NRR E-mail Capture - Acceptance Review for License Amendment Application on VCSNS RWST Valve
ML12208A015
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/25/2012
From: Martin R
Plant Licensing Branch II
To: Thompson B
South Carolina Electric & Gas Co
References
Download: ML12208A015 (2)


Text

NRR-PMDAPEm Resource From: Martin, Robert Sent: Wednesday, July 25, 2012 6:50 PM To: bthompson@scana.com Cc: ROBERTSON, GEORGE A

Subject:

Acceptance Review for License Amendment Application on relay surveillance intervals By letter dated June 29 2012, (ML121850005), the South Carolina Electric & Gas Company (SCE&G) submitted a request to revise the Technical Specifications (TS), in Appendix A to Facility Operating License Number NPF-12 for the Virgil C. Summer Nuclear Station, Unit 1, (VCSNS). The changes would revise TS 3.5.4, "Refueling Water Storage Tank," such that the nonseismically qualified piping of the Spent Fuel Pool (SFP) purification system may be connected to the RWST's seismic piping by manual operation of a RWST seismically qualified boundary valve under administrative controls.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this application. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to conduct a detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of SCE&Gs request in terms of regulatory requirements. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

Bob Martin LPL2-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 1

Hearing Identifier: NRR_PMDA Email Number: 425 Mail Envelope Properties (Robert.Martin@nrc.gov20120725184900)

Subject:

Acceptance Review for License Amendment Application on relay surveillance intervals Sent Date: 7/25/2012 6:49:47 PM Received Date: 7/25/2012 6:49:00 PM From: Martin, Robert Created By: Robert.Martin@nrc.gov Recipients:

"ROBERTSON, GEORGE A" <GROBERTSON@scana.com>

Tracking Status: None "bthompson@scana.com" <bthompson@scana.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1702 7/25/2012 6:49:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: