Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 23,2012 Mr. Preston Gillespie Site Vice President Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672-0752
SUBJECT:
OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3, CLARIFICATION OF RELIEF GRANTED FOR RELIEF REQUEST 09-GO-001 (TAC NOS. ME0962, ME0963, AND ME0964)
Dear Mr. Gillespie:
By letter dated February 24, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090890782), as supplemented by letter August 27,2009 (ADAMS Accession No. ML092520032). Duke Energy Carolinas, LLC (Duke Energy, the licensee). sent relief request (RR) 09-GO-001 to the NRC staff for approval. The U.S. Nuclear Regulatory Commission staff (NRC) approved RR 09-GO-001 by letter dated February 17, 2010 (ADAMS Accession No. ML100471112). After Duke Energy reviewed the safety evaluation (SE) associated with the NRC staff approval of RR 09-GO-001, it determined that clarification of the SE was needed prior to using RR 09-GO-001 and sent a letter dated January 23, 2012 (ADAMS Accession No. ML12030A089), requesting clarification from the NRC staff in writing.
Specifically, Duke Energy requested clarification of Section 4.0 of the SE. In this section, the NRC staff stated that "the licensee will also perform a visual examination of the ground surface areas above buried components to detect any evidence of through-wall leakage." Duke Energy's understanding of RR 09-GO-001 is that the visual examinations described in its proposed alternative do not apply to components that are encased in concrete or are located beneath the foundations of plant structures.
The NRC staff has reviewed this issue and confirms that the visual examinations described in the proposed alternative in RR 09-GO-001 do not apply to components that are encased in concrete or are located beneath the foundations of plant structures.
P. Gillespie
- 2 If you have any questions, please call me at 301-415-2901.
Sincerely, o.~
J n P. Boska, Senior Project Manager lant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
As stated cc w/encl: Distribution via Listserv
P. Gillespie
- 2 If you have any questions, please call me at 301-415-2901.
Sincerely, IRA!
John P. Boska, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
As stated cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPLlI-1 R/F RidsAcrsAcnw MailCtr Resource RidsNrrDorlDpr Resource RidsNrrDorlLp2-1 Resource RidsNrrLASFigueroa Resource RidsNrrPMOconee RidsOgcRp Resource RidsRgn2MailCenter Resource ADAMS Accession No ML12289A889
- Via email I
I OFFICE NRRlLPL2-1/PM NRR/LPL2-1/PM NRRlLPL2-1/LA NRR/EPNB/BC NRR/LPL2-1/BC NRRlLPL2-1/PM I NAME JThompson JBoska SFigueroa (sf>>)* TLupold RPascarelli JBoska
~
DATE 10/16112 10/18112 10/16/12 10/19/12 10/22/12 10/23/12 OFFICIAL RECORD COpy