CANDIDATE EXAMINER Adm in-i 20 Page 1 of 13 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE ADMIN-1 20 UNIT 3 SFP BORON AND VOLUME CHANGE CALCULATION

Admin-1 20 Page 2 of 13 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Calculate the minimum makeup volumes from CBAST and 3B BHUT to raise Final SFP Boron Concentration and level and determine operability of CBAST if makeup is performed Alternate Path:

NO Facility JPM #:

ADM-120 K/A Rating(s):

System: Gen K/A:

2.1.23 Rating:

4.3/4.4 Task Standard:

Calculate makeup volumes and recognize that CBAST will be outside the procedural limits of operability if used as the boric acid makeup source Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator In-Plant Classroom X

Perform X

Simulate

References:

OP/3/A/1 104/006 C (SFP Makeup), Enclosure 4.8 (Unit 3 SFP Makeup From CBAST)

OP/3/A/1 104/006 C (SEP Makeup), Enclosure 4.1 (Unit 3 SFP Boron and Volume Change Calculation)

OP/0/A/1 108/001 (Curves and General Information), Enclosure 4.2 (CBAST Volume Vs. Level Curve All Units)

OP/0/A/1108/001 (Curves and General Information), Enclosure 4.15 (CBAST Concentration Vs. Level Curve All Units)

Validation Time: 20 mm.

Time Critical: NO Candidate:

Time Start:

NAME Time Finish:

Performance Rating:

SAT UNSAT Performance Time Examiner:

/

NAME SIGNATURE DATE Comments

NONE SIMULATOR OPERATOR INSTRUCTIONS:

Acim in-I 20 Page 3 of 13

Admin-120 Page 4 of 13 Tools/EguipmentlProcedures Needed:

OP/3/A/l 104/006 C (SEP Makeup)

OP/0/AJl 108/001 (Curves and General Information), Enclosure 4.2 (CBAST Volume Vs. Level Curve All Units)

OP/0/A/1108/001 (Curves and General Information), Enclosure 4.15 (CBAST Concentration Vs. Level CurveAll Units)

Clear plastic chart reading aid READ TO OPERATOR DIRECTIONS TO STUDENT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 3 Reactor power = 75% stable Unit 3 Spent Fuel Pool (SFP) level 0.0 ft Unit 3 SEP Boron = 2275 ppm Unit 3 CBAST Boron = 13,200 ppm Unit 3 CBAST level = 69 inches 3B BHUT Boron = 0 ppm 3SF-I and 3SF-2 are closed Unit 3 SEP level will be increased to ÷ 0.6 ft and the Unit 3 SFP concentration will be raised to 2400 ppmb using Unit 3 CBAST and 3B BHUT.

INITIATING CUE:

You are directed to perform the procedure to makeup to the Unit 3 SEP as follows:

Raise Final Unit 3 SEP Boron Concentration to 2400 ppm and level to +0.6 feet.

Using the in-progress procedure provided and any other required procedure(s), perform OP/3/A/1 104/006 C (SEP Makeup), End. 4.8 (Unit 3 SEP Makeup) through Step 2.4.

Assume you have SRO agreement/concurrence whenever it is required.

Admin-1 20 Page 5 of 13 START TIME:

STEP 1:

Step2.2 Determine required U3 SFP makeup volume from CBAST and DW.

IF, desired utilize Enclosure 4.1 (U3 SEP Boron and Volume Change Calculation).

SAT STANDARD:

Refer to Enclosure 4.1 (U3 SEP Boron and Volume Change Calculation) and determine that there is 1041 gaIlO.1 foot in the SEP UNSAT and then calculate total gallons required to raise level to +0.6 ft.

0.6ftx 1041 gal/0.1 ft 6246 gallons OR Calculate the total gallons required to raise level to + 0.6 ft using OP/I 108/001 (Curves and General Information) End. 4.26 (Miscellaneous Data).

0.6 ft x 1041 gal/U. 1 ft = 6246 gallons COMMENTS:

Admin-120 Page 6 of 13 STEP 2:

Step 2.2 (cont.)

Determine the required concentration of the makeup volume SAT STANDARD:

Refer to Enclosure 4.1 (U3 SFP Boron and Volume Change Calculation) step 2.1.

Note: SFP final vol = 376,000 gal + (1041 gai/0.lftXO.6 ft) = 382,246 gal UNSAT C

1 V

1 + C 2

V 2 = CfVf C1 = 2275 ppm = Present Unit 3 SEP Boron concentration V1 = 376,000 gal = Present Unit 3 SFP volume gal C

2

= unknown V2 = 6246 gal Cf= 2400 ppm = Desired SEP Boron Concentration Vf = 382,246 gal Final SEP Volume Required makeup concentration = 9924.8 ppm Note: This calculation may be performed in different sequences using various derivations of the same equation. Steps 2, 3, and 4 demonstrate one method. Step 5 demonstrates an alternate method. If the candidate performs the calculation as one formula (shown below), skip steps 2, 3, and 4 and go to step 5 (C 1

V 1 + C 2

V 2 + C 3

V 3 = CfVf)

COMMENTS:

Admin-120 Page 7 of 13 STEP 3:

Step 2.2 (cant.)

Determine the required CBAST makeup volume CRITICAL STEP STANDARD:

Refer to Enclosure 4.1 (U3 SEP Boron and Volume Change SAT Calculation) step 2.1.

Clvi + C 2

V 2 = CVt UNSAT C1 = 0 ppm = 3B BHUT concentration V1 unknown C2 = 13,200 ppm = CBAST concentration V2 unknown Cf= 9925 ppm = Desired Boron Concentration of makeup Vf = 6246 gal = Final SEP Makeupo Volume V

2

=CfVf/C 2

=4694ga1 CBAST volume = 4694 gal (+/-5)

Note: This calculation may be performed in different sequences using various derivations of the same equation. Steps Z 3, and 4 demonstrate one method. Step 5 demonstrates an alternate method. If the candidate performs the calculation as one formula (shown below), skip steps 2, 3, and 4 and go to step 5 (C 1

V 1 + C 2

V 2 + C 3

V 3

CfVf)

COMMENTS:

Adm in-i 20 Page 8 of 13 STEP 4:

Step 2.2 (cont.)

CRITICAL STEP Determine 3B BHUT makeup volume required.

SAT STANDARD:

Refer to Enclosure 4.1 (U3 SEP Boron and Volume Change Calculation) step 2.1.

