Southern Nuclear Operating Company, Inc.

FNP-20 11-0075 -TRN Ashford, Aabama 36312

) Tel 334899.5156 Fax 334.814.4661 November 11,2011 SOUTHERNi COMPANY Mr. Bruno Caballero Energy to Serve Your Wor1I U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257

Dear Mr. Caballero:

You will find enclosed the exam material as required by NUREG 1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, supplement 1. All exam materials MUST be withheld from public disclosure until after the examinations are complete.

Enclosed you will find the printed paperwork listed below for the upcoming examination scheduled for the week of June 18, 2012 at Parley Nuclear Plant.

  • ES-20 1-2, Examination Outline Quality Checklist
  • ES-301-l, Administrative Topics Outline with explanation
  • ES-301-2, Control Room/In-Plant Systems Outline
  • ES-301-2, Control Room/In-Plant Systems Outline with explanation
  • ES-301-3, Operating Test Quality Checklist
  • ES-30l-4, Simulator Scenario Quality Checklist
  • ES-D-1, Outline Submittal, forms for Six (6) Simulator exams
  • Excel spreadsheets for the NRC exam simulator scenarios and JPMs and the Simulator Audit exam
  • Audit Exam Operating test (4 simulator scenarios, 301-1 form and 301-2 form)
  • ES-301-1 and ES-301-2 for the past two NRC exams In addition to the above printed material, there is one CD-R provided that includes an electronic version of the above listed materials and the reference disk for 10-10-2011. All of this is provided to ensure complete and proper documentation for the upcoming examination.

If you have any questions, please contact Gary Ohmstede, Billy Thorton or Howard Fitzwater at 334-8 14-4758.

Sincerely, Gary Ohmstede Lead Instructor- Exam Development

Enclosure:

GTO cc: File

Southern Nuclear Operating Company, Inc.

Post Office Drawer 470 FNP-2012-001l -TRN Ashford, Alabama 36312 Tel 334899.5156 Fax 334.814.4661 March 1, 2012 SOUTHERNAgS COMPANY Mr. Bruno Caballero Energy to Serve Your World U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257

Dear Mr. Caballero:

You will find enclosed the exam material as required by NUREG 1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, supplement 1. All exam materials MUST be withheld from public disclosure until after the examinations are complete.

Enclosed you will find the printed paperwork listed below for the upcoming examination scheduled for the week of June 18, 2012 at Farley Nuclear Plant.

  • 25 SRO written exam questions with feedback and analysis
  • 1 simulator JPM
  • 1 Admin JPM In addition to the above printed material, there are two CD-Rs provided that include an electronic version of the above listed materials and a reference disk for 2-27-2012. The 25 SRO questions and the 2 JPMs are our early submittal as requested. The remaining 75 RO questions and the entire operating exam with the proper forms will be sent on March 9, 2012.

If you have any questions, please contact Gary Ohmstede, Billy Thornton or Howard Fitzwater at 334-8 14-4758.

Exam Development

Enclosure:

GTO cc: File

Southern Nuclear Operating Company, Inc.

Post Office Drawer 470 Ashford, Alabama 36312 Tel 3348995156 Fax 334814.4661 SOUTHERN COMPANY March 8, 2012 Mr. Bruno Caballero U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257

Dear lVIr. Caballero:

You will find enclosed the exam material as required by NUREG 1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, supplement 1. All exam materials MUST be withheld from public disclosure until after the examinations are complete.

Enclosed you will find the printed paperwork listed below for the upcoming examination scheduled for the week of June 18, 2012 at Farley Nuclear Plant.

  • ES-20 1-2, Examination Outline Quality Checklist
  • ES-20 1-3, Exam Security Agreement
  • ES-301-l, Administrative Topics Outline for RO and SRO exams
  • ES-30 1-2, Control Room/In-Plant Systems Outline
  • ES-30 1-3, Operating Test Quality Checklist
  • ES-301-4, Simulator Scenario Quality Checklist
  • ES-401 -6, Written Examination Quality Checklist
  • ES-D- 1, Outline Submittal, forms for Six (6) Simulator exams
  • Two (2) separate bindings containing the 75 question RO Written Exam, and includes the references for the RO exam and the SRO exam
  • One (1) binding containing the Administrative Topics JPMs and Simulator JPMs and In-plant JPMs
  • One (1) binding containing the six (6) simulator scenarios and Excel spreadsheets for the NRC exam simulator scenarios and JPMs and the Simulator Audit exam In addition to the above printed material, there is one CD-R provided that includes an electronic version of the above listed materials plus the following:
  • A copy of the written examination (25 SRO questions and 75 RO questions), references for the RO exam and SRO exam, and the cover sheet for the SRO exam
  • A copy of all simulator scenarios, JPMs and Admin JPMs
  • A copy of the Audit exam with the ES-D-l outlines for 4 scenarios, ES-301-1 and -2 forms for the operating exam
  • The past 2 operating exams ES-301-1 and -2 forms

(

In addition, we provided the 25 question SRO exam one week early. This is not included in this submittal on paper but is in the folder titled 1 1LT35 Written on the CD-R and has not changed since our early submittal. Also included in the early submittal was two (2) JPMs. These have been included in printed paperwork for your ease of review.

All of this is provided to ensure complete and proper documentation for the upcoming examination.

If you have any questions, please contact Gary Ohmstede, Billy Thornton or Howard Fitzwater at 334-814-4758.

Sincerely, 4ry Ohmstede Lead Instructor- Exam Development

Enclosure:

GTO cc: File

FNP20120020 -TRN Southern Nuclear Operating Company, Inc.

Post Office Drawer 470 Ashford, Alabama 36312 Tel 334.899. 56 SOUTHERN COMPANY May 31, 2012 Mr. Bruno Caballero U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257

Dear Mr. Caballero:

You will find enclosed the exam material as required by NUREG 1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, supplement 1. All exam materials MUST be withheld from public disclosure until after the examinations are complete.

for Enclosed you will find the printed paperwork listed below for the upcoming examination scheduled the week of June 18, 2012 at Farley Nuclear Plant.

  • ES-201-2, Examination Outline Quality Checklist
  • One copy of the current ES-201-3, Exam Security Agreement
  • ES-301-l, Administrative Topics Outline for RO exam
  • ES-301-2, Control Room!In-Plant Systems Outline
  • ES-301 -3, Operating Test Quality Checklist
  • ES-401-6, Written Examination Quality Checklist
  • One (1) 75 question RO written exam with a cover sheet
  • One (1) 100 question SRO written exam with a cover sheet
  • References for the SRO and RO exam
  • The answer key for the Written Exam consisting of the header information, Feedback and Notes section of the exam V
  • An answer key bubble type sheet for each exam printed from LxR
  • An answer key by number and KA value
  • Eight (8) Administrative JPMs
  • Eleven (11) Control Room/In-Plant JPMs In addition to the above printed material, there is one CD-R provided that includes an electronic version of the above listed materials.

4 ,,Y As discussed the following will be sent on Monday June 4, 2012 when the scenarios have been determined and candidate schedule for the simulator exam is developed.

  • ES-301-4, Simulator Scenario Quality Checklist
  • ES-D-l, Outline Submittal, forms for the Simulator exams
  • The simulator scenarios for scenarios 2, 3, 4 5 and 6 All of this is provided to ensure complete and proper documentation for the upcoming examination.

If you have any questions, please contact Gary Ohmstede, Billy Thornton or Howard Fitzwater at 334-8 14-4758.

Sincerel ary Ohmstede Lead Instr ctor- Exam Development

Enclosure:

GTO cc: File

Thomas A. Lynch Southern Nucear Vice President Farley

- Operating Company, nc.

Farley Nuclear Plant Post Office Drawer 470 Ashford, Alabama 36312 Tel 334.814.4511 Fax 334.8144728 SOUTHERN 2 COMPANY June 1,2012 FNP-2012-0019-TRN Mr. Victor McCree Regional Administrator, Region II U.S. Nuclear Regulatory Commission 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Attention: Mr. Bruno Caballero Dear Mr. Caballero Fancy Nuclear Plant formally request the NRC administer an operating test and a written examination beginning June 18, 2012 to candidates whose final Personal Qualification Statement-Licensee and Certification of Medical Examination by Facility licensee forms are included with this submittal.

If you should you have any questions regarding this matter, please contact Mrs. Donna Christiansen at 334-814-4513 or Mr. Brian Reed at 334-814-4981.

Sincerely, T.A.Lynch Vice President Fancy TAS/BWR

Southern Nuclear FNP-2012-0023 -TRN Operating Company, Inc.

Post Office Drawer 470 Ashford, Alabama 36312 Tel 3348995156 Fax 334814.4661 SOUTH ERN COMPANY June 4,2012 Mr. Bruno Caballero U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257

Dear Mr. Caballero:

You will find enclosed the exam material as required by NUREG 1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, supplement 1. All exam materials MUST be withheld from public disclosure until after the examinations are complete.

