2012 LaSalle County Station Initial License Examination Form Es 301-2
ML12286A201
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/22/2012
From: Mcneil D
Operations Branch III
To:
References
Download: ML12286A201 (3)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: LaSalle Date of Examination: 10/22/2012 Exam Level: RO SRO-I SRO-U Operating Test Number: 2012301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Safety System / JPM Title Type Code*

Function

a. Control Room HVAC / High Control Room Radiation D, S 9
b. Emergency Diesel Generators / 1B DG Fast Start Loading With a Trip A, M, S 6 of MCC 143-1
c. Low Pressure Core Spray / Complete the LPCS Operability Test A, N, S 4
d. Automatic Depressurization System / Initiate ADS with a failure of Two A,EN,L,M,S 3 SRVs to Open
e. Local Power Range Monitor / Bypass a Failed Local Power Range D, S 7 Monitor
f. Reactor Recirculation / Upshift the Reactor Recirc Pumps IAW LOP- P, S 1 RR-05
g. Primary Containment Isolation System / Recover from a Group 10 P, S 5 Isolation
h. Reactor Water Cleanup / Start the 1B RWCU Pump and Respond to a A, N, L, S 2 System Leak In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. DC Electrical Distribution System / Place a Standby Battery Charger in D, R 6 Service
j. Containment Chill Water / Local Emergency Start of 1C VP Chiller D, E, R 5
k. Fire Protection / Lineup a Fire Hose to 2A TDRFP for Injection into the M, E, R 2 RPV

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system)

(L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3 / <3 / < 2 (randomly selected)

(R)CA >1 / >1 / >1 (S)imulator

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: LaSalle Date of Examination: 10/22/2012 Exam Level: RO SRO-I SRO-U Operating Test Number: 2012301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Safety System / JPM Title Type Code*

Function

a. Control Room HVAC / High Control Room Radiation D, S 9
b. Emergency Diesel Generators / 1B DG Fast Start Loading With a Trip A, M, S 6 of MCC 143-1
c. Low Pressure Core Spray / Complete the LPCS Operability Test A, N, S 4
d. Automatic Depressurization System / Initiate ADS with a failure of Two A,EN,L,M,S 3 SRVs to Open
e. Local Power Range Monitor / Bypass a Failed Local Power Range D, S 7 Monitor
f. N/A N/A N/A
g. Primary Containment Isolation System / Recover from a Group 10 P, S 5 Isolation
h. Reactor Water Cleanup / Start the 1B RWCU Pump and Respond to a A, N, L, S 2 System Leak In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. DC Electrical Distribution System / Place a Standby Battery Charger in D, R 6 Service
j. Containment Chill Water / Local Emergency Start of 1C VP Chiller D, E, R 5
k. Fire Protection / Lineup a Fire Hose to 2A TDRFP for Injection into the M, E, R 2 RPV

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system )

(L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3 / <3 / < 2 (randomly selected)

(R)CA >1 / >1 / >1 (S)imulator

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: LaSalle Date of Examination: 10/22/2012 Exam Level: RO SRO-I SRO-U Operating Test Number: 2012301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Safety System / JPM Title Type Code*

Function

a. Control Room HVAC / High Control Room Radiation D, S 9
b. N/A N/A N/A
c. Low Pressure Core Spray / Complete the LPCS Operability Test A, N, S 4
d. Automatic Depressurization System / Initiate ADS with a failure of Two A,EN,L,M,S 3 SRVs to Open
e. N/A N/A N/A
f. N/A N/A N/A
g. N/A N/A N/A
h. N/A N/A N/A In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i. DC Electrical Distribution System / Place a Standby Battery Charger in D, R 6 Service
j. N/A N/A N/A
k. Fire Protection / Lineup a Fire Hose to 2A TDRFP for Injection into the M, E, R 2 RPV

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank

<9 / <8 / <4 (E)mergency or abnormal in-plant

>1 / >1 / >1 (EN)gineered safety feature

- / - / > 1 (control room system (L)ow-Power / Shutdown

>1 / >1 / >1 (N)ew or (M)odified from bank including 1(A)

>2 / >2 / >1 (P)revious 2 exams

<3 / <3 / < 2 (randomly selected)

(R)CA

>1 / >1 / >1 (S)imulator ES-301, Page 23 of 27