UNSAT 3B BHUT volume Total required makeup volume

- CBAST volume 3B BHUT volume = 6246 gal 4696 gal 1550 gal 3B BHUT volume = 1550 gal (+/-2)

Note: This calculation may be performed in different sequences using various derivations of the same equation. Steps 2, 3, and 4 demonstrate one method. Step 5 demonstrates an alternate method. If the candidate performs the calculation as one formula (shown below), skip steps 2, 3, and 4 and go to step 5 (C 1

V 1 + C 2

V 2 + C 3

V 3

CfV 1

)

COMMENTS:

Adm in-i 20 Page 9 of 13 STEP 5:

ALTERNATE CALCULATION

  • CRITICAL STEP C

1 V

1 + C 2

V 2 + C 3

V 3 = CV C1 = 2275 ppm = Initial SEP concentration SAT V1 = 376,000 gal = Initial SFP Volume C2 0 ppm = 3B BHUT concentration unknown UNSAT C

3

= 13,200 ppm = CBAST concentration V3 = unknown Cf= 2400 ppm = Desired SEP Concentraton Vf = 382,246 gal = Final SEP Volume Vf = V1 + V2 + V3 V2 + V3 = 6246 gal (from step 1)

V3 = 6246

- V2 (2275)(376,000) + (0)(V 2

) + (13,200)(6246

- V2) = (2400)(382246) 8.554E8 + 0 + 8.245E7

- 13,200V 2 = 9.174E8

= 1549 gal (+/-2) = 3B BHUT volume

  • V 3

6246-1549 = 4697 gal (+/-5) = CBAST Volume STANDARD:

Candidate performs calculation as described above.

= 1549 gal (+/-2) = 3B BHUT volume

  • V 3

6246-1549 = 4697 gal (+/-5) = CBAST Volume Note: THis step is not required if calculations in Steps Z 3, and 4 are used.

COMMENTS:

STEP 6:

Step 2.3 Obtain SRO approval of the CBAST and DW makeup volumes.

SAT STANDARD:

SRO approval of the CBAST and DW makeup volumes is obtained.

UNSAT CUE: SRO approval of the makeup volumes has been given COMMENTS:

Admin-1 20 Page 10 of 13 STEP 7:

Step 2.4 CRITICAL STEP Determine if sufficient level will be available to satisfy CBAST Concentration vs. Level curve in OPIOIAII 108/001 (Curves and SAT General Information)

STANDARD:

Refer to OP/0/Af1 108/001 Enclosure 4.2 (CBAST Volume Vs. Level Curve All Units) and determine that a CBAST level of 69 inches UNSAT equates to 10,000 gallons in CBAST.

COMMENTS:

STEP 8:

Step 2.4 (cont.)

CRITICAL STEP Determine if sufficient level will be available to satisfy CBAST Concentration vs. Level Curve - All Units in OP/0/A11108/001 (Curves SAT and General Information)

STANDARD:

Refer to OP/0/A/1 108/001 Enclosure 4.15 (CBAST Concentration vs.

Level Curve

- All Units) and determine that the minimum level required UNSAT in CBAST at 13,200 ppm to meet Operability is approximately 58 +/- I inches COMMENTS:

Adm in-i 20 Page 11 of 13 STEP 9:

Step 2.4 (cont.)

CRITICAL STEP Determine if sufficient level will be available to satisfy CBAST Concentration vs. Level curve in OPIOIAI1 108/001 (Curves and SAT General Information)

STANDARD:

Refer to OP/0/AI1 108/001 Enclosure 4.2 (CBAST Volume Vs. Level Curve All Units) and calculate the remaining level in CBAST if 4696 UNSAT gallons is transferred from CBAST to the Unit 3 SEP.

10,000 gal 4696 gal 5304 gal 5304 gal is approximately 43 +/- 3 inches which is less than the required level of 58 +/- 1 inches COMMENTS END TASK TIME STOP:

Adm in-I 20 Page 12 of 13 CRITICAL STEP EXPLANATIONS:

STEP #

Explanation 3

C1VI calculation required to determine CBAST volume 4

C1V1 calculation required to determine minimum 3B BHUT volume 5

Required to calculate final CBAST and BHUT volumes if using alternate calculation 7

Required to determine minimum CBAST level to meet Operability 8

Required to determine minimum CBAST level to meet Operability 9

Required to determine if final CAST level is less than that required to meet Operability

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 3 Reactor power = 75% stable Unit 3 Spent Fuel Pool (SFP) level = 0.0 ft Unit 3 SEP Boron = 2275 ppm Unit 3 CBAST Boron = 13,200 ppm Unit 3 CBAST level = 69 inches 3B BHUT Boron = 0 ppm 3SF-I and 3SF-2 are closed Unit 3 SFP level will be increased to + 0.6 ft and the Unit 3 SEP concentration will be raised to 2400 ppmb using Unit 3 CBAST and 3B BHUT.

INITIATING CUE:

You are directed to perform the procedure to makeup to the Unit 3 SEP as follows:

Raise Final Unit 3 SEP Boron Concentration to 2400 ppm and level to +0.6 feet.

Using the in-progress procedure provided and any other required procedure(s), perform OPI3INI 104/006 C (SEP Makeup), End. 4.8 (Unit 3 SEP Makeup) through Step 2.4.

Assume you have SRO agreement/concurrence whenever it is required.

Adm in-i 27 Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Admin-I 27 DIVERSE VERIFICATION OF REACTOR POWER CANDIDATE EXAMINER

Adm in-i 27 Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Verify diverse reactor power indications between NI power and power based on loop delta T Alternate Path:

N/A Facility JPM #:

New K/A Rating(s):

System:

Gen K/A:

2.1.45 Rating:

4.3/4.3 Task Standard:

Compare the average NI Power Range Rx power to the average Loop delta T power and determine that they are NOT within 2% of each other.

Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator In-Plant Classroom X

Perform X

Simulate

References:

Validation Time: 20 mm.

