ML12244A077
ML12244A077 | |
Person / Time | |
---|---|
Site: | Watts Bar |
Issue date: | 08/23/2012 |
From: | Tennessee Valley Authority |
To: | Office of Nuclear Reactor Regulation |
References | |
Download: ML12244A077 (195) | |
Text
WATTS BAR WBNP-109 2.4 HYDROLOGIC ENGINEERING Watts Bar Nuclear Plant is located on the right bank of Chickamauga Lake at Tennessee River Mile (TRM) 528 with plant grade at elevation 728.0 ft. MSL. The plant has been designed to have the capability for safe shutdown in floods up to the computed maximum water level, in accordance with regulatory position 2 of Regulatory Guide 1.59, Revision 2, August 1977.
Determination of the maximum flood level included consideration of postulated dam failures from seismic and hydrologic causes. The maximum flood Elevation 739.2 ft.
would result from an occurrence of the probable maximum storm. Coincident wind wave activity results in wind waves of up to 2.2 ft. (crest to trough). Run up on the 4:1 slopes approaching the Diesel Generator Building reaches Elevation 741.6 ft. Wind wave run up on the critical wall of the Intake Pumping Station reaches Elevation 741.7 ft. and wind wave run up on the walls of the Auxiliary, Control and Shield Buildings reaches Elevation 741.0 ft.
The nearest surface water user located downstream from Watts Bar Nuclear Plant is Dayton, Tennessee, at TRM 503.8, 24.2 miles downstream. All surface water supplies withdrawn from the 58.9 mile reach of the mainstream of the Tennessee River between Watts Bar Dam (TRM 529.9) and Chickamauga Dam (TRM 471.0) are listed in Table 2.4-1.
The probable minimum flow past the site is estimated to be 3,200 cfs, which is more than adequate for plant water requirements.
2.4.1 Hydrological Description 2.4.1.1 Sites and Facilities The location of key plant structures and their relationship to the original site topography is shown on Figure 2.1-5. The structures which have safety-related equipment and systems are indicated on this figure and are tabulated below along with the elevation of exterior accesses.
Structure Access Accesses Elev.
Intake Pumping (1) Access Hatches 3 728.0 Station (2) Stairwell Entrances 2 741.0 (3) Access Hatches 6 741.0 Auxiliary and (1) Door to Turbine Bldg. 1 708.0 Control Bldgs. (2) Door to Service Bldg. 2 713.0 (3) Railroad Access Opening 1 729.0 (4) Door to Turbine Bldg. 2 729.0 HYDROLOGIC ENGINEERING 2.4-1
WATTS BAR WBNP-109 Structure Access Accesses Elev.
(5) Emergency Exit 1 730.0 (6) Door to Turbine Bldg. 2 755.0 Shield Building (1) Personnel Lock 1 714.0 (2) Equipment Hatch 1 753.0 (3) Personnel Lock 1 755.0 Diesel Generator (1) Equipment Access Doors 4 742.0 Building (2) Emergency Exits 4 742.0 (3) Personnel Access Door 1 742.0 (4) Emergency Exit 1 760.5 Additional Diesel (1) Equipment Access Door 2 742.0 Generator Building (2) Personnel Access Door 1 742.0 (3) Emergency Exit 1 742.0 (4) Emergency Exit 1 760.5 Exterior accesses are also provided to each of the Class 1E electrical systems manholes and handholes at elevations varying from 714.5 ft. MSL to 728.5 ft. MSL, depending upon the location of each structure.
The relationship of the plant site to the surrounding area can be seen in Figures 2.1-4a and 2.1-5. It can be seen from these figures that significant natural drainage features of the site have not been altered. Local surface runoff drains into the Tennessee River.
2.4.1.2 Hydrosphere The Watts Bar Nuclear Plant site, along with the Watts Bar Dam Reservation, comprises approximately 1770 acres on the west bank of Chickamauga Lake at TRM 528. As shown by Figure 2.1-4a, the site is on high ground with the Tennessee River being the major potential source of flooding. The Watts Bar Nuclear Plant is located in the Middle Tennessee Chickamauga watershed, U.S. Geological Survey (USGS) hydrologic unit code 06020001, one of 32 watersheds in the Region 06 - Tennessee River Watershed (Figure 2.4-1).
The Tennessee River above the Watts Bar plant site drains 17,319 square miles. Watts Bar Dam, 1.9 miles upstream, has a drainage area of 17,310 square miles.
Chickamauga Dam, the next dam downstream, has a drainage area of 20,790 square 2.4-2 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 miles. Two major tributaries, Little Tennessee and French Broad Rivers, rise to the east in the rugged Southern Appalachian Highlands. They flow northwestward through the Appalachian Divide which is essentially defined by the North Carolina-Tennessee border to join the Tennessee River which flows southwestward. The Tennessee River and its Clinch and Holston River tributaries flow southwest through the Valley and Ridge physiographic province which, while not as rugged as the Southern Highlands, features a number of mountains including the Clinch and Powell Mountain chains. The drainage pattern is shown on Figure 2.1-1. About 20% of the watershed rises above elevation 3,000 ft. with a maximum elevation of 6,684 ft. at Mt. Mitchell, North Carolina.
The watershed is about 70% forested with much of the mountainous area being 100%
forested.
The climate of the watershed is humid temperate. Above Watts Bar Dam annual rainfall averages 50 inches and varies from a low of 40 inches at sheltered locations within the mountains to high spots of 90 inches on the southern and eastern divide.
Rainfall occurs fairly evenly throughout the year. The lowest monthly average is 2.8 inches in October. The highest monthly average is 5.4 inches in July, with March a close second with an average of 5.1 inches.
Major flood-producing storms are of two general types: the cool-season, winter type, and the warm-season, hurricane type. Most floods at Watts Bar Nuclear Plant, however, have been produced by winter-type storms in the main flood-season months of January through early April.
Watershed snowfall is relatively light, averaging about 14 inches annually above the plant. Snowfall above the 3,000 ft. elevation averages 22 inches annually. The highest average annual snowfall in the basin is 63 inches at Mt. Mitchell, the highest point east of the Mississippi River. Individual snowfalls are normally light, with an average of 13 snowfalls per year. Snowmelt is not a factor in maximum flood determinations.
The Tennessee River, particularly above Chattanooga, Tennessee, is one of the most highly regulated rivers in the United States. The TVA reservoir system is operated for flood control, navigation, and power generation with flood control a prime purpose with particular emphasis on protection for Chattanooga, 64 miles downstream from Watts Bar Nuclear Plant.
Chickamauga Dam, 57 miles downstream, affects water surface elevations at Watts Bar Nuclear Plant. Normal full pool elevation is 682.5 ft. At this elevation the reservoir is 58.9 miles long on the Tennessee River and 32 miles long on the Hiwassee River, covering an area of 36,050 acres, with a volume of 622,500 acre ft. The reservoir has an average width of nearly 1 mile, ranging from 700 ft. to 1.7 miles. At the Watts Bar site the reservoir is about 1100 ft. wide with depths ranging between 18 ft. and 26 ft. at normal pool elevation.
There are 12 major dams (South Holston, Boone, Fort Patrick Henry, Watauga, Fontana, Norris, Cherokee, Douglas, Tellico, Fort Loudoun, Melton Hill, and Watts Bar) in the TVA system upstream from Watts Bar Nuclear Plant, ten of which (those previously identified excluding Fort Partick Henry and Melton Hill) provide about 4.4 HYDROLOGIC ENGINEERING 2.4-3
WATTS BAR WBNP-109 million acre-feet of reserved flood-detention (March 15) capacity during the main flood season. Table 2.4-2 lists pertinent data for TVA's dams and reservoirs. Figure 2.4-2 presents a simplified flow diagram for the Tennessee River system. Table 2.4-3 provides the relative distances in river miles of upstream dams to the Watts Bar Nuclear Plant site. Details for TVA dam outlet works are provided in Table 2.4-4. In addition, there are six major dams owned by the Aluminum Company of America (ALCOA). The ALCOA reservoirs often contribute to flood reduction, but they do not have dependable reserved flood detention capacity. Table 2.4-5 lists pertinent data for the ALCOA dams and Walters Dam (Waterville Lake). The locations of these dams are shown on Figure 2.1-1.
Flood control above the plant is provided largely by eight tributary reservoirs. Tellico Dam is counted as a tributary reservoir because it is located on the Little Tennessee River although, because of canal connection with Fort Loudoun Dam, it also functions as a main river dam. On March 15, near the end of the flood season, these provide a minimum of 3,937,400 acre ft. of detention capacity equivalent to 5.5 inches on the 13,508-square-mile area they control. This is 89% of the total available above the plant. The two main river reservoirs, Fort Loudoun and Watts Bar, provide 490,000 acre ft. equivalent to 2.4 inches on the remaining 3,802-square-mile area above Watts Bar Dam.
The flood detention capacity reserved in the TVA system varies seasonally, with the greatest amounts during the January through March flood season. Figure 2.4-3 (12 sheets) shows the reservoir seasonal operating guides for reservoirs above the plant site. Table 2.4-6 shows the flood control reservations at the multiple-purpose projects above Watts Bar Nuclear Plant at the beginning and end of the winter flood season and in the summer. Total assured system detention capacity above Watts Bar Dam varies from 4.9 inches on January 1 to 4.8 inches on March 15 and decreasing to 1.5 inches during the summer and fall. Actual detention capacity may exceed these amounts, depending upon inflows and power demands.
Chickamauga Dam, the headwater elevation of which affects flood elevations at the plant, has a drainage area of 20,790 square miles, 3,480 square miles more than Watts Bar Dam. There are seven major tributary dams (Chatuge, Nottely, Hiwassee, Apalachia, Blue Ridge, Ocoee No. 1 and Ocoee No. 3) in the 3,480-square-mile intervening watershed, of which four have substantial reserved capacity. On March 15, near the end of the flood season, these provide a minimum of 379,300 acre ft.
equivalent to 5.9 inches on the 1,200-square-mile controlled area. Chickamauga Dam contains 345,300 acre ft. of detention capacity on March 15 equivalent to 2.8 inches on the remaining 2,280 square miles. Figure 2.4-3 (Sheet 1) shows the seasonal operating guide for Chickamauga.
Elevation-storage relationships for the reservoirs above the site and Chickamauga, downstream, are shown in Figure 2.4-4 (13 sheets).
Daily flow volumes at the plant, for all practical purposes, are represented by discharges from Watts Bar Dam with a drainage area of 17,310 square miles, only 9 square miles less than at the plant. Momentary flows at the nuclear plant site may vary 2.4-4 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 considerably from daily averages, depending upon turbine operations at Watts Bar and Chickamauga Dams. There may be periods of several hours when no releases from either or both Watts Bar and Chickamauga Dams occur. Rapid turbine shutdown at Chickamauga may sometimes cause periods of reverse flow in Chickamauga Reservoir.
Based upon Watts Bar Dam discharge records since dam closure in 1942, the average daily streamflow at the plant is 27,000 cfs. The maximum daily discharge was 208,400 cfs on May 8, 1984. Daily average releases of zero have been recorded on seven occasions during the past 51 years. Flow data for water years 1960-2010 with regulation essentially equivalent to present conditions indicate an average rate of about 23,000 cfs during the summer months (May-October) and about 31,500 cfs during the winter months (November-April). Flow durations based upon Watts Bar Dam discharge records for the period 1960-2010 are tabulated below:
Average Daily Percent of Time Discharge, cfs Equaled or Exceeded 5,000 97.4 10,000 87.9 15,000 77.5 20,000 64.2 25,000 48.5 30,000 33.4 35,000 21.4 Channel velocities at the Watts Bar site average about 2.3 fps under normal winter conditions. Because of lower flows and higher reservoir elevations in the summer months, channel velocities average about 1.0 fps.
The Watts Bar plant site is underlain by geologic formations belonging to the lower Conasauga Formation of Middle Cambrian age. The formation consists of interbedded shales and limestones overlain by alluvial material averaging 40 ft. in thickness.
Ground water yields from this formation are low.
All surface water supplies withdrawn from the 58.9 mile reach of the mainstream of the Tennessee River between Watts Bar Dam (TRM 529.9) and Chickamauga Dam (TRM 471.0) are listed in Table 2.4-1. See Section 2.4.13.2 for description of the ground water users in the vicinity of the Watts Bar site.
HYDROLOGIC ENGINEERING 2.4-5
WATTS BAR WBNP-109 2.4.2 Floods 2.4.2.1 Flood History The nearest location with extensive formal flood records is 64 miles downstream at Chattanooga, Tennessee, where continuous records are available since 1874.
Knowledge about significant floods extends back to 1826 based upon newspaper and historical reports. Flood flows and stages at Chattanooga have been altered by TVA's reservoir system beginning with closure of Norris Dam in 1936 and reaching essentially the present level of control in 1952 with closure of Boone Dam, the last major dam with reserved flood detention capacity constructed above Chattanooga prior to construction of Tellico Dam. Tellico Dam provides additional reserved flood detention capacity; however, the percentage increase in the total detention capacity above the Watts Bar site is small. Therefore, flood records for the period 1952 to date can be considered representative of prevailing conditions. Table 2.4-7 provides annual peak flow data at Chattanooga. Figure 2.4-5 shows the known flood experience at Chattanooga in diagram form. The maximum known flood under natural conditions occurred in 1867.
This flood was estimated to reach elevation 716.3 ft. at Watts Bar Nuclear Plant site with a discharge of about 440,000 cfs. The maximum flood elevation at the site under present-day regulation would be approximately elevation 698 ft. based on a maximum tailwater elevation of 698.23 ft. at Watts Bar dam located just upstream.
The following tabulation lists the highest floods at Watts Bar Dam (TRM 529.9) tailwater located upstream of Watts Bar Nuclear Plant site under present-day regulation:
Date Elevation, Feet Discharge, cfs February 2, 1957 No Record 157,600 November 19, 1957 No Record 151,600 March 13, 1963 694.75 167,700 December 31, 1969 693.28 167,300 March 17, 1973 696.95 184,800 May 28, 1973 695.24 175,200 April 5, 1977 694.79 181,600 May 8, 1984 698.23 208,400 April 20, 1998 694.67 167,500 May 7, 2003 694.17 153,100 There are no records of flooding from seiches, dam failures, or ice jams. Historic information about icing is provided in Section 2.4.7.
2.4-6 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 2.4.2.2 Flood Design Considerations TVA has planned the Watts Bar project to conform with Regulatory Guide 1.59, including position 2.
The types of events evaluated to determine the worst potential flood included (1)
Probable Maximum Precipitation (PMP) on the total watershed and critical sub-watersheds including seasonal variations and potential consequent dam failures and (2) dam failures in a postulated SSE or OBE with guide specified concurrent flood conditions.
Specific analysis of Tennessee River flood levels resulting from ocean front surges and tsunamis is not required because of the inland location of the plant. Snow melt and ice jam considerations are also unnecessary because of the temperate zone location of the plant. Flood waves from landslides into upstream reservoirs required no specific analysis, in part because of the absence of major elevation relief in nearby upstream reservoirs and because the prevailing thin soils offer small slide volume potential compared to the available detention space in reservoirs. Seiches pose no flood threats because of the size and configuration of the lake and the elevation difference between normal lake level and plant grade.
The maximum PMF plant site flood level is Elevation 739.2 ft. This elevation would result from the PMP critically centered on the watershed as described in Section 2.4.3.
Wind waves based on an overland wind speed of 21 miles per hour were assumed to occur coincident with the flood peak. This would create maximum wind waves up to 2.2 ft. high (trough to crest).
All safety-related facilities, systems, and equipment are housed in structures which provide protection from flooding for all flood conditions up to plant grade at Elevation 728.0 ft. See Section 2.4.10 for more specific information.
Other rainfall floods will also exceed plant grade Elevation 728.0 ft. and require plant shutdown. Section 2.4.14 describes emergency protective measures to be taken in flood events exceeding plant grade.
Seismic and flood events could cause dam failure surges exceeding plant grade Elevation 728.0 ft. Section 2.4.14 describes emergency protective measures to be taken in seismic events exceeding plant grade.
For the condition where flooding exceeds plant grade, as described in Sections 2.4.3 and 2.4.4, those safety-related facilities, systems, and equipment located in the containment structure are protected from flooding by the Shield Building structure with those accesses and penetrations below the maximum flood level designed and constructed as watertight elements. The Diesel Generator Building and Essential Raw Cooling Water (ERCW) pumps are located above this flood level, thereby providing protection from flooding.
HYDROLOGIC ENGINEERING 2.4-7
WATTS BAR WBNP-109 Wind wave run up during the PMF at the Diesel Generator Building would reach Elevation 741.6 ft. which is 0.4 ft. below the operating floor. Consequently, wind wave run up will not impair the safety functions of the Diesel Generator Building.
Those Class 1E electrical system conduit banks located below the PMF plus wind wave run up flood level are designed to function submerged with either continuous cable runs or qualified, type tested splices. The ERCW pumps are structurally protected from wind waves. Therefore, the safety function of the ERCW pumps will not be affected by floods or flood-related conditions.
The Turbine, Control, and Auxiliary Buildings will be allowed to flood. All equipment required to maintain the plant safely during the flood, and for 100 days after the beginning of the flood, is either designed to operate submerged, is located above the maximum flood level, or is otherwise protected.
The electrical equipment room of the Intake Pumping Station will flood at Elevation 728.0 ft. However, the design basis flood level for the remaining structure is Elevation 741.0 ft. The Auxiliary and Control Buildings will flood with the water level at Elevation 729.0 ft. The design basis flood level for the Auxiliary, Control, and Shield Buildings is Elevation 741.0 ft. The Diesel Generator Building is located above the design basis flood level of Elevation 741.6 ft.
2.4.2.3 Effects of Local Intense Precipitation All streams in the vicinity of the plant shown on Figure 2.1-4a were investigated, including Yellow Creek, with probable maximum flows from a local storm and from breaching of the Watts Bar Dam West Saddle Dike and were found not to create potential flood problems at the plant. Local drainage which required detailed design is from the plant area itself and from a 150-acre area north of the plant.
The underground storm drainage system is designed for a maximum one-hour rainfall of four inches. The one-hour rainfall with 1% exceedance frequency is 3.3 inches.
Structures housing safety-related facilities, systems, and equipment are protected from flooding during a local PMF by the slope of the plant yard. The yard is graded so that the surface runoff will be carried to Chickamauga Reservoir without exceeding the elevation of the accesses given in Section 2.4.1.1. The exterior accesses that are below the grade elevation for that specific structure exit from that structure into another structure and are not exterior in the sense that they exit or are exposed to the environment. For any access exposed to the environment and located at grade elevation, sufficient drainage is provided to prevent water from entering the opening.
This is accomplished by sloping away from the opening.
PMP for the plant drainage systems has been defined for TVA by the Hydrometeorological Branch of the National Weather Service and is described in Hydrometeorological Report No. 56[35].
Ice accumulation would occur only at infrequent intervals because of the temperate climate. Maximum winter precipitation concurrent with ice accumulation would impose less severe conditions on the drainage system than would the PMF.
2.4-8 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Figure 2.4-40a (sheet 1) shows the Watts Bar site grading and drainage system and building outlines for the main plant area. Direction of flow for runoff has been indicated by arrows. Figure 2.4-40b shows the Watts Bar general plan; Figure 2.4-40c shows the yard site grading and drainage system for flood studies for the area north and northwest of the plant along with the outline of the low-level radwaste storage facility.
The 150-acre drainage area north of the site has been outlined on Figure 2.4-40b with direction of flow for runoff indicated by arrows.
Figure 2.4-40d (three sheets) shows the plans and profiles for the perimeter roads; Figure 2.4-40e (two sheets) shows the plan and profile for the access highway. Figure 2.4-40f (three sheets) shows the plan, sections, and profiles for the main plant railroad tracks. Figure 2.4-40g (three sheets) shows the yard grading, drainage, and surfacing for the switchyard.
In testing the adequacy of the site drainage system, all underground drains were assumed clogged. Peak discharges were evaluated using storm intensities for the maximum one-hour rainfall obtained from the PMP mass curve shown on Figure 2.4-40h. Runoff was assumed equal to rainfall. Each watershed was analyzed using the more appropriate of two methods: (1) when flow conditions controlled, standard-step backwater from the control section using peak discharges estimated from rainfall intensities corresponding to the time of concentration of the area above the control or (2) when ponding or reservoir-type conditions controlled, storage routing the inflow hydrograph equivalent to the PMP hydrograph using two-minute time intervals.
Computed maximum water surface elevations are below critical floor Elevation 729.0 ft. The separate watershed areas are numbered for identification on Figure 2.4-40a.
Runoff from the employee parking lot and the areas south of the office building and west of the Turbine Building (area 1) will flow along the perimeter road west of the switchyard and drain into the area surrounding the chemical holdup ponds. The control is the drainage ditch and road which acts as a channel between the west end of the switchyard and the embankment to the west. To be conservative it was assumed water would not flow into the switchyard. Maximum water surface elevations at the office and Turbine Buildings computed using method (1) were less than Elevation 729.0 ft.
Flow from the area west of the Service, Auxiliary, Reactor, and Diesel Generator Buildings and north of the office building and gatehouse (area 2) will drain along and then across the perimeter road, flow west through a swale and across the low point in the access road. The swale and the roads have sufficient capacity to keep water surface elevations below 729.0 ft. at all buildings. Method (1) was used in this analysis.
The area east of the Turbine, Reactor, and Diesel Generator Buildings (area 3) forms a pool bounded by the main and transformer yard railroad tracks with top of rail elevations at 728.00 ft. and 728.25 ft. respectively. Method (2) was used to route the inflow hydrograph through this pool from an initial elevation of 728.00 ft. with outflow over the railroads. Maximum water surface elevations at the Turbine and Reactor Buildings were less than Elevation 729.0 ft. Use of method (1) starting just downstream of the railroad confirmed this result.
HYDROLOGIC ENGINEERING 2.4-9
WATTS BAR WBNP-109 The flow from area 3 over the railroad north of the east-west baseline drains north along a channel between the main railroad and the ERCW maintenance road and east between the ERCW maintenance road and the north cooling tower. Flow from area 3 over the railroad south of the east-west baseline drains south along a channel between the storage yard road and the switchyard past the storage yard to the river. Analysis using method (1) shows that flow over the Diesel Generator Building road controls the elevations at the Turbine and Reactor Buildings. Maximum water surface elevations were computed to be less than Elevation 729.0 ft.
Flow from the switchyard and transformer yard (area 4) will drain to the east, west, and south. Maximum water surface elevations at the Turbine Building obtained using method (2) were less than Elevation 729.0 ft.
Table 2.4-8 provides the weir length description and coefficient of discharge used in the analysis for areas 3 and 4.
Flow from the 150-acre drainage area north of the site drains two ways: (1) 50 acres drain east through the double 96-inch culvert under the access railroad shown on Figure 2.4-40c and (2) drainage from the remaining 100 acres is diverted to the west through an 81-inch by 59-inch pipe arch and, when flows exceed the pipe capacity, south over a swale in the construction access road. The flow over the construction access road drains to the west across the access highway. The following information provides details of our analysis.
The discharge hydrograph for the 100-acre area north of the plant and upstream from the construction access road was determined using a dimensionless unit graph based upon SCS procedures and PMP defined by the National Weather Service.[35] The PMP mass curve used in the determination is shown on Figure 2.4-40h. Runoff was assumed equal to rainfall. The construction access road will act as a dam with the 81-inch by 59-inch pipe arch acting as a low-level outlet. Flow is prevented from draining to the east above the construction access road by a dike with top elevation at 736.5 ft. (dike location and cross-section shown on Figure 2.4-40c). The profile of the construction access road and the location of the pipe arch are shown on Figure 2.4-40c. The discharge hydrograph was routed using two-minute time intervals through the pipe arch and over the construction access road using standard storage routing techniques. The rating curve for flow over the construction access road was developed from critical flow relationships with losses assumed equal to 0.5 V2/2g.
The maximum elevation reached at the construction access road was 735.28 ft. The pipe arch is designed for AASHTO H-20 loading which we judge is adequate for the loading expected. In the unlikely event of pipe arch failure and flow blockage, the maximum flood level at the construction access road would increase only 0.12 ft., from Elevation 735.28 ft. to 735.4 ft. The peak flow over the construction road was used in computations.
Flow over the construction access road discharges into the 67-acre area west of the Service, Auxiliary, Reactor, and Diesel Generator Buildings and north of the office building and gatehouse (area 2 of Figure 2.4-40a) before flowing west across the 2.4-10 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 access highway (Figure 2.4-40e). Flow from 60 additional acres to the northwest of the site is also added to this area just upstream of the main access road. Elevations for area 2 were examined to include these additional flows. Backwater was computed from downstream of the access highway, crossing the perimeter road, to the Reactor, Diesel Generator, and Waste Evaporation System Buildings. The elevation at the access highway control was computed conservatively assuming that the peak flows from area 2 and over the construction road added directly. The maximum flood elevation reached in the main plant area was less than Elevation 729.0 ft.
The discharge hydrograph for the 50-acre area north of the plant was conservatively assumed equivalent to the PMP hydrograph using two minute time intervals. This hydrograph was routed using two-minute time intervals through the double 96-inch culvert using standard storage routing techniques.
The maximum elevation reached at the culvert was 725.67 ft. Flow is prevented from entering the main plant area by site grading as shown on Figure 2.4-40c.
The double 96-inch culvert is designed to carry a Cooper E-80 loading as recommended by the American Railway Engineering Association (AREA). The culvert has already been exposed to the maximum loading (the generator stator with a total load of 792 tons on 22 axles) with no damage to the pipes or tracks. This maximum loading is less than the design load. Loading conditions will not be a problem.
The site will be well maintained and any debris generated from it will be minimal; therefore, debris blockage of the double 96-inch culvert or the 81-inch by 59-inch pipe arch will not be a problem.
Table 2.4-9 provides a description of drainage area, estimated peak discharge, and computed maximum water surface elevation for each subwatershed investigated in the site drainage analysis.
A local PMF on the holding pond does not pose a threat with respect to flooding of safety-related structures. The top of the holding pond dikes is set at Elevation 714.0 ft., whereas water level must exceed the plant grade at Elevation 728.0 ft. before safety- related structures can be flooded. A wide emergency spillway is cut in original ground at an elevation 2 ft. below the top of the dikes. During a local PMF the water trapped by the pond rise will be considerably less than the 14-ft. difference between the top of the dikes and plant grade.
2.4.3 Probable Maximum Flood (PMF) on Streams and Rivers The guidance of Appendix A of Regulatory Guide 1.59 was followed in determining the PMF.
The PMF was determined from PMP for the watershed above the plant with consideration given to seasonal and areal variations in rainfall. Two basic storm situations were found to have the potential to produce maximum flood levels at Watts Bar Nuclear Plant. These are (1) a sequence of storms producing PMP depths on the 21,400-square-mile watershed above Chattanooga and (2) a sequence of storms HYDROLOGIC ENGINEERING 2.4-11
WATTS BAR WBNP-109 producing PMP depths in the basin above Chattanooga and below the five major tributary dams (Norris, Cherokee, Douglas, Fontana, and Hiwassee), hereafter called the 7,980-square-mile storm. The maximum flood level at the plant would be caused by the March PMP 21,400-square-mile storm. The flood level for the 7,980 square mile storm would be slightly less.
In both storms, the West Saddle Dike at Watts Bar Dam would be overtopped and breached. No other failure would occur. Maximum discharge at the plant is 1,003,363 cfs from Watts Bar Dam with an additional 97,990 cfs from Watts Creek and 243,782 cfs from Yellow Creek for the 21,400-square-mile storm. The resulting PMF elevation at the plant would be 739.2 ft. excluding wind wave effects.
2.4.3.1 Probable Maximum Precipitation (PMP)
Probable maximum precipitation (PMP) for the watershed above Chickamauga and Watts Bar Dams for determining PMF has been defined for TVA by the Hydrometeorological Report No. 41[4]. This reports defines depth-area-duration characteristics, seasonal variations, and antecedent storm potentials and incorporates orographic effects of the Tennessee River Valley. Due to the temperate climate of the watershed and relatively light snowfall, snowmelt is not a factor in generating maximum floods for the Tennessee River at the site.
