ET 12-0006, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process
ML12124A339 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 04/26/2012 |
From: | Broschak J Wolf Creek |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
ET 12-0006 | |
Download: ML12124A339 (28) | |
Text
WCREEK
'NUCLEAR OPERATING CORPORATION April 26, 2012 John P. Broschak Vice President Engineering ET 12-0006 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Subject:
Docket No. 50-482: Application to Revise Technical Specifications.
to Adopt TSTF-510, "Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection," Using the Consolidated Line Item Improvement Process Gentlemen:
Pursuant to 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Wolf Creek Nuclear Operating Corporation (WCNOC) hereby requests an amendment to Renewed Facility Operating License No. NPF-42 for the Wolf Creek Generating Station (WCGS). The proposed amendment would modify the WCGS Technical Specification (TS) requirements regarding steam generator tube inspections and reporting as described in Technical Specification Task Force (TSTF) traveler TSTF-510, Revision 2, "Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection."
Attachments I through IV provide the Description and Assessment, Proposed TS Changes, Revised TS pages, and Proposed TS Bases Changes, respectively, in support of this amendment request. Attachment IV is provided for information only. Final TS Bases changes will be implemented pursuant to TS 5.5.14, "Technical Specification (TS) Bases Control Program," at the time the amendment is implemented.
It has been determined that this amendment application does not involve a significant hazard consideration as determined per 10 CFR 50.92, "Issuance of amendment." Pursuant to 10 CFR 50.22, "Criterion for categorical exclusion; identification of licensing and regulatory actions eligible or otherwise not requiring environmental review," Section (b), no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of this amendment.
P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HC/VET
ET 12-0006 Page 2 of 3 The Plant Safety Review Committee reviewed this amendment application. In accordance with 10 CFR 50.91, "Notice for public comment; State consultation," a copy of this amendment application, with attachments, is being provided to the designated Kansas State official.
WCNOC requests approval of the proposed amendment by April 15, 2013. It is anticipated that the license amendment, as approved, will be effective upon issuance and will be implemented within 90 days from the date of issuance.
This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4085, or Mr. Gautam Sen at (620) 364-4175.
Sincerely, John P. Broschak JPB/rlt
Attachment:
Description and Assessment IV III Proposed Technical Specification Changes (Markup)
Revised Technical Specification Pages IV Proposed TS Bases Changes (for information only) cc: E. E. Collins (NRC), w/a T. A. Conley (KDHE), w/a J. R. Hall (NRC), w/a N. F. O'Keefe (NRC), w/a Senior Resident Inspector (NRC), w/a
ET 12-0006 Page 3 of 3 STATE OF KANSAS ))ss COUNTY OF COFFEY )
John P. Broschak, of lawful age, being first duly sworn upon oath says that he is Vice President Engineering of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the contents thereof; that he has executed the same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
sent Engineering SUBSCRIBED and sworn to before me this Z day of ,pAZ ,2012.
F AGAYLE SHEPHEARD1 CNotary Public - State of Kansasl Notaryoublic My Apot. Expirs q/2A I1- '71 Expiration Date C)
Attachment I to ET 12-0006 Page 1 of 5 DESCRIPTION AND ASSESSMENT
1.0 DESCRIPTION
2.0 ASSESSMENT 2,1 Applicability of Published Safety Evaluation 2,2 Optional Changes and Variations
3.0 REGULATORY ANALYSIS
3,1 No Significant Hazards Consideration Determination 4.0 ENVIRONMENTAL EVALUATION
Attachment I to ET 12-0006 Page 2 of 5
1.0 DESCRIPTION
The proposed change revises Wolf Creek Generating Station (WCGS) Technical Specification (TS) 3.4.17, "Steam Generator (SG) Tube Integrity," 5.5.9, "Steam Generator (SG) Program,"
and 5.6.10, "Steam Generator Tube Inspection Report." The proposed changes are needed to address implementation issues associated with the inspection periods, and address other administrative changes and clarifications.
The proposed amendment is consistent with Technical Specification Task Force (TSTF) traveler TSTF-510, Revision 2, "Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection."
2.0 ASSESSMENT 2.1 Applicability of Published Safety Evaluation Wolf Creek Nuclear Operating Corporation (WCNOC) has reviewed TSTF-510, Revision 2, "Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection,"
(ADAMS Accession No. ML110610350) and the model safety evaluation dated October 19, 2011 (ADAMS Accession No. ML112101513) as identified in the Federal Register Notice of Availability dated October 27, 2011 (76 FR 66763). As described in the subsequent paragraphs, WCNOC has concluded that the justifications presented in TSTF-510 and the model safety evaluation prepared by the Nuclear Regulatory Commission (NRC) staff are applicable to WCGS and justify this amendment for the incorporation of the changes to the WCGS TS.