Time Critical: No Candidate:

Time Start:

NAME Time Finish:

Performance Rating:

SAT UNSAT Performance Time:

Examiner:

I NAME SIGNATURE DATE Comments

NONE SIMULATOR OPERATOR INSTRUCTIONS Admin-127 Page 3 of 10

Adm in-i 27 Page 4 of 10 Tools/Equipment/Procedures Needed:

PTI1/A106001001 (Periodic Instrument Surveillance)

PTIIIAIO600IOOI (Loss Of Computer)

Picture of front board indications READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit I is at 80% RTP of Cycle 27 PT/I/A/0600/001 (Periodic Instrument Surveillance) Enclosure 13.1 (Mode 1&2) has just been initiated for your shift OAC is unavailable Rx Engineering is not immediately available INITIATING CUE You have been asked to perform the Time = 2000 requirements on page 1 of 27 of PT/1/A106001001 (Periodic Instrument Surveillance) Enclosure 13.1 (Mode 1&2) and determine if the conditions that will allow signing Step 1 as complete are met. Circle your choice below to indicate if the requirements of the step are met.

START TIME:

Adm in-127 Page 5 of 10 STEP 1:

Step 1.

If Rx critical, verify Core Thermal Power indications every 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

SAT 1.1

- Priority of power indications STANDARD:

Candidate reviews step 1.1 and determines A-D are not available due to UNSAT OAC out of service COMMENTS:

STEP 2:

Step 1.2 Verify diverse reactor power indications within +/-2% per one of the following:

1.2.1

- Compare the following (OAC points)

SAT STANDARD:

Candidate determines that the points listed in step 1.2.1 rely on the OAC and are not available UNSAT COMMENTS:

Adm in-127 Page 6 of 10 STEP 3:

Step 1.2 Verify diverse reactor power indications within +/-2% per one of the following:

SAT 1.2.2

- Compare the following:

Average of N 1-5, N 1-6, N 1-7, and NI-8 (refer to Step 1.1.E)

OR UNSAT Thermal Power from Rx Engineering using PT/0/A10205/002 (Thermal Power Calculation) versus Average two RC Loop tTs from RC Loop T gauge and use Enclosure Loop tT Vs Reactor Power to determine percent power from T STANDARD:

Candidate refers to the attached graphic and averages the four NI power ranges since Rx Engineering is not available to perform the Thermal Power Calculation NI-S = 80.1 NI-6 = 79.9 NI-7 = 79.8 Nl-8 = 80.0 80.1 + 79.9 + 79.8 + 80.0 319.8/4 = 79.95 COMMENTS:

Adm in-i 27 Page 7 of 10 STEP 4:

Step 1.2 CRITICAL TASK Verify diverse reactor power indications within +/-2% per one of the following:

1.2.2

- Compare the following:

SAT Average of N 1-5, N 1-6, N 1-7, and NI-8 (refer to Step 1.1.E)

OR Thermal Power from Rx Engineering using PTIO/A102051002 UNSAT (Thermal Power Calculation) versus Average two RC Loop tTs from RC Loop iT gauge and use Enclosure Loop T Vs Reactor Power to determine percent power from T STANDARD:

Candidate refers to the attached graphic and averages the Loop A and Loop B delta T indications Loop A = 35.3 Loop B = 37.3 37.2 + 37.4 = 74.6 I 2 = 37.3 COMMENTS:

Adm in-i 27 Page 8 of 10 STEP 5:

Step 1.2 CRITICAL TASK Verify diverse reactor power indications within +/-2% per one of the following:

1.2.2

- Compare the following:

SAT Average of NI-5, NI-6, Nl-7, and NI-8 (refer to Step 1.1.E)

OR Thermal Power from Rx Engineering using PT/0/A10205/002 UNSAT (Thermal Power Calculation) versus Average two RC Loop ATs from RC Loop AT gauge and use Enclosure Loop AT Vs Reactor Power to determine percent power from AT STANDARD:

Candidate refers to PT/1/A10600/001 Enclosurel3.1 1 (Loop AT Vs Reactor Power) and using 36.8 °F determines that Reactor Power from delta T is 85% (+ 2%)

COMMENTS:

STEP 6:

Step 1.2 CRITICAL TASK Verify diverse reactor power indications within +/-2% per one of the following:

1.2.2

- Compare the following:

SAT Average of NI-5, NI-6, NI-7, and NI-8 (refer to Step 1.1.E)

OR Thermal Power from Rx Engineering using PT/0/A10205/002 UNSAT (Thermal Power Calculation) versus Average two RC Loop ATs from RC Loop AT gauge and use Enclosure Loop AT Vs Reactor Power to determine percent power from AT STANDARD:

Candidate refers to PT/1/A/0600/001 Step 1.2 and determines that the 85% power from delta T is NOT within the allowed +/-2% (NI power =

80%) therefore the step cannot be signed off as completed.

COMMENTS:

END OF TASK TIME STOP:

CRITICAL STEP EXPLANATIONS STEP #

Explanation 4

Required to determine the correct delta T to use 5

Required to determine % power from delta T 6

Required to determine if the acceptance criteria for the step has been met.

Admin-1 27 Page 9 of 10

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Unit 1 is at 80% RTP of Cycle 27 PTIIIAIO600IOO1 (Periodic Instrument Surveillance) Enclosure 13.1 (Mode 1&2) has just been initiated for your shift QAC is unavailable Rx Engineering is not immediately available INITIATING CUE You have been asked to perform the Time = 2000 requirements on page 1 of 27 of PT/1/A10600/001 (Periodic Instrument Surveillance) Enclosure 13.1 (Mode 1&2) and determine if the conditions that will allow signing Step I as complete are met. Circle your choice below to indicate if the requirements of the step are met.

U) z Ui C,z Ui 00 C-)

I UI L0z I Ii I

I II II II II I

I I

II l I

I II II JIll I

l I I I III I

I I

I I

I I

I 1.1.1 I

I 1.1 C)

I-

=

I-Cl)wa:

a:

I IIII II

C L

Reactor Power (% FP) r\\)

0)

C C

C C

C C

C L

I

b

I I

  • 1 I

h C

01 C

01 F) 0

01 m

ID UI

-n 0

C-.)

01 C

01 C

4I

h.

C 00 CD CD

CD C,z C/)

C)

CD p)

CD C-CD L)

J

C-)

i I.

I*

CD CD

.1

CD h

Adm in-i 41 Page 1 of 11 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE ADMIN-1 41 CALCULATION OF PRIMARY TO SECONDARY LEAK RATE CANDIDATE EXAMINER

Adm in-i 41 Page 2 of 1 1 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Calculation of Primary to Secondary Leak Rate and determination of shutdown requirements Alternate Path:

No Facility JPM #:

ADMIN-122 K/A Rating(s):

System:

Gen K/A:

2.1.7 Rating

4.4/4.7 Task Standard:

Utilize APIIIA/17001031 (Primary to Secondary Leakage) Subsequent Actions to determine correct procedure path, calculation enclosure to use to quantify the leak rate, and enclosure to determine unit shutdown requirements.

