ML12286A201

From kanterella
Jump to navigation Jump to search
2012 LaSalle County Station Initial License Examination Form Es 301-2
ML12286A201
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/22/2012
From: Mcneil D
Operations Branch III
To:
References
Download: ML12286A201 (3)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: LaSalle Date of Examination: 10/22/2012 Exam Level: RO SRO-I SRO-U Operating Test Number: 2012301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. Control Room HVAC / High Control Room Radiation D, S 9
b. Emergency Diesel Generators / 1B DG Fast Start Loading With a Trip of MCC 143-1 A, M, S 6
c. Low Pressure Core Spray / Complete the LPCS Operability Test A, N, S 4
d. Automatic Depressurization System / Initiate ADS with a failure of Two SRVs to Open A,EN,L,M,S 3
e. Local Power Range Monitor / Bypass a Failed Local Power Range Monitor D, S 7
f.

Reactor Recirculation / Upshift the Reactor Recirc Pumps IAW LOP-RR-05 P, S 1

g. Primary Containment Isolation System / Recover from a Group 10 Isolation P, S 5
h. Reactor Water Cleanup / Start the 1B RWCU Pump and Respond to a System Leak A, N, L, S 2

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i.

DC Electrical Distribution System / Place a Standby Battery Charger in Service D, R 6

j.

Containment Chill Water / Local Emergency Start of 1C VP Chiller D, E, R 5

k. Fire Protection / Lineup a Fire Hose to 2A TDRFP for Injection into the RPV M, E, R 2

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /

4-6 / 2-3

< 9 /

< 8

/ < 4

> 1 /

> 1

/ > 1

/

/ > 1 (control room system)

> 1 /

> 1

/ > 1

> 2 /

> 2

/ > 1

< 3 /

< 3

/ < 2 (randomly selected)

> 1 /

> 1

/ > 1

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: LaSalle Date of Examination: 10/22/2012 Exam Level: RO SRO-I SRO-U Operating Test Number: 2012301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. Control Room HVAC / High Control Room Radiation D, S 9
b. Emergency Diesel Generators / 1B DG Fast Start Loading With a Trip of MCC 143-1 A, M, S 6
c. Low Pressure Core Spray / Complete the LPCS Operability Test A, N, S 4
d. Automatic Depressurization System / Initiate ADS with a failure of Two SRVs to Open A,EN,L,M,S 3
e. Local Power Range Monitor / Bypass a Failed Local Power Range Monitor D, S 7
f.

N/A N/A N/A

g. Primary Containment Isolation System / Recover from a Group 10 Isolation P, S 5
h. Reactor Water Cleanup / Start the 1B RWCU Pump and Respond to a System Leak A, N, L, S 2

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i.

DC Electrical Distribution System / Place a Standby Battery Charger in Service D, R 6

j.

Containment Chill Water / Local Emergency Start of 1C VP Chiller D, E, R 5

k. Fire Protection / Lineup a Fire Hose to 2A TDRFP for Injection into the RPV M, E, R 2

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /

4-6 / 2-3

< 9 /

< 8

/ < 4

> 1 /

> 1

/ > 1

/

/ > 1 (control room system )

> 1 /

> 1

/ > 1

> 2 /

> 2

/ > 1

< 3 /

< 3

/ < 2 (randomly selected)

> 1 /

> 1

/ > 1

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: LaSalle Date of Examination: 10/22/2012 Exam Level: RO SRO-I SRO-U Operating Test Number: 2012301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. Control Room HVAC / High Control Room Radiation D, S 9
b. N/A N/A N/A
c. Low Pressure Core Spray / Complete the LPCS Operability Test A, N, S 4
d. Automatic Depressurization System / Initiate ADS with a failure of Two SRVs to Open A,EN,L,M,S 3
e. N/A N/A N/A
f.

N/A N/A N/A

g. N/A N/A N/A
h. N/A N/A N/A In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
i.

DC Electrical Distribution System / Place a Standby Battery Charger in Service D, R 6

j.

N/A N/A N/A

k. Fire Protection / Lineup a Fire Hose to 2A TDRFP for Injection into the RPV M, E, R 2

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /

4-6

/ 2-3

< 9 /

< 8

/ < 4

> 1 /

> 1

/ > 1

/

/ > 1 (control room system

> 1 /

> 1

/ > 1

> 2 /

> 2

/ > 1

< 3 /

< 3

/ < 2 (randomly selected)

> 1 /

> 1

/ > 1 ES-301, Page 23 of 27