Two basic storms with three possible isohyetal patterns and seasonal variations described in Hydrometeorological Report No. 41[4] were examined to determine which would produce maximum flood levels at the Watts Bar plant site. One would produce PMP depths on the 21,400-square-mile watershed above Chattanooga. Two isohyetal patterns are presented in Hydrometeorological Report No. 41[4] for this storm. The isohyetal pattern with downstream center would produce maximum rainfall on the middle portion of the watershed and is shown in Figure 2.4-6.
The second storm described in Hydrometeorological Report No. 41[4] would produce PMP depths on the 7,980-square-mile watershed above Chattanooga and below the five major tributary dams. The isohyetal pattern for the 7,980-square-mile storm is not geographically fixed and can be moved parallel to the long axis, northeast and southwest, along the Tennessee Valley. The isohyetal pattern centered at Bulls Gap, Tennessee, would produce maximum rainfall on the upper part of the watershed and is shown in Figure 2.4-7.
Seasonal variations were also considered. Table 2.4-10 provides the seasonal variations of PMP. The two seasons evaluated were March and June. The March storm was evaluated because the PMP was maximum and surface runoff was also maximum. The June storm was evaluated because the June PMP was maximum for the summer season and reservoir elevations were at their highest levels. Although September PMP is somewhat higher than that in June, less runoff and lower reservoir levels more than compensate for the higher rainfall.
All PMP storms are nine-day events. A three-day antecedent storm was postulated to occur three days prior to the three-day PMP storm in all PMF determinations. Rainfall 2.4-12 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 depths equivalent to 40% of the main storm were used for the antecedent storms with uniform areal distribution as recommended in Report No. 41[4].
A standard time distribution pattern was adopted for the storms based upon major observed storms transposable to the Tennessee Valley and in conformance with the usual practice of Federal agencies. The adopted distribution is within the limits stipulated in Chapter VII of Hydrometeorological Report No. 41[4]. This places the heaviest precipitation in the middle of the storm. The adopted sequence closely conforms to that used by the U.S. Army Corps of Engineers. A typical distribution mass curve resulting from this approach is shown in Figure 2.4-8.
The PMF discharge at the Watts Bar Nuclear Plant was determined to result from the 21,400 square mile storm producing PMP on the watershed with the downstream storm pattern, as defined in Hydrometeorological Report No. 41[4]. The PMP storm would occur in the month of March and would produce 16.25 inches of rainfall in three days on the watershed above Chickamauga Dam. The storm producing the PMP would be preceded by a three-day antecedent storm producing 6.18 inches of rainfall, which would end three days prior to the start of the PMP storm. Precipitation temporal distribution is determined by applying the mass curve (Figure 2.4-8) to the basin rainfall depths in Table 2.4-11.
2.4.3.2 Precipitation Losses A multi-variable relationship, used in the day-to-day operation of the TVA reservoir system, has been applied to determine precipitation excess directly. The relationships were developed from observed storm and flood data. They relate precipitation excess to the rainfall, week of the year, geographic location, and antecedent precipitation index (API). In their application, precipitation excess becomes an increasing fraction of rainfall as the storm progresses in time and becomes equal to rainfall in the later part of extreme storms. An API determined from an 11-year period of historical rainfall records (1997-2007) was used at the start of the antecedent storm. The precipitation excess computed for the main storm is not sensitive to variations in adopted initial moisture conditions because of the large antecedent storm.
Basin rainfall, precipitation excess, and API are provided in Table 2.4-11. The average precipitation loss for the watershed above Chickamauga Dam is 2.33 inches for the three-day antecedent storm and 1.86 inches for the three-day main storm. The losses are approximately 38% of antecedent rainfall and 11% of the PMP, respectively. The precipitation loss of 2.33 inches in the antecedent storm compares favorably with that of historical flood events shown in Table 2.4-12.
2.4.3.3 Runoff and Stream Course Model The runoff model used to determine Tennessee River flood hydrographs at Watts Bar Nuclear Plant is divided into 40 unit areas and includes the total watershed above Chickamauga Dam. Unit hydrographs are used to compute flows from the unit areas.
The watershed unit areas are shown in Figure 2.4-9. The unit area flows are combined with appropriate time sequencing or channel routing procedures to compute inflows into the most upstream tributary reservoirs which in turn are routed through the HYDROLOGIC ENGINEERING 2.4-13
WATTS BAR WBNP-109 reservoirs using standard routing techniques. Resulting outflows are combined with additional local inflows and carried downstream using appropriate time sequencing or routing procedures including unsteady flow routing.
Unit hydrographs were developed for each unit area for which discharge records were available from maximum flood hydrographs either recorded at stream gaging stations or estimated from reservoir headwater elevation, inflow, and discharge data using the procedures described by Newton and Vineyard, Reference [5]. For non-gaged unit areas synthetic unit graphs were developed from relationships of unit hydrographs from similar watersheds relating the unit hydrograph peak flow to the drainage area size, time to peak in terms of watershed slope and length, and the shape to the unit hydrograph peak discharge in cfs per square mile. Unit hydrograph plots are provided in Figure 2.4-10 (11 Sheets). Table 2.4-13 contains essential dimension data for each unit hydrograph.
Tributary reservoir routings, except for Tellico and Melton Hill, were made using standard reservoir routing procedures and flat pool storage conditions. The main river reservoirs, Tellico, and Melton Hill routings were made using unsteady flow techniques.
Unsteady flow routings were computer-solved with the Simulated Open Channel Hydraulics (SOCH) mathematical model, based on the equations of unsteady flow, Reference [6]. The SOCH model inputs include the reservoir geometry, upstream boundary inflow hydrograph, local inflows, and the downstream boundary headwater discharge relationships based upon operating guides or rating curves when the structure geometry controls. Seasonal operating curves are provided in Figure 2.4-3 (12 Sheets).
Discharge rating curves are provided in Figure 2.4-11 (13 Sheets) for the reservoirs in the watershed at and above Chickamauga. The discharge rating curve for Chickamauga Dam is for the current lock configuration with all 18 spillway bays available. Above Watts Bar Nuclear Plant, temporary flood barriers have been installed at four reservoirs (Watts Bar, Fort Loudoun, Tellico and Cherokee Reservoirs) to increase the height of embankments and are included in the discharge rating curves for these four dams. Increasing the height of embankments at these four dams prevents embankment overflow and failure of the embankment. The vendor supplied temporary flood barriers were shown to be stable for the most severe PMF headwater/tailwater conditions using vendor recommended base friction values. A single posulated Fort Loudoun Reservoir rim leak north of the Marina Saddle Dam which discharges into the Tennessee River at Tennesee River Mile (TRM) 602.3 was added as an additional discharge component to the Fort Loudoun Dam discharge rating curve. Seven Watts Bar Reservoir rim leaks were added as an additional discharge components to the Watts Bar Dam discharge rating curve. Three of the rim leak locations dicharge to Yellow Creek, entering the Tennessee River three miles downstream of Watts Bar Dam. The remaining four rim leak locations discharge to Watts Creek, which enters Chickamauga Reservoir just below Watts Bar Dam.
2.4-14 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 The unsteady flow mathematical model configuration for the Fort Loudoun-Tellico complex is shown by the schematic in Figure 2.4-12. The Fort Loudoun Reservoir portion of the model from TRM 602.3 to TRM 652.22 is described by 29 cross-sections with additional sections being interpolated between the original sections for a total of 59 cross-sections in the SOCH model, with a variable cross-section spacing of about 1 mile. The unsteady flow model was extended upstream on the French Broad and Holston Rivers to Douglas and Cherokee Dams, respectively.
The French Broad River from the mouth to Douglas Dam at French Broad River mile (FBRM) 32.3 was described by 25 cross-sections with additional sections being interpolated between the original sections for a total of 49 cross-sections in the SOCH model, with a variable cross-section spacing of about 1 mile. The Holston River from the mouth to Cherokee Dam at Holston River mile (HRM) 52.3 was described by 29 cross-sections with one additional cross-section being interpolated between each of the original sections for a total of 57 cross-sections in the SOCH model, with a variable cross-section spacing of about 1 mile.
The Little Tennessee River was modeled from Tellico Dam, Little Tennessee River mile (LTRM) 0.3 to Chilhowee Dam at Little Tennessee River mile (LTRM) 33.6. The Little Tennessee River from Tellico Dam to Chilhowee Dam at LTRM 33.6 was described by 23 cross-sections with additional sections being interpolated between the original sections for a total of 49 cross-sections in the SOCH model, with a variable cross-section spacing of up to about 1.8 miles.
Fort Loudoun and Tellico unsteady flow models are joined by an interconnecting canal.
The canal was modeled using nine cross-sections within average cross-section spacing of about 0.18 miles.
The Fort Loudoun-Tellico complex was verified by two different methods as follows:
(1) Using the available data for the March 1973 flood on Fort Loudoun Reservoir and for the French Broad and Holston rivers. The verification of the 1973 flood is shown in Figure 2.4-13 (2 Sheets). Because there were limited data to verify against on the French Broad and Holston rivers, the steady-state HEC-RAS model was used to replicate the Federal Emergency Management Agency (FEMA) published 100- and 500-year profiles. Tellico Dam was not closed until 1979, thus was not in place during the 1973 flood for verification.
(2) Using available data for the May 2003 flood for the Fort Loudoun-Tellico complex. The verification of the May 2003 flood is shown in Figure 2.4-14 (3 Sheets). The Tellico Reservoir steady-state HEC-RAS model was also used to replicate the FEMA published 100- and 500-year profiles.
A schematic of the steady state SOCH flow model for Watts Bar Reservoir is shown in Figure 2.4-15. The model for the 72.4 mile long Watts Bar Reservoir was described by 39 cross-sections with two additional sections being added in the upper reach for a total of 41 sections in the SOCH steady state model with a variable cross-section spacing of up to about 2.8 miles. The model also includes a junction with the Clinch River at Tennessee River mile (TRM) 567.7. The Clinch River arm of the model goes HYDROLOGIC ENGINEERING 2.4-15
WATTS BAR WBNP-109 from Clinch River mile (CRM) 0.0 to CRM 23.1 at Melton Hill Dam with one additional section being interpolated between each of the original 13 sections and cross-section spaces of up to about 1 mile. Another junction at TRM 601.1 connects the Little Tennessee River arm of the model from the mouth to Tellico Dam at LTRM 0.3 with cross-section spaces of about 0.08 miles. The time step was tested between 5 and 60 seconds which produced stable and comparable results over the full range. A time step of 5 seconds was used for the analysis to allow multiple reservoirs and/or river segments to be coupled together with different cross-section spacing. The verification of Watts Bar Reservoir for the March 1973 and the May 2003 floods are shown in Figure 2.4-16 and Figure 2.4-17, respectively.
A schematic of the unsteady flow model for Chickamauga Reservoir is shown in Figure 2.4-18. The model for the 58.9 mile long Chickamauga Reservoir was described by 29 cross-sections with one additional section being interpolated between each of the original 29 sections for a total of 53 sections in the SOCH model with a variable cross-section spacing of up to about 1 mile. The model also includes a junction with the Dallas Bay embayment at TRM 480.5. The Dallas Bay arm of the model goes from Dallas Bay mile (DB) 5.23 to DB 2.86, the control point for flow out of Chickamauga Reservoir. Another junction at TRM 499.4 connects the Hiwassee River arm of the model from the mouth to the Charleston gage at HRM 18.9. The time step was tested between 5 and 50 seconds producing stable and comparable results over the full range. A time step of 5 seconds was used for the analysis to allow multiple reservoirs and/or river segments to be coupled together with different cross-section spacing. The verification of Chickamauga Reservoir for the March 1973 and the May 2003 floods are shown in Figure 2.4-19 and Figure 2.4-20, respectively.
Verifying the reservoir models with actual data approaching the magnitude of the PMF is not possible, because no such events have been observed. Therefore, using flows in the magnitude of the PMF (1,200,000 - 1,300,000 cfs), steady-state profiles were computed using the HEC-RAS[34] steady state model and compared to computed elevations from the SOCH model. An example of the comparison between HEC-RAS and SOCH profiles is shown for Chickamauga Reservoir in Figure 2.4-21. This approach was applied for each of the SOCH reservoir models. Similarly, the tailwater rating curve was compared at each project as shown for Watts Bar Dam in Figure 2.4-
- 22. In this figure, the initial tailwater curve is compared to results from the HEC-RAS or SOCH models.
The reservoir operating guides applied during the SOCH model simulations mimic, to the extent possible, operating policies and are within the current reservoir operating flexibility. In addition to spillway discharge, turbine and sluice discharges were used to release water from the tributary reservoirs. Turbine discharges were also used at the main river reservoirs up to the point where the head differentials are too small and/or the powerhouse would flood. All discharge outlets (spillway gates, sluice gates, and valves) for projects in the reservoir system will remain operable without failure up to the point the operating deck is flooded for the passage of water when and as needed during the flood. A high confidence that all gates/outlets will be operable is provided by periodic inspections by TVA plant personnel, the intermediate and five-year dam safety engineering inspections consistent with Federal Guidelines for Dam Safety, and the 2.4-16 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 significant capability of the emergency response teams to direct and manage resources to address issues potentially impacting gate/outlet functionality.
Median initial reservoir elevations for the appropriate season were used at the start of the PMF storm sequence. Use of median elevations is consistent with statistical experience and avoids unreasonable combinations of extreme events.
The flood from the antecedent storm occupies about 70% of the reserved system detention capacity above Watts Bar Dam at the beginning of the main storm (day 7 of the event). Reservoir levels are at or above guide levels at the beginning of the main storm in all but Apalachia and Fort Patrick Henry Reservoirs, which have no reserved flood detention capacity.
2.4.3.4 Probable Maximum Flood Flow The PMF discharge at the Watts Bar Nuclear Plant was determined to be 1,088,625 cfs. This flood would result from the 21,400-square-mile storm in March with a downstream orographically-fixed storm pattern (Figure 2.4-6).
The PMF discharge hydrograph is shown in Figure 2.4-23. The West Saddle Dike at Watts Bar Dam (Figure 2.4-24) would be overtopped and the earth embankment breached. The discharge from the failed West Saddle Dike flows into Yellow Creek which joins the Tennessee River at mile 526.82, 1.18 miles below Watts Bar Nuclear Plant.
Chickamauga Dam downstream would be overtopped. The dam was postulated to remain in place, and any potential lowering of the flood levels at Watts Bar Nuclear Plant due to dam failure at Chickamauga Dam was not considered in the resulting water surface elevation.
Concrete Section Analysis For concrete dam sections, factors of safety in sliding were determined by comparison of the existing design headwater/tailwater levels to the headwater/tailwater levels that would occur in the PMF as described in Section 2.4.3. The structures were considered safe against failure if a factor of safety greater than 1.0 for sliding was demonstrated.
The dams upstream of Watts Bar Nuclear Plant passed this test.
Spillway Gates During peak PMF conditions, the radial spillway gates of Fort Loudoun and Watts Bar Dams are wide open with flow over the gates and under the gates. For this condition, both the static and dynamic load stresses in the main structural members of the Watts Bar Dam spillway gate are determined to be less than the yield stress and the stress in the trunnion pin is less than the allowable design stress. The open radial spillway gates at other dams upstream of Watts Bar Dam were determined to not fail by comparison to the Watts Bar Dam spillway gate analysis.
HYDROLOGIC ENGINEERING 2.4-17
WATTS BAR WBNP-109 Waterborne Objects Consideration has been given to the effect of waterborne objects striking the spillway gates and bents supporting the bridge across Watts Bar Dam at peak water level at the dam. The most severe potential for damage is postulated to be by a barge which has been torn loose from its moorings and floats into the dam.
Should the barge approach the spillway portion of the dam end on, one bridge bent could be failed by the barge and two spillway gates could be damaged and possibly swept away. The loss of one bridge bent will likely not collapse the bridge because the bridge girders are continuous members and the stress in the girders is postulated to be less than the ultimate stress for this condition of one support being lost. Should two gates be swept away, the nape of the water surface over the spillway weir would be such that the barge would likely be grounded on the tops of the concrete spillway piers and provide a partial obstruction to flow comparable to unfailed spillway gates. Hence the loss of two gates from this cause will have little effect on the peak flow and elevation.
Should the barge approach the spillway portion broadside, two and possibly three bridge bents may fail. For this condition the bridge would likely collapse on the barge and the barge would be grounded on the tops of the spillway piers. For this condition the barge would likely ground before striking the spillway gates because the gates are about 20 ft. downstream from the leg of the upstream bridge bents.
Lock Gates The lock gates at Fort Loudoun, Watts Bar, and Chickamauga were examined for possible failure with the conclusion that no potential for failure exists. The lock gate structural elements may experience localized yielding and may not function normally following the most severe headwater/tailwater conditions.
2.4.3.5 Water Level Determinations The controlling PMF elevation at the Watts Bar Nuclear Plant was determined to be 738.8 ft., produced by the 21,400 square mile storm in March and coincident with overtopping failure of the West Saddle Dike at Watts Bar Dam. The PMF elevation hydrograph is shown in Figure 2.4-25. Elevations were computed concurrently with discharges using the SOCH unsteady flow reservoir model described in Section 2.4.3.3. The PMF profile, together with the regulated maximum known flood, median summer elevation, and bottom profiles along a four-mile reach of the Chickamauga Reservoir, which encompasses the plant location, is shown in Figure 2.4-26.
2.4.3.6 Coincident Wind Wave Activity Some wind waves are likely when the probable maximum flood crests at Watts Bar Nuclear Plant. The flood would be near its crest for a day beginning about 2 days after cessation of the probable maximum storm (Figure 2.4-25). The day of occurrence would be in the month of March or possibly the first week in April.
2.4-18 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Figure 2.4-27 shows the main plant general grading plan. The Diesel Generator Buildings to the north and the pumping station to the southeast of the main building complex must be protected from flooding to assure plant safety. The Diesel Generator Buildings operating floors are at elevation 742.0 ft. which are above the maximum computed elevation including wind wave runup. The electrical equipment room of the Intake Pumping Station will flood at elevation 728.0 ft. The Auxiliary and Control Buildings are allowed to flood. All equipment required to maintain the plant safely during the flood is either designed to operate submerged, is located above the maximum flood level, or is otherwise protected. Those safety-related facilities, systems, and equipment located in the containment structure are protected from flooding by the Shield Building structure with those accesses and penetrations below the maximum flood level designed and constructed as watertight elements.
The maximum effective fetches for the structures are shown on Figure 2.4-28.
Effective fetch accounts for the sheltering effect of several hills on the south riverbank which become islands at maximum flood levels. The maximum effective fetch in all cases, except for the west face of the Intake Pumping Station occurs from the northeast or east northeast direction. The maximum effective fetch for the west face of the Intake Pumping Station occurs from the west direction. The Diesel Generator Building maximum effective fetch is 1.1 miles, and the critical west face of the Intake Pumping Station maximum effective fetch is 1.3 miles. The maximum effective fetch for the Auxiliary, Control, and Shield Buildings is 0.8 miles.
For the Watts Bar plant site, the two-year extreme wind for the season in which the PMF could occur was adopted to associate with the PMF crest as specified in Regulatory Guide 1.59. The storm studies on which the PMF determination is based[4]
show that the season of maximum rain depth is the month of March. Wind velocity was determined from a statistical analysis of maximum March winds observed at Chattanooga, Tennessee.
Records of daily maximum average hourly winds for each direction are available at the Watts Bar site for the period May 23, 1973, through April 30, 1978. This record, however, is too short to use in a statistical analysis to determine the two-year extreme wind, as specified in ANSI Standard N170-1976, an appendix to Regulatory Guide 1.59. Further, the necessary 30-minute wind data are not available. To determine applicability of Chattanooga winds at the Watts Bar plant, a Kolmogorov-Smirnov (K-S) statistical test was applied to cumulative frequency distributions of daily maximum hourly winds for each direction at Chattanooga and Watts Bar. The winds compared were those recorded at Chattanooga during the period 1948-74 (the period when the necessary triple-register records were available for analysis) and the Watts Bar record.
A concurrent record is not available; however, the K-S test showed that (except for the noncritical east direction) the record of daily maximum hourly velocities at Chattanooga were equal to or greater than that at Watts Bar. From this analysis it was concluded that use of the Chattanooga wind records to define seasonal maximum winds at the Watts Bar site is conservative.
The available data at Chattanooga included 30-minute and hourly winds by seasons and direction for the 27-year period 1948 through 1974.
HYDROLOGIC ENGINEERING 2.4-19
WATTS BAR WBNP-109 The 30-minute wind data were analyzed for both the southwest and northeast directions. The winds from the northeast are considerably less than those from the southwest; hence, the southwest direction is controlling. Figure 2.4-29 shows the plot of the Chattanooga March maximum 30-minute winds from the critical southwest direction. The two-year, 30-minute wind speed is 21 miles per hour determined from a mathematical fit to the Gumbel distribution. This compares with 15 miles per hour determined for the March season from the noncontrolling northeast direction.
Computation of wind waves used the procedures of the Corps Of Engineers[14]. Wind speed was adjusted based on the effective fetch length for over water conditions. For the Diesel Generator Building, the adjusted wind speed is 23.8 miles per hour. The Intake Pumping Station maximum adjusted wind speed is 24.2 miles per hour for the critical west face. For the Auxiliary, Control, and Shield Buildings the adjusted wind speed is 23.4 miles per hour.
For waves approaching the Diesel Generator Building, the maximum wave height (average height of the maximum 1 percent of waves) would be 1.7 ft. high, crest to trough, and the significant wave height (average height of the maximum 33-1/3 percent of waves) would be 1.0 ft. high, crest to trough. The corresponding wave period is 2.0 seconds. For the Intake Pumping Station, the maximum wave height would be 2.2 ft. and the significant wave height would be 1.3 ft., with a corresponding wave period of 2.3 seconds. For the critical west face, the maximum wave height would be 1.9 ft. high, and the significant wave height would be 1.1 ft. high. The corresponding wave period is 2.1 seconds. The maximum wave height approaching the Auxiliary, Control, and Shield Buildings would be 1.5 ft. high, and the significant wave height would be 0.9 ft. high. The corresponding wave period is 1.9 seconds.
Computation of wind setup used the procedures of the Corps Of Engineers[14]. The maximum wind setup is 0.1 ft. for all structures. Computation of runup used the procedures of the Corps Of Engineers[14]. At the Diesel Generator Building the corresponding runup on the earth embankment with a 4:1 slope is 2.3 ft. and reaches elevation 741.6 ft., including wind setup. The runup on the critical west face wall of the Intake Pumping Station is 2.1 ft. and reaches elevation 741.7 ft., including wind setup.
The configuration of the north face of the Intake Pumping Station, opposite of the intake channel, allows higher runup of 3.4 ft. The remaining south and east faces allow runup of 2.4 ft.. However, there are no credible entry points to the structure on the north, south, or east faces. Therefore, the runup on these faces is discounted. The runup on the walls of the Auxiliary, Control, and Shield Buildings is 1.7 ft. and reaches elevation 741.0 ft., including wind setup.
Runup does not exceed the design basis flood level for any of the structures.
Additionally, runup at the Diesel Generator Building is maintained on the slopes approaching the structure and is below all access points to the building. Runup has no consequence at the Shield Building because all accesses and penetrations below runup are designed and constructed as watertight elements.
2.4-20 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 The static effect of wind waves was accounted for by taking the static water pressure from the maximum height of the runup. The dynamic effects of wind waves were accounted for as follows:
The dynamic effect of nonbreaking waves on the walls of safety-related structures was investigated using the Sainflou method[15]. Concrete and reinforcing stresses were found to be within allowable limits.
The dynamic effect of breaking waves on the walls of safety-related structures was investigated using a method developed by D. D. Gaillard and D. A. Molitar[16]. The concrete and reinforcing stresses were found to be less than the allowable stresses.
The dynamic effect of broken waves on the walls of safety-related structures was investigated using the method proposed by the U.S. Army Coastal Engineering Research Center.[15] Concrete and reinforcing stresses were found to be within allowable limits.
2.4.4 Potential Dam Failures, Seismically Induced The procedures described in Appendix A of Regulatory Guide 1.59 were followed when evaluating potential flood levels from seismically induced dam failures.
The plant site and upstream reservoirs are located in the Southern Appalachian Tectonic Province and, therefore, subject to moderate earthquake forces with possible attendant failure. Upstream dams whose failure has the potential to cause flood problems at the plant were investigated to determine if failure from seismic events would endanger plant safety.
It should be clearly understood that these studies have been made solely to ensure the safety of Watts Bar Nuclear Plant against failure by floods caused by the assumed failure of dams due to seismic forces. To assure that safe shutdown of the Watts Bar Nuclear Plant is not impaired by flood waters, TVA has in these studies added conservative assumptions to be able to show that the plant can be safety controlled even in the event that all these unlikely events occur in just the proper sequence.
By furnishing this information TVA does not infer or concede that its dams are inadequate to withstand earthquakes that may be reasonably expected to occur in the TVA region under consideration. The TVA Dam Safety Program (DSP), which is consistent with the Federal Guidelines for Dam Safety [37], conducts technical studies and engineering analyses to assess the hydrologic and seismic integrity of agency dams and verifies that they can be operated in accordance with Federal Emergency Management Agency (FEMA) guidelines. These guidelines were developed to enhance national dam safety such that the potential for loss of life and property damage is minimized. As part of the TVA DSP, inspection and maintenance activities are carried out on a regular schedule to confirm the dams are maintained in a safe condition. Instrumentation to monitor the dams' behavior was installed in many of the dams during original construction and other instrumentation has been added since.
Based on the implementation of the DSP, TVA has confidence that its dams are safe against catastrophic destruction by any natural forces that could be expected to occur.
HYDROLOGIC ENGINEERING 2.4-21
WATTS BAR WBNP-109 2.4.4.1 Dam Failure Permutations There are 12 major dams above Watts Bar Nuclear Plant whose failure could influence plant site flood levels. Dam locations with respect to the Watts Bar Nuclear Plant site are shown in Figure 2.4-2. These are Watts Bar and Fort Loudoun Dams on the Tennessee River; Watauga, South Holston, Boone, Fort Patrick Henry, Cherokee, and Douglas Dams above Fort Loudoun; and Norris, Melton Hill, Fontana, and Tellico Dams between Fort Loudoun and Watts Bar. These were examined individually, and in combinations, to determine if failure might result from a seismic event and, if so, would failure concurrent with storm runoff create maximum flood levels at the plant.
The procedures referred to in Regulatory Guide (RG) 1.59, Appendix A, were followed for evaluating potential flood levels from seismically induced dam failures. In accordance with this guidance, seismic dam failure is examined using the two specified alternatives:
(1) the Safe Shutdown Earthquake (SSE) coincident with the peak of the 25-year flood and a two-year wind speed applied in the critical direction, (2) the Operating Basis Earthquake (OBE) coincident with the peak of the one-half PMF and a two-year wind speed applied in the critical direction.
The OBE and SSE are defined in Sections 2.5.2.4 and 2.5.2.7 as having maximum horizontal rock acceleration levels of 0.09 g and 0.18 g respectively. As described in Section 2.5.2.4, TVA agreed to use 0.18 g as the maximum bedrock acceleration level for the SSE.
From the seismic dam failure analyses made for TVA's operating nuclear plants, it was determined that five separate, combined events have the potential to create flood levels above plant grade at Watts Bar Nuclear Plant. These events are as follows:
(1) The simultaneous failure of Fontana and Tellico Dams in the OBE coincident with one-half PMF.
(2) The simultaneous failure of Fontana, Tellico, Hiwassee, Apalachia, and Blue Ridge Dams in the OBE coincident with one-half PMF.
(3) The simultaneous failure of Norris and Tellico Dams in the OBE coincident with one-half PMF.
(4) The simultaneous failure of Cherokee, Douglas, and Tellico Dams in the OBE coincident with one-half PMF.
(5) The simultaneous failure of Norris, Cherokee, Douglas, and Tellico Dams in the SSE coincident with a 25-year flood.
Tellico has been added to all five combinations which was not included in the original analyses for TVA's operating nuclear plants. It was included because the seismic stability analysis of Tellico is not conclusive. Therefore, Tellico was postulated to fail.
2.4-22 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Concrete Structures The standard method of computing stability is used. The maximum base compressive stress, average base shear stress, the factor of safety against overturning, and the shear strength required for a shear-friction factor of safety of 1 are determined. To find the shear strength required to provide a safety factor of 1, a coefficient of friction of 0.65 is assigned at the elevation of the base under consideration.
The analyses for earthquake are based on the pseudo-static analysis method as given by Hinds[17] with increased hydrodynamic pressures determined by the method developed by Bustamante and Flores[18]. These analyses include applying masonry inertia forces and increased water pressure to the structure resulting from the acceleration of the structure horizontally in the upstream direction and simultaneously in a downward direction. The masonry inertia forces are determined by a dynamic analysis of the structure which takes into account amplification of the accelerations above the foundation rock.
No reduction of hydrostatic or hydrodynamic forces due to the decrease of the unit weight of water from the downward acceleration of the reservoir bottom is included in the analysis.
Waves created at the free surface of the reservoir by an earthquake are considered of no importance. Based upon studies by Chopra[19] and Zienkiewicz[20] it is TVA's judgment that before waves of any significant height have time to develop, the earthquake will be over. The duration of earthquake used in this analysis is in the range of 20 to 30 seconds.
Although accumulated silt on the reservoir bottom would dampen vertically traveling waves, the effect of silt on structures is not considered. The accumulation rate is slow, as measured by TVA for many years[21].
Embankment Embankment analysis was made using the standard slip circle method. The effect of the earthquake is taken into account by applying the appropriate static inertia force to the dam mass within the assumed slip circle (pseudo-static method).
In the analysis the embankment design constants used, including the shear strength of the materials in the dam and the foundation, are the same as those used in the original stability analysis.
Although detailed dynamic soil properties are not available, a value for seismic amplification through the soil has been assumed based on previous studies pertaining to TVA nuclear plants. These studies have indicated maximum amplification values slightly in excess of two for a rather wide range of shear wave velocity to soil height ratios. For these analyses, a straight-line variation is used with an acceleration at the top of the embankment being two times the top of rock acceleration.
As discussed in Section 2.4.3, temporary flood barriers are installed on embankments at Cherokee, Watts Bar, Fort Loudoun and Tellico Reservoirs. However, the temporary HYDROLOGIC ENGINEERING 2.4-23
WATTS BAR WBNP-109 flood barriers are not required to be stable following an OBE or SSE and are not assumed to increase the height of the embankments for these loading conditions.
Flood Routing The runoff model of Section 2.4.3.3 was used to reevaluate potentially five critical seismic events involving dam failures above the plant. Other events addressed in earlier studies (the postulated OBE single failures of Watts Bar and Fort Loudoun, the postulated SSE combination failure of Fontana and Douglas, the postulated SSE combination failure of Fontana, Fort Loudoun, and Tellico, the SSE combination failure of Norris, Douglas, Fort Loudoun and Tellico, and the single SSE failure of Norris) produced plant site flood levels sufficiently lower than the controlling events and therefore were not re-evaluated.
The procedures prescribed by Regulatory Guide 1.59 require seismic dam failure to be examined using the SSE coincident with the peak of the 25-year flood, and the OBE coincident with the peak of one-half the PMF.
Reservoir operating procedures used were those applicable to the season and flood inflows.
OBE Concurrent With One-Half the Probable Maximum Flood Watts Bar Dam Stability analyses of Watts Bar Dam powerhouse and spillway sections result in the judgment that these structures will not fail. The analyses show low stresses in the spillway base, and the powerhouse base. Original results are given in Figure 2.4-68 and were not updated in the current analysis. Dynamic analysis of the concrete structures resulted in the determination that the base acceleration is amplified at levels above the base. The original slip circle analysis of the earth embankment section results in a factor of safety greater than 1, and the embankment is judged not to fail.
For the condition of peak discharge at the dam for one-half the probable maximum flood the spillway gates are in the wide-open position with the bottom of the gates above the water. This condition was not analyzed because the condition with bridge failure described in the following paragraphs produces the controlling condition.
Analysis of the bridge structure for forces resulting from the OBE, including amplification of acceleration results in the determination that the bridge could fail as a result of shearing the anchor bolts. The downstream bridge girders are assumed to strike the spillway gates. The impact of the girders striking the gates is assumed to fail the bolts which anchor the gate trunnions to the pier anchorages allowing the gates to fall on the spillway crest and be washed into the channel below the dam. The flow over the spillway crest would be the same as that prior to bridge and gate failure, i.e., peak discharge for one-half the probable maximum flood with gates in the wide-open position. Hence, bridge failure will cause no adverse effect on the flood.
Previous evaluations determined that if the dam was postulated to fail from embankment overtopping in the most severe case (gate opening prevented by bridge 2.4-24 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 failure) that the resulting elevations at Watts Bar Nuclear Plant would be several ft.
below plant grade elevation 728.0 ft. Therefore, this event was not reevaluated.
Fort Loudoun Dam Stability analyses of Fort Loudoun Dam powerhouse and spillway sections result in the judgment that these structures will not fail. The analyses show low base stresses, with near two-thirds of the base in compression. The original results, given in Figure 2.4-71, were not updated for the current analysis.
Slip circle analysis of the earth embankment results in a factor of safety of 1.26, and the embankment is judged not to fail. The original results, given in Figure 2.4-72, were not updated in the current analysis.
The spillway gates and bridge are of the same design as those at Watts Bar Dam.
Conditions of failure during the OBE are the same, and no problems are likely.
Coincident failure at Fort Loudoun and Watts Bar does not occur.
For the potentially critical case of Fort Loudoun bridge failure at the onset of the main portion of one half the probable maximum flood flow into Fort Loudoun Reservoir, in an earlier analysis it was found that the Watts Bar inflows are much less than the condition resulting from simultaneous failure of Cherokee, Douglas, and Tellico Dams as described later.
Tellico Dam Although, not included in the original analyses for TVA's operating nuclear plants, Tellico is judged to fail completely because the seismic stability analysis of Tellico is not conclusive. No hydrologic results are given for the single failure of Tellico because the simultaneous failure of Tellico Dam with other dams discussed under multiple failures, is more critical.
Norris Dam Although an evaluation made in 1975 by Agbabian Associates concluded that Norris Dam would not fail in an OBE (with one-half PMF) or SSE (with 25-year flood) the original study postulated failure in both seismic events. To be consistent with prior studies, Norris was conservatively postulated to fail. Figure 2.4-76 shows the postulated condition of the dam after OBE failure. The location of the debris is not based on any calculated procedure of failure because it is believed that this is not possible. It is TVA's judgment, however, that the failure mode shown is one logical assumption; and, although there may be many other logical assumptions, the amount of channel obstruction would probably be about the same.
The discharge rating for this controlling, debris section was developed from a 1:150 scale hydraulic model at the TVA Engineering Laboratory and was verified closely by mathematical analysis.
HYDROLOGIC ENGINEERING 2.4-25
WATTS BAR WBNP-109 No hydrologic results are given for the single failure of Norris Dam because the simultaneous failure of Norris and Tellico Dams, discussed under multiple failures, is more critical.
Cherokee Dam Results of the original Cherokee Dam stability analysis for a typical spillway block are shown in Figure 2.4-77. The spillway is judged stable at the foundation base Elevation 900.0 ft. Analyses made for other elevations above Elevation 900.0 ft., but not shown in Figure 2.4-77, indicate the resultant of forces falls outside the base at Elevation 1,010.0 ft. The spillway is assumed to fail at this elevation.
The non-overflow dam is embedded in fill to elevation 981.5 ft. and is considered stable below that elevation. However, original stability analysis indicates failure will occur above the fill line.
The powerhouse intake is massive and backed up by the powerhouse. Therefore, it is judged able to withstand the OBE without failure.
Results of the original analysis for the highest portion of the south embankment are shown on Figure 2.4-78. The analysis was made using the same shear strengths of material as were used in the original analysis and shows a factor of safety of 0.85.
Therefore, the south embankment is assumed to fail during the OBE. Because the north embankment and Saddle Dams 1, 2, and 3 are generally about one-half, or less, as high as the south embankment, they are judged to be stable for the OBE.
Figure 2.4-79 shows the assumed condition of the dam after failure. All debris from failure of the concrete portion is assumed to be located downstream in the channel at elevations lower than the remaining portions of the dam and, therefore, will not obstruct flow.
No hydrologic results are given for the single failure of Cherokee Dam because the simultaneous failure of Cherokee, Douglas, and Tellico Dams discussed under multiple failures, is more critical.
Douglas Dam Results of the original Douglas Dam stability analysis for a typical spillway block are shown in Figure 2.4-80. The upper part of the Douglas spillway is approximately 12 ft.
higher than Cherokee, but the amplification of the rock surface acceleration is the same. Therefore, based on the Cherokee analysis, it is judged that the Douglas spillway will fail at Elevation 937.0 ft., which corresponds to the assumed failure elevation of the Cherokee spillway.
The Douglas non-overflow dam is similar to that at Cherokee and is embedded in fill to Elevation 927.5 ft. It is considered stable below that elevation. However, based on the Cherokee analysis, it is assumed to fail above the fill line. The abutment non-overflow blocks 1-5 and 29-35, being short blocks, are considered able to resist the OBE without failure.
2.4-26 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 The powerhouse intake is massive and backed up downstream by the powerhouse.
Therefore, it is considered able to withstand the OBE without failure.
Results of the original analysis of the Saddle Dam shown on Figure 2.4-81 indicate a factor of safety of 1. Therefore, the Saddle Dam is considered to be stable for the OBE.
Figure 2.4-82 shows the portions of the dam judged to fail and the portions judged to remain. All debris from the failed portions is assumed to be located downstream in the channel at elevations lower than the remaining portions of the dam and, therefore, will not obstruct flow.
No hydrologic results are given for the single failure of Douglas Dam because the simultaneous failure of Cherokee, Douglas, and Tellico Dams as discussed later under multiple failures, is more critical.
Fontana Dam The original hydrological analysis used a conservative seismic failure condition for Fontana Dam. A subsequent review which takes advantage of later earthquake stability analysis and dam safety modifications performed for the TVA DSP has defined a conservative but less restrictive seismic failure condition at Fontana. This subsequent review used a finite element model for the analysis and considered the maximum credible earthquake expected at the Fontana Dam site. Figure 2.4-83 shows the part of Fontana Dam judged to remain in its original position after postulated failure.
No hydrologic results are given for the single failure of Fontana Dam because the simultaneous failure of Fontana and Tellico Dams, as discussed later under multiple failures, is more critical.
Multiple Failures Previous attenuation studies of the OBE above Watts Bar Dam result in the judgment that the following simultaneous failure combinations require reevaluation:
(1) The Simultaneous Failure of Fontana and Tellico Dams in the OBE Coincident with One-Half PMF Figure 2.4-83 shows the postulated condition of Fontana for the OBE event. Tellico was conservatively postulated to completely fail.
The seismic failure scenario for Fontana and Tellico include postulated simultaneous and complete failure of non-TVA dams on the Little Tennessee River, Cheoah, Calderwood, and Chilhowee Dams and on its tributaries, Nantahala and Santeetlah Dams. Failure of the bridge at Fort Loudoun Dam would render the spillway gates inoperable in the wide open position. Watts Bar Dam spillway gates would be operable during and after the OBE.
Watts Bar Dam headwater would reach 756.13 ft., 13.87 ft. below the top of the embankment. The West Saddle Dike at Watts Bar Dam with top Elevation of 757.0 ft.
would not be overtopped. The peak discharge at Watts Bar Nuclear Plant would be HYDROLOGIC ENGINEERING 2.4-27
WATTS BAR WBNP-109 743,668 cfs. The elevation at Watts Bar Nuclear Plant would be 720.65 ft., 7.35 ft.
below plant grade Elevation 728.0 ft.
(2) The Simultaneous Failure of Fontana, Tellico, Hiwassee, Apalachia, and Blue Ridge Dams in the OBE Coincident with One-Half PMF Fontana, Tellico, Hiwassee, Apalachia and Blue Ridge Dams could fail when the OBE is located within a flattened oval-shaped area located between Fontana and Hiwassee Dams (Figure 2.4-112). Failure scenarios for Fontana, Tellico, Hiwassee, Apalachia, and Blue Ridge Dams include postulated simultaneous failure of non-TVA dams on the Little Tennessee River, Cheoah, Calderwood and Chilhowee Dams and on its tributaries, Nantahala and Santeetlah Dams.
Based on previous attenuation studies, the OBE event produces maximum ground accelerations of 0.09 g at Fontana, 0.09 g at Hiwassee, 0.07 g at Apalachia, 0.08 g at Chatuge, 0.05 g at Nottely, 0.03 g at Ocoee No.1, 0.04 g at Blue Ridge, 0.04 g at Fort Loudoun and Tellico, and 0.03 g at Watts Bar. Figure 2.4-83 shows the postulated condition of Fontana Dam after failure. Hiwassee, Apalachia, Blue Ridge, and Tellico Dams are postulated to completely fail. Chatuge Dam is judged not to fail in this defined OBE event.
Nottely Dam is a rock-fill dam with large central impervious rolled fill core. The maximum attenuated ground acceleration at Nottely in this event is only 0.054 g. A field exploration boring program and laboratory testing program of samples obtained in a field exploration was conducted. During the field exploration program, standard penetration test blow counts were obtained on both the embankment and its foundation materials. Both static and dynamic (cyclic) triaxial shear tests were made.
The Newmark Method of Analysis utilizing the information obtained from the testing program was used to determine the structural stability of Nottely Dam. It is concluded that Nottely Dam can resist the attenuated ground acceleration of 0.054 g with no detrimental damage.
Ocoee No.1 Dam is a concrete gravity structure. The maximum attenuated ground acceleration is 0.03 g. Based on past experience of concrete dam structures under significantly higher seismic ground accelerations, the Ocoee No. 1 Dam is judged to remain stable following exposure to a 0.03 g base acceleration with amplification.
Ocoee No. 1 and Ocoee No. 3 Dams, downstream of Blue Ridge Dam, would be overtopped and were postulated to completely fail at their respective maximum headwater elevations. Ocoee No. 2 Dam has no reservoir storage and was not considered.
Fort Loudoun and Watts Bar spillways would remain operable. The Fontana failure wave would transfer water through the canal from Tellico into Fort Loudoun, but it would not be sufficient to overtop Fort Loudoun Dam. The maximum headwater at Fort Loudoun would reach elevation 817.13 ft., 19.87 ft. below the top of the dam. Watts Bar headwater would reach elevation 756.13 ft., 13.87 ft. below the top of dam. The West Saddle Dike at Watts Bar with a top elevation of 757.00 ft. would not be overtopped.
2.4-28 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 The peak discharge at the Watts Bar Nuclear Plant site produced by the OBE failure of Fontana, Tellico, Hiwassee, Apalachia, and Blue Ridge coincident with the one-half PMF is 742,572 cfs. The peak elevation is 722.01 ft, 5.99 ft. below 728.0 ft. plant grade.
(3) The Simultaneous Failure of Norris and Tellico Dams in the OBE Coincident with One-Half PMF Figure 2.4-76 shows the postulated condition of Norris Dam for the OBE event. Tellico was conservatively postulated to completely fail in this event.
In the hydrologic routing for this failure, Melton Hill Dam would be overtopped and was postulated to fail when the flood wave reached headwater elevation 817.0 ft., based on the structural analysis and subsequent structural modifications performed at the dam as a result of the Dam Safety Program.
The headwater at Watts Bar Dam would reach elevation 762.96 ft., 6.54 ft. below top of dam. The West Saddle Dike at Watts Bar with top at elevation 757.0 ft. would be overtopped and breached. A complete washout of the dike was assumed.
Chickamauga headwater would reach 701.05 ft., 4.95 ft. below top of dam. The embankments at Nickajack Dam would be overtopped but was postulated not to breach which is conservative.
The peak discharge at the Watts Bar Nuclear Plant site produced by the OBE failure of Norris and Tellico Dams coincident with the one-half PMF is 917,284 cfs. The peak elevation is 728.67 ft., 0.67 ft. above 728.0 ft. plant grade.
(4) The Simultaneous Failure of Cherokee, Douglas, and Tellico Dams in the OBE Coincident with One-Half PMF Figures 2.4-79 and 2.4-82 show the postulated condition after failure of Cherokee and Douglas Dams, respectively. Tellico was conservatively postulated to completely fail.
In the hydrological routing for these postulated failures, the headwater at Watts Bar Dam would reach elevation 763.1 ft., 6.9 ft. below the top of the dam. The West Saddle Dike at Watts Bar with a top elevation of 757.0 ft. would be overtopped and breached.
A complete washout of the dike is assumed. Chickamauga Dam headwater would reach 702.95 ft., 3.05 ft. below the top of the dam. The embankments at Nickajack Dam would be overtopped but were conservatively postulated not to breach.
The peak discharge at the Watts Bar Nuclear Plant site produced by the OBE failure of Cherokee, Douglas, and Tellico with the one-half PMF is 902,687 cfs. The peak elevation is 729.07 ft., 1.07 ft. above 728.0 ft. plant grade.
SSE Concurrent With 25-Year Flood The SSE will produce the same postulated failure of the Fort Loudoun and Watts Bar bridges as described for the OBE described earlier. The resulting flood level at the Watts Bar plant was not determined because the larger flood during the OBE makes that situation controlling.
HYDROLOGIC ENGINEERING 2.4-29
WATTS BAR WBNP-109 Watts Bar Dam A reevaluation using the revised amplification factors was not made for Watts Bar Dam for SSE conditions. However, even if the dam is arbitrarily removed instantaneously, the level at the Watts Bar Nuclear plant based on previous analyses would be below 728.0 ft. plant grade.
Fort Loudoun Dam Results of the original stability analysis for Fort Loudoun Dam are shown on Figure 2.4-
- 86. Because the resultant of forces falls outside the base, a portion of the spillway is judged to fail. Based on previous modes of failure for Cherokee and Douglas, the spillway is judged to fail above elevation 750.0 as well as the bridge supported by the spillway piers.
The results of the original slip circle analysis for the highest portion of the embankment are shown on Figure 2.4-87. Because the factor of safety is less than one, the embankment is assumed to fail.
No analysis was made for the powerhouse under SSE. However, an analysis was made for the OBE with no water in the units, a condition believed to be an extremely remote occurrence during the OBE. Because the stresses were low and a large percentage of the base was in compression, it is considered that the addition of water in the units would be a stabilizing factor, and the powerhouse is judged not to fail.
Figure 2.4-88 shows the condition of the dam after assumed failure. All debris from the failure of the concrete portions is assumed to be located in the channel below the failure elevations.
No hydrologic routing for the single failure of Fort Loudoun, including the bridge structure, is made because its simultaneous failure with other dams is considered as discussed later in this subparagraph.
Tellico Dam No hydrologic routing for the single failure of Tellico is made because its simultaneous failure with other dams is more critical as discussed later in this sub-paragraph.
Norris Dam Although an evaluation made in 1975 by Agbabian Associates concluded that Norris Dam would not fail in the SSE (with 25 year flood), Norris Dam was postulated to fail.
The resulting debris downstream would occupy a greater span of the valley cross section than would the debris from the OBE but with the same top level, elevation 970.0 ft. Figure 2.4-90 shows the part of the dam judged to fail and the location and height of the resulting debris.
The discharge rating for this controlling, debris section was developed from a 1:150 scale hydraulic model at the TVA Engineering Laboratory and was verified closely by mathematical analysis. The somewhat more extensive debris in SSE failure restricts discharge slightly compared to OBE failure conditions.
2.4-30 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 No hydrologic routing for the single failure of Norris was made because the simultaneous failure with Cherokee, Douglas and Tellico Dams, discussed under multiple failures, is more critical.
Cherokee The SSE is judged to produce the same postulated failure of Cherokee as was described for the OBE. The single failure does not need to be carried downstream because elevations would be lower than the same OBE failure in one-half the probable maximum flood.
Douglas The SSE is judged to produce the same postulated failure of Douglas as was described for the OBE. The single failure does not need to be carried downstream because elevations would be lower than the same OBE failure in one-half the probable maximum flood.
Multiple Failures TVA considered the following multiple SSE dam failure combinations.
(5) The Simultaneous Failure of Norris, Cherokee, Douglas, and Tellico Dams in the SSE Coincident with 25-year Flood The SSE must be located in a very precise region to have the potential for multiple dam failures. In order to fail Norris, Cherokee, Douglas and Tellico Dams, the epicenter of SSE must be confined to a relatively small area the shape of a football, about 10 miles wide and 20 miles long.
Figure 2.4-91 shows the location of an SSE, and its attenuation, which produces 0.15 g at Norris, 0.09 g at Cherokee and Douglas, 0.08 g at Fort Loudoun and Tellico, 0.05 g at Fontana, and 0.03 g at Watts Bar. Fort Loudoun and Watts Bar have previously been judged not to fail for the OBE (0.09 g). The bridge at Fort Loudoun Dam, however, might fail under 0.08 g forces, falling on any open gates and on gate hoisting machinery. Trunnion anchor bolts of open gates would fail and the gates would be washed downstream, leaving an open spillway. Closed gates could not be opened.
By the time of the seismic event at upstream tributary dams the crest of the 25 year flood would likely have passed Fort Loudoun and flows would have been reduced to turbine capacity. Hence, spillway gates would be closed. As stated before, it is believed that multiple dam failure is extremely remote, and it seems reasonable to exclude Fontana on the basis of being the most distant in the cluster of dams under consideration. For the postulated failures of Norris, Cherokee, and Douglas the portions judged to remain and debris arrangements are as given in Figures 2.4-90, 2.4-79, and 2.4-82, respectively. Tellico is conservatively postulated to completely fail.
As discussed in Section 2.4.3, temporary flood barriers are installed on embankments at Fort Loudoun and Tellico Reservoirs. The temporary flood barriers are assumed to fail in the SSE and are thus not credited for increasing the height of the Fort Loudoun or Telico Reservoirs embankments. The flood for this postulated failure combination HYDROLOGIC ENGINEERING 2.4-31
WATTS BAR WBNP-109 would overtop and breach the south embankment and Marina Saddle Dam at Fort Loudoun. At Watts Bar Dam the headwater would reach Elevation 765.54 ft., 4.46 ft.
below the top of the earth embankment of the main dam. However, the West Saddle Dike with top at elevation 757.0 ft. would be overtopped and breached. The headwater at Chickamauga Dam would reach elevation 701.14 ft., 4.86 ft. below top of dam. The embankments at Nickajack Dam would be overtopped but was conservatively postulated not to breach.
The maximum discharge at Watts Bar Nuclear Plant would be 979,385 cfs. The elevation at the plant site would be 731.17 ft., 3.17 ft. above 728.0 ft.plant grade. This is the highest flood elevation resulting from any combination of seismic events.
The flood elevation hydrograph at the plant site is shown on Figure 2.4-114.
In addition to the SSE failure combination of Norris, Cherokee, Douglas, and Tellico Dams identified as the critical case, three other combinations were evaluated in earlier studies . These three originally analyzed combinations produced significantly lower elevations and were therefore not reevaluated.
In order to fail Norris, Douglas, Fort Loudoun, and Tellico Dams, the epicenter of an SSE must be confined to a triangular area with sides of approximately one mile in length. However, as an extreme upper limit the above combination of dams is postulated to fail as well as the combination of (1) Fontana, Fort Loudoun, and Tellico; and (2) Fontana and Douglas.
An SSE centered between Fontana and the Fort Loudoun Tellico complex was postulated to fail these three dams. The four ALCOA dams downstream from Fontana and Nantahala, a Duke Energy dam (formerly ALCOA) upstream, were also postulated to fail completely in this event. Watts Bar Dam would remain intact.
This flood level was not reevaluated because previous analysis showed it was not controlling .
Norris, Douglas, Fort Loudoun, and Tellico Dams were postulated to fail simultaneously. Figure 2.4-93 shows the location of an SSE, and its attenuation, which produces 0.12 g at Norris, 0.08 g at Douglas, 0.12 g at Fort Loudoun and Tellico, 0.07 g at Cherokee, 0.06 g at Fontana, and 0.04 g at Watts Bar. Cherokee is judged not to fail at 0.07 g; Watts Bar has previously been judged not to fail at 0.09 g; and, for the same reasons as given above, it seems reasonable to exclude Fontana in this failure combination. For the postulated failures of Norris, Douglas, Fort Loudoun, and Tellico, the portions judged to remain and the debris arrangements are as given in Figures 2.4-90, 2.4-82, 2.4-88 and 2.4-89 for single dam failure. Fort Loudoun and Tellico were postulated to fail completely as the portions judged to remain are relatively small. This combination was not reevaluated.
Douglas and Fontana Dams were postulated to fail simultaneously. Figure 2.4-94 shows the location of an SSE and its attenuation, which produces 0.14 g at Douglas, 0.09 g at Fontana, 0.07 g at Cherokee, 0.05 g at Norris, 0.06 g at Fort Loudoun and Tellico, and 0.03 g at Watts Bar. For the postulated failures of Douglas and Fontana 2.4-32 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Dams, the portions judged to remain and the debris arrangements for Douglas Dam are as given in Figures 2.4-82 and 2.4-83 for single dam failure. Fort Loudoun, and Watts Bar Dams have previously been judged not to fail for the OBE (0.09 g).
Postulation of Tellico failure in this combination has not been evaluated but is bounded by the SSE failure of Norris, Cherokee, Douglas and Tellico.
2.4.4.2 Unsteady Flow Analysis of Potential Dam Failures Unsteady flow routing techniques (Reference 23) were used to evaluate plant site flood levels from postulated seismically induced dam failures wherever their inherent accuracy was needed. In addition to the flow models described in Section 2.4.3.3, the models described below were used to develop the outflow hydrographs from the postulated dam failures. The HEC-HMS storage routing was used to compute the outflow hydrograph from the postulated failure of each dam except main river dams.
In the case of dams which were postulated to fail completely (Hiwassee, Apalachia and Blue Ridge) HEC-RAS or SOCH was used to develop the outflow hydrograph. For Tellico Dam the complete failure was analyzed with the SOCH model.
The failure time and initial reservoir elevations for each dam were determined from a pre-failure TRBROUTE analysis. HEC-HMS was used to develop the post failure outflow hydrographs based on the previously determined dam failure rating curves.
The outflow hydrographs were validated by comparing the HEC-HMS results with those generated by simulations using TRBROUTE.
2.4.4.3 Water Level at Plant Site The unsteady flow analyses of the five postulated combinations of seismic dam failures coincident with floods analyzed yields a maximum elevation of 731.17 ft. at Watts Bar Nuclear Plant, excluding wind wave effects. The maximum elevation would result from the SSE failure of Norris, Cherokee, Douglas, and Tellico Dams coincident with the 25-year flood postulated to occur in June when reservoir levels are high. Table 2.4-14 provides a summary of flood elevations determined for the five failure combinations analyzed.
Coincident wind wave activity for the PMF is described in Section 2.4.3.6. Wind waves were not computed for the seismic events, but superimposed wind wave activity from guide specified two-year wind speed would result in water surface elevations several ft. below the PMF elevation 739.2 ft. described in section 2.4.3.
2.4.5 Probable Maximum Surge and Seiche Flooding Chickamauga Lake level during non-flood conditions would not exceed elevation 682.5 ft., normal maximum pool level, for any significant time. No conceivable meteorological conditions could produce a seiche nor reservoir operations a surge which would reach plant grade elevation 728.0 ft., some 45 ft. above normal maximum pool levels.
