023, Annual Radioactive Effluent Release Report2017-04-28028 April 2017 Annual Radioactive Effluent Release Report HNP-17-034, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106..2017-04-25025 April 2017 Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106.. HNP-17-035, Request for Pilot Plant Status and Fee Waiver to Implement Tornado Missile Risk Evaluator2017-04-12012 April 2017 Request for Pilot Plant Status and Fee Waiver to Implement Tornado Missile Risk Evaluator HNP-17-045, 10 CFR 50.54(q) Evaluation of Change in Emergency Plan Implementation Procedure PEP-241, Revision 7, Technical Support Center (TSC) Emergency Ventilation System Operation2017-03-30030 March 2017 10 CFR 50.54(q) Evaluation of Change in Emergency Plan Implementation Procedure PEP-241, Revision 7, Technical Support Center (TSC) Emergency Ventilation System Operation HNP-17-014, Annual Report in Accordance with Technical Specifications, Section 6.9.1.22017-02-16016 February 2017 Annual Report in Accordance with Technical Specifications, Section 6.9.1.2 HNP-17-015, Summary of 10 CFR 50.54(q) Evaluation2017-02-15015 February 2017 Summary of 10 CFR 50.54(q) Evaluation 2018-09-17
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARRA-23-0028, Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable2024-05-23023 May 2024 Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable RA-23-0244, Application for Technical Specification Improvement to Extend a Completion Time of Technical Specification 3/4.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2024-03-20020 March 2024 Application for Technical Specification Improvement to Extend a Completion Time of Technical Specification 3/4.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications2023-05-31031 May 2023 License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0081, License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications2023-02-0707 February 2023 License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies ML22020A0072022-03-10010 March 2022 Issuance of Amendment No. 192 Regarding Removal of Extraneous Content and Requirements from the Renewed Facility Operating License and Technical Specifications RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0197, William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility2021-12-14014 December 2021 William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility RA-21-0213, License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown2021-09-23023 September 2021 License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown RA-21-0162, Supplement to License Amendment Request to Revise the 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to Reflect an Alternative2021-06-0808 June 2021 Supplement to License Amendment Request to Revise the 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to Reflect an Alternative RA-21-0112, License Amendment Request Regarding Administrative Change to Reflect Development of a Technical Requirements Manual2021-06-0707 June 2021 License Amendment Request Regarding Administrative Change to Reflect Development of a Technical Requirements Manual RA-21-0052, License Amendment Request Regarding Change to Containment Spray Nozzle Test Frequency2021-03-24024 March 2021 License Amendment Request Regarding Change to Containment Spray Nozzle Test Frequency RA-21-0073, Notification of Permit Application for Industrial Stormwater Activities2021-02-24024 February 2021 Notification of Permit Application for Industrial Stormwater Activities RA-21-0061, Notification of NPDES Permit Renewal Application2021-02-24024 February 2021 Notification of NPDES Permit Renewal Application RA-20-0252, License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications2021-02-24024 February 2021 License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications RA-20-0311, License Amendment Request to Revise the 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process.2021-01-14014 January 2021 License Amendment Request to Revise the 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process. RA-20-0223, Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2020-07-27027 July 2020 Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-20-0148, Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications2020-05-27027 May 2020 Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications RA-19-0359, License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System2020-05-12012 May 2020 License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System RA-20-0012, License Amendment Request to Revise Technical Specifications Related to Accident Monitoring Instrumentation, Refueling Operations Instrumentation, and Electrical Equipment Protective Devices2020-03-12012 March 2020 License Amendment Request to Revise Technical Specifications Related to Accident Monitoring Instrumentation, Refueling Operations Instrumentation, and Electrical Equipment Protective Devices RA-20-0032, License Amendment Request to Reduce the Minimum Required Reactor Coolant System Flow Rate and Update the List of Analytical Methods Used in the Determination of Core Operating Limits2020-03-0606 March 2020 License Amendment Request to Reduce the Minimum Required Reactor Coolant System Flow Rate and Update the List of Analytical Methods Used in the Determination of Core Operating Limits RA-20-0011, Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2020-02-0606 February 2020 Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process RA-19-0067, License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies2019-11-0808 November 2019 License Amendment Request to Revise Technical Specifications for the Adoption of 10 CFR 50, Appendix J, Option B for Type B and C Testing and for Permanent Extension of Type a, B and C Leak Rate Test Frequencies RA-19-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-10-0707 October 2019 License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-19-0123, License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications2019-07-25025 July 2019 License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-19-0252, Supplemental Information for License