Utilize AP/11A11700/031 (Primary to Secondary Leakage) Enclosure 5.5 (Calculation of Primary to Secondary Leak Rate using I RIA-40) and RCS Samples to correctly calculate SG Tube Leak flow rate.

Utilize AP/1/A/1700/031 (Primary to Secondary Leakage), Enclosure 5.1 (Unit Shutdown Requirements) to determine shutdown requirements based on quantified leak rate from Enclosure 5.5.

Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator In-Plant Classroom X

Perform X

Simulate

References:

Validation Time: 16 minutes Time Critical: NO Candidate:

Time Start:

NAME Time Finish:

Performance Rating:

SAT UNSAT Performance Time:

NAME SIGNATURE DATE COMMENTS

None SIMULATOR OPERATOR INSTRUCTIONS:

Adm in-i 41 Page 3 of ii

Adm in-i 41 Page 4 of 11 Tools/EguipmentlProcedures Needed:

AP/1/A/1700/031 complete up thru Step 4.14 Calculator READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit ONE initial conditions:

Time = 0400 Reactor power 37% stable AP/1/A11700/031 (Primary to Secondary Leakage) entered due to suspected leakage

> 5 gpd but < 25 gpm I RIA-40 (from View Node information) = 452 cpm Spiked as high as 605 cpm over the last two hours OAC primary to secondary leak rate calculation is NOT available RP and Primary Chemistry sample results are as follows:

Total Xe 133 equivalent activity (from RP CSAE off-gas sample) = 2.1 E-5 pCi/mI Total Xe 133 activity (from RP CSAE off-gas sample) = 2.23 E-5 pCi/mI RCS Xe 133 equivalent corrected (from Primary Chemistry RCS sample) = 0.278 pCi/mI RCS Xe 133 activity (from Primary Chemistry RCS sample) = 0.301 pCi/mI CSAE off-gas flow = I 2.5 scfm INITIATING CUES:

AP/1/A/1700/031 is complete up thru Step 4.14. You are to continue in the AP and determine the primary to secondary leak rate and make a recommendation for continued operation and/or required time to shutdown based on the calculated leak rate. Document the primary to secondary leak rate and your operational recommendation below.

Adm in-i 41 Page 5 of ii START TIME:

STEP 1:

SAStep4.15 Verify OAC primary to secondary leak rate calculation available (including I RIA-40 operable).

SAT STANDARD:

Candidate determines from initial conditions that OAC program is NOT available. He must follow the RNO and GO TO Step 4.18 UNSAT COMMENTS:

STEP2:

SAStep4.18 Verify aN of the following:

Rx power >40%

SAT 1 RIA-59 operable 1 RIA-60 operable UNSAT STANDARD:

Candidate determines from initial conditions that power is <40%. He must follow the RNO and GO TO Step 4.20 COMMENTS:

STEP 3:

SA Step 4.20 Verify 1 RIA-40 operable.

SAT STANDARD:

Candidate determines from initial conditions that I RIA-40 is operable.

UNSAT COMMENTS:

Admin-1 41 Page 6 of 11 STEP 4:

SA Step 4.21 PERFORM End 5.5 (Calculation of Primary to Secondary Leak Rate using 1 RIA-40).

SAT STANDARD:

Candidate proceeds to Enclosure 5.5 UNSAT COMMENTS:

STEP 5:.5 Step I CRITICAL STEP Obtain RCS Xe 133 equivalent corrected from the latest available Primary Chemistry RCS sample.

SAT STANDARD:

Candidate must pick the RCS Xe 133 equivalent corrected from the Initial conditions (0.272 pCi/mI).

UN SAT COMMENTS:

STEP 6:.5 Step 2 CRITICAL STEP Obtain 1 RIA-40 counts from the Control Room RIA View Node information. (1VB2)

SAT STANDARD:

Candidate obtains the I RIA-40 spike counts (from initial conditions) per the NOTE preceding Step 2 (721 cpm).

UNSAT COMMENTS:

Admin-141 Page 7 of 11 STEP 7:.5 Step 3 CRITICAL STEP Determine primary to secondary leak rate from the following formulas:

SAT STANDARD:

Candidate calculates the SGTL size as follows per End. 5.5. formula, determines leak rate is 80 gpd:

UNSAT LR = 100 ft3 X

1 RIA-40 (crm)

X 3.67E-4 (qal)(min)(uCi/ml)

Mm RCS Xe 133 eq corr (uCi/mI)

(ft3)(day)(cpm)

LR = 100 ft3 X

605 cpm X

3.67E-4 (qal)(min)(uCi/ml) = 80 qpd (+/- 2 gpd)

Mm 0.278 uCi/ml rcs (ft3)(day)(cpm)

COMMENTS:

STEP 8:

SA Step 4.22 GO TO the appropriate step based on Primary to Secondary Leak rate:

SAT STANDARD:

Candidate determines that the Go TO step is 4.51 based on leak rate calculation being between 75 gpd and 100 gpd and proceeds to that UNSAT step.

COMMENTS:

STEP 9:

SA Step 4.51 Verify primary to secondary leak rate is 75 gpd for at least 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

SAT STANDARD:

Candidate proceeds to step 4.52.

UN SAT Inform candidate that the leak rate has not changed over the past 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

COMMENTS:

Adm in-i 41 Page 8 of 11 STEP 10:

SA Step 4.52 GO TO step 4.86.

SAT STANDARD:

Candidate proceeds to step 4.86.

UNSAT COMMENTS:

STEP 11:

SA Step 4.86 Initiate log readings from the following every 15 minutes in the Auto Log.

SAT STANDARD:

Candidate proceeds to step 4.87.

UNSAT CUE:

Inform candidate that this direction has already been given to another operator to take these log readings every 15 minutes..