2.2 Optional Changes and Variations WCNOC is proposing the following variations from the TS changes described in the TSTF-510, Revision 2, or the applicable parts of the NRC staff's model safety evaluation dated October 19, 2011.
WCGS TSs utilize different numbering than the Standard Technical Specifications (NUREG-1431, Revision 3.1, "Standard Technical Specifications Westinghouse Plants") on which TSTF-510 was based. The specific numbering differences are:
TSTF-510 Rev. 2 WCGS TSs 3.4.20, "Steam Generator Tube Integrity" 3.4.17 5.6.7, "Steam Generator Tube Inspection Report" 5.6.10
Attachment I to ET 12-0006 Page 3 of 5 During the February 15, 2012 TSTF meeting with the NRC, it was identified that the proposed wording for paragraph d.2 contained an administrative error. Paragraph d.2 contains the following statement:
If a degradation assessment indicates the potential for a type of degradation to occur at a location not previously inspected with a technique capable of detecting this type of degradation at this location and that may satisfy the applicable tube repair criteria, the minimum number of locations inspected with such a capable inspection technique during the remainder of the inspection period may be prorated. (emphasis added)
The underlined phrase should state "tube plugging [or repair] criteria," consistent with the other changes made in TSTF-510. WCNOC is changing the phrase to "tube plugging criteria." This change is an administrative change and should not result in this application being removed from the Consolidated Line Item Improvement Process.
Additionally, TSTF-510, revises Standard TS 5.6.7 by deleting item h. from the reporting requirements. The WCGS TSs do not include this requirement.
These differences are administrative and do not affect the applicability of TSTF-510 to the WCGS TS.
3.0 REGULATORY ANALYSIS
3.1 No Siqnificant Hazards Consideration Determination Wolf Creek Nuclear Operating Corporation (WCNOC) requests adoption of an approved change to the Standard Technical Specifications (STS) into the Wolf Creek Generating Station (WCGS) plant specific technical specifications (TS), to revise TS 3.4.17, "Steam Generator Tube Integrity," Specification 5.5.9, "Steam Generator (SG) Program," and Specification 5.6.10, "Steam Generator Tube Inspection Report," to address inspection periods and other administrative changes and clarifications.
As required by 10 CFR 50.91(a), an analysis of the issue of no significant hazards consideration is presented below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No The proposed change revises the Steam Generator (SG) Program to modify the frequency of verification of SG tube integrity and SG tube sample selection. A steam generator tube rupture (SGTR) event is one of the design basis accidents that are analyzed as part of a plant's licensing basis. The proposed SG tube inspection frequency and sample selection criteria will continue to ensure that the SG tubes are inspected such that the probability of a SGTR is not increased. The consequences of a SGTR are bounded by the conservative assumptions in the design basis accident analysis. The
Attachment I to ET 12-0006 Page 4 of 5 proposed change will not cause the consequences of a SGTR to exceed those assumptions.
Therefore, it is concluded that this change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No The proposed changes to the SG Program will not introduce any adverse changes to the plant design basis or postulated accidents resulting from potential tube degradation. The proposed change does not affect the design of the SGs or their method of operation. In addition, the proposed change does not impact any other plant system or component.
Therefore, it is concluded that this change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No The SG tubes in pressurized water reactors are an integral part of the reactor coolant pressure boundary and, as such, are relied upon to maintain the primary system's pressure and inventory. As part of the reactor coolant pressure boundary, the SG tubes are unique in that they are also relied upon as a heat transfer surface between the primary and secondary systems such that residual heat can be removed from the primary system. In addition, the SG tubes also isolate the radioactive fission products in the primary coolant from the secondary system. In summary, the safety function of a SG is maintained by ensuring the integrity of its tubes.
Steam generator tube integrity is a function of the design, environment, and the physical condition of the tube. The proposed change does not affect tube design or operating environment. The proposed change will continue to require monitoring of the physical condition of the SG tubes such that there will not be a reduction in the margin of safety compared to the current requirements.
Therefore, it is concluded that the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, WCNOC concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
Attachment I to ET 12-0006 Page 5 of 5 4.0 ENVIRONMENTAL EVALUATION The proposed change would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement, or environmental assessment need be prepared in connection with the proposed change.
Attachment II to ET 12-0006 Page 1 of 8 PROPOSED TECHNICAL SPECIFICATION CHANGES (MARKUP)
Attachment II to ET 12-0006 Page 2 of 8 SG Tube Integrity 3.4.17 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.17 Steam Generator (SG) Tube Integrity LCO 3.4.17 SG tube integrity shall be maintained.
AND All SG tubes satisfying the tubeý_criteria shall be plugged in accordance with the Steam Generator Program.
