MONTHYEARIR 05000373/20243012024-10-31031 October 2024 Initial License Examination Report 05000373/2024301 05000374/2024301 ML24260A0492024-09-16016 September 2024 Operator Licensing Examination Approval - Lasalle County Station, Unit 1 and 2, September 2024 ML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 ML23193A8602023-07-12012 July 2023 Form 5.1-1 Post Examination Check Sheet (LaSalle 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23171A9542023-06-12012 June 2023 Form 2.1-1 Examination Preparation Checklist (LaSalle 2023) ML23171A9522023-06-12012 June 2023 Form 1.3-1 Exam Security Agreement ML23171A9562023-06-12012 June 2023 Post Exam Ltr ML23107A1822023-04-18018 April 2023 Operator Licensing Examination Approval Lasalle County Station, May 2023 ML23067A0552023-03-0808 March 2023 Form 2.3-2 Operating Test Quality Checklist (LCS 2023) - Final ML23067A0562023-03-0808 March 2023 Form 2.3-4 Written Exam Quality Checklist (LCS 2023) - Final RA23-014, 75-Day Exam Submittal Letter2023-02-15015 February 2023 75-Day Exam Submittal Letter ML23065A0542022-12-28028 December 2022 Form 3.4-1 Events and Evolutions Checklist (LCS 2023) ML23065A0472022-12-28028 December 2022 Form 2.3-1 Examination Outline - Op Test ML23065A0442022-12-28028 December 2022 Form 2.3-1 Examination Outline - Written (LCS 2023) RA22-066, 150 Day Submittal Cover Letter2022-12-0202 December 2022 150 Day Submittal Cover Letter ML22251A0732022-09-14014 September 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000373/20203012020-12-17017 December 2020 NRC Initial License Examination Report 05000373/2020301; 05000374/2020301 RA20-058, Licensee Post Exam Submittal Letter2020-12-0202 December 2020 Licensee Post Exam Submittal Letter ML21004A2312020-12-0101 December 2020 County, ES-301-3 ML21004A2302020-12-0101 December 2020 County, Written Exam ML21004A2322020-12-0101 December 2020 County, ES-301-4 ML21005A0432020-12-0101 December 2020 ES-201-2 ML21005A0802020-12-0101 December 2020 RO Admin JPM ML21005A0402020-12-0101 December 2020 Scenario D-1 ML21005A1012020-12-0101 December 2020 in Plant JPM ML21005A0392020-12-0101 December 2020 2020_401-1 and 401-3 ML21005A0922020-12-0101 December 2020 Sim JPM ML21004A2242020-12-0101 December 2020 County, RO Admin JPMs ML21004A2192020-12-0101 December 2020 County, ES-401-6 ML21005A0982020-12-0101 December 2020 SRO Admin JPM ML21005A3722020-12-0101 December 2020 ES-401-9 ML21005A3692020-12-0101 December 2020 ES-401-4 ML21005A2402020-12-0101 December 2020 SRO Ile (Answer Key) ML21005A2382020-12-0101 December 2020 RO Ile (Answer Key) ML21005A3652020-12-0101 December 2020 ES-301-7 ML21005A0202020-12-0101 December 2020 ES-301-1 RO ML21004A2222020-12-0101 December 2020 County, Inplant JPMs ML21005A3802020-12-0101 December 2020 ES-201-1 ML21005A0222020-12-0101 December 2020 ES-301-1 SRO ML21004A2272020-12-0101 December 2020 County, Sim JPMs ML21005A0882020-12-0101 December 2020 Scenarios ML21005A3842020-12-0101 December 2020 ES-403-1 ML21005A3832020-12-0101 December 2020 ES-201-3 ML21005A0232020-12-0101 December 2020 ES-301-2 RO ML21005A0462020-12-0101 December 2020 ES-301-5 ML21004A2332020-12-0101 December 2020 County, ES-301-6 ML21004A2282020-12-0101 December 2020 County, SRO Admin JPMs 2024-09-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000373/20243012024-10-31031 October 2024 Initial License Examination Report 05000373/2024301 05000374/2024301 ML24260A0492024-09-16016 