Amendment Request to Modify Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type2019-06-0606 June 2019 Supplemental Information for License Amendment Request to Modify Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type RA-19-0017, License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type2019-04-10010 April 2019 License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type RA-19-0007, License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications2019-02-18018 February 2019 License Amendment Request for Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications RA-18-0206, Supplement for License Amendment Request to Self-Perform Core Reload Design and Safety Analyses2018-11-0606 November 2018 Supplement for License Amendment Request to Self-Perform Core Reload Design and Safety Analyses ML18230A8042018-08-18018 August 2018 Amendment No. 40 to Application for Construction Permit and Operating License RA-18-0072, License Amendment Request to Modify Reactor Trip System and Engineered Safety Features Actuation System Instrumentation Trip Setpoints2018-07-30030 July 2018 License Amendment Request to Modify Reactor Trip System and Engineered Safety Features Actuation System Instrumentation Trip Setpoints RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications HNP-18-001, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors.2018-02-0101 February 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors. HNP-17-093, Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 32017-11-29029 November 2017 Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3 RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing HNP-17-072, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis2017-10-19019 October 2017 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis HNP-17-077, License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications2017-10-10010 October 2017 License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules HNP-17-008, License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2017-06-28028 June 2017 License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses HNP-17-003, License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection2017-06-0505 June 2017 License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection HNP-17-033, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 112017-05-22022 May 2017 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11 HNP-16-066, License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report2016-12-0202 December 2016 License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report ML16272A4152016-09-28028 September 2016 NPDES Permit Renewal and Prior Amendment RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process HNP-16-076, Supplement to the License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement2016-09-16016 September 2016 Supplement to the License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement HNP-16-068, Supplement to the License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement2016-08-26026 August 2016 Supplement to the License Amendment Request for Temporary Changes to Technical Specifications for the 'A' Emergency Service Water Pump Replacement 2024-05-23
[Table view] Category:Technical Specifications
MONTHYEARML24059A4252024-08-14014 August 2024 Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML22126A0082022-08-0909 August 2022 Issuance of Amendment No. 194 Revise Technical Specifications Related to Reactor Protection System Instrumentation P7 ML21316A2482022-01-19019 January 2022 Issuance of Amendment No. 188, Regarding Revision of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML21035A1322021-03-16016 March 2021 Issuance of Amendment No. 182 Regarding Technical Specifications Related to Accident Monitoring Instrumentation, and Refueling Operations Instrumentation RA-20-0321, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Comple2020-11-11011 November 2020 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completi ML20183A4082020-07-0909 July 2020 Correction to Amendment No. 177 Regarding Elimination of Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications ML19225C0692019-09-19019 September 2019 Issuance of Amendment No. 175 Modify Reactor Trip System and Engineered Safety Features Actuation System Instrumentation Trip Setpoints RA-18-0201, Corrected Technical Specification Page Regarding License Amendment Request to Self Perform Core Reload Design and Safety Analyses2018-10-15015 October 2018 Corrected Technical Specification Page Regarding License Amendment Request to Self Perform Core Reload Design and Safety Analyses ML17324B1292017-12-0606 December 2017 Correction to License Amendment No. 127 Regarding Changes to the Inservice Inspection and Testing Requirements and Establishment of a TS Bases Control Program (CAC No. MD5802) - Corrected TS Pages ML17324B0482017-12-0606 December 2017 Correction to License Amendment No. 127 Regarding Changes to the Inservice Inspection and Testing Requirements and Establishment of a Technical Specifications Bases Control Program RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML17074A6722017-05-25025 May 2017 Issuance of Amendment Relocation of Explosion Gas Monitoring Program Technical Specifications ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML16155A1242016-07-25025 July 2016 Issuance of Amendment on Main Steam Safety Valve Lift Setting Tolerance, Nominal Reactor Trip Setpoint on Pressurizer Water Level, and Pressurizer Water Level Span in Technical Specifications RA-15-0042, Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis.2015-11-19019 November 2015 Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis. RA-15-0031, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors.2015-08-19019 August 2015 Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors. HNP-15-040, Transmittal of Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2015-08-18018 August 2015 Transmittal of Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML15163A0562015-06-30030 June 2015 Issuance of Amendment to Revised Technical Specifications Table 3.3-4, Engineered Safety Features