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTIONS
..--- ...... N---- ------
Separate Condition entry is allowed for each SG tube.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more SG tubes A.1 Verify tube integrity of the 7 days satisfying the tube affected tube(s) is criteria and not plugged in maintained until the next accordance with the Steam refueling outage or SG Generator Program. tube inspection.
F, .95n.5AND A.2 Plug the affected tube(s) in Prior to entering accordance with the Steam MODE 4 following Generator Program. the next refueling outage or SG tube inspection B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND met.
B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR SG tube integrity not maintained.
I Wolf Creek - Unit 1 3.4-43 Amendment No. 464,170 1
Attachment II to ET 12-0006 Page 3 of 8 SG Tube Integrity 3.4.17 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.17.1 Verify SG tube integrity in accordance with the In accordance Steam Generator Program. with the Steam Generator Program SR 3.4.17.2 Veri that each inspected SG tube that satisfies the Prior to entering tubeWpalrcriteria is plugged in accordance with the MODE 4 following Steam Generator Program. a SG tube inspection Wolf Creek - Unit 1 3.4-44 Amendment No. 464,170 I
Attachment II to ET 12-0006 Page 4 of 8 Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Program A Steam Generator Program shall be established and implemented to ensure that SG tube integrity is maintained. In addition, the Steam Generator Program shall include the followingý-
- a. Provisions for condition monitoring assessments. Condition monitoring assessment means an evaluation of the "as found" condition of the tubing with respect to the performance criteria for structural integrity and accident induced leakage. The "as found" condition refers to the condition of the tubing during an SG inspection outage, as determined from the inservice inspection results or by other means, prior to the plugging of tubes.
Condition monitoring assessments shall be conducted during each outage during which the SG tubes are inspected or plugged to confirm that the performance criteria are being met.
- b. Performance criteria for SG tube integrity. SG tube integrity shall be maintained by meeting the performance criteria for tube structural integrity, accident induced leakage, and operational LEAKAGE.
- 1. Structural integrity performance criterion: All in-service steam generator tubes shall retain structural integrity over the full range of normal operating conditions (including startup, operation in the power range, hot standby, and cool down all anticipated transients included in the design specificatioriknd design basis accidents. This includes retaining a safety factor of 3.0 against burst under normal steady state full power operation primary-to-secondary pressure differential and a safety factor of 1.4 against burst applied to the design basis accident primary-to-secondary pressure differentials. Apart from the above requirements, additional loading conditions associated with the design basis accidents, or combination of accidents in accordance with the design and licensing basis, shall also be evaluated to determine if the associated loads contribute significantly to burst or collapse. In the assessment of tube integrity, those loads that do significantly affect burst or collapse shall be determined and assessed in combination with the loads due to pressure with a safety factor of 1.2 on the combined primary loads and 1.0 on axial secondary loads.
- 2. Accident induced leakage performance criterion: The primary to secondary accident induced leakage rate for any design basis accident, other than a SG tube rupture, shall not exceed the leakage rate assumed in the accident analysis in terms of total leakage rate for all SGs and leakage rate for an individual SG.
Leakage is not to exceed 1 gpm per SG.
(continued)
Wolf Creek - Unit 1 5.0-11 Amendment No. 1,23-1..., 164
Attachment II to ET 12-0006 Page 5.of 8 Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Pro-gram (continued)
- 3. The operational LEAKAGE performance criterion is specified in LCO 3.4.13, "RCS Operational LEAKAGE."
- c. Provisions for SG tub criteria. Tubes found by inservice inspection o contain flaws with a dept equal to or exceeding 40% of the nominal tube wall thickness shall be plugged.
The following alternate tub criteria shall be applied as an alternative to the 40% depth-based criteria:
- 1. For Refueling Outage 18 and the subsequent operating cycle, tubes with service-induced flaws located greater than 15.2 inches below the top of the tubesheet do not require plugging. Tubes with service-induced flaws located in the portion of the tube from the top of the tubesheet to 15.2 inches below the top of the tubesheet shall be plugged upon detection.
(continued)
Wolf Creek - Unit 1 5.0-12 Amendment No. 123, 153, 172, 178, 1-86, 195
Attachment II to ET 12-0006 Page 6 of 8 Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Program (continued)
- d. Provisions for SG tube inspections. Periodic SG tube inspections shall be performed. The number and portions of the tubes inspected and methods of inspection shall be performed with the objective of detecting flaws of any type (e.g., volumetric flaws, axial and circumferential cracks) that may be present along the length of the tube, from the tube-to-tubesheet weld at the tube inlet to the tube-to-tubesheet weld at the tube outlet, and that may satisfy the applicable tubI r criteria. For Refueling Outage 18 and the subsequent operating cycte, the portion of the tube below 15.2 inches from the top of the tubesheet is excluded from this requirement.