2.4.6 Probable Maximum Tsunami Flooding Because of its inland location the Watts Bar plant is not endangered by tsunami flooding.
HYDROLOGIC ENGINEERING 2.4-33
WATTS BAR WBNP-109 2.4.7 Ice Effects Because of its location in a temperate climate significant amounts of ice do not form on lakes and rivers in the plant vicinity and ice jams are not a source of major flooding.
The present potential for generator of significant surface ice at the site is less today than prior to closure of Chickamauga and Watts Bar Lakes in 1940 and 1942, respectively. This condition exists because of (1) daily water level fluctuations from operating Chickamauga Reservoir downstream and Watts Bar Reservoir upstream would break up surface icing before significant thickness could be formed, (2) flows are warmed by releases from near the bottom of Watts Bar Reservoir, and (3) increased water depths due to Chickamauga Reservoir result in a greater mass needing to be cooled by radiation compared to pre-reservoir conditions.
After closure of Watts Bar in January 1942, there have been no extended periods of cold weather and no serious icing conditions in the Watts Bar Nuclear Plant site region.
On several occasions, ice has formed near the shore and across protected inlets but has not constituted a problem on the main reservoirs.
The lowest water temperature observed in Watts Bar Lake at the dam during the periods 1942-1953, and June 1967 to November 1973 for which records were kept, was 39 degrees on January 30, 1970, the coldest January since 1940 in the eastern part of the Basin. This lake temperature is indicative of the lowest water temperature released from Watts Bar Lake during winter months.
The most severe period of cold weather recorded in the Valley was January and early February 1940 prior to present lake conditions at the plant site. A maximum ice depth of five inches was recorded on the Tennessee River at Chattanooga. There were no ice jams except one small one on the lower French Broad River.
Records of icing are limited and none are available at the site prior to 1942. From newspaper records, the earliest known freeze in the vicinity was at Knoxville in 1796.
More recently, newspaper accounts and U.S. Weather Bureau records for Knoxville provide a fairly complete ice history from 1840 to 1940. At Knoxville the Tennessee River was frozen over 16 times, and floating ice was observed six other times.
The most severe event in this period prior to 1940 was in December-January 1917-18 when ice jammed the Tennessee River at Knoxville for 1 to 2 weeks, reaching 10 ft.
high at some places. In late January rain and temperature rise produced flooding on the Clinch River referred to by local people as the "ice tide." There is no record of ice jamming, however.
There are no safety-related facilities at the Watts Bar site which could be affected by an ice jam flood, wind-drive ice ridges, or ice-produced forces other than a flooding of the plant itself. An ice jam sufficient to cause plant flooding is inconceivable. There are no valley restrictions in the 1.9-mile reach below Watts Bar Dam to initiate a jam, and an ice dam would need to reach at least 68 ft. above streambed to endanger the plant.
2.4-34 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Intake pump suctions which will be used for the intake of river water will be located a minimum of 7.6 ft. below minimum reservoir water level; hence, no thin surface ice which may form will effect the pipe intake. In the assumed event of complete failure of Chickamauga Dam downstream, the minimum release from Watts Bar Dam will ensure a 5.9 ft. depth of water in the intake channel.
2.4.8 Cooling Water Canals and Reservoirs The intake channel, as shown in Figure 2.1-5, extends approximately 800 ft. from the edge of the reservoir through the flood plain to the Intake Pumping Station.
The channel, as shown in Figure 2.4-99, has an average depth of 36 ft. and is 50 ft.
wide at the bottom. The side slopes are 4 on 1 and are designed for sudden drawdown, due to assumed loss of downstream dam, coincident with a safe shutdown earthquake.
In response to multipurpose operations, the level of Chickamauga Reservoir fluctuates between a normal minimum of 675.0 ft. and a normal maximum of 682.5 ft.. The minimum average elevation of the reservoir bottom at the intake channel is 656 ft. and the elevation of the intake channel bottom is 660 ft. The 15 ft. normal minimum depth of water provided in the intake channel is more than ample to guarantee flow requirements. The intake provides cooling water makeup to the closed-cycle cooling system and the essential raw cooling water systems. The maximum flow requirement for the plant for all purposes is 178 cfs based on four ERCW pumps and six RCW pumps inservice.
The protection of the intake channel slopes from wind-wave activity is afforded by the placement of riprap, shown in Figures 2.4-99 in accordance with TVA design standards, from elevation 660.0 ft. to elevation 690.0 ft. The riprap is designed for waves resulting from a wind velocity of 50 mph.
2.4.9 Channel Diversions Channel diversion is not a potential problem for the plant. Currently, no channel diversions upstream of the Watts Bar plant would cause diverting or rerouting of the source of plant cooling water, and none are anticipated in the future. The floodplain is such that large floods do not produce major channel meanders or cutoffs. The topography is such that only an unimaginable catastrophic event could result in flow diversion above the plant.
2.4.10 Flooding Protection Requirements Assurance that safety-related facilities are capable of surviving all possible flood conditions is provided by the discussions given in Sections 2.4.14, 3.4, 3.8.1, 3.8.2 and 3.8.4 The plant is designed to shut down and remain in a safe shutdown condition for any rainfall flood exceeding plant grade, up to the "design basis flood" discussed in Section 2.4.3 and for lower, seismic-caused floods discussed in Section 2.4.4. Any rainfall HYDROLOGIC ENGINEERING 2.4-35
WATTS BAR WBNP-109 flood exceeding plant grade will be predicted at least 28 hours3.240741e-4 days <br />0.00778 hours <br />4.62963e-5 weeks <br />1.0654e-5 months <br /> in advance by TVA's River Operations (RO) organization.
Notification of seismic failure of key upstream dams will be available at the plant approximately 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> before a resulting flood surge would reach plant grade. Hence, there is adequate time to prepare the plant for any flood.
See Section 2.4.14 for a detailed presentation of the flood protection plan.
2.4.11 Low Water Considerations Because of its location on Chickamauga Reservoir, maintaining minimum water levels at the Watts Bar plant is not a problem. The high rainfall and runoff of the watershed and the regulation afforded by upstream dams assure minimum flows for plant cooling.
2.4.11.1 Low Flow in Rivers and Streams The probable minimum water level at the Watts Bar plant is Elevation 675.0 ft. and would occur in the winter flood season as a result of Chickamauga Reservoir operation. The most severe drought in the history of the Tennessee Valley region occurred in 1925. Frequency studies for the 1874-1935 period prior to regulation show that there is less than one percent change that the 1925 observed minimum one-day flow of 3300 cfs downstream at Chattanooga might occur in a given year. At the plant site the corresponding minimum one-day flow is estimated to be 2700 cfs.
In the assumed event of complete failure of Chickamauga Dam and with the headwater before failure assumed to be the normal summer level, Elevation 682.5 ft., the water surface at Watts Bar Nuclear Plant will begin to drop 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> after failure of the dam and will fall at a fairly uniform rate to Elevation 666.0 ft. in approximately 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> from failure. This time period is more than ample for initiating the release of water from Watts Bar Dam.
The estimated minimum flow requirement for the ERCW System is 50 cfs; however, in order to guarantee both ample depth and supply of water, a minimum flow of 3,200 cfs will be released from Watts Bar Dam. With flow of 3,200 cfs water surface elevation would be 665.9 ft. producing 5.9-ft. depth in the intake channel.
2.4.11.2 Low Water Resulting From Surges, Seiches, or Tsunami Because of Watts Bar's inland location on a relatively small, narrow lake, low water levels resulting from surges, seiches, or tsunamis are not a potential problem.
2.4.11.3 Historical Low Water From the beginning of stream gage records at Chattanooga in 1874 until the closure of Chickamauga Dam in January 1940, the estimated minimum daily flow at Watts Bar Nuclear Plant site was 2700 cfs on September 7 and 13, 1925. The next lowest estimated flow of 3900 cfs occurred in 1881 and also in 1883.
Since January 1942 low flows at the site have been regulated by TVA reservoirs, particularly by Watts Bar and Chickamauga Dams. Under normal operating 2.4-36 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 conditions, there may be periods of several hours daily when there are no releases from either or both dams, but average daily flows at the site have been less than 5,000 cfs about 2.2% of the time and have been less than 10,000 cfs about 10.4% of the time.
On March 30 and 31, 1968, during special operations for the control of water milfoil there were no releases from either Watts Bar or Chickamauga Dams during the two-day period. Over the last 25 years (1986 - 2010) the number of zero flow days at Watts Bar and Chickamauga Dams have been 0 and 2, respectively.
Since January 1940, water levels at the plant have been controlled by Chickamauga Dam. For the period (1940 - 2010) the minimum level at the dam was 673.3 ft. on January 21, 1942.
2.4.11.4 Future Control Future added controls which could alter low flow conditions at the plant are not anticipated because no sites that would have a significant influence remain to be developed. However, any control that might be considered would be evaluated before implementation.
2.4.11.5 Plant Requirements The Engineering Safety Feature System water supply requiring river water is the Essential Raw Cooling Water (ERCW). Also, the high pressure fire pumps perform an essential safety function during flood conditions by providing a feedwater supply to steam generators, makeup to the spent fuel pool, and auxiliary boration makeup tank.
For interface of the fire protection system with the Auxiliary Feedwater System, see Section 10.4.9. The ERCW pumps are located on the Intake Pumping Station deck at Elevation 741.0 ft. and the ERCW pump intake is at Elevation 653.33 ft. The ERCW intake will require 5 ft. of submergence. Based on a minimum river surface elevation of 665.9 ft., a minimum of 12.57 ft. of pump suction submergence will be provided.
In the assumed event of complete failure of Chickamauga Dam and with the headwater before failure assumed to be the normal summer level, Elevation 682.5 ft., the water surface at the site will begin to drop 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> after failure of the dam and will fall at a fairly uniform rate to Elevation 666.0 ft. in approximately 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> from failure. This time period is more than ample for initiating the release of water from Watts Bar Dam.
The estimated minimum flow requirement for the ERCW System is 50 cfs. However, in order to guarantee both ample depth and supply of water, a minimum flow of 3,200 cfs can be released from Watts Bar Dam. This flow will give a river surface elevation of 665.9 ft., which ensures a 5.9-ft. depth of water in the intake channel and approximately 10 ft. in the river.
A flow of at least 3,200 cfs can be released at the upstream dam, Watts Bar Dam, through the spillway gates, the turbines or the lock. The spillway gates offer the largest flow of water. There are twenty 40-ft.-wide radial gates operated by two traveling gate hoists on the deck and one of the hoists is always located over a gate. At minimum headwater Elevation 735.0 ft., there are several gate arrangements that could be used to supply the minimum 3,200 cfs flow.
HYDROLOGIC ENGINEERING 2.4-37
WATTS BAR WBNP-109 There are five turbines, each with a maximum flow of 9,400 cfs and an estimated speed/non-load flow of 900 to 1100 cfs. The lock culvert emptying and filling valves are electrically operated segmental type with a bypass switch located in each of the four valve control stations. These can be used at any time to open or close both filling and emptying valves.
In the improbable event of loss of station service power at the dam, a 300-kVA gasoline-engine-driven generator located in the powerhouse will supply emergency power. The generator feeds into the main board when used and the emergency power is adequate to operate each of the three sources of water supply discussed.
For concurrent loss of upstream and downstream dams, assurance that sufficient flow will be available is provided by review of the estimated low flows for the period 1903 -
2010 on the basin above Watts Bar Dam which shows that the 15 day, 30 day, 50 day, and 100 day sustained low flow would be 2907 cfs, 3158 cfs, 3473 cfs, and 4012 cfs, respectively. If additional flow is needed to supply the minimum 3200 cfs it could be supplemented by use of upstream reservoir storage.
2.4.12 Dispersion, Dilution, and Travel Times of Accidental Releases of Liquid Effluents 2.4.12.1 Radioactive Liquid Wastes A discussion of the routine handling and release of liquid radioactive wastes is found in Section 11.2, "Liquid Waste Management Systems." The routine and nonroutine nonradiologial liquid discharges are addressed in the Watts Bar Nuclear Plant's NPDES permit (Permit No. TN0020168) and the Spill, Prevention, Control, and Countermeasure Plan (SPCC plan), respectively. The nonradiological liquid discharges are under the regulatory jurisdiction of the State of Tennessee.
2.4.12.2 Accidental Slug Releases to Surface Water An accidental release of radioactive or nonradioactive liquid from the plant site would be subject to naturally induced mixing in the Tennessee River. The worst case for a given volume, Vo (cubic ft.), of liquid is a release which takes place over a short period of time. Calculations have been made to determine the reduction in concentration of such a release as it progresses downstream; particular emphasis has been placed on the concentrations at the surface water intakes downstream of the plant. The model used here is based on the convective diffusion equation as applied to the dispersion in natural streams[24,25]. The major assumptions used in this analysis are:
(1) The release is assumed to occur at the right bank with no diffuser induced mixing whether the release occurs at the bank or through the diffuser.
(2) The effluent becomes well mixed vertically (but not horizontally) relatively rapidly (well before reaching first downstream water intake). This assumption is usually justified in riverine situations[26,27].
(3) The river flow is uniform and one-dimensional over a rectangular cross-section.
2.4-38 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Other less restrictive assumptions are described in Reference [27].
Under assumption 2, the two-dimensional form of the convective diffusion equation is sufficient and may be written as 2
c c 2c c
+ u ------ = E x --------- + E y --------- (1) t x ux 2
y 2
in which C is the concentration of radioactive effluent in the river; u is cross-sectionally averaged river velocity; x and y are coordinates in the downstream and lateral directions, respectively; and Ex and Ey are the dispersion coefficients in the x and y directions. Following Reference [25], it is assumed that the formal dependence of Ex and Ey on river parameters is Ex = ax U* H (2a) and Ey = ay U* H (2b) in which ax and ay are empirical coefficients, U* is the river shear velocity, and H is the river depth. Relationships between U* and bulk river parameters may be found in any open channel hydraulics text.[28]
Equation (1) was solved for the slug release by applying the method of images[27,29]
to the instantaneous infinite flow field solution of equation (1) which is given in Reference [29]
HYDROLOGIC ENGINEERING 2.4-39
WATTS BAR WBNP-109 2
x - ut ) - + (--------------------
y - y0 )
2
- (-------------------- -
C V0 4E x t 4E y t
= ----------------------------- exp (3)
C0 4Ht E x E y in which C0 is the initial concentration of radioactive material in the liquid effluent, t is the time elapsed since the release of the slug and y is the distance of the release from the right bank. Equation (3) was used in the method of images solutions.
2.4.12.2.1 Calculations The above model was applied to predict the maximum concentrations which would be observed on the right bank of the Tennessee River at two downstream locations; the right bank concentrations will always be higher than those on the left bank. The release is assumed to occur on the right bank at Tennessee River Mile (TRM) 528; the river width is assumed constant at 1,100 ft. and the river depth is assumed constant at 30 ft.. The Watts Bar Dam discharge equaled or exceeded 50% of the time is 28,200 cfs.
The coefficients ax and ay in Equation (2) were chosen to be 100 and 0.6, respectively; these values are based on the results in Reference [25]. The shear velocity, U* was computed assuming a Manning's n of 0.030 to describe the bed roughness of the river.
Because the actual release volume, V0, is not known a priori, results are presented in terms of a relative concentration, defined as C/(C0,V0). Thus, to obtain the concentration reduction factor C/C0, this relative concentration must be multiplied by the release volume V0 (in cubic ft.).
Calculations show that the concentrations along the right bank at the downstream water intakes will be as follows:
Relative Tennessee Concentration Water Intake River Mile (l/cu. ft.)
Dayton 503.8 2.8 x 10-9 East Side Utility 473.0 1.3 x 10-9 (formerly Volunteer Army Ammunition Plant) 2.4.12.3 Effects on Ground Water The plant site is underlain by terrace deposits of gravel, sand, and clay, having an average thickness of 40 ft. The deposit is variable in grain-size composition from place to place. Locally, very permeable gravel is present. Essentially all of the ground water under the site is in this deposit.
Bedrock of the Conasauga Shale underlies the terrace deposit. Foundation exploration drilling and foundation excavation revealed that very little water occurs in the bedrock. The average saturated thickness of the terrace deposit is about 25 ft.
2.4-40 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Discharge from this material is mostly small springs and seeps to drainways along the margin of the site. Directions of ground water flow are discussed in Section 2.4.13.
The nearest point of probable ground water discharge is along a small tributary to Yellow Creek, which at its nearest point is 2,600 ft. from the center of the plant. In this direction, the hydraulic gradient (dh/dl) is 26 ft. (maximum) in 2,600 ft., or 0.01. The hydraulic conductivity (K) of the terrace materials is estimated to be 48 ft./day. (The basis for this estimate is described in Section 2.4.13.3.) Porosity (0) is estimated to be 0.15.
Average ground water velocity = (K dh/dl)/O = 3.2 ft/day or 812 days average travel time through the terrace deposit to the nearest point of ground water discharge.
Estimating the density of the water-bearing material to be 2.0 and the distribution coefficient for strontium to be 20, the computed average travel time for strontium indicates a period of over 200 times longer than that for water, or 1.8 x 105 days (almost 500 years) travel time from the plant site to the nearest point of ground water discharge. This time of travel would be further increased by accounting for the delay resulting from movement through and absorption by unsaturated materials above the water table.
Water available for dilution, based on-the estimated porosity of 0.15 and a saturated thickness of 25 ft., is estimated to be 3.75 cubic ft. per square ft. of surface area. In a 1000-ft. wide strip extending from the plant site to the nearest point of ground water discharge, the volume of stored water would be 9.8 x 106 cubic ft.
There are no data on which to base a computation of dispersion in the ground water system. For a conservative analysis, it would be necessary to assume that no dispersion occurs.
2.4.13 Groundwater 2.4.13.1 Description and On-Site Use Only the Knox Dolomite is regionally significant as an aquifer. This formation is the principal source of base flow to streams of the region. Large springs, such as Ward Spring 2.7 miles west of the site, are fairly common, especially at or near the contact between the Knox Dolomite and the overlying Chickamauga Limestone. Water occurs in the Knox Dolomite in solution openings formed along bedding planes and joints and in the moderately thick to thick cherty clay overburden. The formation underlies a one-to two-mile wide belt 2.5 miles west of the site at its nearest point; a narrow slice, the tip of which is about one mile north of the site; and a one- to two-mile wide belt, one mile east of the site and across Chickamauga Lake.
Within a two-mile radius of the site, there is no use of the Knox Dolomite as a source of water to wells for other than small supplies.
Other formations within the site region, described in detail in Section 2.5.1.1, include the Rome Formation, a poor water-bearing formation; the Conasauga Shale, a poor HYDROLOGIC ENGINEERING 2.4-41
WATTS BAR WBNP-109 water-bearing formation; and the Chickamauga Limestone, a poor to moderate water-bearing formation that normally yields no more than 25 gallons per minute (gpm) to wells.
The plant site is underlain by the Conasauga Shale, which is made up of about 84%
shale and 16% limestone and occurs as thin discontinuous beds (Section 2.5.1.2).
Surficial materials are older terrace deposits and recent alluvial deposits, fine-grained, poorly sorted, and poorly waterbearing.
The pattern of groundwater movement shown on Figure 2.4-105 indicates that recharge of the shallow water-bearing formations occurs from infiltration of local precipitation and from lateral underflow from the area north of the plant site. All ground-water discharge from the site is to Chickamauga Lake, either directly or via Yellow Creek.
Potable water for plant use is obtained from the Watts Bar Utility District. Their water is obtained from 3 wells located 2.5 miles northwest of the plant.
2.4.13.2 Sources Ground water sources within a two-mile radius of the site are listed in Table 2.4-15 and their locations are shown on Figure 2.4-102. Of the 89 wells listed, only 58 are equipped with pumps. Two of the thirteen spring sources listed are equipped with pumps. Seventy-nine residences are supplied by ground water, with one well supplying five houses. Assuming three persons per residence and a per capita use rate of 75 gpd, total ground-water use is less than 10,000 gpd.
Drawdown data are available only for the Watts Bar Reservation wells, as listed in the previous section.
Water-level fluctuations have been observed monthly in six observation wells since January 1973. Data collection for wells 7, 8, & 9 began in December 1981. The locations of these wells are shown on Figure 2.4-104. Data for the period January 1973 through December 1975 is shown on Figure 2.4-103.
As elsewhere in the region, water levels normally reach maximum elevations in February or March and are at minimum elevations in late summer and early fall. Depth to the water table is generally less than 20 ft. throughout the plant site.
Figure 2.4-105 is a water-table contour map of the area within a two-mile radius of the plant site, based on 48 water-level measurements made in January 1972. The water table conforms fairly closely to surface topography, so that directions of ground-water movement are generally the same as those of surface-water movement. The water-table gradient between plant site and Chickamauga Lake at maximum water-table elevation and minimum river stage is about 44 ft. in 3200 ft., or 0.014.
Water occurs in the Consauga Shale in very small openings along fractures and bedding planes. Examination of records of 5500 ft. of foundation exploration drilling showed only one cavity, 0.6-ft. thick, penetrated.
2.4-42 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Water occurs in the terrace deposit material in pore spaces between particles. The deposit is composed mostly of poorly-sorted clay- to gravel-sized particles and is poorly water bearing, although an approximately six-ft.-thick permeable gravel zone is locally present at the base of the terrace deposit. The foundation excavation required only intermittent dewatering after initial drainage. The excavation was taken below the base of the terrace deposit into fresh shale. No weathered shale was found to be present; the contact between the terrace deposit and fresh shale is sharp.
The average depth to the water table in the plant area, based on data collected during August through December 1970, is 17 ft.; the average overburden thickness is 40 ft.;
the saturated overburden thickness is therefore, 24 ft.. No weathered zones or cavities were penetrated in the Conasauga Shale below a depth of 85 ft., so that the average saturated thickness of bedrock is assumed to be less than 50 ft..
The plant site is hydraulically isolated by Yellow Creek and Chickamauga lake to the west, south, and east; it is hydraulically isolated to the north by the relatively impermeable Rome Formation underlying the site. Therefore, it is believed that any off-site groundwater withdrawals could not result in altered groundwater movement at the site.
No attempt was made to measure hydraulic properties of overburden or of bedrock at this site because of the very limited occurrence of ground water and the heterogeneity and anisotropy of the materials underlying the site.
2.4.13.3 Accident Effects Assuming a maximum annual range in saturated thickness of overburden of between 23 ft. and 33 ft., and a porosity of 0.15, total water stored in this material, and the maximum volume available for dilution, ranges seasonally between 4.6 and 6.6 cubic ft. per square ft. of surface area. Water available for dilution in bedrock is very small and may be less than 0.01 cubic ft. per square ft. of surface area.
Since dispersion and exchange characteristics are not known, it must be assumed that these are not factors in a release of liquid radioactive material which would then travel to discharge points at the same rate as water movement. There are no direct pathways to ground-water users since all groundwater discharge from the site is to adjacent surface-water bodies.
Groundwater travel time has been estimated for water in the terrace deposit, in which essentially all ground water at the site occurs.
The nearest point of possible groundwater discharge is 2600 ft. west of the plant site, along a tributary to Yellow Creek. In this direction the maximum hydraulic gradient is 26 ft. in 2600 ft., or 0.01. The maximum hydraulic conductivity of the terrace materials is estimated to be 48 ft/day, based on particle-size analyses of terrace-deposit materials as related to permeability[30].
HYDROLOGIC ENGINEERING 2.4-43
WATTS BAR WBNP-109 v = K dh/dl-O where v = mean velocity, ft/day; K = hydraulic conductivity = 48 ft/day; dh/dl = hydraulicgradient = .01 O = porosity = 0.15 (extimated average effective)
( .01 )
V = 48 ------------ = 3.2 ft/day
( .15 )
or 812 days travel time from plant to nearest point of groundwater discharge.
Packer tests on the Conasauga Shale in foundation holes, using water at 50 psi, showed no acceptance, although one 0.6 ft. cavity was penetrated in one hole in a total of more than 5,000 ft. of drilling. Therefore, no estimate of time of water travel was made for water in bedrock.
2.4.13.4 Monitoring and Safeguard Requirements The potential for the plant to affect groundwater users is very low because of its physical location, however, any provisions for radiological groundwater monitoring will be as described in the Watts Bar Monitoring Plan. A network of observation wells will be maintained as needed and ground water will be analyzed for radioactivity as required by the Technical Specifications.
In the event of accidental release of radioactivity to the groundwater system, nearby groundwater users will be advised not to use their wells for drinking water until an investigation can be made of the extent, rate, and direction of movement of the contaminant.
Monitoring and notification for both the routine and any accidental nonradioactive liquid discharges to either surface or groundwaters would be implemented as required by the facilities NPDES permit (Permit No. TN0020168) and the Spill, Prevention, Control, and Countermeasure Plan (SPCC plan), respectively. These requirements for the nonradiological liquid discharges are under the regulatory jurisdiction of the State of Tennessee.
2.4.13.5 Design Basis for Subsurface Hydrostatic Loading The ground water levels used for structural design are discussed in Section 2.5.4.6.
Dewatering of the construction excavation is discussed in Section 2.5.4.6.
2.4.14 Flooding Protection Requirements The plant grade elevation at WBN can be exceeded by large rainfall and seismically-induced dam failure floods. Assurance that WBN can be safely shut down and maintained in these extreme flood conditions (Section 2.4.2.2 and this Section 2.4.14) is provided by the discussions given in Sections 3.4, 3.8.1, and 3.8.4.
2.4-44 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 2.4.14.1 Introduction This subsection describes the methods by which WBN is capable of tolerating floods above plant grade without jeopardizing public safety. Since flooding of this magnitude, as illustrated in Sections 2.4.2 and 2.4.4 is most unlikely, extreme steps are considered acceptable, including actions that create or allow extensive economic consequence to the plant. The actions described herein will be implemented for floods ranging from slightly below plant grade, to allow for wave runup to the design basis flood. The plant Flood Protection Plan (Technical Requirement 3.7.2) specifies the flood warning conditions and subsequent actions.
2.4.14.1.1 Design Basis Flood The design basis flood (DBF) is the calculated upper-limit flood that includes the PMF plus the wave runup caused by a 21 mph overland wind; this is discussed in Section 2.4.3.6. The table below gives representative levels of the DBF at different plant locations.
Design Basis Flood (DBF) Levels Probable Maximum Flood (still reservoir) 739.2 ft.
DBF Runup on 4:1 sloped surfaces 741.6 ft.
DBF Runup on the critical vertical wall of the 741.7 ft.
intake pumping station DBF Surge level within flooded structures 739.7 ft.
In addition to flood level considerations, plant flood preparations cope with the "fastest rising" flood which is the calculated flood, including seismically induced floods, that can exceed plant grade with the shortest warning time. Reservoir levels for large rainfall floods in the Tennessee Valley can be predicted well in advance. By dividing the pre-flood preparation steps into two stages, a minimum of a 27 hour3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br />, pre-flood transition interval is available between the time a flood warning is received and the time the flood waters exceed plant grade. The first stage, a minimum of 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> long, commences upon receipt of a flood warning. The second stage, a minimum of 17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> long, is based on a confirmed estimate that conditions will produce a flood above plant grade.
This two-stage scheme is designed to prevent excessive economic loss in case a potential flood does not fully develop. Refer to Section 2.4.14.4.
2.4.14.1.2 Combinations of Events Because floods above plant grade, earthquakes, tornadoes, or design basis accidents, including a LOCA, are individually very unlikely, a combination of a flood plus any of these events, or the occurrence of one of these during the flood recovery time, or of the flood during the recovery time after one of these events, is considered incredible.
HYDROLOGIC ENGINEERING 2.4-45
WATTS BAR WBNP-109 However, as an exception, certain reduced levels of floods are considered together with seismic events. Refer to Section 2.4.14.10 and 2.4.4.
2.4.14.1.3 Post Flood Period Because of the improbability of a flood above plant grade, no detailed procedures are established for return of the plant to normal operation unless and until a flood actually occurs. If flood mode operation (Section 2.4.14.2) should ever become necessary, it is possible to maintain this mode of operation for a sufficient period of time (100 days) so that appropriate recovery steps can be formulated and taken. The actual flood waters are expected to recede below plant grade within 1 to 5 days.
2.4.14.1.4 Localized Floods Localized plant site flooding due to the probable maximum storm (Section 2.4.2.3) will not enter vital structures or endanger the plant. Any offsite power loss resulting from water ponding on the switchyard or water entry into the Turbine Building will be similar to a loss of offsite power situation as described in Chapter 15. The other steps described in this subsection are not applicable to this case. Refer to Section 2.4.2.3.
2.4.14.2 Plant Operation During Floods Above Grade "Flood mode" operation is defined as the set of conditions described below by means of which the plant is safely maintained during the time when flood waters exceed plant grade (Elevation 728.0 ft.) and during the subsequent period until recovery (Section 2.4.14.7) is accomplished.
2.4.14.2.1 Flooding of Structures The Reactor Building will be maintained dry during the flood mode. Walls and penetrations are designed to withstand all static and dynamic forces imposed by the DBF; minor seepage through the concrete walls and through the leading penetrations into the annulus will be allowed to flow to the Reactor Building floor and equipment drain sump by removing the blind flange on penetration X-118. The Reactor Building floor and equipment drain sumps are more than capable of pumping this flow.
The Diesel Generator Buildings also will remain dry during the flood mode since its lowest floor is at elevation 742.0 ft. Other structures, including the Service, Turbine, Auxiliary, and Control Buildings, would be allowed to flood as the water exceeds their grade level entrances. Equipment that is located in these structures and required for operation in the flood mode is either above the DBF or suitable for submerged operation.
2.4.14.2.2 Fuel Cooling Spent Fuel Pool Fuel in the spent fuel pool is cooled by the Spent Fuel Pool Cooling and Cleanup System (SFPCCS), the active components of which are located above flood waters.
During the flood mode of operation, heat is removed from the heat exchangers by essential raw cooling water instead of component cooling water. The SFPCCS cooling 2.4-46 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 circuit is assured of two operable SFPCCS pumps (a third pump is available as a backup) as well as two SFPCCS heat exchangers. High spent fuel pool temperature causes an annunciation in the Main Control Room indicating equipment malfunction.
Additionally, that portion of the cooling system above flood water is inspected approximately every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to confirm continued proper operation. As a backup to spent fuel cooling, water from the High Pressure Fire Protection (HPFP) System can be added to the spent fuel pool.
Reactors Residual core heat is be removed from the fuel in the reactors by natural circulation in the reactor coolant system. Heat removal from the steam generators is accomplished by adding river water from the HPFP System and relieving steam to the atmosphere through the power operated relief valves. This transition from auxiliary feedwater to river water is accomplished during Stage II of the flood preparation procedures. Refer to Section 2.4.14.4.1. Reactor coolant system pressure is maintained at less than 350 psig by operation of the pressurizer relief valves and heaters. Secondary side pressure is maintained below 125 psig by operation of the power operated relief valves. At times beyond approximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> following shutdown of the plant two relief valves have sufficient capacity to remove the steam generated by decay heat.
Since 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> is less than the minimum flood warning time available, the plant can be safely shut down and decay heat removed by operation of two power operated relief valves per unit.
The earliest that the HPFP pumps would be utilized to supply auxiliary feedwater would be about 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> after reactor shutdown. At this time, in order to remove the decay heat from both reactor units, the water requirement to the steam generators would be approximately 300 gpm. Later times following reactor shutdown would have gradually decreasing HPFP system makeup water flow rate requirements. With the steam generator secondary side pressure less than 125 psig, a single HPFP pump can supply makeup water well in excess of the requirement of 300 gpm. Additional surplus flow is available since there are four HPFP pumps, two powered from each emergency power train.
The main steam power operated relief valves are adjusted by controls in the auxiliary control room as required to maintain the steam pressure within the desired pressure range. The controls in the main control room also can be utilized to operate the valves in an open-closed manner. Also, a manual loading station and the relief valve handwheel provide additional backup control for each relief valve.
The power operated relief valves would be used to depressurize the steam generators as discussed above to maintain steam generator pressure sufficiently below the developed head of the fire pumps. Note that even in the event of a total loss of makeup water flow at the time of maximum decay heat load, approximately 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> are available to restore makeup water flow before the steam generators would boil dry.
If one or both reactors are open to the containment atmosphere during the refueling operations, then the decay heat of the fuel in the open unit(s) and spent fuel pool heat is removed in the following manner. The refueling cavity is filled with borated water HYDROLOGIC ENGINEERING 2.4-47
WATTS BAR WBNP-109 (nominal ppm boron concentration) from the refueling water storage tank. The SFPCCS pump takes suction from the spent fuel pool and discharges to the SFPCCS heat exchangers. The SFPCCS heat exchanger output flow is directed by a temporary piping connection to the Residual Heat Removal (RHR) System upstream to the RHR heat exchangers. This piping (spool piece) connection is prefabricated and is installed only during preparation for flood mode operation. (The tie-in locations in the SFPCCS and RHRS are shown in Figures 2.4-106 and 2.4-107 respectively.) After passing through the RHR heat exchangers, the water enters the reactor vessel through the normal cold leg RHR injection paths, flows downward through the annulus, upward through the core (thus cooling the fuel), then exits the vessel directly into the refueling cavity. This results in a water level differential between the spent fuel pool and the refueling cavity with sufficient water head to assure the required return flow through the twenty-inch diameter fuel transfer tube thereby completing the path to the spent fuel pool.
Any leakage from the reactor coolant system will be collected to the extent possible in the reactor coolant drain tank; nonrecoverable leakage is made up from supplies of clean water stored in the four cold leg accumulators, the pressurizer relief tank, and the demineralized water tank. Even if these sources are unavailable, the fire protection system can be connected to the auxiliary charging system (Section 9.3.6) as a backup.
Whatever the source, makeup water is filtered, demineralized, tested, and borated, as necessary, to the normal refueling concentration, and pumped by the auxiliary charging system into the reactor (see Figures 2.4-108 and 2.4-109).
2.4.14.2.3 Cooling of Plant Loads Plant cooling requirements with the exception of the fire protection system which must supply makeup water to the steam generators, are met by the ERCW System. The Intake Pumping Station is designed to retain full functional capability of the ERCW system and HPFP system water intakes for all floods up to and including the DBF. The ERCW System and HPFP System water intakes also remain fully functional in the remote possibility of a flood induced failure of Chickamauga Dam. (Refer to Sections 9.2.1 and 9.5.1.)
2.4.14.3 Warning Scheme See Section 2.4.14.8 (Warning Plan).
2.4.14.4 Preparation for Flood Mode An abnormal operating instruction is available to support operation of the plant.
At the time the initial flood warning is issued, the plant could be operating in any normal mode. This means that either or both units may be at power or in any stage of refueling.
2.4.14.4.1 Reactor Initially Operating at Power If the reactor is operating at power, Stage I and then, if necessary, Stage II procedures are initiated. Stage I procedures consist of a controlled reactor shutdown and other 2.4-48 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 easily revocable steps, such as moving flood mode supplies above the probable maximum flood elevation and making load adjustments on the onsite power supply.
After scram, the reactor coolant system is cooled by the auxiliary feedwater (Section 10.4.9) and the pressure is reduced to less than 350 psig.
Stage II procedures are the less easily revocable and more damaging steps necessary to have the plant in the flood mode when the flood exceeds plant grade. HPFP System water (Section 9.5.1) will replace auxiliary feedwater for steam generator makeup water. Other essential plant cooling loads are transferred from the Component Cooling Water System to the ERCW System and the ERCW replaces raw cooling water to the ice condensers (Section 9.2.1). The radioactive waste (Chapter 11) system will be secured by filling tanks below DBF level with enough water to prevent flotation. One exception is the waste gas decay tanks, which are sealed and anchored against flotation. Power and communication cables below the DBF level that are not required for submerged operation are disconnected, and batteries beneath the DBF level are disconnected.
2.4.14.4.2 Reactor Initially Refueling If time permits, fuel is removed from the unit undergoing refueling and placed in the spent fuel pool; otherwise fuel cooling is accomplished as described in Section 2.4.14.2.2. If the refueling canal is not already flooded, the mode of cooling described in Section 2.4.14.2.2 requires that the canal be flooded with borated water from the refueling water storage tank. If the flood warning occurs after the reactor vessel head has been removed or at a time when it could be removed before the flood exceeds plant grade, the flood mode reactor cooling water flows directly from the vessel into the refueling cavity.
Flood mode operation requires that the prefabricated piping be installed to connect the RHR and SFPC Systems, that the proper flow to the spent fuel pit diffuser and the RHRS be established and that essential raw cooling water be directed to the secondary side of the RHRS and SFPCCS heat exchangers. The connection of the RHR and SFPC Systems is made using prefabricated in-position piping which is normally disconnected. During flood mode preparations, the piping is connected using prefabricated spool pieces.
2.4.14.4.3 Plant Preparation Time The steps needed to prepare the plant for flood mode operation can be accomplished within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of notification that a flood above plant grade is expected. An additional 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> are available for contingency margin.
2.4.14.5 Equipment Both normal plant components and specialized flood-oriented supplements are utilized in coping with floods. Equipment required in the flood mode is either located above the DBF, within a nonflooded structure, or is suitable for submerged operation. Systems and components needed only in the preflood period are protected only during that period.
HYDROLOGIC ENGINEERING 2.4-49
WATTS BAR WBNP-109 2.4.14.5.1 Equipment Qualification To ensure capable performance in this highly unlikely, limiting design case, only high quality components are utilized. Active components are redundant or their functions diversely supplied. Since no rapidly changing events are associated with the flood, repairability is an available option for both active and passive components during the long period of flood mode operation. Equipment potentially requiring maintenance is accessible throughout its use, including components in the Diesel Generator Building.
2.4.14.5.2 Temporary Modification and Setup Normal plant systems used in flood mode operation and in preparation for flood mode operation may require modification from their normal plant operating configuration.
Such modification, since it is for a limiting design condition and since extensive economic consequences are acceptable, is permitted to allow operation of systems outside of their normal plant configuration. However, most alterations will be only temporary and inconsequential in nature. For example, the switchover of plant cooling loads from the component cooling water to ERCW is done through valves and prefabricated spool pieces, causing little system disturbance or damage.
2.4.14.5.3 Electric Power Because there is a possibility that high winds could destroy power lines and disconnect the plant from offsite power at any time during the preflood transition period, the preparation procedure and flood mode operation are accomplished assuming only onsite power circuits available. While most equipment requiring ac electric power is a part of the permanent emergency onsite power distribution system other components, if required, could be temporarily connected, when the time comes, by prefabricated jumper cables.
The loads that are normally supplied by onsite power but are not required for the flood are disconnected early in the preflood period. Those loads used only during the preflood period are disconnected from the onsite power system during flood mode operations. DC electric power is similarly disconnected from unused loads and potentially flooded cables.
Charging is maintained for each battery by the onsite ac power system as long as it is required. Batteries that are beneath the DBF level are disconnected during the preflood period when they are no longer needed.
2.4.14.5.4 Instrument, Control, Communication and Ventilation Systems The instrument, control, and communication wiring or cables required for operation in the flood mode are either above the DBF or within a nonflooded structure, or are suitable for submerged operation. Unneeded wiring or cables that run below the DBF level will be disconnected to prevent short circuits.
Instrumentation is provided to monitor vital plant parameters such as the reactor coolant temperature and pressure and steam generator pressure and level. Important plant functions are either monitored and controlled from the main control area, or, in 2.4-50 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 some cases where time margins permit, from other points in the plant that are in close communication with the main control area.
Communications are provided between the central control area (the Main and Auxiliary Control Rooms) and other vital areas that might require operator attention, such as the Diesel Generator Building.
Ventilation, when necessary, and limited heating or air conditioning is maintained for locations throughout the plant where operators might be required to go or where required by equipment heat loads.
2.4.14.6 Supplies The equipment and most supplies required for the flood are on hand in the plant at all times. Some supplies may require replenishment before the end of the period in which the plant is in the flood mode. In such cases supplies on hand are sufficient to last through the short time (Section 2.4.14.1.3) that flood waters will be above plant grade and until replenishment can be supplied.
2.4.14.7 Plant Recovery The plant is designed to continue safely in the flood mode for 100 days even though the water is not expected to remain above plant grade for more than 1 to 4 days. After recession of the flood, damage will be assessed and detailed recovery plans developed. Arrangements will then be made for reestablishment of off-site power and removal of spent fuel. A decision based on economics would be made on whether or not to regain the plant for power production. In either case, detailed plans would be formulated after the flood, when damage can be accurately assessed. The 100-day period provides a more than adequate time for the development of procedures for any maintenance, inspection, or installation of replacements for the recovery of the plant or for a continuation of flood mode operations in excess of 100 days.
2.4.14.8 Warning Plan Plant grade elevation 728.0 ft. can be exceeded by rainfall floods and seismic-caused dam failure floods. A warning plan is needed to assure plant safety from these floods.
The warning plan is divided into two stages: Stage I, a minimum of 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> long and Stage II, a minimum of 17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> so that unnecessary economic consequences can be avoided, while adequate time is allowed for preparing for operation in the flood mode.
Stage I allows preparation steps causing minimal economic consequences to be sustained but will postpone major economic damage until the Stage II warning forecasts a likely forthcoming flood above elevation 727.0 ft.
2.4.14.8.1 Rainfall Floods Protection of the Watts Bar Plant from rainfall floods that might exceed plant grade utilizes a flood warning issued by TVA's RO. TVA's climatic monitoring and flood forecasting systems and flood control facilities permit early identification of potentially critical flood producing conditions and reliable prediction of floods which may exceed plant grade well in advance of the event.
HYDROLOGIC ENGINEERING 2.4-51
WATTS BAR WBNP-109 The WBN flood warning plan provides a minimum of 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> to prepare for operation in the flood mode, 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> more than the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> needed. Four additional preceding hours would be available to gather and analyze rainfall data and produce the warning.
The first stage, Stage I, of shutdown begins when there is sufficient rainfall on the ground in the upstream watershed to yield a forecasted plant site water level of elevation 715.5 ft.in the winter months and elevation 720.6 ft. in the summer. This assures that additional rain will not produce water levels to elevation 727.0 ft. in less than 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> from the time shutdown is initiated. The water level of elevation 727.0 ft. (one ft. below plant grade) allows margin so that waves due to winds cannot disrupt the flood mode preparation.
The plant preparation status is held at Stage I until either Stage II begins or TVA's RO determines that floodwaters will not exceed Elevation 727.0 ft. at the plant. The Stage II warning is issued only when enough additional rain has fallen to forecast that elevation 727.0 ft. (winter or summer) is likely to be reached.
2.4.14.8.2 Seismically-Induced Dam Failure Floods Three postulated combinations of seismically induced dam failures and coincident storm conditions were shown to result in floods which could exceed Elevation 727.0 ft.
at the plant. WBNs notification of these floods utilizes TVAs RO forecast system to identify when a critical combination exists. Stage I shutdown is initiated upon notification that a critical dam failure combination has occurred or loss of communication prevents determining a critical case has not occurred. Stage I shutdown continues until it has been determined positively that critical combinations do not exist. If communications do not document this certainty, shutdown procedures continue into Stage II activity. Stage II shutdown continues to completion or until lack of critical combinations is verified.
2.4.14.9 Basis For Flood Protection Plan In Rainfall Floods 2.4.14.9.1 Overview Large Tennessee River floods can exceed plant grade elevation 728.0 ft. at WBN.
Plant safety in such an event requires shutdown procedures which may take 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to implement. TVA flood forecast procedures are used to provide at least 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> of warning before river levels reach elevation 727.0 ft. Use of elevation 727.0 ft, one ft.
below plant grade, provides enough margin to prevent wind generated waves from endangering plant safety during the final hours of shutdown activity. Forecast will be based upon rainfall already reported to be on the ground.
To be certain of 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> for preflood preparation, flood warnings with the prospect of reaching elevation 727.0 ft. must be issued early when lower target elevations are forecast. Consequently, some of the warnings may later prove to have been unnecessary. For this reason preflood preparations are divided into two stages. Stage I steps requiring 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> are easily revocable and cause minimum economic consequences. The estimated probability is small that a Stage I warning will be issued during the life of the plant.
2.4-52 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Added rain and stream-flow information obtained during Stage I activity will determine if the more serious steps of Stage II need to be taken with the assurance that at least 17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> will be available before elevation 727.0 ft. is reached. The probability of a Stage II warning during the life of the plant is very small.
Flood forecasting and warnings, to assure adequate warning time for safe plant shutdown during floods, will be conducted by TVA's RO.
2.4.14.9.2 TVA Forecast System TVA has in constant use an extensive, effective system to forecast flow and elevation as needed in the Tennessee River basin. This permits efficient operation of the reservoir system and provides warning of when water levels will exceed critical elevations at selected, sensitive locations which includes WBN.
TVAs RO normal operation produces daily forecasts by 12 noon made from data collected at 6 a.m. Central time. During major flood events, RO may issue forecasts as frequent as 4 to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> at specific site locations.
Elements of the present (2010) forecast system above WBN include the following:
(1) More than 90 rain gages measure rainfall, with an average density of about 190 square miles per rain gage. All are Geostationary Operational Environmental Satellites (GOES) Data Collection Platform (DCP) satellite telemetered gages, and 27 are Data Logger telemetered gages.
Some of the satellite gages transmit hourly rainfall data every 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> while others transmit hourly during normal operations.
(2) Streamflow data are received from 23 gages in the system. All are GOES Data Collection Platform satellite telemetered gages. The satellite gages transmit 15-minute stage data every three hours during normal operations.
(3) Real-time headwater elevation, tailwater elevation, and discharge data are received from 21 TVA hydro projects (Watts Bar, Melton Hill, Fort Loudoun, Tellico, Norris, Douglas, Cherokee, Fort Patrick Henry, Boone, Watauga, Wilbur, South Holston, Chickamauga, Ocoee No. 1, Ocoee No. 2, Ocoee No.
3, Blue Ridge, Apalachia, Hiwassee, Chatuge and Nottely) and hourly data are received from non-TVA hydro plants (Chilhowee, Cheoah, Calderwood and Santeelah).
(4) Weather forecasts including quantitative precipitation forecasts received at least twice daily and at other times when changes are expected.
(5) Computer programs which translate rainfall into streamflow based on current runoff conditions and which permit a forecast of flows and elevations based upon both observed and predicted rainfall. A network of UNIX servers and personal computers are utilized and are designed to provide backup for each other. One computer is used primarily for data collection, with the others HYDROLOGIC ENGINEERING 2.4-53
WATTS BAR WBNP-109 used for executing forecasting programs for reservoir operations. The time interval between receiving input data and producing a forecast is less than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Forecasts normally cover at least a three-day period.
As effective as the forecast system already is, it is constantly being improved as new technology provides better methods to interrogate the watershed during floods and as the watershed mathematical model and computer system are improved. Also, in the future, improved quantitative precipitation forecasts may provide a more reliable early alert of impending major storm conditions and thus provide greater flood warning time.
2.4.14.9.3 Basic Analysis The forecast procedure to assure safe shutdown of WBN for flooding is based upon an analysis of nine hypothetical storms up to PMP magnitude. The storms enveloped potentially critical areal and seasonal variations and time distributions of rainfall. To be certain that fastest rising flood conditions were included, the effects of varied time distribution of rainfall were tested by alternatively placing the maximum daily PMP in the middle, and the last day of the three-day main storm. Earlier analysis of 17 hypothetical storms demonstrated that the shortest warning times resulted from storms in which the heavy rainfall occurred on the last day and that warning times were significantly longer when heavy rainfall occurred on the first day. Therefore, heavy rainfall on the first day was not reevaluated. The warning system is based on those storm situations which resulted in the shortest time interval between watershed rainfall and Elevation 727.0 ft. at WBN, thus assuring that this elevation could be predicted at least 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> in advance.
The procedures used to compute flood flows and elevations for those flood conditions which establish controlling elements of the forecast system are described in Section 2.4.3.
2.4.14.9.4 Hydrologic Basis for Warning System A minimum of 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> has been allowed for preparation of the plant for operation in the flood mode, three hours more than the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> needed. An additional 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for communication and forecasting computations is provided to allow TVAs RO to translate rain on the ground to river elevations at the plant. Hence, the warning plan provides 31 hours3.587963e-4 days <br />0.00861 hours <br />5.125661e-5 weeks <br />1.17955e-5 months <br /> from arrival of rain on the ground until Elevation 727.0 ft. could be reached. The 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> allowed for shutdown at the plant consists of a minimum of 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> of Stage I preparation and an additional 17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> for Stage II preparation that is not concurrent with the Stage I activity.
Although river Elevation 727.0 ft., 1 ft. below plant grade to allow for wind waves, is the controlling elevation for determining the need for plant shutdown, lower forecast target levels are used in some situations to assure that the 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> pre-flood transition interval will always be available. The target river levels differ with season.
During the "winter" season, Stage I shutdown procedures will be started as soon as target river Elevation 715.5 ft. has been forecast. Stage II shutdown will be initiated and carried to completion if and when target river Elevation 727.0 ft. at WBN has been 2.4-54 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 forecast. Corresponding target river elevations for the "summer" season at WBN are Elevation 720.6 ft. and Elevation 727.0 ft.
Inasmuch as the hydrologic procedures and target river elevations have been designed to provide adequate shutdown time in the fastest rising flood, longer times will be available in other floods. In such cases there may be a waiting period after the Stage I, 10-hour shutdown activity during which activities shall be in abeyance until weather conditions determine if plant operation can be resumed, or if Stage II shutdown should be implemented.
Resumption of plant operation following just Stage I shutdown activities will be allowable only after flood levels and weather conditions, as determined by TVAs RO, have returned to a condition in which 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> of warning will again be available.
2.4.14.9.5 Hydrologic Basis for Warning Times and Elevations Figure 2.4-110 (Sheet 1) and Figure 2.4-110 (Sheet 2) for winter and summer respectively, show target forecast flood warning time and elevation at WBN which assure adequate warning times. The fastest rising probable maximum flood for the winter at the site is shown in Figure 2.4-110 (Sheet 1A). Figure 2.4-110 (Sheets 1B and 1C) show the adopted rainfall distribution for the 21,400 square mile storm and the 7,980 square mile storm, respectively. An intermediate flood with average basin rainfall of 10 inches (rainfall heavy at the end) is shown in Figure 2.4-110 (Sheet 1D). Figure 2.4-110 (Sheet 2A) shows the 7,980 square mile fastest rising probable maximum flood for the summer with heavy rainfall at the end. The 7,980 square mile adopted rainfall distribution is shown in Figure 2.4-110 (Sheet 2B). An intermediate flood with average basin rainfall of 10 inches heavy at the end is shown in Figure 2.4-110 (Sheet 2C). All of these storms have been preceded three days earlier by a three-day storm having 40% of PMP storm rainfall.
The fastest rising flood occurs during a PMP when the six-hour increments increase throughout the storm with the maximum 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> occurring in the last period. Figure 2.4-110 (Sheet 1A) shows the essential elements of this storm which provides the basis for the warning plan. In this flood 8.6 inches of rain would have fallen 31 hours3.587963e-4 days <br />0.00861 hours <br />5.125661e-5 weeks <br />1.17955e-5 months <br /> (27 + 4) prior to the flood crossing Elevation 727.0 ft. and would produce elevation 715.5 ft. at the plant. Hence, any time rain on the ground results in a forecast plant elevation of 715.5 ft. a Stage I shutdown warning will be issued. Examination of Figure 2.4-110 (Sheets 1B and 1C) show that following this procedure in these floods would result in longer times to reach Elevation 727.0 ft. after Stage I warning was issued. These times would be 41 and 46.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> (includes 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for forecasting and communication) for Figure 2.4-110 (Sheet 1B) and (Sheet 1C), respectively. This compares to the 31 hours3.587963e-4 days <br />0.00861 hours <br />5.125661e-5 weeks <br />1.17955e-5 months <br /> for the fastest rising flood Figure 2.4-110 (Sheet 1A). Stage I warning would be issued for the storm shown in Figure 2.4-110 (Sheet 1D) but would not reach a Stage II warning as the maximum elevation reached is 721.92 ft. which is well below elevation 727.0 ft.
An additional 2.6 inches of rain must fall promptly for a total of 11.2 inches of rain to cause the flood to exceed Elevation 727.0 ft. In the fastest rising flood, Figure 2.4-110 (Sheet 1A), this rain would have fallen in the next 6.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />. A Stage II warning would HYDROLOGIC ENGINEERING 2.4-55
WATTS BAR WBNP-109 be issued within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Thus, the Stage II warning would be issued 6.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> after issuance of a Stage I warning and 21.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> before the flood would exceed elevation 727.0 ft. In the slower rising floods, Figure 2.4-110 (Sheets 1B and 1C), the time between issuance of a Stage I warning and when the 11.2 inches of rain required to put the flood to elevation 727.0 ft. would have occurred, is 7.0 and 5.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> respectively. This would result in issuance of a Stage II warning not more than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> later or 30.0 or 37.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, respectively, before the flood would reach elevation 727.0 ft.
The summer flood, shown by Figure 2.4-110 (Sheet 2A), with the maximum one-day rain on the last day provides controlling conditions when reservoirs are at summer levels. At a time 31 hours3.587963e-4 days <br />0.00861 hours <br />5.125661e-5 weeks <br />1.17955e-5 months <br /> (27 + 4) before the flood reaches elevation 727.0 ft., 9.3 inches of rain would have fallen. This 9.3 inches of rain under these runoff conditions would produce elevation 720.6 ft., so this level becomes the Stage I target. An additional 2.0 inches of rain must fall promptly for a total of 11.3 inches of rain to cause the flood to exceed elevation 727.0 ft. In this fastest rising summer flood, Figure 2.4-110 (Sheet 2A), this rain would have fallen in the next 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. A Stage II warning would be issued within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Thus, the Stage II warning would be issued 4.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> after issuance of a Stage I warning and 22.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> before the flood would exceed elevation 727.0 ft.
The above criteria all relate to forecasts which use rain on the ground. In actual practice quantitative rain forecasts, which are already a part of daily operations, would be used to provide advance alerts that the need for shutdown may be imminent. Only rain on the ground, however, is included in the procedure for firm warning use.
Because the above analyses used fastest possible rising floods at the plant, all other floods will allow longer warning times than required for physical plant shutdown activities.
In summary, the forecast elevations which will assure adequate shutdown times are:
Forecast Elevations at Watts Bar Season Stage I shutdown Stage II shutdown Winter 715.5 ft. 727.0 ft.
Summer 720.6 ft. 727.0 ft.
2.4.14.9.6 Communications Reliability Communication between projects in the TVA power system is via (a) TVA-owned microwave network, (b) Fiber-Optics System, and (c) by commercial telephone. In emergencies, additional communication links are provided by Transmission Power Supply radio networks. The four networks provide a high level of dependability against emergencies. Additionally, RO have available satellite telephone communications with the TVA hydro projects upstream of Chattanooga (listed in Section 2.4.14.9.2).
2.4-56 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 RO is linked to the TVA power system by all five communication networks. The data from the satellite gages are received via a data collection platform-satellite computer system located in the RO office.
2.4.14.10 Basis for Flood Protection Plan in Seismic-Caused Dam Failures Plant grade would be exceeded by three of the five candidate seismic failure combinations evaluated, thus requiring emergency measures. The seismic dam failure combination, the SSE failure of Norris, Cherokee, Douglas and Tellico Dams concurrent with the 25-year flood would result in a maximum flood elevation of 731.17 ft. at WBN. The OBE failure of Norris and Tellico Dams and the OBE failure of Cherokee, Douglas, and Tellico Dams concurrent with the one-half PMF would result in flood elevations above WBN plant grade. Table 2.4-14, shows the maximum elevations at WBN for the candidate combinations.