Actuation System Instrumentation ML15075A2122014-11-30030 November 2014 Attachment 8 - DPC-NE-2005 Appendix H Robinson Plant Specific Data RA-15-000, Attachment 8 - DPC-NE-2005 Appendix H Robinson Plant Specific Data2014-11-30030 November 2014 Attachment 8 - DPC-NE-2005 Appendix H Robinson Plant Specific Data ML15075A2132014-11-30030 November 2014 Attachment 9 - DPC-NE-2005 Appendix I Harris Plant Specific Data ML12339A0672012-12-18018 December 2012 Issuance of License Amendments Regarding Cyber Security HNP-12-116, License Amendment Request to Revise Technical Specification Table 3.3-4 Re Degraded Voltage Time Delay Values2012-11-29029 November 2012 License Amendment Request to Revise Technical Specification Table 3.3-4 Re Degraded Voltage Time Delay Values HNP-12-098, Application for Technical Specification Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process2012-10-22022 October 2012 Application for Technical Specification Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process ML12080A2172012-03-20020 March 2012 Application for Revision to Technical Specification 5.3.1 and Core Operating Limits Report References for M5 Cladding Revised Technical Specification Pages HNP-12-040, Application for Revision to Technical Specification 5.3.1 and Core Operating Limits Report References for M5 Cladding Revised Technical Specification Pages2012-03-20020 March 2012 Application for Revision to Technical Specification 5.3.1 and Core Operating Limits Report References for M5 Cladding Revised Technical Specification Pages HNP-11-067, License Amendment Request for Revision to Technical Specification Core Operating Limits Report References for Realistic Large Break LOCA Analysis2011-08-22022 August 2011 License Amendment Request for Revision to Technical Specification Core Operating Limits Report References for Realistic Large Break LOCA Analysis HNP-11-053, Transmittal of Technical Specifications Bases Revisions2011-05-0505 May 2011 Transmittal of Technical Specifications Bases Revisions ML1023707682010-08-16016 August 2010 Response to Second Request for Additional Information Regarding Amendment to Remove Credit for Boraflex in Boiling Water Reactor Spent Fuel Pool Storage Racks ML0926402472009-10-14014 October 2009 Issuance of Amendment Regarding Lowering the Minimum Allowed Level of the Ultimate Heat Sink Main Reservoir ML0923203862009-08-25025 August 2009 Correction to Operating License and Technical Specification Page Issued with Amendment No. 131 Issued on July 2, 2009 ML0923102232009-08-25025 August 2009 Correction to Operating License and Technical Specification Page Issued with Amendment No. 131 Issued on July 2, 2009 ML0923102862009-08-20020 August 2009 Letter & Technical Specifications - Corrections to Technical Specification Pages Issued with Amendment No. 128 Issued on January 29, 2009 HNP-08-075, Request for License Amendment Technical Specifications 5.6.1.3.a and 5.6.1.3.b - Incorporation of Updated Criticality Analyses to Reflect Removal of Credit for Boraflex in BWR Spent Fuel Pool Storage Racks2008-09-29029 September 2008 Request for License Amendment Technical Specifications 5.6.1.3.a and 5.6.1.3.b - Incorporation of Updated Criticality Analyses to Reflect Removal of Credit for Boraflex in BWR Spent Fuel Pool Storage Racks ML0814301512008-06-12012 June 2008 Technical Specifications, Changes to the Inservice Inspection and Testing Requirements and Establishment of a Technical Specifications Bases Control Program HNP-08-049, Request for License Amendment Technical Specification 3.7.5a2008-04-30030 April 2008 Request for License Amendment Technical Specification 3.7.5a ML0726003592007-09-19019 September 2007 Technical Specification Page Correction Issued with Amendment No. 125 Issued on July 23, 2007 HNP-07-127, Correction to Technical Specification Page in Amendment 1252007-09-13013 September 2007 Correction to Technical Specification Page in Amendment 125 ML0724707482007-08-31031 August 2007 Technical Specification, Issuance of Amendment to Revise Steam Generator Water Level Trip Setpoint Values HNP-07-005, Request for License Amendment to Relocate and Revise Technical Specifications Surveillance Requirement 4.0.52007-06-15015 June 2007 Request for License Amendment to Relocate and Revise Technical Specifications Surveillance Requirement 4.0.5 ML0622003982006-08-0202 August 2006 Request for License Amendment to Revise Values Associated with the Steam Generator Water Level Trip Setpoints ML0622004022006-08-0202 August 2006 Request for License Amendment HNP Calculation HNP-I/INST-1010 HNP-06-060, License Amendment Request Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity2006-05-23023 May 2006 License Amendment Request Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0606803122006-03-0808 March 2006 Tech Spec Pages for Amendment 120 Regarding Temperature Limit for Dissolved Oxygen in Reactor Coolant System HNP-05-143, Supplement to Request for License Amendment to Credit Soluble Boron for Fuel Storage Pools2005-12-22022 December 2005 Supplement to Request for License Amendment to Credit Soluble Boron for Fuel Storage Pools HNP-05-002, Supplemental Information to the Proposed License Amendment Request to Technical Specification (TS) 6.8.4.k and TS Surveillance Requirement (SR) 4.6.1.6.12005-12-0909 December 2005 Supplemental Information to the Proposed License Amendment Request to Technical Specification (TS) 6.8.4.k and TS Surveillance Requirement (SR) 4.6.1.6.1 ML0525105022005-09-0101 September 2005 Request for License Amendment to Credit Soluble Boron for Fuel Storage Pools 2024-08-02
[Table view] |
Text
George T. Hamrick Vice President Harris Nuclear Plant 5413 Shearon Harris Rd New Hill NC 27562-9300 919-362-2502 October 22, 2012 10 CFR 50.90 Serial: HNP-12-098 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400
Subject:
Application for Technical Specification Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process Ladies and Gentlemen:
In accordance with the provisions of 10 CFR 50.90, Carolina Power & Light Company is submitting a request for an amendment to the Technical Specifications (TS) for Shearon Harris Nuclear Power Plant, Unit 1 (HNP).