The tube-to-tubesheet weld is not part of the tube. In addition to meeting the requirements of d.1, d.2, and d.3 below, the inspection scope, inspection methods, and inspection intervals shall be such as to ensure that SG tube integrity is maintained until the next SG inspection. A@
kdegradatio rshall be performed to determine the type and cisses'5eYx-iiw location of flaws to which tie tubes may be susceptible and, based on this assessment, to determine which inspection methods need to be employed and at what locations.
_outage
- 1. Inspect following 100% of the S tubes QJ]* in *each SC during the first refueling
- 2. spect 0% of thet.dbes at se ential peri of 120, 9 , and, ther er, 60 eff tive full po r months. 2The first se . ential nod shall b considere o/dbegin afte '14e first in rvice inspectio the SGs./Af addition, i pect 50% the tubes the rfuel*
- outage re est the mid int of the riod and t re ining 50% the refuelin outage ne" est the e of the eriod. No shall oper for more tAn 48 effe ye full powr months oro refuelin utages (whi ever is Ies) witho j4eing inspec d. ,.
- 3. If crack indications are found in an portion of the SG tube not excluded above, then the next inspection for eac SG for the degradation mechanism that caused the crack indication shall not exceed 24 effective full power months or one refueling outage (whichever . If definitive information, such as from examination of a pulled tube, diagnostic non-destructive testing, or engineering evaluation indicates that a crack-like indication is not associated with a crack(s), then the indication need not be treated as a crack.
- e. Provisions for monitoring operational primary to secondary LEAKAGE.
(continued)
Wolf Creek - Unit 1 5.0-13 Amendment No. 123, 1*3, 172, 178,
--86, 195
Attachment II to ET 12-0006 Page 7 of 8 INSERT 5.0-13
- 2. After the first refueling outage following SG installation, inspect each SG at least every 48 effective full power months or at least every other refueling outage (whichever results in more frequent inspections). In addition, the minimum number of tubes inspected at each scheduled inspection shall be the number of tubes in all SGs divided by the number of SG inspection outages scheduled in each inspection period as defined in a, b, and c below. If a degradation assessment indicates the potential for a type of degradation to occur at a location not previously inspected with a technique capable of detecting this type of degradation at this location and that may satisfy the applicable tube plugging criteria, the minimum number of locations inspected with such a capable inspection technique during the remainder of the inspection period may be prorated.
The fraction of locations to be inspected for this potential type of degradation at this location at the end of the inspection period shall be no less than the ratio of the number of times the SG is scheduled to be inspected in the inspection period after the determination that a new form of degradation could potentially be occurring at this location divided by the total number of times the SG is scheduled to be inspected in the inspection period. Each inspection period defined below may be extended up to 3 effective full power months to include a SG inspection outage in an inspection period and the subsequent inspection period begins at the conclusion of the included SG inspection outage.
a) After the first refueling outage following SG installation, inspect 100% of the tubes during the next 120 effective full power months. This constitutes the first inspection period.
b) During the next 96 effective full power months, inspect 100% of the tubes. This constitutes the second inspection period; and c) During the remaining life of the SGs, inspect 100% of the tubes every 72 effective full power months. This constitutes the third and subsequent inspection periods.
Attachment II to ET 12-0006 Page 8 of 8 Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.10 Steam Generator Tube Inspection Report A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Specification 5.5.9, Steam Generator (SG) Program. The report shall include:
- a. The scope of inspections performed on each SG;
- b. gradation mechanisms found;
- c. Nondestructive examination techniques utilized for each degradation mechanism;
- d. Location, orientation (if linear), and measured sizes (if available) of service induced indications;
- e. Number of tubes plugged during the inspection outage for each degradation mechanism;
- g. The results of condition monitoring, including the results of tube pulls and in-situ testing;
- h. Following completion of an inspection performed in Refueling Outage 18 (and any inspections performed in the subsequent operating cycle) the primary to secondary LEAKAGE rate observed in each SG (if it is not practical to assign the LEAKAGE to an individual SG, the entire primary to secondary LEAKAGE should be conservatively assumed to be from one SG) during the cycle preceding the inspection which is the subject of the report; Following completion of an inspection performed in Refueling Outage 18 (and any inspections performed in the subsequent operating cycle) the calculated accident induced leakage rate from the portion of the tubes below 15.2 inches from the top of the tubesheet for the most limiting accident in the most limiting SG. In addition, ifthe calculated accident induced leakage rate from the most limiting accident is less than 2.50 times the maximum operational primary to secondary leak rate, the report should describe how it was determined; and Following completion of an inspection performed in Refueling Outage 18 (and any inspections performed in the subsequent operating cycle) the results of monitoring for the tube axial displacement (slippage). If slippage is discovered, the implications of discovery and corrective action shall be provided.
