Followup Assessment Letter for Wolf Creek Generating Station
ML12265A287
Person / Time
Site: Wolf Creek 
Issue date: 09/21/2012
From: Collins E
NRC Region 4
To: Matthew Sunseri
Wolf Creek
O'Keefe N
References
Download: ML12265A287 (3)


Text

September 21, 2012 Matthew W. Sunseri, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

SUBJECT:

FOLLOWUP ASSESSMENT LETTER FOR WOLF CREEK GENERATING STATION

Dear Mr. Sunseri:

As a result of our continuous review of plant performance, which was completed on September 21, 2012, the U. S. Nuclear Regulatory Commission (NRC) updated its assessment of Wolf Creek Generating Station. The NRCs evaluation consisted of a review of performance indicators and inspection results. This letter informs you of the NRCs assessment and plans for a future inspection at your facility. This letter supplements, but does not supersede, the mid-cycle assessment letter issued on September 4, 2012.

On September 21, 2012, the NRC forwarded a letter (NRC Inspection Report 05000482/2012010) that stated the final significance determination of a Yellow finding in the Initiating Events Cornerstone. The finding involved your staffs failure to provide adequate oversight of contractors while they performed work that could affect safety-related equipment in April 2011. As a result, your staff failed to identify that electrical maintenance contractors had not installed insulating sleeves on wires that affected the differential current protection circuit, contrary to work order instructions. This allowed an electrical short to prevent transfer of power to the startup transformer during a plant trip on January 13, 2012, resulting in a prolonged loss of offsite power. Based on this finding, the NRC determined the performance at Wolf Creek Generating Station to be in the Degraded Cornerstone Column of the Reactor Oversight Process Action Matrix beginning on August 6, 2012, the date the preliminary finding was first discussed with your staff at the exit meeting for Inspection Report 05000482/2012009. The NRC plans to conduct a supplemental inspection to review the actions taken to address the performance issues using Inspection Procedure 95002, Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area. The NRC will plan this inspection activity when you provide written notification of your readiness for the inspection.

The supplemental inspection will provide assurance that the root and contributing causes of risk-significant performance issues are understood, the extent of condition and the extent of cause of risk-significant performance issues are identified, determine if safety culture components caused or significantly contributed to the risk-significant performance issues, and UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511

that corrective actions for risk-significant performance issues are sufficient to address the root and contributing causes and prevent recurrence.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.

Sincerely,

/RA/

Elmo E. Collins Regional Administrator Docket: 50-482 License: NPF-42

Distribution OEMail Resource OEWEB Resource; RidsSecyMailCenter Resource RidsOcaMailCenter Resource RidsOgcMailCenter Resource RidsEdoMailCenter Resource RidsNmssOd Resource RidsOiMailCenter Resource RidsRgn1MailCenter Resource RidsOcfoMailCenter Resource RidsOigMailCenter Resource RidsRgn2MailCenter Resource RidsRgn3MailCenter Resource RidsOpaMail Resource R4Enforcement Elmo.Collins@nrc.gov Karla.Fuller@nrc.gov Roy.Zimmerman@nrc.gov Art.Howell@nrc.gov Bill.Maier@nrc.gov Nick.Hilton@nrc.gov Patrick.Louden@nrc.gov Kriss.Kennedy@nrc.gov John.Wray@nrc.gov Tom.Blount@nrc.gov Troy.Pruett@nrc.gov David.Furst@nrc.gov Heather.Gepford@nrc.gov Rachel.Browder@nrc.gov Gerald.Gulla@nrc.gov Christi.Maier@nrc.gov Victor.Dricks@nrc.gov Nicole.Coleman@nrc.gov Marisa.Herrera@nrc.gov Lara.Uselding@nrc.gov Jeremy.Bowen@nrc.gov Allen.Howe@nrc.gov Neil.OKeefe@nrc.gov Lauren.Casey@nrc.gov Chris.Long@nrc.gov Charles.Peabody@nrc.gov Shirley.Allen@nrc.gov Leonard.Willoughby@nrc.gov Ray.Kellar@nrc.gov Nestor.Makris@nrc.gov Jenny.Weil@nrc.gov Brian.Benney@nrc.gov Silas.Kennedy@nrc.gov NRREnforcement.Resource@nrc.gov OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax R:\\_REACTORS\\_WC\\2012\\WC Followup Assessment Letter.docx ADAMS No Yes SUNSI Review Complete Reviewer Initials: NFO Publicly Available Non-publicly Available Sensitive Non-sensitive Category:

KEYWORD:

C:PBB D:DRP DRA RA NOKeefe KMKennedy ATHowell EECollins

/RA/

/RA/

/TPruett for/

/RA/

9/17/12 9/19/12 9/20/12 9/21/12