The proposed amendment would modify TS requirements for missed surveillances in Surveillance Requirement (SR) 4.0.3 and also TS SR 4.0.1 to address how a surveillance requirement is met, for consistency with the model safety evaluation. provides a description of the proposed change, the requested confirmation of applicability, and plant-specific verifications. Attachment 2 provides the existing TS pages marked up to show the proposed change. Attachment 3 provides revised (clean) TS pages. provides a summary of the regulatory commitment made in this submittal. provides the existing TS Bases pages marked up to show the proposed change (for information only).
HNP requests approval of the proposed License Amendment by April 30, 2013, with the amendment being implemented within 90 days of issuance.
In accordance with 10 CFR 50.91, a copy of this application, with attachments, is being provided to the State of North Carolina.
Please refer any questions regarding this submittal to Mr. Dave Corlett, Supervisor -
Licensing/Regulatory Programs, at (919) 362-3137.
HNP-12-098 Page 2 I declare, under penalty of perjury, that the foregoing is true and correct.
Executed on [ I o / 9;'1--/ ~0 \ ~ ]
- Sincerely, Attachments (5) cc: Mr. J.D. Austin, NRC Sr. Resident Inspector, HNP Ms. A. T. Billoch Colon, NRC Project Manager, HNP Mr. W. L. Cox Ill, Section Chief, N.C. DENR Mr. V. M. McCree, NRC Regional Administrator, Region II
HNP-12-098 Page 1 of 5 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400 Application for Technical Specification Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process Attachment 1 Description of the Proposed Change, the Requested Confirmation of Applicability, and Plant-Specific Verifications Contents 1.0 Description 2.0 Assessment 2.1 Applicability of Published Safety Evaluation 2.2 Optional Changes and Variations 3.0 Regulatory Analysis 3.1 Significant Hazards Consideration 3.2 Verification and Commitments 4.0 Environmental Consideration 4.1 Incorporation of TSTF-358, Revision 6 4.2 Incorporation of Improved Standard Technical Specification Wording for HNP TS SR 4.0.1
HNP-12-098 Page 2 of 5 1.0 Description The proposed amendment would modify Technical Specifications (TS) requirements for missed surveillances in Surveillance Requirement (SR) 4.0.3 and also TS SR 4.0.1 to address how a surveillance requirement is met, for consistency with the TSTF-358 model safety evaluation.
The changes are consistent with Nuclear Regulatory Commission (NRC) approved Industry/Technical Specification Task Force (TSTF) Standard Technical Specifications (STS) change TSTF-358 Revision 6, "Missed Surveillance Requirements. The availability of this TS improvement was published in the Federal Register on September 28, 2001, as part of the consolidated line item improvement process (CLIIP).
To facilitate implementation of TSTF-358 into the HNP TS, SR 4.0.1 and its associated Bases require revision for consistency with the corresponding NUREG-1431, Rev. 4, "Standard Technical Specifications Westinghouse Plants," Specification 3.0.1, to address how a surveillance is met and to specify the actions required for a missed surveillance.
A TS Bases Control Program, required for implementation of TSTF-358, was previously incorporated into the HNP TS by License Amendment 127, dated June 12, 2008.
2.0 Assessment 2.1 Applicability of Published Safety Evaluation HNP has reviewed the model safety evaluation dated June 14, 2001 and the comment incorporation dated September 28, 2001, as part of the CLIIP. This review included a review of the NRC staff's evaluation, as well as the supporting information provided to support TSTF-358.
HNP has concluded that the justifications presented in the TSTF proposal and the safety evaluation prepared by the NRC staff are applicable to HNP and justify this amendment for the incorporation of the changes to the HNP TS.
2.2 Optional Changes and Variations HNP is not proposing any variations or deviations from the intent of the TS changes described in the TSTF-358, Revision 6, or the NRC staff's model safety evaluation dated June 14, 2001 and modified by staff review and comments dated September 28, 2001. However, to ensure consistent implementation of TSTF-358 with the justification and safety analysis provided, HNP is also revising HNP TS SR 4.0.1 and its associated Bases for consistency with its corresponding improved STS Sections 3.0.1, to address how a surveillance is met and to specify the actions required for a missed surveillance. Minor variations/deviations in the TS terminology used in NUREG-1431 and TSTF-358 are required because the HNP TS are not in the improved TS format and the wording does not directly correspond to the improved STS and TSTF-358 wording in every instance. For example, the HNP TS do not use the improved STS terms Completion Times, Required Actions or Frequencies, rather they use the corresponding terms specified time intervals, ACTION requirements, and surveillance intervals instead. These and
HNP-12-098 Page 3 of 5 similar terminology variations/deviations from TSTF-358 and STS SR 3.0.1 wording are necessary to ensure that the language used in the License Amendment Request is consistent with the terminology used throughout the HNP TS. However, the minor variations/deviations from the specific wording included in the NUREG CLIIP do not change the intent of the TS, Bases or CLIIP.
The variations/deviations in TS terminology are consistent with the wording used in a similar License Amendment Request submitted by Virginia Electric and Power Company (Dominion) on January 31, 2007 (ML070320178). The NRC approved the License Amendment Request in a letter dated May 3, 2007 (ML070930193).
3.0 Regulatory Analysis 3.1 No Significant Hazards Consideration Determination HNP has reviewed the proposed no significant hazards consideration determination (NSHCD) published in the Federal Register as part of the CLIIP. HNP has concluded that the proposed NSHCD presented in the Federal Register notice is applicable to HNP and is hereby incorporated by reference to satisfy the requirements of 10 CFR 50.91(a).
HNP has also evaluated whether a significant hazards consideration is involved by incorporating the wording of improved STS Surveillance Requirement (SR) 3.0.1, as specified in NUREG-1431, into HNP TS SR 4.0.1. This change has been made to the extent practical to facilitate the incorporation of Industry/Technical Specification Task Force (TSTF) Standard Technical Specifications (STS) change TSTF-358, Revision 6, regarding missed surveillance requirements.
Based on this evaluation, HNP has determined that no significant hazards consideration exists based on the following:
- 1. Does the Proposed Change Involve a Significant Increase in the Probability or Consequences of an Accident Previously Evaluated?
Response: No The proposed change to incorporate the requirements of improved STS SR 3.0.1 into corresponding HNP TS SR 4.0.1, does not affect the design or operation of the plant.
The proposed change involves revising the existing HNP TS to be consistent with NUREG-1431, Revision 4, to facilitate the incorporation of TSTF-358 into the TS. The proposed change involves no technical changes to the existing TS as it merely clarifies how SRs are met. As such, these changes are administrative in nature and do not affect initiators of analyzed events or assumed mitigation of accident or transient events.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
HNP-12-098 Page 4 of 5
- 2. Does the Proposed Change Create the Possibility of a New or Different Kind of Accident from any Accident Previously Evaluated?
Response: No.
The proposed change to incorporate the requirements of improved STS SR 3.0.1 into corresponding HNP TS SR 4.0.1, does not involve a physical alteration to the plant (no new or different type of equipment will be installed) or changes in methods governing normal plant operation. The proposed change revises the existing HNP TS to be consistent with NUREG-1431, Revision 4, to clarify how SRs are met and facilitates the incorporation of TSTF-358 for addressing missed surveillances. As such, the proposed change will not impose any new or different requirements or eliminate any existing requirements. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed Change Involve a Significant Reduction in a Margin of Safety?
Response: No.
The proposed change to incorporate the requirements of improved STS SR 3.0.1 into corresponding HNP TS SR 4.0.1, does not affect plant operation or safety analysis assumptions in any way. The change provides additional clarification on how a surveillance is met and facilitates the incorporation of TSTF-358 for addressing missed surveillances. The change is administrative in nature and does not affect the operation of safety-related systems, structures, or components. Therefore, the proposed change does not involve a significant reduction in a margin of safety.
3.2 Verification and Commitments As discussed in the notice of availability published in the Federal Register on September 28, 2001, for this TS improvement, plant-specific verifications were performed as follows:
To facilitate implementation of TSTF-358, HNP is incorporating the wording from the improved STS SR 3.0.1 and SR 3.0.3 and their associated Bases into corresponding HNP TS SR 4.0.1 and SR 4.0.3 respectively, as well as the changes included in TSTF-358.
HNP will establish TS Bases for SR 4.0.3 which state that the use of the delay period established for SR 4.0.3 is a flexibility which is not intended to be used as an operational convenience to extend surveillance intervals, but only for the performance of a missed surveillance.
The modification will also include changes to the Bases for SR 4.0.3 that provide detail on how to implement the new requirements. The Bases changes provide guidance for surveillance frequencies that are not based on time intervals but are based on specified unit conditions, operating situations, or requirements of regulations. In addition, the Bases changes state that
HNP-12-098 Page 5 of 5 HNP is expected to perform a missed surveillance test at the first reasonable opportunity, taking into account appropriate considerations, such as the impact on plant risk and accident analysis assumptions, consideration of unit conditions, planning, availability of personnel, and the time required to perform the surveillance. The Bases also state that the risk impact should be managed through the program in place to implement 10 CFR 50.65(a)(4) and its implementation guidance, NRC Regulatory Guide 1.182, "Assessing and Managing Risks Before Maintenance Activities at Nuclear Power Plants," and that the missed surveillance should then be treated as an emergent condition, as discussed in Regulatory Guide 1.182. In addition, the Bases state that the degree of depth and rigor of the evaluation should be commensurate with the importance of the component and that a missed surveillance for important components should be analyzed quantitatively. The Bases also state that the results of the risk evaluation determine the course of action. In addition, the Bases state that all missed surveillance tests will be placed in the licensee's Corrective Action Program. Finally, the HNP has a Bases Control Program TS (6.8.4.n) consistent with Section 5.5 of the improved STS.