Wolf Creek-Unit 1 5.0-28 Amendment No. 123,* 2,158,161, rA 178,179 , 195
_NC n Feer cvL+&_1e&
5 W' eAA sie-'yv cneri or3
Attachment III to ET 12-0006 Page 1 of 7 REVISED TECHNICAL SPECIFICATION PAGES
SG Tube Integrity 3.4.17 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.17 Steam Generator (SG) Tube Integrity LCO 3.4.17 SG tube integrity shall be maintained.
AND All SG tubes satisfying the tube plugging criteria shall be plugged in accordance with the Steam Generator Program.
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTIONS I* I f"*"r F
I-jL I---------------------------------------
I---
Separate Condition entry is allowed for each SG tube.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more SG tubes A.1 Verify tube integrity of the 7 days satisfying the tube plugging affected tube(s) is criteria and not plugged in maintained until the next accordance with the Steam refueling outage or SG Generator Program. tube inspection.
AND A.2 Plug the affected tube(s) in Prior to entering accordance with the Steam MODE 4 following Generator Program. the next refueling outage or SG tube inspection B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND met.
B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR SG tube integrity not maintained.
Wolf Creek - Unit 1 3.4-43 Amendment No. 164, 170, 1
SG Tube Integrity 3.4.17 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.17.1 Verify SG tube integrity in accordance with the In accordance Steam Generator Program. with the Steam Generator Program SR 3.4.17.2 Verify that each inspected SG tube that satisfies the Prior to entering tube plugging criteria is plugged in accordance with MODE 4 following the Steam Generator Program. a SG tube inspection Wolf Creek - Unit 1 3.4-44 Amendment No. 464.--,*,
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Program A Steam Generator Program shall be established and implemented to ensure that SG tube integrity is maintained. In addition, the Steam Generator Program shall include the following:
- a. Provisions for condition monitoring assessments. Condition monitoring assessment means an evaluation of the "as found" condition of the tubing with respect to the performance criteria for structural integrity and accident induced leakage. The "as found" condition refers to the condition of the tubing during an SG inspection outage, as determined from the inservice inspection results or by other means, prior to the plugging of tubes.
Condition monitoring assessments shall be conducted during each outage during which the SG tubes are inspected or plugged to confirm that the performance criteria are being met.
- b. Performance criteria for SG tube integrity. SG tube integrity shall be maintained by meeting the performance criteria for tube structural integrity, accident induced leakage, and operational LEAKAGE.
- 1. Structural integrity performance criterion: All in-service steam generator tubes shall retain structural integrity over the full range of normal operating conditions (including startup, operation in the power range, hot standby, and cool down), all anticipated transients included in the design specification, and design basis accidents. This includes retaining a safety factor of 3.0 against burst under normal steady state full power operation primary-to-secondary pressure differential and a safety factor of 1.4 against burst applied to the design basis accident primary-to-secondary pressure differentials. Apart from the above requirements, additional loading conditions associated with the design basis accidents, or combination of accidents in accordance with the design and licensing basis, shall also be evaluated to determine if the associated loads contribute significantly to burst or collapse. In the assessment of tube integrity, those loads that do significantly affect burst or collapse shall be determined and assessed in combination with the loads due to pressure with a safety factor of 1.2 on the combined primary loads and 1.0 on axial secondary loads.
- 2. Accident induced leakage performance criterion: The primary to secondary accident induced leakage rate for any design basis accident, other than a SG tube rupture, shall not exceed the leakage rate assumed in the accident analysis in terms of total leakage rate for all SGs and leakage rate for an individual SG.
Leakage is not to exceed 1 gpm per SG.
(continued)
Wolf Creek - Unit 1 5.0-11 Amendment No. 123,159,164,
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Program (continued)
- 3. The operational LEAKAGE performance criterion is specified in LCO 3.4.13, "RCS Operational LEAKAGE."
- c. Provisions for SG tube plugging criteria. Tubes found by inservice inspection to contain flaws with a depth equal to or exceeding 40% of the nominal tube wall thickness shall be plugged.
The following alternate tube plugging criteria shall be applied as an alternative to the 40% depth-based criteria:
- 1. For Refueling Outage 18 and the subsequent operating cycle, tubes with service-induced flaws located greater than 15.2 inches below the top of the tubesheet do not require plugging. Tubes with service-induced flaws located in the portion of the tube from the top of the tubesheet to 15.2 inches below the top of the tubesheet shall be plugged upon detection.
