ML12271A068

From kanterella
Jump to navigation Jump to search
Initial Exam 2012-301 General Correspondence
ML12271A068
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/08/2012
From: Gillespie T
Duke Energy Carolinas
To: Mccree V
NRC/RGN-II
References
Download: ML12271A068 (6)


Text

4 Duke T. PRESTON G1LLESPIE JR.

Vice President 0 Energy .

Oconee Nuclear Station Duke Energy ONQJ VP / 7800 Rochester Hwy.

March 8, 2012 Seneca, SC 29572 Mr. Victor McCree, Regional Administrator fax T. Gillespie@duke-energy.com U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257

Subject:

OCONEE NUCLEAR STATION Operating Exam Outlines 75 day submittal

Dear Mr. McCree:

In accordance with the provisions of NUREG-1 021, Duke Energy is submitting the operating exam outlines, quality checklists, and other documentation as required for the initial license exam scheduled for the week of June 11, 2012 at the Operator Training Center, Oconee Nuclear Site. Submitted for review are:

  • Form ES-201-2, Examination Outline Quality Checklist
  • Form ES-201-3, Examination Security Agreement
  • Form ES-301-2, RO Control Roomlln-Plant Systems Outline
  • Form ES-301-2, SRO (I) Control Room/In-Plant Systems Outline
  • Form ES-301-2, SRO (U) Control Room/In-Plant Systems Outline
  • Form ES-D-1, Scenario outline (three)
  • Form ES-401-4, Record of Rejected KIAs If you require any additional information, or have any questions, please contact Gabriel Washburn at (864) 873-4490 or Cliff Witherspoon at (864) 873-4330.

Sincerely, T. P. Gillespie, Jr.

Site Vice President www. duke-energy, corn

U.S. Nuclear Regulatory Commission, Region II March 8, 2012 Page 2 cc: Malcolm Widmann, Chief U.S. Nuclear Regulatory Commission, Region II Division of Reactor Safety Operations Branch Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Gerry Laska U.S. Nuclear Regulatory Commission, Region II Division of Reactor Safety Operations Branch Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257

  • Duke T. PRESTON GILLESPIE JR.

Vice President 0 nergy Oconee Nuclear Station Duke Energy April II, 2012 ONO1VP / 7800 Rochester Hwy.

Seneca, SC 29672 Mr. Victor McCree, Regional Administrator 864-873-4478 U.S. Nuclear Regulatory Commission Region II 864-873-4208 fax T. Gil/espie@duke-energy. corn Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257

Subject:

OCONEE NUCLEAR STATION ILT4I NRC Written Exam 45 day submittal

Dear Mr. McCree:

In accordance with the provisions of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Duke Energy is submitting the written exams, quality checklists, and other documentation as required for the initial license exam scheduled for the week of June 11, 2012, at the Operator Training Center, Oconee Nuclear Site.

Submitted for review are:

  • Form ES-201-3, Examination Security Agreement
  • Form ES-401-6, Written Examination Quality Checklist
  • RO written exam (with reference package)
  • RO written exam key
  • SRO written exam (with reference package)
  • SRO written exam key
  • Reference material on a DVD If you require any additional information, or have any questions, please contact Cliff Witherspoon at (864) 873-4330 or Gabriel Washburn at (864) 873-4490.

Sincerely, Tr --

T. Preston Gillespie, Jr.

Vice President Oconee Nuclear Station www. duke-energy. corn

U.S. Nuclear Regulatory Commission, Region II April 11,2012 Page 2 cc: Malcolm Widmann, Chief U.S. Nuclear Regulatory Commission, Region II Division of Reactor Safety Operations Branch Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Gerry Laska U.S. Nuclear Regulatory Commission, Region II Division of Reactor Safety Operations Branch Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257

T. PRESTON GILLESPIE. JR.

Duke Vice President Ocon Nuclear Station Energy Duke Energy ONOJ VP I 7800 Rochester Hwy.

Seneca, SC 29672 April23, 2012 864-873-4478 864-873-4208 fax Mr. Victor McCree, Regional Administrator T.Gillespie@duke-energy.com U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta; GA 303031257

Subject:

OCONEE NUCLEAR STATION ILT41 NRC Operating Exam 45 day submittal

Dear Mr. McCree:

Licensing Examination In accordance with the provisions of NUREG-1 021, Operator ing Exam documentation Standards for Power Reactors, Duke Energy is submitting Operat of June 11, 2012, at the as required for the initial license exam scheduled for the week are:

Operator Training Center, Oconee Nuclear Site. Submitted for review

  • One RD Administrative Test
  • One SRO Administrative Test
  • One RD Control Room/In-Plant Test
  • One SRO (U) Control Room/In-Plant Test
  • Form ES-301 -2, RD Control Room/In-Plant Systems Outline
  • Form ES-301-2, SRO (U) Control Room/In-Plant Systems Outline
  • Forms ES-DI and ES-D2 for Three Simulator Scenarios
  • Form ES-201-2, Examination Outline Quality Checklist
  • Form ES-201 -3, Examination Security Agreement
  • Form ES-301-3, Operating Test Quality Checklist
  • Form ES-301-4, Simulator Scenario Quality Checklist

If you require any additional information, or have any questions, please contac 90.

Cliff Witherspoon at (864) 873-4330 or Gabriel Washburn at (864) 873-44 Sincerely, T. Preston Gillespie, Jr.

Vice President Oconee Nuclear Station www.duke-energy.com

U.S. Nuclear Regulatory Commission, Region II April 23, 2012 Page 2 cc: Malcolm Widmann, Chief U.S. Nuclear Regulatory Commission, Region II Division of Reactor Safety Operations Branch Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Gerry Laska U.S. Nuclear Regulatory Commission, Region Il Division of Reactor Safety Operations Branch Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257