4.0 Environmental Consideration 4.1 Incorporation of TSTF-358, Revision 6 HNP has reviewed the environmental evaluation associated with TSTF-358 included in the model safety evaluation dated June 14, 2001 and modified by staff review and comments dated September 28, 2001, as part of the CLIIP. HNP has concluded that the staff's findings presented in that evaluation are applicable to HNP, and the evaluation is hereby incorporated by reference for this application.
4.2 Incorporation of Improved Standard Technical Specification Wording for HNP TS SR 4.0.
HNP has further determined that the revision of HNP TS SR 4.0.1 and its associated Bases to make them consistent with NUREG-1431, Revision 3, will not result in any significant increases in the amounts of any effluents that may be released offsite or any significant increases in individual or cumulative occupational radiation exposure. The proposed change is administrative in nature, and, as such, does not affect the operation of the plant. Therefore, the proposed change is eligible for categorical exclusion as set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment is needed in connection with the approval of the proposed change as the proposed administrative change will not result in an undue risk to the health and safety of the public.
HNP-12-098 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400 Application for Technical Specification Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process Attachment 2 Technical Specification Page Mark-ups (1 page plus cover)
APPLICABILITY SURVEILLANCE REqUIREMENTS 4.0 .1 Surveillance Requirements shall be met during the OPERATIONAL MODES or other conditions specified for individual L1mit1ng Conditions for Operation unless otherwise stated in an individual Surveillance Requirement. INSERT 1 4.0 . 2 Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25%of the specified surveillance interval .
4.0.3 If 1t is discovered that a surveillance was not performed within 1tS specified surveillance interval. then compliance with the requirement to declare the LCD not met may be delayed. from the time of d1scovery. up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of t he specified sUI'veillance interval. whichever is less. This delay period is permitted to allow performance of the surveillance . INSERT 2 greater If the surveill ance is not performed w1thin the delay period. the LCD must immediately be declared not met. and the applicable ACT ION requirements must be met.
When the surveillance is performed within the delay period and the surveillance criteria are not met. the LCD must immediately be declared not met . and the applicable ACTION requirements must be met.
Surveillance ReQu1rements do not have to be performed on inoperable equipment .
4.0.4 Entry into an OPERATIONAL MODE or other specified condition shall not be made unless the Surveillance ReQuirement(s) associated with the Limiting Conditi on for Operati on has been performed within the stated surveillance interval or as otherwise specified. This prov1sion shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION requirements .
4.0 .5 DELETED Insert 1:
Failure to meet a Surveillance Requirement, whether such failure is experienced during the performance of the surveillance or between performances of the surveillance, shall be failure to meet the LCO. Failure to perform a surveillance within the specified surveillance interval shall be failure to meet the LCO except as provided in SR 4.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.
Insert 2:
A risk evaluation shall be performed for any surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.
SHEARON HARRIS - UN IT 1 3/4 0-2 Amendment No 127
HNP-12-098 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400 Application for Technical Specification Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process Attachment 3 Retyped Technical Specification Page (1 page plus cover)
APPLICABILITY SURVEILLANCE REQUIREMENTS 4.0.1 Surveillance Requirements shall be met during the OPERATIONAL MODES or other conditions specified for individual Limiting Conditions for Operation, unless otherwise stated in an individual Surveillance Requirement. Failure to meet a Surveillance Requirement, whether such failure is experienced during the performance of the surveillance or between performances of the surveillance, shall be failure to meet the LCO. Failure to perform a surveillance within the specified surveillance interval shall be failure to meet the LCO except as provided in SR 4.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.
4.0.2 Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25% of the specified surveillance interval.
4.0.3 If it is discovered that a surveillance was not performed within its specified surveillance interval, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified surveillance interval, whichever is greater. This delay period is permitted to allow performance of the surveillance. A risk evaluation shall be performed for any surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.
If the surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable ACTION requirements must be met.
When the surveillance is performed within the delay period and the surveillance criteria are not met, the LCO must immediately be declared not met, and the applicable ACTION requirements must be met.
4.0.4 Entry into an OPERATIONAL MODE or other specified condition shall not be made unless the Surveillance Requirement(s) associated with the Limiting Condition for Operation has been performed within the stated surveillance interval or as otherwise specified. This provision shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION requirements.