- d. Provisions for SG tube inspections. Periodic SG tube inspections shall be performed. The number and portions of the tubes inspected and methods of inspection shall be performed with the objective of detecting flaws of any type (e.g., volumetric flaws, axial and circumferential cracks) that may be present along the length of the tube, from the tube-to-tubesheet weld at the tube inlet to the tube-to-tubesheet weld at the tube outlet, and that may satisfy the applicable tube plugging criteria. For Refueling Outage 18 and the subsequent operating cycle, the portion of the tube below 15.2 inches from the top of the tubesheet is excluded from this requirement.
The tube-to-tubesheet weld is not part of the tube. In addition to meeting the requirements of d.1, d.2, and d.3 below, the inspection scope, inspection methods, and inspection intervals shall be such as to ensure that SG tube integrity is maintained until the next SG inspection. A degradation assessment shall be performed to determine the type and location of flaws to which the tubes may be susceptible and, based on this assessment, to determine which inspection methods need to be employed and at what locations.
- 1. Inspect 100% of the tubes in each SG during the first refueling outage following SG installation.
- 2. After the first refueling outage following SG installation, inspect each SG at least every 48 effective full power months or at least every other refueling outage (whichever results in more frequent inspections). In addition, the minimum number of tubes inspected (continued)
Wolf Creek - Unit 1 5.0-12 Amendment No. 123*,153, 172, 178, 186, 195,
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Progqram (continued) at each scheduled inspection shall be the number of tubes in all SGs divided by the number of SG inspection outages scheduled in each inspection period as defined in a, b, and c below. If a degradation assessment indicates the potential for a type of degradation to occur at a location not previously inspected with a technique capable of detecting this type of degradation at this location and that may satisfy the applicable tube plugging criteria, the minimum number of locations inspected with such a capable inspection technique during the remainder of the inspection period may be prorated. The fraction of locations to be inspected for this potential type of degradation at this location at the end of the inspection period shall be no less than the ratio of the number of times the SG is scheduled to be inspected in the inspection period after the determination that a new form of degradation could potentially be occurring at this location divided by the total number of times the SG is scheduled to be inspected in the inspection period. Each inspection period defined below may be extended up to 3 effective full power months to include a SG inspection outage in an inspection period and the subsequent inspection period begins at the conclusion of the included SG inspection outage.
a) After the first refueling outage following SG installation, inspect 100% of the tubes during the next 120 effective full power months. This constitutes the first inspection period.
b) During the next 96 effective full power months, inspect 100% of the tubes. This constitutes the second inspection period; and c) During the remaining life of the SGs, inspect 100% of the tubes every 72 effective full power months. This constitutes the third and subsequent inspection periods.
- 3. If crack indications are found in any portion of the SG tube not excluded above, then the next inspection for each affected and potentially affected SG for the degradation mechanism that caused the crack indication shall not exceed 24 effective full power months or one refueling outage (whichever results in more frequent inspections). If definitive information, such as from examination of a pulled tube, diagnostic non-destructive testing, or engineering evaluation indicates that a crack-like indication is not associated with a crack(s), then the indication need not be treated as a crack.
- e. Provisions for monitoring operational primary to secondary LEAKAGE.
(continued)
Wolf Creek - Unit 1 5.0-13 Amendment No. 123, 153, 172, 178, 186,195,
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.10 Steam Generator Tube Inspection Report A report shall be submitted within 180 days after the initial entry into MODE 4 following completion of an inspection performed in accordance with the Specification 5.5.9, Steam Generator (SG) Program. The report shall include:
- a. The scope of inspections performed on each SG;
- b. Degradation mechanisms found;
- c. Nondestructive examination techniques utilized for each degradation mechanism;
- d. Location, orientation (if linear), and measured sizes (if available) of service induced indications;
- e. Number of tubes plugged during the inspection outage for each degradation mechanism;
- f. The number and percentage of tubes plugged to date, and the effective plugging percentage in each steam generator;
- g. The results of condition monitoring, including the results of tube pulls and in-situ testing;
- h. Following completion of an inspection performed in Refueling Outage 18 (and any inspections performed in the subsequent operating cycle) the primary to secondary LEAKAGE rate observed in each SG (if it is not practical to assign the LEAKAGE to an individual SG, the entire primary to secondary LEAKAGE should be conservatively assumed to be from one SG) during the cycle preceding the inspection which is the subject of the report; Following completion of an inspection performed in Refueling Outage 18 (and any inspections performed in the subsequent operating cycle) the calculated accident induced leakage rate from the portion of the tubes below 15.2 inches from the top of the tubesheet for the most limiting accident in the most limiting SG. In addition, if the calculated accident induced leakage rate from the most limiting accident is less than 2.50 times the maximum operational primary to secondary leak rate, the report should describe how it was determined; and
- j. Following completion of an inspection performed in Refueling Outage 18 (and any inspections performed in the subsequent operating cycle) the results of monitoring for the tube axial displacement (slippage). If slippage is discovered, the implications of discovery and corrective action shall be provided.