COMMENTS:

STEP 12:

SA Step 4.87 Initiate a unit shutdown to meet requirements of End 5.1 (Unit Shutdown SAT Requirements) using the following, as applicable:

STANDARD:

Candidate proceeds to Enclosure 5.1 UNSAT COMMENTS

Admin-1 41 Page 9 of 11 STEP 13:

End 5.1

- Unit Shutdown Requirement CRITICAL STEP Most recent RP and Primary Chemistry samples have resulted in a SGTL rate = 80 gpd SAT STANDARD:

Candidate utilizes the Table and Notes in AP/31 End. 5.1, Unit Shutdown Requirements, and determines the time to be in Mode 3 based on a leak rate of 80 gpd to be 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> from the time of UNSAT quantification. Unit 1 must be shutdown and in Mode 3 by 1000 EXAMINER NOTE:

The candidate must determine from bullet #4 that Continuous Monitoring is inoperable.

If he incorrectly interprets it as operable based on 1 RIA-40 operable, he will incorrectly pick 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Time of quantification is assumed to be 0400 since the present time is 0400 and the time to perform the calculation should not be that long.

Leak rate 75 gpd < 100 gpd (sustained leak or spike).

Per Note bullet 1, the time limits for all conditions begins when the associated leak rate is first quantified.

Per bullet #3, shutdown may be delayed until leak rate is confirmed by grab samples COMMENTS:

END TASK STOP TIME:

CRITICAL STEP EXPLANATIONS:

STEP #

Explanation 5

Required to calculate the leak rate correctly 6

Required to calculate the leak rate correctly 7

Required to calculate the leak rate correctly 13 Required to determine time of shutdown to Mode 3 Admin-1 41 Page lOot 11

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit ONE initial conditions:

Time = 0400 Reactor power = 37% stable AP/1/A11700/031 (Primary to Secondary Leakage) entered due to suspected leakage

>5gpd but<25gpm I RIA-40 (from View Node information) 452 cpm Spiked as high as 605 cpm over the last two hours QAC primary to secondary leak rate calculation is NOT available RP and Primary Chemistry sample results are as follows:

Total Xe 133 equivalent activity (from RP CSAE off-gas sample) = 2.1 E-5 pCi/mI Total Xe 133 activity (from RP CSAE off-gas sample) = 2.23 E-5 pCi/mI RCS Xe 133 equivalent corrected (from Primary Chemistry RCS sample) = 0.278 pCi/mI RCS Xe 133 activity (from Primary Chemistry RCS sample) = 0.301 pCi/mI CSAE off-gas flow = 12.5 scfm INITIATING CUES:

AP/1/A/1700/031 is complete up thru Step 4.14. You are to continue in the AP and determine the primary to secondary leak rate and make a recommendation for continued operation and/or required time to shutdown based on the calculated leak rate. Document the primary to secondary leak rate and your operational recommendation below.

REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE ADMIN-202 DETERMINE SSF RCMUP OPERABILITY Admin-202 Page 1 of 7 CANDIDATE EXAMINER

Admin-202 Page 2 of 7 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Determine SSF RCMUP Operability Alternate Path:

No Facility JPM #:

ADM-202 K/A Rating(s):

System:

GEN K/A:

2.2.42 Rating:

3.9/4.6 Task Standard:

Determine SSF RCMUP Operability as directed by OP/l/A11105/014 (Control Room Instrumentation And Information) End. 4.1 (Mode 1 & 2). Curve on Page 9 of Enclosure 4.34 (Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve) of OP/0/A/1 108/001 (Curves And General Information) is used to determine the RCMUP is Operable.

Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator In-Plant Classroom X

Perform X

Simulate

References:

OP/I/All 105/014 (Control Room Instrumentation And Information), End. 4.1 (Mode 1 & 2) Page 13 of 14.34 (Unit 1 &2 Spent Fuel Pool Level Vs Temperature Curve) of OPIO/A/1 108/001 (Curves And General Information)

Validation Time: 15 minutes Time Critical: NO Candidate:

Time Start:

NAME Time Finish:

Performance Rating:

SAT UNSAT Performance Time Examiner:

NAME SIGNATURE DATE COMM ENTS

NONE SIMULATOR OPERATOR INSTRUCTIONS:

Admin-202 Page 3 of 7

Admin-202 Page 4 of 7 ToolslEguipment/Procedures Needed:

OPII/A/1105/014 (Control Room Instrumentation And Information), End. 4.1 (Mode I & 2)

  • .34 (Unit l&2 Spent Fuel Pool Level Vs Temperature Curve) of OP/OIA/l 108/001 (Curves And General Information)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit I at 100%

Unit 2 was shutdown (subcritical) on 06/01 at 1900 Unit 2 core 2E0C25 defueling has just completed 2SF-i and 2SF-2 are open and FTC is full Last confirmed 2SF-I and 2SF-2 leakage = 0.15 gpm Spent Fuel Pool Level = -01.92 feet (OSF LT0001)

Spent Fuel Pool Temperature = 115°F (OSF TT0002P)

OP/i/A11105/014 End. 4.1 in progress Current date and time: 06/12 at 2300 INITIATING CUES:

The SRO instructs you to continue with OP/i /A/1105/014 (Control Room Instrumentation and Information), End. 4.1 (Mode I & 2) starting on page 13 of 14, and determine Unit 1 SSF RCMUP Operability.

START TIME:

Admin-202 Page 5 of 7 STEP 1:

Determine pages of Enclosure 4.34 (Unit 1 &2 Spent Fuel Pool Level Vs Temperature Curve) that apply SAT STANDARD:

Refer to Enclosure 4.34 (Unit 1 &2 Spent Fuel Pool Level Vs Temperature Curve) of 0P111081001 and using the NOTE on page 1, determine that pages 5-17 apply.

UNSAT COMMENTS:

STEP 2:

Determine appropriate curve.

SAT STANDARD:

Based on Step 3 of NOTE on page 5, determine that page 9 or 15 curve should be used since Unit 2 has defueled and the FTC is still full.

COMMENTS:

STEP 3:

Determine appropriate curve.

CRITICAL STEP STANDARD:

Based on NOTE on page regarding instrumentation, determine that page SAT 9 curve should be used since using the installed instrumentation.

COMMENTS:

U N SAT STEP 4:

Verify SFP level > specified on appropriate curve on page 9 of Enclosure CRITICAL STEP 4.34 (Unit 1&2 Spent Fuel Pool Level Vs Temperature Curve).

SAT STANDARD:

Determine that the correct curve is Day> 11 &

12.

Determine from initiating cue that Spent Fuel Pool water temperature is 115°F Determine from initiating cue that Spent Fuel Pool water level is -1.92 feet.