4.0.5 Deleted SHEARON HARRIS - UNIT 1 3/4 0-2 Amendment No.
HNP-12-098 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400 Application for Technical Specification Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process Attachment 4 Regulatory Commitment Summary This document contains the following Regulatory Commitment:
Commitment Due Date/Event HNP will establish the Technical Specification Bases for SRs 4.0.1 and To be implemented 4.0.3 as adopted with the applicable license amendment. with the amendment Any other actions discussed in this document should be considered intended or planned actions.
They are included for informational purposes but are not considered Regulatory Commitments.
HNP-12-098 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400 Application for Technical Specification Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process Attachment 5 Technical Specification Bases Mark-ups (For Information Only)
(5 pages plus cover)
APPLICABILITY BASES 4.0.1 This specification provides that surveillance activities necessary to ensure the Limiting Conditions for Operation are met and will be performed during the OPERATIONAL MODES or other conditions for which the Limiting Conditions for Operation are applicable. Provisions for additional surveillance activities to be performed without regard to the applicable OPERATIONAL MODES or other conditions are provided in the individual Surveillance Requirements. Surveillance Requirements for Special Test Exceptions need only be performed when the Special Test Exception is being utilized as an exception to an individual specification.
INSERT 1 4.0.2 The provisions of this specification establish the limit for which the specified time interval for Surveillance Requirements may be extended. It permits an allowable extension of the normal surveillance interval to facilitate surveillance scheduling and consideration of plant operating conditions that may not be suitable for conducting surveillance; e.g.,
transient conditions or other ongoing surveillance or maintenance activities. It also provides flexibility to accommodate the length of a fuel cycle for surveillances that are performed at each refueling outage and are specified with an IS month surveillance interval. It is not intended that this provision be used repeatedly as a convenience to extend surveillance intervals beyond that specified for surveillances that are not performed during refueling outages. Likewise, it is not the intent that the IS-month interval surveillances be performed during power operation unless it is consistent with safe plant operation. The limitation of Specification 4.0.2 is based on engineering judgement and the recognition that the most probable result of any particular surveillance being performed is the verification of conformance with the Surveillance Requirements. This provision is sufficient to ensure that the reliability ensured through surveillance activities is not significantly degraded beyond that obtained from the specified surveillance interval.
4.0.3 Specification 4.0.3 establishes the flexibility to defer declaring affected equipment inoperable or an affected variable outside the specified limits when a surveillance has not been completed within the specified surveillance interval. A delay period of up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified surveillance interval, whichever is less, applies from the point in time that it is discovered that the surveillance has not been performed in accordance with Specification 4.0.2, and not at the time that the specified surveillance interval was not met. greater This delay period provides adequate time to complete surveillances that have been missed. This delay period permits the completion of a surveillance before complying with ACTION requirements or other remedial measures that might preclude completion of the surveillance.
The basis for this delay period includes consideration of unit conditions, adequate planning, availability of personnel, the time required to perform the surveillance, the safety significance of the delay in completing the required surveillance, and the recognition that the most probable result of any particular surveillance being performed is the verification of conformance with the requirements. When a surveillance with a surveillance interval based not on time intervals, but upon specified unit conditions or operational situations, is discovered not to have been performed when specified, Specification 4.0.3 allows the full delay period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to perform the surveillance.
SHEARON HARRIS - UNIT 1 B 3/4 0-2a Amendment No. S4 I
APPLICABILITY BASES 4.0.3 (Continued)
Specification 4.0.3 also provides a time limit for completion of surveillances that become applicable as a consequence of MODE changes imposed by ACTION requirements.
INSERT 2 Failure to comply with specified surveillance intervals for surveillance requirements is expected to be an infrequent occurrence. Use of the delay period established by Specification 4.0.3 is a flexibility which is not intended to be used as an operational convenience to extend surveillance intervals.
INSERT 3 If a surveillance is not completed within the allowed delay period, then the equipment is considered inoperable or the variable is considered outside the specified limits and the time limits of the ACTION requirements for the applicable LCO begin immediately upon expiration of the delay period. If a surveillance is failed within the delay period, then the equipment is inoperable or the variable is outside the specified limits, and the time limits of the ACTION requirements for the applicable LCO begin immediately upon the failure of the surveillance.
Completion of the surveillance within the delay period allowed by this Specification, or within the completion time of the ACTIONS, restores compliance with Specification 4.0.1.
4.0.4 This specification establishes the requirement that all applicable surveillances must be met before entry into an OPERATIONAL MODE or other condition of operation specified in the Applicability statement. The purpose of this specification is to ensure that system and component OPERABILITY requirements or parameter limits are met before entry into a MODE or condition for which these systems and components ensure safe operation of the facility.
This provision applies to changes in OPERATIONAL MODES or other specified conditions associated with plant shutdown as well as startup.
Under the provisions of this specification, the applicable Surveillance Requirements must be performed within the specified surveillance interval to ensure that the Limiting Conditions for Operation are met during initial plant startup or following a plant outage.
When a shutdown is required to comply with ACTION requirements, the provisions of Specification 4.0.4 do not apply because this would delay placing the facility in a lower MODE of operation.