September 2024 Operator Licensing Examination Approval - Lasalle County Station, Unit 1 and 2, September 2024 ML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 ML23193A8602023-07-12012 July 2023 Form 5.1-1 Post Examination Check Sheet (LaSalle 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23171A9522023-06-12012 June 2023 Form 1.3-1 Exam Security Agreement ML23171A9562023-06-12012 June 2023 Post Exam Ltr ML23171A9542023-06-12012 June 2023 Form 2.1-1 Examination Preparation Checklist (LaSalle 2023) ML23107A1822023-04-18018 April 2023 Operator Licensing Examination Approval Lasalle County Station, May 2023 ML23067A0562023-03-0808 March 2023 Form 2.3-4 Written Exam Quality Checklist (LCS 2023) - Final ML23067A0552023-03-0808 March 2023 Form 2.3-2 Operating Test Quality Checklist (LCS 2023) - Final RA23-014, 75-Day Exam Submittal Letter2023-02-15015 February 2023 75-Day Exam Submittal Letter ML23065A0442022-12-28028 December 2022 Form 2.3-1 Examination Outline - Written (LCS 2023) ML23065A0472022-12-28028 December 2022 Form 2.3-1 Examination Outline - Op Test ML23065A0542022-12-28028 December 2022 Form 3.4-1 Events and Evolutions Checklist (LCS 2023) RA22-066, 150 Day Submittal Cover Letter2022-12-0202 December 2022 150 Day Submittal Cover Letter ML22251A0732022-09-14014 September 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000373/20203012020-12-17017 December 2020 NRC Initial License Examination Report 05000373/2020301; 05000374/2020301 RA20-058, Licensee Post Exam Submittal Letter2020-12-0202 December 2020 Licensee Post Exam Submittal Letter ML21004A2272020-12-0101 December 2020 County, Sim JPMs ML21005A0392020-12-0101 December 2020 2020_401-1 and 401-3 ML21005A0262020-12-0101 December 2020 ES-301-2 SRO ML21005A0232020-12-0101 December 2020 ES-301-2 RO ML21005A0402020-12-0101 December 2020 Scenario D-1 ML21005A2402020-12-0101 December 2020 SRO Ile (Answer Key) ML21005A3692020-12-0101 December 2020 ES-401-4 ML21004A2242020-12-0101 December 2020 County, RO Admin JPMs ML21005A3722020-12-0101 December 2020 ES-401-9 ML21005A2382020-12-0101 December 2020 RO Ile (Answer Key) ML21005A1012020-12-0101 December 2020 in Plant JPM ML21005A0982020-12-0101 December 2020 SRO Admin JPM ML21004A2282020-12-0101 December 2020 County, SRO Admin JPMs ML21005A0802020-12-0101 December 2020 RO Admin JPM ML21005A0882020-12-0101 December 2020 Scenarios ML21005A0922020-12-0101 December 2020 Sim JPM ML21005A3652020-12-0101 December 2020 ES-301-7 ML21004A2312020-12-0101 December 2020 County, ES-301-3 ML21004A2322020-12-0101 December 2020 County, ES-301-4 ML21004A2332020-12-0101 December 2020 County, ES-301-6 ML21005A0462020-12-0101 December 2020 ES-301-5 ML21005A0202020-12-0101 December 2020 ES-301-1 RO ML21004A2222020-12-0101 December 2020 County, Inplant JPMs ML21004A2302020-12-0101 December 2020 County, Written Exam ML21004A2192020-12-0101 December 2020 County, ES-401-6 ML21005A3802020-12-0101 December 2020 ES-201-1 ML21005A0432020-12-0101 December 2020 ES-201-2 ML21005A3832020-12-0101 December 2020 ES-201-3 ML21005A3842020-12-0101 December 2020 ES-403-1 2024-09-16
[Table view] |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: LaSalle Date of Examination: 10/22/2012 Exam Level: RO SRO-I SRO-U Operating Test Number: 2012301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title Type Code*
Function
- a. Control Room HVAC / High Control Room Radiation D, S 9