Determine that SFP level is > than the appropriate curve and therefore the RCMUP is OPERABLE.

COMMENTS:

END OF TASK STOP TIME:

CRITICAL STEP EXPLANATIONS:

STEP #

Explanation 3

Required to determine correct curves 4

SSF RCMUP is determined operable.

Admin-202 Page 6 of 7

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit I at 100%

Unit 2 was shutdown (subcritical) on 06/01 at 1900 Unit 2 core 2E0C25 defueling has just completed 2SF-I and 2SF-2 are open and FTC is full Last confirmed 2SF-I and 2SF-2 leakage = 0.15 gpm Spent Fuel Pool Level = -01.92 feet (OSF LT0001)

Spent Fuel Pool Temperature = 115°F (OSF TT0002P)

OP/I/A/1105/014 End. 4.1 in progress Current date and time: 06/12 at 2300 INITIATING CUES:

The SRO instructs you to continue with OP/I /A/1105/014 (Control Room Instrumentation and Information), End. 4.1 (Mode I & 2) starting on page 13 of 14, and determine Unit 1 SSF RCMUP Operability.

Admin-21 1 Page 1 of 7 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Admin-21 I DETERMINE TECH SPEC AND SLC REQUIREMENTS FOR INOPERABLE ADV FLOWPATH CANDIDATE EXAMINER

Admin-21 1 Page 2 of 7 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Determine Tech Spec and SLC requirements for inoperable ADV flow path Alternate Path:

N/A Facility JPM #:

ADMIN-211 K/A Rating(s):

System:

GEN K/A:

2.2.40 Rating:

3.4/4.7 Task Standard:

Determine that entry into Tech Spec 3.7.4 Condition A is required (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to MODE 3 and 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to MODE 4 with no reliance on SGs) AND entry into SLC 16.9.9 Condition B is required (restore ASW to Operable in 7 days).

Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator In-Plant Classroom X

Perform X

Simulate

References:

Technical Specifications Selected Licensee Commitments Validation Time: 20 minutes Time Critical: NO Candidate:

Time Start:

NAME Time Finish:

Performance Rating:

SAT UNSAT Performance Time:

Examiner:

I NAME SIGNATURE DATE COMMENTS

None SIMULATOR OPERATOR INSTRUCTIONS:

Admin-21 1 Page 3 of 7

Admin-21 1 Page 4 of 7 Tools/EguipmentlProcedures Needed:

Technical Specifications Selected Licensee Commitments READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 2 is operating at 100% power.

The SSF ASW system is inoperable and Tech Spec 3.10.1 Conditions A thru E have been entered.

There are 6 days remaining on the 7 day completion time for Tech Spec 3.10.1 Conditions A thru E.

INITIATING CUES:

2MS-1 54 (2A MS Line Atmospheric Vent Block) cannot be opened and has just been declared inoperable. The OSM has directed you to determine ALL Tech Spec and SLC Conditions, Required Actions and associated Completion Times.

Document the Tech Spec and SLC Conditions, Required Actions, and Completion Times below.

Admin-21 1 Page 5 of 7 START TIME:

STEP 1:

Candidate will evaluate Tech Spec requirements.

CRITICAL STEP TS 3.7.4 requires both ADV flowpaths be operable when in MODE I SAT STANDARD:

Determine that:

TS 3.7.4 Condition A must be entered Required Action and Completion Time is to be in MODE 3 in 12 UNSAT hours Required Action and Completion Time is to be in MODE 4 without reliance on Steam Generators in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> COMMENTS:

STEP 2:

Candidate will evaluate SLC requirements.

CRITICAL STEP STANDARD:

Determine that with the SSF ASW system inoperable, SAT SLC 16.9.9 Condition B must be entered. (The SLC bases explains that the ADVs are required to be operable for the Station ASW system to be Operable)

UNSAT Required Action and Completion Time is to restore Station ASW system to Operable within 7 days COMMENTS:

END TASK STOP TIME:

CRfl1CAL STEP EXPLANATIONS:

STEP #

Explanation I

Critical since this step Is required to ensure compliance with Tech Specs 2

Critical since this step Is required to ensure compliance with SLCs AdmIn-21 I Page 6o17

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 2 is operating at 100% power.

The SSF ASW system is inoperable and Tech Spec 3.10.1 Conditions A thru E have been entered.

There are 6 days remaining on the 7 day completion time for Tech Spec 3.10.1 Conditions A thru E.

INITIATING CUES:

2MS-1 54 (2A MS Line Atmospheric Vent Block) cannot be opened and has just been declared inoperable. The OSM has directed you to determine ALL Tech Spec and SLC Conditions, Required Actions and associated Completion Times.

Document the Tech Spec and SLC Conditions, Required Actions, and Completion Times below.

REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE ADMIN-331 GWD TANK RELEASE REQUIREMENTS CANDIDATE EXAMINER Adm in-33 1 Page 1 of 8

Admin-331 Page 2 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Complete requirements of OP/I -2/All 104/018, Enclosure 4.9 GWD Tank release step 3.4 thru 3.7.

Alternate Path:

N/A Facility JPM #:

New KIA Rating(s):

System:

Gen K/A:

2.3.11 Rating:

3.8/4.3 Task Standard:

Correctly determine the GWD tank volume and calculate 1 RIA-37 and 1 RIA-38 setpoints using OP/i -2/Ni 104/018,.9 and Enclosure 4.10.

Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator In-Plant Classroom X

Perform X

Simulate

References:

OP/i -2/NI 104/018 GWD System Enclosure 4.9 (GWD Tank release) and Enclosure 4.10 (GWD Tank Sample Request)

OP/0/N1 108/001 (Curves and General Information) End. 4.3 (GWD Tank Volume Vs. Pressure Curve (A, B, 3A, 3B))

Validation Time: 15 mm.

Time Critical: No Candidate:

Time Start:

NAME Time Finish:

Performance Rating:

SAT UNSAT Performance Time:

Examiner:

/

NAME SIGNATURE DATE Comments

NONE SIMULATOR OPERATOR INSTRUCTIONS Admin-33 1 Page3of8

Adm in-33 1 Page 4 of 8 ToolslEguipmentlProcedures Needed:

OP/i-21A11 104/018 (GWD System).9 (GWD Tank release).10 (GWD Tank Sample Request)

OP/0/AI1 108/001 (Curves and General Information) End. 4.3 (GWD Tank Volume Vs. Pressure Curve (A, B, 3A, 3B))

READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Waste Gas Decay Tank A Pressure is 65 psi.