SHEARON HARRIS - UNIT 1 B 3/4 0-2b Amendment No. 84 I
TECHNICAL SPECIFICATION BASES MARKUP INSERTS INSERT 1 Specification 4.0.1 establishes the requirement that surveillances must be met during the OPERATIONAL MODES or other specified conditions in the Applicability for which the requirements of the LCO apply, unless otherwise specified in the individual surveillances. This Specification is to ensure that surveillances are performed to verify the OPERABILITY of systems and components, and that variables are within specified limits. Failure to meet a surveillance within the specified surveillance interval, in accordance with Specification 4.0.2, constitutes a failure to meet an LCO. Surveillances may be performed by means of any series of sequential, overlapping, or total steps provided the entire surveillance is performed within the specified surveillance interval. Additionally, the definitions related to instrument testing (e.g.,
CHANNEL CALIBRATION) specify that these tests are performed by means of any series of sequential, overlapping, or total steps.
Systems and components are assumed to be OPERABLE when the associated surveillances have been met. Nothing in this Specification, however, is to be construed as implying that systems or components are OPERABLE when:
- a. The systems or components are known to be inoperable, although still meeting the surveillances; or
- b. The requirements of the surveillance(s) are known not to be met between required surveillance performances.
Surveillances do not have to be performed when the unit is in an OPERATIONAL MODE or other specified condition for which the requirements of the associated LCO are not applicable, unless otherwise specified. The surveillances associated with a test exception are only applicable when the test exception is used as an allowable exception to the requirements of a Specification.
Unplanned events may satisfy the requirements (including applicable acceptance criteria) for a given surveillance. In this case, the unplanned event may be credited as fulfilling the performance of the surveillance. This allowance includes those surveillances whose performance is normally precluded in a given OPERATIONAL MODE or other specified condition.
Surveillances, including surveillances invoked by ACTION requirements, do not have to be performed on inoperable equipment because the ACTION requirements define the remedial measures that apply. Surveillances have to be met and performed in accordance with Specification 4.0.2, prior to returning equipment to OPERABLE status.
Upon completion of maintenance, appropriate post maintenance testing is required to declare equipment OPERABLE. This includes ensuring applicable surveillances are not failed and their most recent performance is in accordance with Specification 4.0.2. Post maintenance testing
may not be possible in the current OPERATIONAL MODE or other specified conditions in the Applicability due to the necessary unit parameters not having been established. In these situations, the equipment may be considered OPERABLE provided testing has been satisfactorily completed to the extent possible and the equipment is not otherwise believed to be incapable of performing its function. This will allow operation to proceed to an OPERATIONAL MODE or other specified condition where other necessary post maintenance tests can be completed.
An example of this process is Auxiliary Feedwater (AFW) pump turbine maintenance during refueling that requires testing at steam pressures that cannot be obtained until the unit is at HOT SHUTDOWN conditions. However, if other appropriate testing is satisfactorily completed, the AFW System can be considered OPERABLE. This allows startup and other necessary testing to proceed until the plant reaches the steam pressure required to perform the testing.
INSERT 2 When a surveillance with a surveillance interval based not on time intervals, but upon specified unit conditions, operating situations, or requirements of regulations (e.g., prior to entering OPERATIONAL MODE 1 after each fuel loading, or in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions, etc.) is discovered to not have been performed when specified, Specification 4.0.3 allows for the full delay period of up to the specified surveillance interval to perform the surveillance. However, since there is not a time interval specified, the missed surveillance should be performed at the first reasonable opportunity.
Specification 4.0.3 provides a time limit for, and allowances for the performance of, surveillances that become applicable as a consequence of OPERATIONAL MODE changes imposed by ACTION requirements.
INSERT 3 While up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or the limit of the specified surveillance interval is provided to perform the missed surveillance, it is expected that the missed surveillance will be performed at the first reasonable opportunity. The determination of the first reasonable opportunity should include consideration of the impact on plant risk (from delaying the surveillance as well as any plant configuration changes required or shutting the plant down to perform the surveillance) and impact on any analysis assumptions, in addition to unit conditions, planning, availability of personnel, and the time required to perform the surveillance. This risk impact should be managed through the program in place to implement 10 CFR 50.65(a)(4) and its implementation guidance, NRC Regulatory Guide 1.182, 'Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants.' This Regulatory Guide addresses consideration of temporary and aggregate risk impacts, determination of risk management action thresholds, and risk management action up to and including plant shutdown. The missed surveillance should be treated as an emergent condition as discussed in the Regulatory Guide. The risk evaluation may use quantitative, qualitative, or blended methods. The degree of depth and rigor of the
evaluation should be commensurate with the importance of the component. Missed surveillances for important components should be analyzed quantitatively. If the results of the risk evaluation determine the risk increase is significant, this evaluation should be used to determine the safest course of action. All missed surveillances will be placed in the licensee's Corrective Action Program.