Wolf Creek - Unit 1 5.0-28 Amendment No. 123, 12,158, 161, 178, 179, 186, 195,
Attachment IV to ET 12-0006 Page 1 of 5 PROPOSED TS BASES CHANGES (for information only)
Attachment IV to ET 12-0006 Page 2 of 5 SG Tube Integrity B 3.4.17 BASES APPLICABLE The steam generator tube rupture (SGTR) accident is the limiting design SAFETY basis event for SG tubes and avoiding an SGTR is the basis for this ANALYSES Specification. The analysis of an SGTR event assumes a bounding primary to secondary LEAKAGE rate equal to the operational LEAKAGE rate limits in LCO 3.4.13, "RCS Operational LEAKAGE," plus the leakage rate associated with a double-ended rupture of a single tube. The accident analysis for an SGTR assumes the contaminated secondary fluid is released to the atmosphere via SG atmospheric relief valves and safety valves.
The analysis for design basis accidents and transients other than an SGTR assume the SG tubes retain their structural integrity (i.e., they are assumed not to rupture.) In these analyses, the steam discharge to the atmosphere is based on the total primary to secondary LEAKAGE from all SGs of 1 gallon per minute or is assumed to increase to 1 gallon per minute as a result of accident induced conditions. For accidents that do not involve fuel damage, the primary coolant activity level of DOSE EQUIVALENT 1-131 is assumed to be equal to the LCO 3.4.16, "RCS Specific Activity," limits. For accidents that assume fuel damage, the primary coolant activity is a function of the amount of activity released from the damaged fuel. The dose consequences of these events are within the limits of GDC 19 (Ref. 2), 10 CFR 100 (Ref. 3) or the NRC approved licensing basis (e.g., a small fraction of these limits).
Steam generator tube integrity satisfies Criterion 2 of 10 CFR 50.36(c)(2)(ii).
LCO The LCO requires that SG tube integrity be maintained. The LCO also requires that all SG tubes that satisfy the criteria be plugged in accordance with the Steam Generator Program.
During a SG inspection, any inspected tube that satisfies the Steam Generator Programt criteria is removed from service by plugging. If a tube was determined to satisfy the[ )criteria but was not plugged, the tube may still have tube integrity. ,7 In the context of this Specification, a SG tube is defined as the entire length of the tube, including the tube wall, between the tube-to-tubesheet weld at the tube inlet and the tube-to-tubesheet weld at the tube outlet.
For R Ofuel'nOutage 18 and the subsequent operating cycle, a one-time alternattraFrriterion for the portion of the tube below 15.2 inches from top of e ubesheet is specified in TS 5.5.9c.1. (Ref. 7) The tube-to-tubesheet weld is not considered part of the tube.
Wolf Creek - Unit 1 B 3.4.17-2 Revision 52
Attachment IV to ET 12-0006 Page 3 of 5 SG Tube Integrity B 3.4.17 BASES LCO The accident induced leakage performance criterion ensures that the (continued) primary to secondary LEAKAGE caused by a design basis accident, other than a SGTR, is within the accident analysis assumptions. The accident analysis assumes that accident induced leakage does not exceed 1 gpm per SG. The accident induced leakage rate includes any primary to secondary LEAKAGE existing prior to the accident in addition to primary to secondary LEAKAGE induced during the accident.
The operational LEAKAGE performance criterion provides an observable indication of SG tube conditions during plant operation. The limit on operational LEAKAGE is contained in LCO 3.4.13, "RCS Operational LEAKAGE," and limits primary to secondary LEAKAGE through any one SG to 150 gallons per day. This limit is based on the assumption that a single crack leaking this amount would not propagate to an SGTR under the stress conditions of a LOCA or a main steam line break. If this amount of LEAKAGE is due to more than one crack, the cracks are very small, and the above assumption is conservative.
APPLICABILITY Steam generator tube integrity is challenged when the pressure differential across the tubes is large. Large differential pressures across SG tubes can only be experienced in MODE 1, 2, 3, or 4.
RCS conditions are far less challenging in MODES 5 and 6 than during MODES 1, 2, 3, and 4. In MODES 5 and 6, primary to secondary differential pressure is low, resulting in lower stresses and reduced potential for LEAKAGE.
ACTIONS The ACTIONS are modified by a Note clarifying that the Conditions may be entered independently for each SG tube. This is acceptable because the Required Actions provide appropriate compensatory actions for each affected SG tube. Complying with the Required Actions may allow for continued operation, and subsequent affected SG tubes are governed by subsequent Condition entry and application of associated Required Actions.