The times from seismic failure to the time Elevation 727.0 ft. is reached at WBN in the three critical events is about 35, 27, and 44 hours5.092593e-4 days <br />0.0122 hours <br />7.275132e-5 weeks <br />1.6742e-5 months <br /> as shown in Figures 2.4-114, 2.4-115, and 2.4-116 for the Norris, Cherokee, Douglas and Tellico Dams SSE failure combination, the Norris and Tellico Dams OBE failure combination and the Cherokee, Douglas, and Tellico Dams OBE failure combinations, respectively. These times are adequate to permit safe plant shutdown in readiness for flooding.
Dam failure during non-flood periods was not evaluated, but would be bounded by the three critical failure combinations.
The warning scheme for safe plant shutdown is based on the fact that a combination of critically centered large earthquake conditions must coincide before the flood wave from seismically caused dam failures will approach plant grade. In flood situations, an extreme earthquake must be precisely located to fail Norris, Cherokee, Douglas, and Tellico Dams before a flood threat to the site would exist. This would also be the case with the failure of Norris and Tellico. Cherokee and Douglas Dams failures could occur when the OBE is located midway between the dams which are just 15 miles apart.
The warning system utilizes TVA's RO flood forecast system to identify when flood conditions will be such that seismic failure of critical dams could cause a flood wave to approach elevation 728.0 ft.at the plant site. In addition to the critical combinations, failure of a single major upstream dam will lead to an early warning. A Stage I warning is declared once failure of (1) Norris, Cherokee, Douglas, and Tellico Dams or (2)
Norris and Tellico Dams or (3) Cherokee, Douglas and Tellico Dams has been confirmed.
If loss of or damage to an upstream dam is suspected based on monitoring by TVAs RO, efforts will be made by TVA to determine whether dam failure has occurred. If the critical case has occurred or it cannot be determined that it has not occurred, Stage I shutdown will be initiated. Once initiated, the flood preparation procedures will be carried to completion unless it is determined that the critical case has not occurred.
Communications between WBN, dams, power system control center, and TVA RO are accomplished by TVA-owned microwave networks, fiber-optics network, radio HYDROLOGIC ENGINEERING 2.4-57
WATTS BAR WBNP-109 networks, and commercial and satellite telephone service. These systems are described in FSAR Section 9.5.2.3.
2.4.14.11 Special Condition Allowance The flood protection plan is based upon the minimum time available for the worst case.
This worst case provides adequate preparation time including contingency margin for normal and anticipated plant conditions including anticipated maintenance operations.
It is conceivable, however, that a plant condition might develop for which maintenance operations would make a longer warning time desirable. In such a situation the Plant Manager determines the desirable warning time. He contacts TVA's RO to determine if the desired warning time is available. If weather and reservoir conditions are such that the desired time can be provided, special warning procedures will be developed, if necessary, to ensure the time is available. This special case continues until the Plant Manager notifies TVA's RO that maintenance has been completed. If threatening storm conditions are forecast which might shorten the available time for special maintenance, the Plant Manager is notified by RO and steps taken to assure that the plant is placed in a safe shutdown mode.
REFERENCES (1) Reference deleted.
(2) Reference deleted.
(3) SCS National Engineering Handbook, Section 4, Hydrology, July 1969.
(4) U.S. Weather Bureau, "Probable Maximum and TVA Precipitation Over The Tennessee River Basin Above Chattanooga," Hydrometeorological Report No. 41, 1965.
(5) Newton, Donald W., and Vineyard, J. W., "Computer-Determined Unit Hydrographs From Floods," Journal of the Hydraulics Division, ASCE, Volume 93, No. HY5, September 1967.
(6) Garrison, J. M., Granju, J. P., and Price, J. T., "Unsteady Flow Simulation in Rivers and Reservoirs," Journal of the Hydraulics Division, ASCE, Volume 95, No. HY5, Proceedings Paper 6771, September 1969, pages 1559-1576.
(7) Reference deleted.
(8) Reference deleted.
(9) Reference deleted.
(10) Reference deleted.
(11) Reference deleted.
2.4-58 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 (12) Reference deleted.
(13) Reference deleted.
(14) U.S. Army Corps of Engineers, "Computation of Freeboard Allowances for Waves in Reservoirs," Engineering Technical Letter No. 1110-2-8, August 1966.
(15) U.S. Army coastal Engineering Research Center, "Shore Protection Planning and Design," Third Edition, 1966.
(16) Anderson, Paul, "Substructure Analysis and Design," 1948.
(17) Hinds, Julian, Cregar, William P., and Justin, Joel D., "Engineering For Dams," Volume 11, Concrete Dams, John Wiley and Sons, Incorporated, 1945.
(18) Bustamante, Jurge I., Flores, Arando, "Water Pressure in Dams Subject to Earthquakes," Journal of the Engineering Mechanics Division, ASCE Proceedings, October 1966.
(19) Chopra, Anil K., "Hydrodynamic Pressures on Dams During Earthquakes,"
Journal of the Engineering Mechanics Division ASCE Proceedings, December 1967, pages 205-223.
(20) Zienkiewicz, O. C., "Hydrodynamic Pressures Due to Earthquakes," Water Pressures Due to Earthquakes," Water Power, Volume 16, September 1964, pages 382-388.
(21) Tennessee Valley Authority, "Sedimentation in TVA Reservoirs," TVA Report No. 0-6693, Division of Water Control Planning, February 1968.
(22) Reference deleted.
(23) Price, J. T. and Garrison, J. M., Flood Waves From Hydrologic and Seismic Dam Failures," paper presented at the 1973 ASCE National Water Resources Engineering Meeting, Washington, D. C.
(24) Fisher, H. B., "Longitudinal Dispersion in Laboratory and Natural Systems" Keck Laboratory Report KH-R-12, California Institute of Technology, Pasadena, California, June 1966.
(25) Fisher, H. B., "The Mechanics of Dispersion in Natural Streams," Journal of the Hydraulics Division, ASCE Vol. 93, No HY6, November 1967.
(26) Yotsukura, N., "A Two-Dimensional Temperature Model for the Thermally Loaded River with Steady Discharge" Proceedings of the Eleventh Annual Environmental and Water Resources Engineering Conference, Vanderbilt University, Nashville, Tennessee, 1972.
HYDROLOGIC ENGINEERING 2.4-59
WATTS BAR WBNP-109 (27) Almquist, C. W., "A Simple Model for the Calculation of Transverse Mixing in Rivers with Application to the Watts Bar Nuclear Plant," TVA, Division of Water Management, Water Systems Development Branch, Technical Report No. 9-2012, March 1977.
(28) Henderson, E. M., Open Channel Flow, MacMillen, 1966.
(29) Carlslaw, B. S. and J. C. Jaeger, Conduction of Heat in Solids, Oxford University Press, London England, 1959.
(30) Johnson, A. E., 1963, Application of Laboratory Permeability.
(31) Reference deleted.
(32) Reference deleted.
(33) Reference deleted.
(34) U.S. Army Corps of Engineers, Hydrologic Engineering Center, River Analysis System, HEC-RAS computer software, version 3.1.3.
(35) National Weather Service, "Probable Maximum and TVA Precipitation Estimates with Areal Distribution for Tennessee River Drainages Less Than 3,000 Square Miles in Area," Hydrometeorological Report No. 56, October 1986.
(36) U.S. Geological Survey, National Water Information System: Web Interface, USGS Surface-Water Data for the Nation, Website, http://waterdata.usgs.gov/usa/nwis/ws, accessed April 2006.
(37) American Nation Standards Institute, American National Standard for Determining Design Basis Flooding at Power Reactor Sites, "ANS 2.8/ANSI N170-1976, American Nuclear Society, Hinsdale, Illinois, November 1, 1976.
(38) Federal Emergency Management Agency (FEMA), "Federal Guidelines for Dam Safety: Earthquake Analysis and Design of Dams, FEMA 65, May 2005.
2.4-60 HYDROLOGIC ENGINEERING
Table 2.4-1 Location of Surface Water Supplies in the 58.9 Mile Reach of the Mainstream of the Tennessee River Between Watts Bar Dam (Trm 529.9) and Chichamagua Dam (Trm 471.0)
Approximate Distance From Site WATTS BAR Plant Name Use (MGD) Location (Bank) (River Miles) Type Supply Watts Bar Dam # TRM 529.9 1.9 (Upstream) Industrial HYDROLOGIC ENGINEERING Watts Bar Steam Plant ## TRM 529.9 R 1.9 (Upstream) Industrial Watts Bar Nuclear Plant 40,000### TRM 528 R 0 Industrial City of Dayton 1.78 TRM 503.8 R 24.2 (Downstream) Municipal Sequoyah Nuclear Plant 1615.68 TRM 483.6 R 44.4 (Downstream) Industrial East Side Utility 5.00 TRM 473 L 55.0 (Downstream) Municipal Chickamagua Dam # TRM 471 57.0 (Downstream) Industrial
- Water usage is not metered. Flow Rate fluctuates as needed and is directed by power control center in Chattanooga.
- Not active at this time. If plant is reactivated, new numbers will be needed.
- Unit 2 is not in operation at this time. When operational maximum combined intake will be - 115 million gallons per day.
2.4-61 WBNP-109
2.4-62 Table 2.4-2 Facts About TVA Dams and Reservoirs (Page 1 of 2)
Reservoir Elevation Dam Locations Drainage Location (Feet Above Mean Sea Level) Reservoir Volume (Acre Feet)
Area of Dam Lock Chamber Area of Jan. 1 WATTS BAR Above First Unit in Last Unit in Winter Net Above Size: Width x Reservoir Original Jan. 1 June 1 Controlled Dam Service Service Dependable Number of Mouth of Height Length Length x Length of Surface River Flood Flood At Jan. 1 At June 1 Storage Number Main River (Square Cost(b) Construction Dam (Actual or (Actual or Capacity(c) Generating River of Dam of Dam Type of Maximum Lift Reservoir(e) Miles of Area(e) Bed Guide Top of Guide Flood Guide At Top of Flood Guide (Acre of Dams Projects River State Miles) (Millions) Began Closure Scheduled) Scheduled) (Megawatts) Units (Miles) (Feet) (Feet) Dam(d) (Feet) (Miles) Shoreline(e) (Acres) (Acres) Elevation Gates Elevation Elevation Gates Elevation Feet)(f) Project in Project Kentucky(g) Tennessee KY 40,200 128.8 7/1/1938 8/30/1944 9/14/1944 1/16/1948 184 5 22.4 206 8,422 CGE 110x600x75(v) 184.3 2064.3 160,300 25,200 354.0 375.00 359.0 2,121,000 6,129,000 2,839,000 4,008,000 TN River 9 Pickwick Tennessee TN 32,820 120.9 12/30/1934 2/8/1938 6/29/1938 12/31/1952 229 6 206.7 113 7,715 CGE 110x1000x63(i) 52.7 490.6 42,700 9,580 408.0 418.00 414.0 839,300 1,332,000 1,119,000 492,700 TN River 9 Landing 110x600x63 60x232x48 Wilson(h) Tennessee AL 30,750 133.5 4/14/1918 4/14/1924 9/12/1925 4/12/1962 663 21 259.4 137 4,541 CG 110x600x100(i) 15.5 166.2 15,600 9,108 504.7 507.88 507.7 589,700 640,200 637,200 50,500 TN River 9 60x300x52 60x292x48 Wheeler Tennessee AL 29,590 69.0 11/21/1933 10/3/1936 11/9/1936 12/18/1963 361 11 274.9 72 6,342 CG 60x400x52 74.1 1027.2 67,070 17,600 550.5 556.28 556.0 742,600 1,069,000 1,050,000 326,500 TN River 9 110x600x52(i)
Guntersville Tennessee AL 24,450 74.2 12/4/1935 1/16/1939 8/1/1939 3/24/1952 124 4 349.0 96.5 3,979 CGE 60x360x45 75.7 889.1 66,000 12,065 593.0 595.44 595.0 886,600 1,048,700 1,018,000 162,100 TN River 9 110x600x45(i)
Nickajack Tennessee TN 21,870 56.1 4/1/1964 12/14/1967 2/20/1968 4/30/1968 105 4 424.7 86 3,767 CGE 110x800x41(j) 46.3 178.7 10,200 4,200 632.5- 635.00 632.5- N/A 251,600 N/A N/A TN River 9 110x600x41 634.5 634.5 Chickamauga Tennessee TN 20,790 74.4 1/13/1936 1/15/1940 3/4/1940 3/7/1952 119 4 471.0 129 5,800 CGE 60x360x53(v) 58.9 783.7 36,050 9,500 675.0 685.44 682.5 392,000 737,300 622,500 345,300 TN River 9 Watts Bar Tennessee TN 17,310 66.4 7/1/1939 1/1/1942 2/11/1942 4/24/1944 182 5 529.9 125(w) 2,960 CGE 60x360x70 95.5(r) 721.7 37,500 10,343 735.0 745.00 741.0 796,000 1,175,000 1,010,000 379,000 TN River 9 Fort Loudoun Tennessee TN 9,550 45.3 7/8/1940 8/2/1943 11/9/1943 1/27/1949 162 4 602.3 129(w) 4,190 CGE 60x360x80 60.8(s) 378.2 14,000 4,420 807.0 815.00 813.0 282,000 393,000 363,000 111,000 TN River 9 Pumped Storage Project Raccoon Tennessee TN 1 237.8 7/1/1970 7/11/1978 12/31/1978 8/31/1979 1653 4(k) 230 8,500 ER N/A 528 1530.0- N/A N/A N/A Raccoon 1 Mountain 1672.0 Mtn.
Tributary Power Projects Tims Ford Elk TN 529 43.8 3/28/1966 12/1/1970 3/1/1972 3/1/1972 36 1 133.3 175 1,580 ER N/A 34.2 308.7 10,500 565 873.0 895.00 888.0 388,400 608,000 530,000 219,600 Elk River 1 Apalachia Hiwassee NC 1,018 29.4 7/17/1941 2/14/1943 9/22/1943 11/17/1943 82 2 66.0 150 1,308 CG N/A 9.8 31.5 1,100 80 1272.0- 1280.00 1272.0- N/A 57,800 N/A N/A Hiwassee 4 1280.0 1280.0 Hiwassee Hiwassee NC 968 42.5 7/15/1936 2/8/1940 5/21/1940 5/24/1956 141 2(l) 75.8 307 1,376 CG N/A 22.2 164.8 5,870 1,000 1485.0 1526.50 1521.0 228,400 434,000 399,000 205,600 Hiwassee 4 Chatuge Hiwassee NC 189 9.5 7/17/1941 2/12/1942 12/9/1954 12/9/1954 13 1 121.0 150 2,850 E N/A 13.0 128.0 6,700 107 1918.0 1928.00 1926.0 177,900 240,500 226,600 62,600 Hiwassee 4 Ocoee 1(h)(m) Ocoee TN 595 11.8 8/00/1910 12/15/1911 1/28/1912 0/0/1914 24 5 11.9 135 840 CG N/A 7.5 47.0 1,620 170 820.0 830.76 829.0 64,300 83,300 79,900 19,000 Ocoee 3 Ocoee 2(h) Ocoee TN 512 28.8 5/00/1912 10/00/1913 10/0/1913 10/00/1913 23 2 24.2 30 450 O N/A N/A N/A N/A N/A N/A 1115.20 N/A N/A N/A N/A N/A Ocoee 3 Ocoee 3 Ocoee TN 492 4.9 7/17/1941 8/15/1942 4/30/1943 4/30/1943 29 1 29.2 110 612.1 CG N/A 7.0 24.0 600 260 1428.0- 1435.00 1428.0- N/A 4,200 N/A N/A Ocoee 3 1435.0 1435.0 Blue Toccoa GA 232 20.4 11/00/1925(n) 12/6/1930 7/0/1931 7/0/1931 13 1 53.0 175 1,000 E N/A 11.0 68.1 3,220 182 1668.0 1691.00 1687.0 127,400 195,900 182,800 68,500 Toccoa/ 1 Ridge(h)(m) Ocoee Nottely Nottely GA 214 17.2 7/17/1941 1/24/1942 1/10/1956 1/10/1956 18 1 21.0 197 2,300 RE N/A 20.2 102.1 3,970 170 1762.0 1780.00 1777.0 112,700 174,300 162,000 61,600 Hiwassee 4 Melton Hill Clinch TN 3,343 21.5 9/6/1960 5/1/1963 7/3/1964 11/11/1964 79 2 23.1 103 1,020 CG 75x400x60 44 193.4 5,690 1,645 792.0- 796.00 792.0- N/A 126,000 N/A N/A Clinch 2 795.0 795.0 Norris Clinch TN 2,912 46.1 10/1/1933 3/4/1936 7/28/1936 9/30/1936 110 2 79.6 265 1,860 CGE N/A 129.0(u) 809.2 34,000 2,930 1000.0 1034.00 1,020.0 1,439,000 2,552,000 2,040,000 1,113,000 Clinch 2 Tellico Little TN TN 2,627 117.0 3/7/1967 11/29/1979 (o) (o) (o) (o) 0.3 133(w) 3,238 CGE (o) 33.2 357.0 15,600 2,133 807.0 815.00 813.0 304,000 424,000 392,000 120,000 Little TN 2 Fontana Little TN TN 1,571 69.1 1/1/1942 11/7/1944 1/20/1945 2/4/1954 304 3 61.0 480 2,365 CG N/A 29.0 237.8 10,290 1,650 1653.0 1710.00 1703.0 929,000 1,443,000 1,370,000 514,000 Little TN 2 Douglas French Broad TN 4,541 83.0 2/2/1942 2/19/1943 3/21/1943 8/3/1954 111 4 32.3 215.5 1,705 CG N/A 43.1 512.5 28,070 3,170 954.0 1002.00 994.0 379,000 1,461,000 1,223,500 1,082,000 French 1 Broad Cherokee Holston TN 3,428 29.3 8/1/1940 12/5/1941 4/16/1942 10/7/1953 148 4 52.3 178(w) 6,760 CGER N/A 54.0 394.5 29,560 2,426 1045.0 1075.00 1071.0 791,600 1,541,000 1,422,900 749,400 Holston 4 Fort Patrick South Fork TN 1,903 18.9 5/14/1951 10/27/1953 12/5/1953 2/22/1954 41 2 8.2 95 737 CG N/A 10.4 31.0 840 339 1258.0- 1263.00 1258.0- N/A 26,900 N/A N/A Holston 4 Henry Holston 1,263.0 1263.0 Boone South Fork TN 1,840 15.5 8/29/1950 12/16/1952 3/16/1953 9/3/1953 89 3 18.6 168 1,532 ECG N/A 32.7(t) 126.6 4,130 719 1364.0 1385.00 1382.0 117,600 193,400 180,500 75,800 Holston 4 Holston South Holston South Fork TN 703 23.1 8/04/1947(p) 11/20/1950 2/13/1951 2/13/1951 44 1 49.8 285 1,600 ER N/A 23.7 181.9 7,600 710 1708.0 1742.00 1729.0 511,300 764,000 658,000 252,800 Holston 4 Holston Watauga Watauga TN 468 22.1 7/22/1946(p) 12/1/1948 8/30/1949 9/29/1949 66 2 36.7 332 900 ER N/A 16.3 104.9 6,440 313 1952.0 1975.00 1959.0 524,200 677,000 568,500 152,800 Watauga 2 Wilbur(h) Watauga TN 471 1.6 00/00/1909 00/00/1912 0/0/1912 7/19/1950 11 4 34.0 76.33 375.5 CG N/A 1.8 4.8 70 1641.0- 1650.00 1641.0- N/A 714 N/A N/A Watauga 2 1648.0 1648.0 Great Caney Fork TN 1,675 21.4 12/7/1915 12/8/1916 0/0/1916 0/0/1925 36 2 91.1 92 800 CG N/A 22.0 120.0 1,830 1,490 785.0 805.30 800.0 19,700 50,200 40,600 30,500 Caney Fork 1 Falls(a)(h)
Nolichucky Nolichucky TN 1,183 0.1 00/00/1913 (q) (q) 46.0 94 482 CG 26.0 380 1240.90 Nolichucky 1 (retired)(h)( m)
WBNP-109 HYDROLOGIC ENGINEERING
Table 2.4-2 Facts About TVA Dams and Reservoirs (Page 2 of 2) a) All in the Tennessee Valley, except for Great Falls which is in the Cumberland Valley.
b) Cost of plant including the inception balance of the plant and all additions and retirements from the plant. Transmission assets are not included.
c) Winter net dependable capacity as of October 2009. Winter net dependable capacity is the amount of power a plant can produce on an average winter day, minus the electricity used by the plant itself.
WATTS BAR d) E: Earth; R: Rock fill; G: Gravity; C: Concrete; O: Other (Codes for each dam are listed in order of importance.)
e) At June 1 flood guide elevation.
HYDROLOGIC ENGINEERING f) Volume between the January 1 elevation and top of gates.
g) Connected to Barkley Reservoir by 1-1/2 mile canal, which opened July 14, 1966.
h) Acquired: Wilson by transfer from the U.S. Army Corps of Engineers in 1933; Ocoee 1, Ocoee 2, Blue Ridge, and Great Falls by purchase from Tennessee Electric Power Company in 1939; Wilbur and Nolichucky (retired) by purchase from East Tennessee Power and Light Company in 1945. Subsequent to acquisition, TVA installed additional units at Wilson and Wilbur. Reconstructed flume at Ocoee 2 was placed in service in November 1983.
i) Main locks placed in operation in 1959 at Wilson, 1963 at Wheeler, 1965 at Guntersville, and 1984 at Pickwick Landing.
j) Construction of main lock at Nickajack limited to underwater construction.
k) Generating units at Raccoon Mountain are reversible Francis type pump-turbine units, each with 428,400 kW generator rating and 612,000 hp pump motor rating.
l) Unit 2 at Hiwassee is a reversible Francis type pump-turbine unit with 95,000 kW generator rating and 121,530 hp pump motor rating at 200 ft. net head.
m) Ocoee 1 creates Parksville Reservoir, Nolichucky (retired) creates Davy Crockett Reservoir, and Blue Ridge creates Toccoa Reservoir.
n) Construction of Blue Ridge discontinued early in 1926; resumed in March 1929.
o) Tellico project has no lock or powerhouse. Streamflow through navigable canal to Fort Loudoun Reservoir permits navigation and increases average annual energy output at Fort Loudoun.
p) Initial construction of South Holston and Watauga started February 16, 1942; temporarily discontinued to conserve critical materials during WWII.
q) Generating units at Nolichucky were removed from system generating capacity in August 1972. The dam was renovated and modified to convert the reservoir for use as a wildlife preserve.
r) Includes 72.4 miles up the Tennessee River to Fort Loudoun Dam and 23.1 miles up Clinch River to Melton Hill Dam.
s) Includes 6.5 miles up the French Broad River and 4.4 miles up the Holston River.
t) Includes 17.4 miles up the South Fork Holston River and 15.3 miles up the Watauga River.
u) Includes 73 miles up the Clinch River and 56 miles up the Powell River.
v) The U.S. Army Corps of Engineers is increasing the size of lock structures at Kentucky and Chickamauga.
w) The structural height of the dam is the vertical distance from the lowest point of the excavated foundation to the top of the dam. Top of dam refers to the highest poing of the water barrier on an embankment (or top of parapet wall) and deck elevation (or top of parapet wall) for concrete structures.
x) As an interim measure to prevent overtopping, these four dams were raised by HESCO Concertainer floodline units.
Watts Bar - 3 feet: embankment at elevation 767 raised to elevation 770.
Fort Loudoun - 3.75 feet: embankment at elevation 830 was raised 7 feet to elevation 837 (3.75 feet above top of concrete wall at elevation 833.25).
Tellico - 4 feet: embankment at elevation 830 raised to elevation 834.
Cherokee - 3 feet: embankment at elevation 1089 raised to elevation 1092.
WBNP-109 2.4-63
WATTS BAR WBNP-109 Table 2.4-3 TVA Dams - River Mile Distances to WBNP (Page 1 of 2)
Distance from River Structure/River Mouth River Mile(a) WBNP (mi.)
Tennessee River Chickamauga Dam 471 57 Hiwassee River 499.5 28.5 WBNP 528 -
Watts Bar Dam 530 2 Clinch River 568 40 Little Tennessee River 601 73 Fort Loudoun Dam 602 74 Holston River 652 124 French Broad River 652 124 Hiwassee River 0 28.5 Ocoee River 34.5 63 Apalachia Dam 66 94.5 Hiwassee Dam 76 104.5 Nottely River 92 120.5 Chatuge Dam 121 149.5 Ocoee River 0 63 Ocoee #1 Dam 12 75 Ocoee #2 Dam 24 87 Ocoee #3 Dam 29 92 Toccoa River 38(b) 101 Toccoa River 0 101 Blue Ridge Dam 15(b) 116 Nottely River 0 120.5 Nottely Dam 21 141.5 Clinch River 0 40 Melton Hill Dam 23 63 Norris Dam 80 120 Little Tennessee River 0 73 Tellico Dam 0.5 73.5 2.4-64 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Table 2.4-3 TVA Dams - River Mile Distances to WBNP (Page 2 of 2)
Distance from River Structure/River Mouth River Mile(a) WBNP (mi.)
Chilhowee Dam 33.5 106.5 Calderwood Dam 43.5 116.5 Cheoah Dam 51.5 124.5 Fontana Dam 61 134 Holston River 0 124 Cherokee Dam 52 176 French Broad River 0 124 Douglas Dam 32 156 a) Approximated to the one-half river mile based on U.S. Geological Survey Quadrangles river mile designations.
b) Estimated river mile. River miles not provided for Toccoa River on U.S. Geological Survey Quadrangles.
HYDROLOGIC ENGINEERING 2.4-65
WATTS BAR WBNP-109 Table 2.4-4 Facts about TVA Dams Above Chickamauga Outlet Works Project Spillway Type Spillway Crest Top of Gate Capacity, cfs at Gate Elevation Elevation Top Apalachia Ogee, radial gates 1257 1280 135,900 Blue Ridge Ogee, tainter gates 1675 1691 39,000 Boone Ogee, radial gates 1350 1385 141,700 Chatuge Concrete chute, curved weir, vertical-lift gates 1923 1928 11,700 Cherokee Ogee, radial gates 1043 1075 255,900 Chickamauga Concrete gravity, vertical-lift fixed roller gates 645 685.44 436,300 Douglas Ogee, radial gates 970 1002 312,700 Fontana Ogee, radial gates 1675 1710 107,300 Fort Loudoun Ogee, radial gates 783 815 392,200 Fort Patrick Henry Ogee, radial gates 1228 1263 141,700 Hiwassee Ogee, radial gates 1503.5 1526.5 88,300 Melton Hill Ogee, radial gates 754 796 115,600 Norris Ogee, drum gates 1020 1034 55,000 Nottely Concrete chute, curved weir vertical-lift gates 1775 1780 11,500 South Holston Uncontrolled morning-glory with concrete-lined 1742 N/A 41,200(a) shaft and discharge tunnel Tellico Ogee, radial gates 773 815 117,900 Watauga Uncontrolled morning-glory with concrete-lined 1975 N/A 41,200(b) shaft and discharge tunnel Watts Bar Ogee, radial gates 713 745 560,300 a) At elevation 1752.
b) At elevation 1985.