- b. Emergency Diesel Generators / 1B DG Fast Start Loading With a Trip A, M, S 6 of MCC 143-1
- c. Low Pressure Core Spray / Complete the LPCS Operability Test A, N, S 4
- d. Automatic Depressurization System / Initiate ADS with a failure of Two A,EN,L,M,S 3 SRVs to Open
- e. Local Power Range Monitor / Bypass a Failed Local Power Range D, S 7 Monitor
- f. Reactor Recirculation / Upshift the Reactor Recirc Pumps IAW LOP- P, S 1 RR-05
- g. Primary Containment Isolation System / Recover from a Group 10 P, S 5 Isolation
- h. Reactor Water Cleanup / Start the 1B RWCU Pump and Respond to a A, N, L, S 2 System Leak In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. DC Electrical Distribution System / Place a Standby Battery Charger in D, R 6 Service
- j. Containment Chill Water / Local Emergency Start of 1C VP Chiller D, E, R 5
- k. Fire Protection / Lineup a Fire Hose to 2A TDRFP for Injection into the M, E, R 2 RPV
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system)
(L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3 / <3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: LaSalle Date of Examination: 10/22/2012 Exam Level: RO SRO-I SRO-U Operating Test Number: 2012301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title Type Code*
Function
- a. Control Room HVAC / High Control Room Radiation D, S 9
- b. Emergency Diesel Generators / 1B DG Fast Start Loading With a Trip A, M, S 6 of MCC 143-1
- c. Low Pressure Core Spray / Complete the LPCS Operability Test A, N, S 4
- d. Automatic Depressurization System / Initiate ADS with a failure of Two A,EN,L,M,S 3 SRVs to Open
- e. Local Power Range Monitor / Bypass a Failed Local Power Range D, S 7 Monitor
- f. N/A N/A N/A
- g. Primary Containment Isolation System / Recover from a Group 10 P, S 5 Isolation
- h. Reactor Water Cleanup / Start the 1B RWCU Pump and Respond to a A, N, L, S 2 System Leak In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. DC Electrical Distribution System / Place a Standby Battery Charger in D, R 6 Service
- j. Containment Chill Water / Local Emergency Start of 1C VP Chiller D, E, R 5
- k. Fire Protection / Lineup a Fire Hose to 2A TDRFP for Injection into the M, E, R 2 RPV
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system )
(L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3 / <3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: LaSalle Date of Examination: 10/22/2012 Exam Level: RO SRO-I SRO-U Operating Test Number: 2012301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title Type Code*
Function
- a. Control Room HVAC / High Control Room Radiation D, S 9
- b. N/A N/A N/A
- c. Low Pressure Core Spray / Complete the LPCS Operability Test A, N, S 4
- d. Automatic Depressurization System / Initiate ADS with a failure of Two A,EN,L,M,S 3 SRVs to Open
- e. N/A N/A N/A
- f. N/A N/A N/A
- g. N/A N/A N/A
- h. N/A N/A N/A In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- i. DC Electrical Distribution System / Place a Standby Battery Charger in D, R 6 Service
- j. N/A N/A N/A
- k. Fire Protection / Lineup a Fire Hose to 2A TDRFP for Injection into the M, E, R 2 RPV
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank
<9 / <8 / <4 (E)mergency or abnormal in-plant
>1 / >1 / >1 (EN)gineered safety feature
- / - / > 1 (control room system (L)ow-Power / Shutdown
>1 / >1 / >1 (N)ew or (M)odified from bank including 1(A)
>2 / >2 / >1 (P)revious 2 exams
<3 / <3 / < 2 (randomly selected)
(R)CA