OPII-2/A/11041018 enclosure 4.9 (GWD Tank release) is in progress.

OP/i -2/A/1104/018 enclosure 4.10 (GWD Tank sample request) was submitted and has been completed by RP and returned to Operations.

The background reading for I RIA-37 = 289 cpm.

The background reading for I RIA-38 is 26 cpm.

INITIATING CUE You are to continue with OP/I -21A/1104/018 enclosure 4.9 (GWD Tank release) starting at step 3.4 and continue through step 3.7.

Admin-331 Page5of8 START TIME:

  • CRITICAL TASK STEP 1:

Step 3.4 Perform the following on Enclosure 4.10 (GWD Tank Sample Request):

SAT Record Initial GWD Tank Pressure AND GWD Tank Volume Record Start Date AND Time Record background readings for 1 RIA-37 & 1 RIA-38 UNSAT STANDARD:

Candidate uses Enclosure 4.10 and records:

GWD Tank Pressure = 65 psig

  • GWD Tank Volume = 5950 SCF (+/- 500)

Record current Date and Time Record IRIA-37 background reading = 289 cpm Record I RIA-38 background reading 26 cpm NOTE: Tank Volume is obtained using tank pressure given in the initial conditions and 0P11108101 (Curves and General Information) Enclosure 4.3 Graph.

COMMENTS:

STEP 2:

Step 3.5 Record recommended I RIA-37 and 38 Alert and High setpoints from SAT.10 (GWD Tank Sample Request):

1 RIA-37 cpm above background I RIA-38 cpm above background UNSAT STANDARD:

Candidate correctly enters recommended setpoints from Enclosure 4.10 IRIA-37 2.73 ES cpm above background IRIA-38 3.13 E2 cpm above background COMMENTS:

COMMENTS:

Step 3.6 IF 1 RIA-37 or 1 RIA-38 is out-of-service, verify the following per.10 (GWD Tank Sample Request):

Independent Data Entry Checks completed Independent Sample agrees with initial sample Candidate identifies that both 1 RIA-37 and 1 RIA-38 are operable and in service and N/As this step.

Step 3.7 Calculate actual setpoints as follows:

IF 1RIA-37 Operable. cilculate Alert and High setpoints as follows:

cpm+

=

IRIA-37 bac1ground cpin IRJA-37 Alert and High alarm setpoiiits 1RIA-38 Operable, calculate Alert and High setpoints as follows:

Cpu

+

=

epin IRJA-38 Alert and High alarm setpoiats CRITICAL STEP COMMENTS:

END OF TASK NOTE: The RIA required to terminate release (RIA within range) must be operable or two independent samples must be taken (SLC 16.11.3).

Adm in-33 I Page6of8 STEP 3:

STANDARD:

SAT UNSAT STEP 4:

Add to background value from Step 15 SAT UNSAT IRJA-3S background Add to background value from Step 15 STANDARD:

Candidate correctly calculates setpoints for I RIA-37 and 1 RIA-38 IRIA-37 setpoint = 289 cpm ÷ 273000 cpm = 2.73 E5 IRIA-38 setpoint = 26 cpm ÷ 313 cpm = 3.39 E2 TIME STOP:

Admin-33 1 Page 7 of 8 CRITICAL STEP EXPLANATIONS STEP #

Explanation 1

Determining GWD tank volume is critical to ensure proper dose release calculations 4

Determining correct RIA setpoints is critical to ensure proper control of dose rates during release

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS Waste Gas Decay Tank A Pressure is 65 psi.

OP/I -2/A/l 104/018 enclosure 4.9 (GWD Tank release) is in progress.

OP/l -2/A/l 104/018 enclosure 4.10 (GWD Tank sample request) was submitted and has been completed by RP and returned to Operations.

The background reading for IRIA-37 = 289 cpm.

The background reading for IRIA-38 is 26 cpm.

INITIATING CUE You are to continue with OP/I -2/A/1104/018 enclosure 4.9 (GWD Tank release) starting at step 3.4 and continue through step 3.7.

Admin-41 0 Page 1 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE ADMIN-410 DETERMINE EMERGENCY CLASSIFICATION AND COMPLETE EMERGENCY NOTIFICATION FORM CANDIDATE EXAMINER

Admin-41 0 Page 2 of 10 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task:

Determine Emergency Classification and complete the Emergency Notification Form Alternate Path:

N/A Facility JPM #:

Admin-405 KIA Rating(s):

System: Gen K/A:

2.4.41 Rating:

2.9/4.6 Task Standard:

Appropriate classification is determined within 15 minutes and associated Emergency Notification Form is completed within an additional 15 minutes.

Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator In-Plant Classroom X

Perform _X_ Simulate

References:

RP/OIB/1 000/0 1 RP/0/B/1 000/02 RP/0/B/1 000/01 5A BASIS Document (Volume A, Section D of the Emergency Plan)

Validation Time: 20 mm.

Time Critical: YES Candidate:

Time Start:

NAME Time Finish:

Performance Rating:

SAT UNSAT Performance Time:

Examiner:

NAME SIGNATURE DATE Comments

NONE SIMULATOR OPERATOR INSTRUCTIONS:

Admin-41 0 Page 3 of 10

Admin-41 0 Page 4 of 10 Tools/EciuipmentlProcedures Needed:

RP/OIB/1 000/001 RP/OIB/1 000/002 Emergency Notification Form 4.4.S.2 READTO OPERATOR DIRECTIONS TO STUDENT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

PLANT CONDITIONS:

08:20:00 While at 100% RTP, Unit 1 experiences a spurious Turbine/Generator trip and a CT-i Lockout.

08:22:28 Unit 1 Procedure Director dispatches the Unit 1 BOP to activate the SSF using AP/01A117001025, as per EOP Immediate Manual Actions step 4.1.3.

08:24:50 Determined that BOTH Keowee Units have experienced Emergency Lockouts, but that CT-5 is available.

08:29:00 SSF operator reports that per AP/lIAJi700/025 flow has been established to Unit ls RCP Seals and SGs.

08:33:55 Power is restored to Unit 1 MFBs from CT-5.

INITIATING CUE:

You are to perform the required actions of the Emergency Coordinator by referring to RP/0/B/1000/001, Emergency Classification, and determining the Emergency Classification required (if any) at 0834 and Complete the Emergency Notification Form.

Note: Do not use Emergency Coordinators judgment while classifying the event. When required, another operator will maintain the Emergency Coordinators Log and assume the duties of the Control Room Offsite Communicator.

THIS IS A TIME CRITICAL JPM

Admin-41 0 Page 5 of 10 START TIME:

STEP 1:

Classify the Event STANDARD:

Refer to RPIOIBI1000IOO1 (Emergency Classification) Enclosure 4.4 SAT (Loss of Shutdown Functions).

Classify the event as a Site Area Emergency due to following:

UN SAT COMPLETE LOSS OF FUNCTION NEEDED TO ACHIEVE OR MAINTAIN MODE 4 (HOT SHUITDOWN)

SSF feeding SG pr EOP Record Time Classified COMMENTS:

STEP 2:

Step 2.1.

IF No EAL exists, AND ERO activation is desired, SAT THEN GO TO Enclosure 4.4, (ERO Pager Activation)

STANDARD:

Determine step 2.1 does not apply U N SAT COMMENTS:

TIME STEP 3:

Step 2.2 CRITICAL STEP Declare the appropriate Emergency Classification level.

Classification SAE (UE, ALERT, SAE, GE)

Time Declared:

SAT STANDARD:

Declare a SAE due to:

COMPLETE LOSS OF FUNCTION NEEDED TO ACHIEVE OR MAINTAIN MODE 4 (HOT SHUITDOWN)

SSF feeding SG per EOP UNSAT STOP TIME #1: Time SAE Declared (Should be the time classified as recorded in step 1)

(SAT is < Start Time + 15 minutes)

COMMENTS:

Admin-41 0 Page 6 of 10 STEP 4:

Step 2.3 IF a Security event is in progress THEN GO TO Step 2.5 STANDARD:

Determine Steps 2.3 does not apply COMMENTS:

UNSAT STEP 5:

Step 2.4 IF assistance from ERO personnel is desired/required:

SAT STANDARD:

Determine Steps 2.4 does not apply COMMENTS:

UNSAT STEP 6:

Step 2.5 Appoint Control Room Offsite Communicator(s) and notify him to be prepared to transmit messages.

STANDARD:

Appoint a Control Room Offsite Communicator SAT Cue: Inform candidate that Billy Henderson has been appointed Offsite Communicator.

UNSAT COMMENTS:

STEP 7:

Step 2.6 IAAT Changing plant conditions require an emergency classification

upgrade, STANDARD:

An Upgrade is not expected.

COMMENTS:

UNSAT

Admin-41 0 Page 7 of 10 CRITICAL STEP STEP 8:

Step 2.7 Obtain the appropriate Offsite Notification form from the Emergency Plan SAT cart.

STANDARD:

Initial Site Area Emergency form # 4.4.S.2 isselected and candidate UNSAT continues to fill-out form per substeps of Step 2.7.

COMMENTS:

  • CRITICAL STEP STEP 9:

Step 2.7 Ensure EAL # as determined by RPIOIBI1000IOO1 matches Line 4. (4.4.S.2)

SAT Line 1 Mark appropriate box Drill or Actual Event (DRILL)

  • Line 1 Enter Message # (#1)
  • Line 2 Mark Initial (INITIAL marked)

UNSAT

  • Line 6 Mark box A (None) since no release is occurring
  • Line 7 Mark box A (Not applicable) since no release is occurring Line 8 Mark Stable unless an upgrade or additional PARs are anticipated within an hour.

Refer to Enclosure 4.9, (Event Prognosis Definitions)

  • Line 10 Military time and date of declaration (Refer to date/time in Step 2.2)

(Inserts time from STEP 3 and todays date, military time is not critical as long as time is specific and accurate)

Line 11 If more than one unit affected, mark All (Unit I only)

  • Line 12 Mark affected unit(s) (reference Line 11) AND enter power level of affected unit(s) or time/date of shutdown {14} (Unit 1 0% power, Shutdown AT 0820 with todays date.)

Line 13 If the OSM has no remarks, write None 2.7.12 If Condition A exists ensure following PARs are included Line 5.

(Condition A does not exist. No PAR required)

STANDARD:

Correctly fills out Emergency Notification Form in accordance with Key.

COMMENTS:

Admin-41 0 Page 8 of 10 TIME STEP 10:

Step 2.7 Continued CRITICAL STEP Line 17

- OSM signature, CURRENT Time/Date STANDARD:

Correctly fills out Emergency Notification Form within 15 minutes of SAT classification time recorded in step 1.

STOP TIME #2: Time for Notification (Record actual time)

UNSAT (SAT is <Stop Time #1 + 15 minutes)

COMMENTS:

END OF TASK TIME STOP:

CRITICAL STEP EXPLANATIONS:

STEP #

Explanation 3

Required to meet the 15 minute requirement of declaration of the event.

8 Required to correctly complete the Emergency Notification Form.

9 Required to correctly complete the Emergency Notification Form.

10 Required to meet the 15 minute notification requirement.

Admin-41 0 Page 9 of 10

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

READ TO OPERATOR DIRECTIONS TO STUDENT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications.

I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

PLANT CONDITIONS:

08:20:00 While at 100% RTP, Unit 1 experiences a spurious Turbine/Generator trip and a CT-I Lockout.

08:22:28 Unit 1 Procedure Director dispatches the Unit 1 BOP to activate the SSF using AP/0/A11700/025, as per EOP Immediate Manual Actions step 4.1.3.

08:24:50 Determined that BOTH Keowee Units have experienced Emergency Lockouts, but that CT-5 is available.

08:29:00 SSF operator reports that per AP/1/A)1700/025 flow has been established to Unit ls RCP Seals and SGs.

08:33:55 Power is restored to Unit 1 MFBs from CT-5.

INITIATING CUE:

You are to perform the required actions of the Emergency Coordinator by referring to RP/0/B/1000/00I, Emergency Classification, and determining the Emergency Classification required (if any) at 0834 and Complete the Emergency Notification Form.

Note: Do not use Emergency Coordinators judgment while classifying the event. When required, another operator will maintain the Emergency Coordinators Log and assume the duties of the Control Room Offsite Communicator.

THIS IS A TIME CRITICAL JPM