Enclosed you will find the printed paperwork listed below for the upcoming examination scheduled for the week of June 18, 2012 at Farley Nuclear Plant.

  • ES-301-3, Operating Test Quality Checklist
  • ES-301-4, Simulator Scenario Quality Checklist
  • The simulator scenario schedule as discussed with candidates names
  • The Simulator Exam Scenario outlines for Five (5) Simulator exams, in which each include:

o The current ES-D-1 o Scenario Outlines and Booth Operator Guide o ES-D-2, Required Operator Actions o The crew briefing sheet and Turnover sheet In addition to the above printed material, there is one CD-R provided that includes an electronic version of the above listed materials.

All of this is provided to ensure complete and proper documentation for the upcoming examination.

If you have any questions, please contact Gary Ohmstede, Billy Thornton or Howard Fitzwater at 334-814-4758.

Sincerely, Lead Exam Development

Enclosure:

GTO cc: File

Southern Nuclear Operating Company, Inc.

Post Office Drawer 470 Ashford, Alabama 36312 Tel 334.8995156 Fax 334.814.4661 SOUTHERN May 04, 2012 COMPANY Mr. Bruno Caballero U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Mr. Caballero:

As discussed in our phone conversation this morning, we have enclosed a CD-R disc which contains the password protected files (2) of the 2012 Written Examination. These files represent the written exam as modified from the original submission based upon our discussions, reviews and Operations Management review of those changes.

Also, included is a password protected electronic copy of the ES-401-4.

Sincerely Howard Fitzwater Facility Author

Enclosure:

HBF cc: File

Southern Nuclear FNP-2012-0026 -TRN Operating Company, Inc.

Post Office Drawer 470 Ashford. Alabama 36312 Tel 334899.5156 Fax 334.814.4661 SOUTHERN COMPANY July 3, 2012 Mr. Bruno Caballero U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257

Dear Mr. Caballero:

You will find enclosed the exam material as required by NUREG 1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, supplement 1.

Enclosed you will find the printed paperwork required upon completing the site administered Initial Written Examination by NUREG 1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, supplement 1.

comjnt.tpclngeor delete any question on the exam.

The Form ES-201-3, Examination Security Agreement, has not been completed but a working copy of the original is included. The final signed original will be sent at a later date when all signatures have been acquired.

Enclosed are the following:

  • A copy of the ES-201-3, Examination Security Agreement.
  • A SCANTRON form Marked as KEY and an LXR TEST KEY report.
  • Statistics for each question for the RO and SRO exams.
  • Preliminary grades (RO, SRO-only, SRO-OVERALL scores).
  • Ten (10) original exam answer SCANTRON sheets: 6 SRO & 4 RO for use in grading the exam and copies of the same.
  • Ten (10) original signed exam cover sheets and copies of the same: 6 SRO & 4 RO.
  • A copy of each applicants LXR generated individual scores report attached to his answer sheet.
  • NMP-TR-423-F15 which list the questions asked by the applicants during the exam with the responses given.
  • Individual question sheets that the students filled out and the proctor returned to the student with the answer.
  • List of Applicants and docket numbers.
  • Seating chart utilized during the written exam.
  • Exams as administered (one 75 question RO exam and one 100 question SRO exam).
  • One entire 100 question exam key with feedback.
  • Compilation of Comments collected from the applicants from the post-exam review with facility response/action stated. This document also identifies the facility reviewed HIGH-Miss questions.

Southern Nucear FNP-2012-0026 -TRN Operating Company, Inc.

Post Office Drawer 470 Ashford, Alabama 36312 Tel 334.8995156 Fax 334.814.4661 SOUTHERN COMPANY If you have any questions, please contact Gary Ohmstede, Billy Thornton or Howard Fitzwater at 334-814-4758.

Lead In ictor- Exam Development

Enclosure:

GTO cc: File

Southern Nuclear FNP-2012-0027 -TRN Operating Company, Inc.

Post Office Drawer 470 Ashford, Alabama 36312 Tel 334.899.5156 Fax 334.814.4661 SOUTHERN COMPANY July 12, 2012 Mr. Bruno Caballero U.S. Nuclear Regulatory Commission, Region II 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257

Dear Mr. Caballero:

You will find enclosed the exam material as required by NUREG 1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, supplement 1.

Enclosed you will find the completed ES-201-3, Exam Security Agreement, paperwork required upon completing the site administered Initial Written Examination by NUREG 1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, supplement 1.

If you have any questions, please contact Gary Ohmstede 334-814-4758.

Sincerely, Gary Ohmstede Lead Instructor- Exam Development

Enclosure:

GTO cc: File