A.1 and A.2 Condition A applies if it is discovered that one or more SG tubes examined in an inservice inspection satisfy the tub r riteria but were not plugged in accordance with the Steam Genera or Program as required by SR 3.4.17.2. An evaluation of SG tube integrity of the affected tube(s) must be made. Steam generator tube integrity is Wolf Creek - Unit 1 B 3.4.17-4 Revision 29
Attachment IV to ET 12-0006 Page 4 of 5 SG Tube Integrity B 3.4.17 1 BASES ACTIONS A.1 and A.2 (continued) based on meeting the SG performance criteria described in the Steam Generator Program. The Sc _acriteria define limits on SG tube degradation that allow for flaw growth between inspections while still providing assurance that the SG performance criteria will continue to be met. In order to determine if a SG tube that should have been plugged has tube integrity, an evaluation must be completed that demonstrates that the SG performance criteria will continue to be met until the next refueling outage or SG tube inspection. The tube integrity determination is based on the estimated condition of the tube at the time the situation is discovered and the estimated growth of the degradation prior to the next SG tube inspection. If it is determined that tube integrity is not being maintained, Condition B applies.
A Completion Time of 7 days is sufficient to complete the evaluation while minimizing the risk of plant operation with a SG tube that may not have tube integrity.
If the evaluation determines that the affected tube(s) have tube integrity, Required Action A.2 allows plant operation to continue until the next refueling outage or SG inspection provided the inspection interval continues to be supported by an operational assessment that reflects the affected tubes. However, the affected tube(s) must be plugged prior to entering MODE 4 following the next refueling outage or SG inspection.
This Completion Time is acceptable since operation until the next inspection is supported by the operational assessment.
B.1 and B.2 If the Required Actions and associated Completion Times of Condition A are not met or if SG tube integrity is not being maintained, the reactor must be brought to MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
The allowed Completion Times are reasonable, based on operating experience, to reach the desired plant conditions from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.4.17.1 REQUIREMENTS During shutdown periods the SGs are inspected as required by this SR and the Steam Generator Program. NEI 97-06, Steam Generator Program Guidelines (Ref. 1), and its referenced EPRI Guidelines, establish the content of the Steam Generator Program. Use of the Steam Generator Program ensures that the inspection is appropriate and consistent with accepted industry practices.
Wolf Creek - Unit 1 B 3.4.17-5 Revision 29
Attachment Page 5of 5 IV to ET 12-0006 SG Tube Integrity B 3.4.17 BASES SURVEILLANCE SR 3.4.17.1 (continued)
REQUIREMENTS During SG inspections a condition monitoring assessment of the SG tubes is performed. The condition monitoring assessment determines the "as found" condition of the SG tubes. The purpose of the condition monitoring assessment is to ensure that the SG performance criteria have been met for the previous operating period.
The Steam Generator Program determines the scope of the inspection and the methods used to determine whether the tubes contain flaws satisfying the tubb criteria. Inspection scope (i.e., which tubes or areas of tubing within'e SG are to be inspected) is a function of existing and potential degradation locations. The Steam Generator Program also specifies the inspection methods to be used to find potential degradation.
Inspection methods are a function of degradation morphology, non-destructive examination (NDE) technique capabilities, and inspection locations.
The Steam Generator Program defines the Frequency of SR 3.4.17.1.
The Frequency is determined by the operational assessment and other limits in the SG examination guidelines (Ref. 6). The Steam Generator Program uses information on existing degradations and growth rates to determine an inspection Frequency that provides reasonable assurance that the tubing will meet the SG performance criteria at the next scheduled inspection. In addition, Specification 5.5.9 contains prescriptive requirements concerning inspection intervals to provide added assurance that the SG performance criteria will be met between scheduled inspections. If a f c~f t am ¢4, t+tZ SR 3.4.17.2 jefCAfO' d stuv1c .*o'5 During a SG inspection, any inspected tube that satisfies the Steam Generator Pro ra r riteria is removed from service by plugging.
The tube riteria delineated in Specification 5.5.9 are intended to ensure that tu es accepted for continued service satisfy the SG performance criteria with allowance for error in the flaw size measurement and for future flaw growth. In addition, the tub criteria, in conjunction with other elements of the Steam Generator Program, ensure that the SG performance criteria will continue to be met until the next inspection of the subject tube(s). Reference 1 provides guidance for performing operational assessments to verify that the tubes remaining in service will continue to meet the SG performance criteria.
The Frequency of prior to entering MODE 4 following a SG inspection ensures that the Surveillance has been completed and all tubes meeting the it)criteria are plugged prior to subjecting the SG tubes to signi icant primary to secondary pressure differential.
Wolf Creek - Unit 1 B 3.4.17-6 Revision 29