2.4-66 HYDROLOGIC ENGINEERING
Table 2.4-5 Facts About Non-TVA Dams and Reservoirs Area Length Drainage Distance Maximum of of Total1 Area from Mouth Height, Lake Lake Storage, Construction Projects River (sq. mi.) (mi.) (ft.) Length(ft.) (ac.) (mi.) (ac.-ft.) Started WATTS BAR Major Dams Calderwood Little Tennessee 1,856 43.7 232 916 536 8 41,160 1928 HYDROLOGIC ENGINEERING Cheoah Little Tennessee 1,608 51.4 225 750 595 10 35,030 1916 Chilhowee Little Tennessee 1,976 33.6 91 1,373 1,690 8.9 49,250 1955 Nantahala Nantahala 108 22.8 250 1,042 1,605 4.6 138,730 1930 Santeetlah Cheoah 176 9.3 212 1,054 2,863 7.5 158,250 1926 Thorpe West Fork (Glenville) Tuckasegee 36.7 9.7 150 900 1,462 4.5 70,810 1940 Minor Dams Bear Creek East Fork Tuckasegee 75.3 4.8 215 740 476 4.6 34,711 1952 Cedar Cliff East Fork Tuckasegee 80.7 2.4 165 600 121 2.4 6,315 1950 Mission 292 106.1 50 390 61 1.46 283 1924 Hiwassee (Andrews) 3.58 1.5 78 382 37 0.5 817 1947 Queens Creek Queens Creek 15.2 1.7 180 810 176 2.2 10,056 1952 Wolf Creek Wolf Creek East Fork East Fork 24.9 10.9 140 385 39 1.4 1,797 1952 Tuckasegee Tuckasegee West Fork Tuckasegee 54.7 3.1 61 254 9 0.5 183 1949 Walters (Carolina P&L) Pigeon 455 38.0 200 870 340 5.5 25,390 1927 (1) Volume at top of gates.
2.4-67 WBNP-109
WATTS BAR WBNP-109 Table 2.4-6 Flood Detention Capacity - TVA Projects Above Watts Bar Nuclear Plant FloodStorage Flood Storage Flood Storage January 1 March 15 Summer Project (ac.-ft.) (ac.-ft.) (ac.-ft.)
Tributary Boone 75,800 48,200 12,900 Cherokee 749,400 749,400 118,100 Douglas 1,082,000 1,020,000 237,500 Fontana 514,000 514,000 73,000 Norris 1,113,000 1,113,000 512,000 South Holston 252,800 220,000 106,000 Tellico 120,000 120,000 32,000 Watauga 152,800 152,800 108,500 Main River Fort Loudoun 111,000 111,000 30,000 Watts Bar 379,000 379,000 165,000 Total 4,549,800 4,427,400 1,395,000 2.4-68 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Table 2.4-7 Peak Streamflow of the Tennessee River at Chattanooga, TN (USGS Station 03568000) 1867 - 2007 (Page 1 of 5)
Water Year(a) Date Discharge (cfs) 1867 3/11/1867 459,000 1874 5/01/1874 195,000 1875 3/01/1875 410,000 1876 12/31/1875 227,000 1877 4/11/1877 190,000 1878 2/25/1878 125,000 1879 1/15/1879 252,000 1880 3/18/1880 254,000 1881 12/03/1880 174,000 1882 1/19/1882 275,000 1883 1/23/1883 261,000 1884 3/10/1884 285,000 1885 1/18/1885 174,000 1886 4/03/1886 391,000 1887 2/28/1887 181,000 1888 3/31/1888 178,000 1889 2/18/1889 198,000 1890 3/02/1890 283,000 1891 3/11/1891 259,000 1892 1/17/1892 252,000 1893 2/20/1893 221,000 1894 2/06/1894 167,000 1895 1/12/1895 212,000 1896 4/05/1896 269,000 1897 3/14/1897 257,000 1898 9/05/1898 167,000 1899 3/22/1899 273,000 1900 2/15/1900 159,000 1901 5/25/1901 221,000 1902 1/02/1902 271,000 1903 4/11/1903 210,000 HYDROLOGIC ENGINEERING 2.4-69
WATTS BAR WBNP-109 Table 2.4-7 Peak Streamflow of the Tennessee River at Chattanooga, TN (USGS Station 03568000) 1867 - 2007 (Page 2 of 5)
Water Year(a) Date Discharge (cfs) 1904 3/25/1904 144,000 1905 2/11/1905 146,000 1906 1/26/1906 140,000 1907 11/22/1906 222,000 1908 2/17/1908 163,000 1909 6/06/1909 163,000 1910 2/19/1910 86,600 1911 4/08/1911 198,000 1912 3/31/1912 190,000 1913 3/30/1913 222,000 1914 4/03/1914 105,000 1915 12/28/1914 185,000 1916 12/20/1915 197,000 1917 3/07/1917 341,000 1918 2/02/1918 270,000 1919 1/05/1919 189,000 1920 4/05/1920 275,000 1921 2/13/1921 213,000 1922 1/23/1922 229,000 1923 2/07/1923 188,000 1924 1/05/1924 143,000 1925 12/11/1924 138,000 1926 4/16/1926 92,900 1927 12/29/1926 249,000 1928 7/02/1928 184,000 1929 3/26/1929 248,000 1930 11/19/1929 180,000 1931 4/08/1931 125,000 1932 2/01/1932 192,000 1933 1/01/1933 241,000 1934 3/06/1934 215,000 2.4-70 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Table 2.4-7 Peak Streamflow of the Tennessee River at Chattanooga, TN (USGS Station 03568000) 1867 - 2007 (Page 3 of 5)
Water Year(a) Date Discharge (cfs) 1935 3/15/1935 175,000 1936 3/29/1936 234,000 1937 1/04/1937 204,000 1938 4/10/1938 136,000 1939 2/17/1939 193,000 1940 9/02/1940 89,400 1941 7/18/1941 58,200 1942 3/22/1942 72,300 1943 12/30/1942 235,000 1944 3/30/1944 201,000 1945 2/18/1945 115,000 1946 1/09/1946 225,000 1947 1/20/1947 186,000 1948 2/14/1948 225,000 1949 1/06/1949 179,000 1950 2/02/1950 192,000 1951 3/30/1951 140,000 1952 (b) (b) 1953 2/22/1953 107,000 1954 1/22/1954 185,000 1955 3/23/1955 118,000 1956 2/04/1956 187,000 1957 2/02/1957 208,000 1958 11/19/1957 189,000 1959 1/23/1959 110,000 1960 12/20/1959 108,000 1961 3/09/1961 178,000 1962 12/18/1961 190,000 1963 3/13/1963 219,000 1964 3/16/1964 122,000 1965 3/26/1965 180,000 HYDROLOGIC ENGINEERING 2.4-71
WATTS BAR WBNP-109 Table 2.4-7 Peak Streamflow of the Tennessee River at Chattanooga, TN (USGS Station 03568000) 1867 - 2007 (Page 4 of 5)
Water Year(a) Date Discharge (cfs) 1966 2/16/1966 104,000 1967 7/08/1967 120,000 1968 12/23/1967 148,000 1969 2/03/1969 121,000 1970 12/31/1969 186,000 1971 2/07/1971 90,700 1972 1/11/1972 116,000 1973 3/18/1973 267,000 1974 1/11/1974 181,000 1975 3/14/1975 148,000 1976 1/28/1976 67,200 1977 4/05/1977 191,000 1978 1/28/1978 115,000 1979 3/05/1979 145,000 1980 3/21/1980 168,000 1981 2/12/1981 50,800 1982 1/04/1982 133,000 1983 5/21/1983 116,000 1984 5/9/1984 239,000 1985 2/02/1985 81,000 1986 2/18/1986 66,200 1987 2/27/1987 109,000 1988 1/21/1988 74,100 1989 6/21/1989 173,000 1990 2/19/1990 169,000 1991 12/23/1990 185,000 1992 12/04/1991 146,000 1993 3/24/1993 113,000 1994 3/28/1994 202,000 1995 2/18/1995 99,900 1996 1/28/1996 145,000 2.4-72 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Table 2.4-7 Peak Streamflow of the Tennessee River at Chattanooga, TN (USGS Station 03568000) 1867 - 2007 (Page 5 of 5)
Water Year(a) Date Discharge (cfs) 1997 3/04/1997 138,000 1998 4/19/1998 207,000 1999 1/24/1999 91,400 2000 4/05/2000 137,000 2001 2/18/2001 86,100 2002 1/24/2002 184,100 2003 5/8/2003 241,000 2004 9/18/2004 160,000 2005 12/13/2004 153,000 2006 1/23/2006 63,800 2007 1/09/2007 66,300 (a) Water Year runs from October 1 of prior year to September 30 of year identified.
(b) Not reported.
[36]
HYDROLOGIC ENGINEERING 2.4-73
WATTS BAR WBNP-109 Table 2.4-8 Weir Length Description and Coefficients of Discharge For Areas 3 and 4 (Sheet 1 of 1)
Weir Parameters Coefficient of Discharge Watershed Length Description "C" in Area Description Feet of Control Q=CLH3/2 3 Area bounded by Reactor 450(1) Main plant track, elevation = 3.0 and Turbine Buildings to 728.0 the west, embankment to the north, and railroad tracks to the east and south.
555 Transformer yard track, 3.0 elevation = 728.25 4 Area consisting of the 590 East condenser tube access 3.0 switchyard area west of the track elevation = 728.22 condenser tube access track and south of the Turbine Building.
1220 Perimeter road, elevation = 3.0 728.0 Area consisting of 540(2) East and south 3.0 the switchyard area end of switchyard area, east of the condenser elevation = 728.0 tube access track and south of the transformer yard track (1) Actual crest length is 600 ft. Length reduced by 150 ft. to conservatively account for decreased flow through fence.
(2) Actual crest length is 1080 ft. Length reduced 50% to conservatively account for decreased flow through fence.
2.4-74 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Table 2.4-9 Drainage Area Peak Discharge (Sheet 1 of 1)
Drainage Watershed Area Maximum Area1 Description (Acres) Elevation 1 Channel formed by the 15.92 728.85 Backwater was computed in the channel from the road west end of the leading to the chemical holdup ponds to the gatehouse and switchyard and the Office Building. The estimated peak discharge at the road adjacent embankment. (15.92 acres) was 570 cfs. Discharges at upstream locations were decreased proportional to drainage area.
2 Natural drain with flow to 67.0 728.81 Backwater was computed from the crossing the perimeter the west from the road, to the Reactor, Diesel Generator, and Waste perimeter road to the Wvaporation System Buildings. The estimated peak access road. discharge at the access road was 6053 cfs. This includes flow from area 2 (67 acres), flow over the construction access road north of the site (100 acres), and flow from 60 acres to the northwest of the site. Discharges at upstream locations were decreased proportional to drainage area.
3 Pool bounded by 22.9 728.87 The inflow hydrograph was routed with a starting elevation Reactor and Turbine of 728.0 and outflow over the main and transformer yard Buildings to the west, railroad tracks.
embankment to the north, and railroad tracks to the east and south.
Flow reach extending 10.0 728.79 Backwater was computed from the main railroad track to the from the main railroad Reactor Building. The estimated peak discharge at the track to a section railroad was 420 cfs. Discharges at upstream locations between the east were decreased proportional to drainage area.
Reactor Ruilding and embankment to the north.
4 Pool consisting of the 11.4 728.50 The inflow hydrograph was routed with a starting elevation switchyard area west of of and outflow to the south and west over the perimeter the condenser tube road, and to the east over the condenser tube access track.
access track and south of the Turbine Building.
Pool consisting of the 6.2 728.75 The inflow hydrograph was routed with a starting elevation switchyard area east of of 728.0 and outflow to the south and east toward the the condenser tube perimeter road.
access track and south of the transformer yard track.
North Pool bounded by the 50 725.67 The inflow hydrograph was routed with a starting elevation of Site embankment to the of 716 (invert of double 96-inch pipe) and outflow through south of the access the double 96-inch pipe.
railroad to the east.
Pool bounded by the dike 100 735.282 The inflow hydrograph routed with a starting elevation of to the east, the access 727.1 (invert of 81- by 59-inch pipe arch) and outflow highway to the west, and through the pipe arch and over the construction access the construction access road.
road to the south.
- 1. Watershed areas 1 - 4 are shown on Figure 2.4-40a; 150-acre area north of site shown on Figure 2.4-40b.
- 2. Maximum elevation reached at the construction access road.
HYDROLOGIC ENGINEERING 2.4-75
WATTS BAR WBNP-109 Table 2.4-10 Seasonal Variations of Rainfall (PMP)
Antecedent 3-Day PMP (in.) (in.)
21,400 Dry Interval Ratio to Main Storm 7,980 Sq.- Sq.-Mi. Before PMP 7,980 Sq.-Mi. 21,400 Sq.-Mi.
Month (Percent) Mi. Basin Basin (Days) Basin Basin March 40 8.14 6.71 3 20.36 16.78 April 40 8.08 6.44 3 20.20 16.11 May 40 7.96 6.10 3 19.92 15.27 June 40 7.81 5.63 3 19.53 14.09 July 30 5.72 3.87 21/2 19.07 12.92 August 30 5.72 3.87 21/2 19.07 13.09 September 30 6.09 4.47 21/2 20.30 14.92 Source: HMR Report 41 2.4-76 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Table 2.4-11 Probable Maximum Storm Precipitation and Precipitation Excess (Page 1 of 2)
Antecedent Storm Main Storm Index Unit Areaa Rain, Excessb Rain, Excessc No. Name (Inches) (Inches) (Inches) (Inches) 1 Asheville 6.18 2.91 18.12 15.44 2 Newport, French Broad 6.18 3.67 18.42 16.43 3 Newport, Pigeon 6.18 2.91 19.26 16.58 4 Embreeville 6.18 3.67 15.30 13.31 5 Nolichucky Local 6.18 3.67 15.42 13.43 6 Douglas Local 6.18 4.43 17.16 15.94 7 Little Pigeon River 6.18 3.81 21.12 19.13 8 French Broad Local 6.18 3.81 19.38 17.39 9 South Holston 6.18 4.60 12.12 10.90 10 Watauga 6.18 3.67 12.96 10.97 11 Boone Local 6.18 3.81 13.86 11.87 12 Fort Patrick Henry 6.18 4.60 14.34 13.12 13 Gate City 6.18 4.60 12.30 11.08 14 & 15 Total Cherokee Local 6.18 4.60 15.42 14.20 16 Holston River Local 6.18 4.60 16.74 15.52 17 Little River 6.18 3.81 20.82 18.83 18 Fort Loudoun Local 6.18 3.81 17.28 15.29 19 Needmore 6.18 2.73 20.22 17.54 20 Nantahala 6.18 2.73 20.94 18.26 21 Bryson City 6.18 2.91 20.04 17.36 22 Fontana Local 6.18 2.91 19.56 16.88 23 Little Tennessee Local - 6.18 2.91 22.50 19.82 Fontana to Chilhowee Dam 24 Little Tennessee Local - 6.18 2.91 19.26 16.58 Chilhowee to Tellico Dam 25 Watts Bar Local above 6.18 3.81 15.84 13.85 Clinch River 26 Norris Dam 6.18 4.60 13.56 12.34 27 Melton Hill Local 6.18 4.27 15.42 14.01 33 Local above mile 16 6.18 4.43 15.42 14.01 34 Poplar Creek 6.18 4.43 14.88 13.47 35 Emory River 6.18 4.43 12.78 11.37 36 Local Area at Mouth 6.18 4.43 14.94 13.53 37 Watts Bar Local below 6.18 4.43 14.28 12.87 Clinch River HYDROLOGIC ENGINEERING 2.4-77
WATTS BAR WBNP-109 Table 2.4-11 Probable Maximum Storm Precipitation and Precipitation Excess (Continued)
(Page 2 of 2)
Antecedent Storm Main Storm Index Unit Areaa Rain, Excessb Rain, Excessc No. Name (Inches) (Inches) (Inches) (Inches) 38 Chatuge 6.18 2.91 21.12 18.44 39 Nottely 6.18 2.91 18.66 15.98 40 Hiwassee Local 6.18 2.73 18.18 15.50 41 Apalachia 6.18 3.81 18.18 16.19 42 Blue Ridge 6.18 2.91 22.14 19.46 43 Ocoee No. 1, Blue Ridge 6.18 2.91 18.42 15.74 to Ocoee No. 1 44A Hiwassee River Local at 6.18 3.81 15.48 13.49 Charleston 44B Hiwassee River Local mouth to 6.18 4.27 14.52 13.11 Charleston 45 Chickamauga Local 6.18 4.27 13.56 12.15 Average above Chickamauga Dam 6.18 3.85 16.25 14.39
- a. Unit area corresponds to Figure 2.4-9 numbered areas.
- b. Adopted antecedent precipitation index prior to antecedent storm varies by unit area, ranging from 0.78-1.29 inches.
c.
Computed antecedent precipitation index prior to main storm, 3.65 inches.
2.4-78 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Table 2.4-12 Historical Flood Events Rain Runoff Unit Area Basin Flood (in.) (in.)
1 French Broad at Asheville 4/05/1957 5.53 2.30 5/03/2003 5.66 1.44 2 French Broad Newport Local 3/13/1963 5.31 2.47 3/17/1973 4.68 2.20 3/28/1994 5.60 2.33 3 Pigeon at Newport 3/28/1994 6.19 2.92 5/06/2003 7.18 2.68 7 Little Pigeon at Sevierville 3/17/2002 4.61 3.46 5/06/2003 6.19 3.85 9 South Holston Dam 3/12/1963 3.12 1.55 3/16/1973 3.33 1.29 3/18/2002 4.41 1.55 10 Watauga Dam 3/12/1963 3.64 2.16 3/17/1973 3.61 1.84 1/14/1995 6.97 3.75 17 Little River at Mouth 3/17/1973 6.26 3.82 18 Fort Loudoun Local 3/17/1973 6.81 3.14 23 Chilhowee Local 3/16/1973 6.97 3.24 5/06/2003 6.19 3.13 24 Tellico Local 3/17/1973 7.34 3.56 5/06/2003 7.84 3.72 26 Norris Dam 3/17/2002 5.00 2.90 27 Melton Hill Local 3/16/1973 6.66 4.85 42 Blue Ridge Dam 3/29/1951 5.70 1.61 44A Hiwassee at Charleston (RM 18.9) 3/27/1965 6.04 3.52 3/16/1973 7.36 5.84 HYDROLOGIC ENGINEERING 2.4-79
WATTS BAR WBNP-109 Table 2.4-13 Unit Hydrograph Data (Page 1 of 2)
Unit Area GIS Drainage Area Duration Number Name (sq. mi.) (hrs.) Qp Cp Tp W50 W75 TB 1 Asheville 944.4 6 14,000 0.21 12 39 15 168 2 Newport,French Broad 913.1 6 43,114 0.66 12 10 4 48 3 Newport, Pigeon 667.1 6 30,910 0.65 12 8 4 90 4 Embreeville 804.8 4 33,275 0.65 12 10 7 80 5 Nolichucky Local 378.7 6 11,740 0.44 12 14 6 90 6 Douglas Local 835 6 47,207 0.27 6 8 5 60 7 Little Pigeon River 352.1 4 17,000 0.75 12 10 6 66 8 French Broad Local 206.5 6 8,600 0.20 6 13 6 60 9 South Holston 703.2 6 15,958 0.53 18 25 17 96 10 Watauga 468.2 4 37,002 0.74 8 6 3 32 11 Boone Local 667.7 6 22,812 0.16 6 13 7 90 12 Fort Patrick Henry 62.8 6 2,550 0.19 6 12 7 66 13 Gate City 668.9 6 11,363 0.56 24 34 26 108 14&15 Total Cherokee Local 854.6 6 25,387 0.42 12 20 10 54 16 Holston River Local 289.6 6 8,400 0.27 9 18 12 96 17 Little River 378.6 4 11,726 0.68 16 15 7 96 18 Fort Loudoun Local 323.4 6 20,000 0.29 6 10 5 36 19 Needmore 436.5 6 9,130 0.49 18 22 12 126 20 Nantahala 90.9 2 3,130 0.38 8 16 11 54 21 Bryson City 653.8 6 26,000 0.43 10 13 7 60 22 Fontana Local 389.8 4 17,931 0.14 4 14 7 28 23 Little Tennessee Local- 404.7 6 16,613 0.58 12 10 4 84 Fontana to Chilhowee Dam 24 Little Tennessee Local- 650.2 6 22,600 0.49 12 15 8 54 Chilhowee to Tellico Dam 25 Watts Bar Local above 295.3 6 11,063 0.18 6 10 4 90 Clinch River 26 Norris Dam 2912.8 6 43,773 0.07 6 18 6 102 27 Melton Hill Local 431.9 6 12,530 0.14 6 19 10 90 2.4-80 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Table 2.4-13 Unit Hydrograph Data (Continued)
(Page 2 of 2)
Unit Area GIS Drainage Area Duration Number Name (sq. mi.) (hrs.) Qp Cp Tp W50 W75 TB 33 Local above mile 16 37.2 2 4,490 0.94 6 3 2 48 34 Poplar Creek 135.2 2 2,800 0.61 20 26 13 90 35 Emory River 868.8 4 36,090 0.39 8 11 6 84 36 Local area at Mouth 29.3 2 3,703 0.99 6 3 2 48 37 Watts Bar Local below 408.4 6 16,125 0.19 6 10 4 90 Clinch River 38 Chatuge 189.1 1 19,062 0.24 2 3 2 37 39 Nottely 214.3 1 44,477 0.16 1 1 1 12 40 Hiwassee Local 565.1 6 23,349 0.58 12 11 6 96 41 Applachia 49.8 1 5,563 0.26 2 4 1 23 42 Blue Ridge 231.6 2 11,902 0.40 6 10 7 60 43 Ocoee No. 1 Local 362.6 6 17,517 0.23 6 12 8 36 44A Hiwassee at Charletson 686.6 6 9,600 0.59 30 39 23 108 44B Hiwassee at Mouth 396.0 6 16,870 1.00 18 11 6 78 45 Chickamauga Local 792.1 6 32,000 0.38 9 14 7 36 Definition of Symbols Qp = Peak discharge in cfs Cp =Snyder coefficient Tp = Time in hours from beginning of precipitation excess to peak of unit hydrograph W50 = Width in hours at 50% of peak discharge W75 = Width in hours at 75% of peak discharge TB = Base length in hours of unit hydrograph HYDROLOGIC ENGINEERING 2.4-81
Table 2.4-14 Floods From Postulated Seismic Failure of Upstream Dams 2.4-82 (Plant Grade is Elevation 728)
Watts Bar Nuclear Plant Elevation WATTS BAR OBE Failures With One-half Probable Maximum Flood
- 1. Norris and Tellico 728.84
- 2. Cherokee, Douglas, and Tellico 729.07
- 3. Fontanaa and Tellico 720.65
- 4. Fontana a, Tellico, Hiwassee, Apalachia, and Blue Ridge 722.01 SSE Failures with 25-Year Flood
- 5. Norris, Cherokee, Douglas and Tellico b 731.17
- a. Includes failure of four ALCOA and one Duke Energy dams--Nantahala (Duke Energy formerly ALCOA), upstream; Santeetlah, on a downstream tributary, and Cheoah, Calderwood, and Chilhowee, downstream. Fort Loudoun gates are inoperable in open position.
- b. Gate opening at Fort Loudoun prevented by bridge failure.
HYDROLOGIC ENGINEERING WBNP-109
WATTS BAR WBNP-109 Table 2.4-15 Well and Spring Inventory Within 2-mile Radius of Watts Bar Nuclear Plant Site (1972 Survey Only)
(Page 1 of 4)
Map Location Estimated Elevation Ident Ground Water Surface Casing No. Latitude Longitude Depth ---------feet------------ Size Pump Data 1 35°36'08" 87°47'03" 200+ 743 712 0.5 *No pump 2 35°36'24" 84°47'41" 59 726 723 0.5 *No pump 3 35°36'10" 84°47'50" 102 721 704 0.5 *No pump 4 35°36'00" 84°47'48" 43.5 730 718 0.5 *No pump 5 35°35'42" 84°47'49" 45 710 687 0.5 *No pump 6 35°35'55" 84°47'48" 6 705 705 2.5 *No pump 7 35°36'04" 84°48'16" 107 710 684 0.5 *No pump 8 35°36'11" 84°48'16" 30 702 684 4.0 *No pump 9 35°36'23" 84°48'06" ** - 740 - No pump 10 35°37'15" 84°49'04" 99 742 696 0.5 1/3 hp 11 35°37'06" 84°49'10" 87 753 Unknown 0.5 1/2 hp 12 35°37'03" 84°49'04" 150 704 700 0.5 1/2 hp 13 35°37'05" 84°49'02" 175 704 698 0.5 1 hp 14 35°37'15" 84°49'01" 140 740 720 0.5 1 hp 15 35°37'03" 84°48'48" 83 729 693 0.5 Hand pump 16 35°36'46' 84°48'18" 205 780 665 0.5 Submerged, Unknown 17 35°36'34" 84°48'13" 28 768 768 0.5 1 hp 18 35°36'30" 84°48'20" 95 794 777 0.5 1 hp 19 35°35'35" 84°48'52" 111 713 715 0.6 No pump, 1 gpm 20 35°36'54" 84°49'10" 68 710 Unknown 0.5 Unknown 21 35°36'18" 84°49'24" 125 725 695 0.5 1/2 hp 22 35°36'20" 84°49'20" 130 729 655 0.5 3/4 hp 23 35°35'20" 84°48'55" 225 730 715 0.5 1 hp 24 35°35'15" 84°48'56" 79 715 705 0.5 1/2 hp 25 35°35'44" 84°49'07" 14 805 804 8.0 No pump 26 35°35'46" 84°49'31" 385 718 Unknown 0.5 1/2 hp 27 35°35'29" 84°49'16" 240 770 600 Unknown Unknown 28 35°37'14" 84°47'04" *** - Watts Bar Lake - 2, 50 hp=500 gpm 735 - 745 29 35°37'19" 84°45'57" 100 706 660 0.5 1 hp 30 35°36'39" 84°45'59" 65 714 unknown 0.5 1/2 hp 31 35°35'49" 84°46'15" Spring - 710 - No pump HYDROLOGIC ENGINEERING 2.4-83
WATTS BAR WBNP-109 Table 2.4-15 Well and Spring Inventory Within 2-mile Radius of Watts Bar Nuclear Plant Site (Continued)
(1972 Survey Only)
(Page 2 of 4)
Map Location Estimated Elevation Ident Ground Water Surface Casing No. Latitude Longitude Depth ---------feet------------ Size Pump Data 32 35°36'19" 84°45'21" 32.5 747 740 2'-10" Windlass and bucket, Square no pump 33 35°35'26" 84°46'44" Spring - 800 - No pump 34 35°35'25" 84°47'02" 120 725 705 Unknown 4 hp 35 35°35'12" 84°47'15" 225 730 710 0.5 No pump 36 35°35'19" 84°47'25" 110 734 715 0.5 3/4 hp 37 35°35'15" 84°47'25" 175 730 710 0.7 No pump 38 35°35'14" 84°47'27" 100 730 710 0.7 3/4 hp 39 35°37'26" 84°45'50" 40 710 702 0.5 1/4 hp 40 35°35'16" 84°47'28" 165 725 705 0.5 3/4 hp 41 35°35'19" 84°47'30" 110 734 695 0.5 3/4 hp 42 35°35'14" 84°47'28" 73 724 724 0.5 No pump 43 35°35'14" 84°47'22" 105 724 720 0.5 1/2 hp 44 35°35'12" 84°47'29" Spring - 710 - 1/2 hp 45 35°35'15" 84°47'16" 125 730 690 0.5 1/2 hp 46 35°35'09" 84°47'31" 105 730 722 0.5 1-1/2 hp 47 35°35'14" 84°47'41" 164 764 755 0.5 1-1/2 hp 48 35°36'55" 84°45'35" Spring - 720 - 3/4 hp 49 35°35'00" 84°47'50" 100 748 708 0.5 1-1/2 hp 50 35°34'48" 84°47'42" 80 710 688 0.5 3/4 hp 51 35°35'02" 84°47'38" 100 750 720 0.5 1/2 hp 52 35°34'58" 84°47'34" 99 722 711 0.5 2 hp 53 35°34'55" 84°47'37" 54 719 691 0.5 3/4 hp 54 35°34'44" 84°47'48" 52 718 703 3.0 Not used 55 35°34'39" 84°47'50" 257 720 692 0.5 5 gpm for five houses, lowered well 20 feet 56 35°34'39" 84°47'29" 56 701 691 0.5 1hp 57 35°34'37" 84°47'32" 252 714 602 0.5 125 gph, 1 hp 58 35°34'59" 84°47'33" Spring - 710 - Not used 59 35°35'03" 84°47'38" Spring - 730 - Cattle pond 60 35°35'04" 84°47'58" Spring - 710 - Not used Investigation made on January 10-11, 1972.
- Residence purchased for Watts Bar Nuclear Plant construction.
- Spring fed pond of approximately 50 feet in diameter.
- Watts Bar Dam, Steam Plant, and Pete Smith Resort water supply taken from Watts Bar Lake.
2.4-84 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Table 2.4-15 Well and Spring Inventory Within 2-mile Radius of Watts Bar Nuclear Plant Site (Continued)
(1972 Survey Only)
(Page 3 of 4)
Map Location Estimated Elevation Ident Ground Water Surface Casing No. Latitude Longitude Depth ---------feet------------ Size Pump Data 61 35°36'58" 84°45'22" NA* 750 NA NA NA 62 35°36'50" 84°45'24" NA 710 NA NA NA 63 35°35'42" 84°47'32" 150 742 INK** 0.5 Yes 64 35°37'16" 84°49'00" 100 740 50 0.33 Yes 65 35°36'29" 84°48'20" 200 710 19 0.5 Yes 66 35°36'52" 84°49'08" 70-83 700 INK 0.5 Yes 67 35°36'50" 84°49'08" 70-83 700 INK 0.5 Yes 68 35°36'49" 84°49'09" 70-83 700 INK 0.5 Yes 69 35°36'47" 84°49'10" 70-83 700 INK 0.5 Yes 70 35°37'03" 84°49'09" NA 750 NA NA No 71 35°37'05" 84°49'10" NA 750 NA Hand dug No 72 35°35'41" 84°49'16" NA 720 NA NA NA 73 35°35'43" 84°48'48" NA 800 NA NA NA 74 35°36'53" 84°48'49" INK 720 INK INK Yes 75 35 35'07" 84°47'58" 100+ 760 Below River INK Yes 76 35°35'07" 84°48'00" INK 740 INK INK Yes 77 35 35'06" 84°48'01" NA 720 NA NA NA 78 35°35'08" 84°48'01" NA 720 NA NA NA 79 35°35'09" 84°47'54" NA 800 NA NA NA 80 35°35'11" 84°47'42" NA 760 NA NA NA 81 35 35'14" 84°47'41" NA 760 NA NA NA 82 35°35'13" 84°47'37" 400+ 760 INK 0.5 Yes 83 35°35'14" 84°47'37" 300+ 760 INK 0.5 Yes 84 35°35'10" 84°47'34" NA 740 NA NA NA 85 35°35'14" 84°47'31" NA 720 NA NA NA 86 35-35'18" 84°47'26" 450 720 20 0.125 Yes 87 35°35'24" 84°47'14" 300 740 INK INK Yes 88 35°35'17" 84°47'15" 300 730 INK 0.5 Yes 89 35°35'19" 84°47'12" 265 730 INK 0.5 Yes 90 35°35'18" 84°47'12" 150 730 INK 0.5 Yes 91 35°35'17" 84°47'09" NA 730 NA NA NA 92 35°35'14" 84°47'13" NA 720 NA NA NA 93 35°35'06" 84°47'17" 210 720 20 0.5 Yes HYDROLOGIC ENGINEERING 2.4-85
WATTS BAR WBNP-109 Table 2.4-15 Well and Spring Inventory Within 2-mile Radius of Watts Bar Nuclear Plant Site (Continued)
(1972 Survey Only)
(Page 4 of 4)
Map Location Estimated Elevation Ident Ground Water Surface Casing No. Latitude Longitude Depth ---------feet------------ Size Pump Data 94 35°35'08" 84°46'58" 130 760 15 0.5 Yes 95 35°35'08" 84°46'55" NA 800 NA NA NA 96 35°35'19" 84°46'41" 80 990 20 0.5 Yes 97 35°35'22" 84°46'34" 600 960 INK 0.5 Yes 98 35°35'39" 84°46'34" INK 740 INK INK Yes S-99 35°37'04" 84°48'59" Spring 710 - - No S-100 35°35'45" 84°49'04" Spring 840 - - No S-101 35°35'40' 84°49'14" Spring 730 - - No S-102 35°35'16" 84°46'44" Spring 980 - - No S-103 35°35'06" 84°46'57" Spring 800 - - No
- none available, many of these residences appeared to be summer houses, 2-3 attempts to locate home owners in the evening hours and on the weekend were unsuccessful.
- Information not known by homeowner.
- No pump sizes were known by current homeowners.
2.4-86 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Table 2.4-16 Deleted by Amendment 98 HYDROLOGIC ENGINEERING 2.4-87
2.4-88 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT USGS Hydrologic Units within the Tennessee River Watershed Figure 2.4-1 HYDROLOGIC ENGINEERING Figure 2.4-1 USGS Hydrologic Units within the Tennessee River Watershed WBNP-109
Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-109 Figure 2.4-2 TVA Water Control System HYDROLOGIC ENGINEERING 2.4-89
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Seasonal Operating Curve, Chickamauga Figure 2.4-3 (Sheet 1 of 12)
Figure 2.4-3 Seasonal Operating Curve, Chickamauga (Sheet 1 of 12) 2.4-90 WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Seasonal Operating Curve, Watts Bar Figure 2.4-3 (Sheet 2 of 12)
Figure 2.4-3 Seasonal Operating Curve, Watts Bar (Sheet 2 of 12) 2.4-91 WBNP-109
2.4-92 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Seasonal Operating Curve, Fort Loudoun - Tellico Figure 2.4-3 (Sheet 3 of 12)
HYDROLOGIC ENGINEERING Figure 2.4-3 Seasonal Operating Curve, Fort Loudoun - Tellico (Sheet 3 of 12)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Seasonal Operating Curve, Boone Figure 2.4-3 (Sheet 4 of 12)
Figure 2.4-3 Seasonal Operating Curve, Boone (Sheet 4 of 12) 2.4-93 WBNP-109
2.4-94 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Seasonal Operating Curve, Cherokee Figure 2.4-3 (Sheet 5 of 12)
HYDROLOGIC ENGINEERING Figure 2.4-3 Seasonal Operating Curve, Cherokee (Sheet 5 of 12)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Seasonal Operating Curve, Douglas Figure 2.4-3 (Sheet 6 of 12)
Figure 2.4-3 Seasonal Operating Curve, Douglas (Sheet 6 of 12) 2.4-95 WBNP-109
2.4-96 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Seasonal Operating Curve, Fontana Figure 2.4-3 (Sheet 7 of 12)
HYDROLOGIC ENGINEERING Figure 2.4-3 Seasonal Operating Curve, Fontana (Sheet 7 of 12)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Seasonal Operating Curve, Fort Patrick Henry Figure 2.4-3 (Sheet 8 of 12)
Figure 2.4-3 Seasonal Operating Curve, Fort Patrick Henry (Sheet 8 of 12) 2.4-97 WBNP-109
2.4-98 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Seasonal Operating Curve, Melton Hill Figure 2.4-3 (Sheet 9 of 12)
HYDROLOGIC ENGINEERING Figure 2.4-3 Seasonal Operating Curve, Melton Hill (Sheet 9 of 12)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Seasonal Operating Curve, Norris Figure 2.4-3 (Sheet 10 of 12)
Figure 2.4-3 Seasonal Operating Curve, Norris (Sheet 10 of 12) 2.4-99 WBNP-109
2.4-100 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Seasonal Operating Curve, South Holston Figure 2.4-3 (Sheet 11 of 12)
HYDROLOGIC ENGINEERING Figure 2.4-3 Seasonal Operating Curve, South Holston (Sheet 11 of 12)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Seasonal Operating Curve, Watauga Figure 2.4-3 (Sheet 12 of 12)
Figure 2.4-3 Seasonal Operating Curve, Watauga (Sheet 12 of 12) 2.4-101 WBNP-109
2.4-102 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Reservoir Elevation - Storage Relationship, Chickamauga Figure 2.4-4 (Sheet 1 of 13)
HYDROLOGIC ENGINEERING Figure 2.4-4 Reservoir Elevation - Storage Relationship, Chickamauga (Sheet 1 of 13)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Reservoir Elevation - Storage Relationship, Watts Bar Figure 2.4-4 (Sheet 2 of 13)
Figure 2.4-4 Reservoir Elevation - Storage Relationship, Watts Bar (Sheet 2 of 13) 2.4-103 WBNP-109
2.4-104 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Reservoir Elevation - Storage Relationship, Fort Loudoun Figure 2.4-4 (Sheet 3 of 13)
HYDROLOGIC ENGINEERING Figure 2.4-4 Reservoir Elevation - Storage Relationship, Fort Loudoun (Sheet 3 of 13)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Reservoir Elevation - Storage Relationship, Tellico Figure 2.4-4 (Sheet 4 of 13)
Figure 2.4-4 Reservoir Elevation - Storage Relationship, Tellico (Sheet 4 of 13) 2.4-105 WBNP-109
2.4-106 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Reservoir Elevation - Storage Relationship, Boone Figure 2.4-4 (Sheet 5 of 13)
HYDROLOGIC ENGINEERING Figure 2.4-4 Reservoir Elevation - Storage Relationship, Boone (Sheet 5 of 13)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Reservoir Elevation - Storage Relationship, Cherokee Figure 2.4-4 (Sheet 6 of 13)
Figure 2.4-4 Reservoir Elevation - Storage Relationship, Cherokee (Sheet 6 of 13) 2.4-107 WBNP-109
2.4-108 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Reservoir Elevation - Storage Relationship, Douglas Figure 2.4-4 (Sheet 7 of 13)
HYDROLOGIC ENGINEERING Figure 2.4-4 Reservoir Elevation - Storage Relationship, Douglas (Sheet 7 of 13)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Reservoir Elevation - Storage Relationship, Fontana Figure 2.4-4 (Sheet 8 of 13)
Figure 2.4-4 Reservoir Elevation - Storage Relationship, Fontana (Sheet 8 of 13) 2.4-109 WBNP-109
2.4-110 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Reservoir Elevation - Storage Relationship, Fort Patrick Henry Figure 2.4-4 (Sheet 9 of 13)
HYDROLOGIC ENGINEERING Figure 2.4-4 Reservoir Elevation - Storage Relationship, Fort Patrick Henry (Sheet 9 of 13)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Reservoir Elevation - Storage Relationship, Melton Hill Figure 2.4-4 (Sheet 10 of 13)
Figure 2.4-4 Reservoir Elevation - Storage Relationship, Melton Hill (Sheet 10 of 13) 2.4-111 WBNP-109
2.4-112 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Reservoir Elevation - Storage Relationship, Norris Figure 2.4-4 (Sheet 11 of 13)
HYDROLOGIC ENGINEERING Figure 2.4-4 Reservoir Elevation - Storage Relationship, Norris (Sheet 11 of 13)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Reservoir Elevation - Storage Relationship, South Holston Figure 2.4-4 (Sheet 12 of 13)
Figure 2.4-4 Reservoir Elevation - Storage Relationship, South Holston (Sheet 12 of 13) 2.4-113 WBNP-109
2.4-114 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Reservoir Elevation - Storage Relationship, Watauga Figure 2.4-4 (Sheet 13 of 13)
HYDROLOGIC ENGINEERING Figure 2.4-4 Reservoir Elevation - Storage Relationship, Watauga (Sheet 13 of 13)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Tennessee River Mile 464.2 -
Distribution of Floods at Chattanooga, Tennessee Figure 2.4-5 Figure 2.4-5 Tennessee River Mile 464.2 - Distribution of Floods at Chattanooga, Tennessee 2.4-115 WBNP-109
2.4-116 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Probable Maximum Precipitation Isohyets for 21,400 Sq. Mi. Event, Downstream Placement Figure 2.4-6 Figure 2.4-6 Probable Maximum Precipitation Isohyets for 21,400 Sq. Mi. Event, Downstream Placement HYDROLOGIC ENGINEERING WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Probable Maximum Precipitation Isohyets for 7980 Sq. Mi. Event, Centered at Bulls Gap, TN Figure 2.4-7 2.4-117 Figure 2.4-7 Probable Maximum Precipitation Isohyets for 7980 Sq. Mi. Event, Centered at Bulls Gap, TN WBNP-109
2.4-118 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Rainfall Time Distribution -
Typical Mass Curve Figure 2.4-8 HYDROLOGIC ENGINEERING Figure 2.4-8 Rainfall Time Distribution - Typical Mass Curve WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Drainage Areas above Chickamauga Dam Figure 2.4-9 2.4-119 Figure 2.4-9 Drainage Areas above Chickamauga Dam WBNP-109
2.4-120 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unit Hydrographs, Areas 1-5 Figure 2.4-10 (Sheet 1 of 11)
HYDROLOGIC ENGINEERING Figure 2.4-10 Unit Hydrographs, Areas 1-5 (Sheet 1 of 11)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unit Hydrographs, Areas 6-9 Figure 2.4-10 (Sheet 2 of 11)
Figure 2.4-10 Unit Hydrographs, Areas 6-9 (Sheet 2 of 11) 2.4-121 WBNP-109
2.4-122 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unit Hydrographs, Areas 10-13 Figure 2.4-10 (Sheet 3 of 11)
HYDROLOGIC ENGINEERING Figure 2.4-10 Unit Hydrographs, Areas 10-13 (Sheet 3 of 11)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unit Hydrographs, Areas 14-18 Figure 2.4-10 (Sheet 4 of 11)
Figure 2.4-10 Unit Hydrographs, Areas 14-18 (Sheet 4 of 11) 2.4-123 WBNP-109
2.4-124 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unit Hydrographs, Areas 19-22 Figure 2.4-10 (Sheet 5 of 11)
HYDROLOGIC ENGINEERING Figure 2.4-10 Unit Hydrographs, Areas 19-22 (Sheet 5 of 11)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unit Hydrographs, Areas 23-27 Figure 2.4-10 (Sheet 6 of 11)
Figure 2.4-10 Unit Hydrographs, Areas 23-27 (Sheet 6 of 11) 2.4-125 WBNP-109
2.4-126 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unit Hydrographs, Areas 33, 34, 36 Figure 2.4-10 (Sheet 7 of 11)
HYDROLOGIC ENGINEERING Figure 2.4-10 Unit Hydrographs, Areas 33, 34, 36 (Sheet 7 of 11)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unit Hydrographs, Areas 35, 37 Figure 2.4-10 (Sheet 8 of 11)
Figure 2.4-10 Unit Hydrographs, Areas 35, 37 (Sheet 8 of 11) 2.4-127 WBNP-109
2.4-128 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unit Hydrographs, Areas 38, 39, 41, 42 Figure 2.4-10 (Sheet 9 of 11)
HYDROLOGIC ENGINEERING Figure 2.4-10 Unit Hydrographs, Areas 38, 39, 41, 42 (Sheet 9 of 11)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unit Hydrographs, Areas 40, 43, 44A, 44B Figure 2.4-10 (Sheet 10 of 11)
Figure 2.4-10 Unit Hydrographs, Areas 40, 43, 44A, 44B (Sheet 10 of 11) 2.4-129 WBNP-109
2.4-130 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unit Hydrographs, Area 45 Figure 2.4-10 (Sheet 11 of 11)
HYDROLOGIC ENGINEERING Figure 2.4-10 Unit Hydrographs, Area 45 (Sheet 11 of 11)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Discharge Rating Curve, Chickamauga Dam Figure 2.4-11 (Sheet 1 of 13)
Figure 2.4-11 Discharge Rating Curve, Chickamauga Dam (Sheet 1 of 13) 2.4-131 WBNP-109
2.4-132 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Discharge Rating Curve, Watts Bar Dam Figure 2.4-11 (Sheet 2 of 13)
HYDROLOGIC ENGINEERING Figure 2.4-11 Discharge Rating Curve, Watts Bar Dam (Sheet 2 of 13)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Discharge Rating Curve, Fort Loudoun Dam Figure 2.4-11 (Sheet 3 of 13)
Figure 2.4-11 Discharge Rating Curve, Fort Loudoun Dam (Sheet 3 of 13) 2.4-133 WBNP-109
2.4-134 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Discharge Rating Curve, Tellico Dam Figure 2.4-11 (Sheet 4 of 13)
HYDROLOGIC ENGINEERING Figure 2.4-11 Discharge Rating Curve, Tellico Dam (Sheet 4 of 13)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Discharge Rating Curve, Boone Dam Figure 2.4-11 (Sheet 5 of 13)
Figure 2.4-11 Discharge Rating Curve, Boone Dam (Sheet 5 of 13) 2.4-135 WBNP-109
2.4-136 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Discharge Rating Curve, Cherokee Dam Figure 2.4-11 (Sheet 6 of 13)
HYDROLOGIC ENGINEERING Figure 2.4-11 Discharge Rating Curve, Cherokee Dam (Sheet 6 of 13)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Discharge Rating Curve, Douglas Dam Figure 2.4-11 (Sheet 7 of 13)
Figure 2.4-11 Discharge Rating Curve, Douglas Dam (Sheet 7 of 13) 2.4-137 WBNP-109
2.4-138 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Discharge Rating Curve, Fontana Dam Figure 2.4-11 (Sheet 8 of 13)
HYDROLOGIC ENGINEERING Figure 2.4-11 Discharge Rating Curve, Fontana Dam (Sheet 8 of 13)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Discharge Rating Curve, Fort Patrick Henry Dam Figure 2.4-11 (Sheet 9 of 13)
Figure 2.4-11 Discharge Rating Curve, Fort Patrick Henry Dam (Sheet 9 of 13) 2.4-139 WBNP-109
2.4-140 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Discharge Rating Curve, Melton Hill Dam Figure 2.4-11 (Sheet 10 of 13)
HYDROLOGIC ENGINEERING Figure 2.4-11 Discharge Rating Curve, Melton Hill Dam (Sheet 10 of 13)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Discharge Rating Curve, Norris Dam Figure 2.4-11 (Sheet 11 of 13)
Figure 2.4-11 Discharge Rating Curve, Norris Dam (Sheet 11 of 13) 2.4-141 WBNP-109
2.4-142 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Discharge Rating Curve, South Holston Dam Figure 2.4-11 (Sheet 12 of 13)
HYDROLOGIC ENGINEERING Figure 2.4-11 Discharge Rating Curve, South Holston Dam (Sheet 12 of 13)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Discharge Rating Curve, Watauga Dam Figure 2.4-11 (Sheet 13 of 13)
Figure 2.4-11 Discharge Rating Curve, Watauga Dam (Sheet 13 of 13) 2.4-143 WBNP-109
2.4-144 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Fort Loudoun - Tellico SOCH Unsteady Flow Model Schematic Figure 2.4-12 HYDROLOGIC ENGINEERING Figure 2.4-12 Fort Loudoun - Tellico SOCH Unsteady Flow Model Schematic WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unsteady Flow Model Fort Loudoun Reservoir March 1973 Flood Figure 2.4-13 (Sheet 1 of 2)
Figure 2.4-13 Unsteady Flow Model Fort Loudoun Reservoir March 1973 Flood (Sheet 1 of 2) 2.4-145 WBNP-109
2.4-146 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unsteady Flow Model Fort Loudoun Reservoir March 1973 Flood Figure 2.4-13 (Sheet 2 of 2)
HYDROLOGIC ENGINEERING Figure 2.4-13 Unsteady Flow Model Fort Loudoun Reservoir March 1973 Flood (Sheet 2 of 2)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unsteady Flow Model Fort Loudoun - Tellico Reservoir May 2003 Flood Figure 2.4-14 (Sheet 1 of 3)
Figure 2.4-14 Unsteady Flow Model Fort Loudoun - Tellico Reservoir May 2003 Flood (Sheet 1 of 3) 2.4-147 WBNP-109
2.4-148 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unsteady Flow Model Fort Loudoun - Tellico Reservoir May 2003 Flood Figure 2.4-14 (Sheet 2 of 3)
HYDROLOGIC ENGINEERING Figure 2.4-14 Unsteady Flow Model Fort Loudoun - Tellico Reservoir May 2003 Flood (Sheet 2 of 3)
WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unsteady Flow Model Fort Loudoun - Tellico Reservoir May 2003 Flood Figure 2.4-14 (Sheet 3 of 3)
Figure 2.4-14 Unsteady Flow Model Fort Loudoun - Tellico Reservoir May 2003 Flood (Sheet 3 of 3) 2.4-149 WBNP-109
2.4-150 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Watts Bar SOCH Unsteady Flow Model Schematic Figure 2.4-15 HYDROLOGIC ENGINEERING Figure 2.4-15 Watts Bar SOCH Unsteady Flow Model Schematic WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unsteady Flow Model Watts Bar Reservoir March 1973 Flood Figure 2.4-16 Figure 2.4-16 Unsteady Flow Model Watts Bar Reservoir March 1973 Flood 2.4-151 WBNP-109
2.4-152 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unsteady Flow Model Watts Bar Reservoir May 2003 Flood Figure 2.4-17 HYDROLOGIC ENGINEERING Figure 2.4-17 Unsteady Flow Model Watts Bar Reservoir May 2003 Flood WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Chickamauga SOCH Unsteady Flow Model Schematic Figure 2.4-18 Figure 2.4-18 Chickamauga SOCH Unsteady Flow Model Schematic 2.4-153 WBNP-109
2.4-154 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unsteady Flow Model Chickamauga Reservoir March 1973 Flood Figure 2.4-19 HYDROLOGIC ENGINEERING Figure 2.4-19 Unsteady Flow Model Chickamauga Reservoir March 1973 Flood WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Unsteady Flow Model Chickamauga Reservoir May 2003 Flood Figure 2.4-20 Figure 2.4-20 Unsteady Flow Model Chickamauga Reservoir May 2003 Flood 2.4-155 WBNP-109
2.4-156 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Chickamauga Steady State Profile Comparisons Figure 2.4-21 HYDROLOGIC ENGINEERING Figure 2.4-21 Chickamauga Steady State Profile Comparisons WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Tailwater Rating Curve, Watts Bar Dam Figure 2.4-22 Figure 2.4-22 Tailwater Rating Curve, Watts Bar Dam 2.4-157 WBNP-109
2.4-158 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT PMF Discharge Hydrograph at Watts Bar Nuclear Plant Figure 2.4-23 HYDROLOGIC ENGINEERING Figure 2.4-23 PMF Discharge Hydrograph at Watts Bar Nuclear Plant WBNP-109
Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-109 Figure 2.4-24 West Saddle Dike Location Plan and Section HYDROLOGIC ENGINEERING 2.4-159
2.4-160 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT PMF Elevation Hydrograph at Watts Bar Nuclear Plant Figure 2.4-25 HYDROLOGIC ENGINEERING Figure 2.4-25 PMF Elevation Hydrograph at Watts Bar Nuclear Plant WBNP-109
WATTS BAR HYDROLOGIC ENGINEERING WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Probable Maximum Flood and Bottom Profiles Figure 2.4-26 Figure 2.4-26 Probable Maximum Flood and Bottom Profiles 2.4-161 WBNP-109
Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-109 Figure 2.4-27 Main Plant General Grading Plan 2.4-162 HYDROLOGIC ENGINEERING
Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-109 Figure 2.4-28 Watts Bar Nuclear Plant Wind Wave Fetch HYDROLOGIC ENGINEERING 2.4-163
2.4-164 WATTS BAR WATTS BAR NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT Extreme Value Analysis 30-Minute Wind Speed From the Southwest Chattanooga, TN 1948-74 Figure 2.4-29 HYDROLOGIC ENGINEERING Figure 2.4-29 Extreme Value Analysis 30-Minute Wind Speed From the Southwest Chattanooga, TN 1948-74 WBNP-109
WATTS BAR WBNP-109 THIS PAGE INTENTIONALLY BLANK 2.4-165 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Figure 2.4-30 thru Figure 2.4-40 Are Not Used HYDROLOGIC ENGINEERING 2.4-166
WATTS BAR WBNP-109 THIS PAGE INTENTIONALLY BLANK 2.4-167 HYDROLOGIC ENGINEERING
Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-109 Figure 2.4-40a Main Plant Site Grading And Drainage System For Flood Studies Sheet 1 HYDROLOGIC ENGINEERING 2.4-168
WATTS BAR WBNP-109 Figure 2.4-40a Deleted by Amendment 101 HYDROLOGIC ENGINEERING 2.4-169
WATTS BAR WBNP-109 Figure 2.4-40a Deleted by Amendment 101 HYDROLOGIC ENGINEERING 2.4-170
Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-109 Figure 2.4-40b Main Plant General Plan HYDROLOGIC ENGINEERING 2.4-171
Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-109 Figure 2.4-40c Yard Site Grading and Drainage System For Flood Studies HYDROLOGIC ENGINEERING 2.4-172
Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-109 Figure 2.4-40d-1 Main Plant Plant Perimeter Roads Plan and Profile Sheet 1 HYDROLOGIC ENGINEERING 2.4-173
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-40d Main Plant Plant Perimeter Roads Plan and Profile - Sheet 2 WBNP-109 2.4-174
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-40d Main Plant Plant Perimeter Roads Plan and Profile - Sheet 3 WBNP-109 2.4-175
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-40e Access Highway TVA DWG 1001H202 R4 - Sheet 1 WBNP-109 2.4-176
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-40e Access Highway TVA DWG. 1001H201 R4 - Sheet 2 WBNP-109 2.4-177
Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-109 Figure 2.4-40f Main Plant Main Plant Tracks Plan - Sheet 1 HYDROLOGIC ENGINEERING 2.4-178
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-40f Main Plant Main Plant Tracks Sections & Profiles - Sheet 2 WBNP-109 2.4-179
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-40f Main Plant Main Plant Tracks Sections & Profiles - Sheet 3 WBNP-109 2.4-180
Security-Related Information - Withheld Under 10CFR2.390 WATTS BAR WBNP-109 Figure 2.4-40g Yard, Grading Drainage and Surfacing Transformer & Switchyard - Sheet 1 HYDROLOGIC ENGINEERING 2.4-181
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-40g Yard, Grading Drainage and Surfacing Transformer & Switchyard - Sheet 2 WBNP-109 2.4-182
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-40g Yard, Grading Drainage and Surfacing Transformer & Switchyard - Sheet 3 WBNP-109 2.4-183
WATTS BAR HYDROLOGIC ENGINEERING Figure 2.4-40h Probable Maximum Precipation Point Rainfall WBNP-109 2.4-184
WATTS BAR WBNP-109 Figure 2.4-40i Deleted by Amendment 83 HYDROLOGIC ENGINEERING 2.4-185
WATTS BAR WBNP-109 Figure 2.4-40j Deleted by Amendment 83 HYDROLOGIC ENGINEERING 2.4-186
WATTS BAR WBNP-109 Figure 2.4-40k Deleted by Amendment 83 HYDROLOGIC ENGINEERING 2.4-187
WATTS BAR WBNP-109 Figure 2.4-40L Deleted by Amendment 83 HYDROLOGIC ENGINEERING 2.4-188
WATTS BAR WBNP-109 THIS PAGE INTENTIONALLY BLANK HYDROLOGIC ENGINEERING 2.4-189
WATTS BAR WBNP-109 Figure 2.4-41 thru Figure 2.4-60 Are Not Used HYDROLOGIC ENGINEERING 2.4-190
WATTS BAR WBNP-109 THIS PAGE INTENTIONALLY BLANK 2.4-191 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Figure 2.4-61 Deleted by Amendment 108 HYDROLOGIC ENGINEERING 2.4-192
WATTS BAR WBNP-109 Figure 2.4-62 Deleted by Amendment 108 2.4-193 HYDROLOGIC ENGINEERING
WATTS BAR WBNP-109 Figure 2.4-63 Deleted by Amendment 108 HYDROLOGIC ENGINEERING 2.4-194
2.4-195 WATTS BAR Figure 2.4-64 Watts Bar Nuclear Plant Probable Maximum Flood Elevation WBNP-109 HYDROLOGIC ENGINEERING