ML121180744

From kanterella
Jump to navigation Jump to search

E-Mail Transmitting Requests for Additional Information License Amendment Request (Emergency Circumstances) Date April 26, 2012
ML121180744
Person / Time
Site: Point Beach  
Issue date: 04/27/2012
From: Beltz T
Plant Licensing Branch III
To: Jim Costedio
Point Beach
beltz T, NRR/DORL/LPL3-1, 301-415-3049
Shared Package
ml121180749 List:
References
TAC ME8488, TAC ME8489
Download: ML121180744 (2)


Text

From:

Beltz, Terry Sent:

Friday, April To:

'Costedio, Ja Cc:

'william.hen

Subject:

Point Beach Information ME8488 and Attachments:

Final RAIs_E ADAMSAccessionNumber:

ML121

Dear Mr. Costedio:

This e-mail is in reference to the Nex license amendment request (LAR) d ML121170493). The licensee is req Facility Operating Licenses DPR-24

2.

The U.S. Nuclear Regulatory Comm Balance of Plant Branch, Componen Specifications Branch of the Office o provided in your LAR and determine review.

On April 27, 2012, the NRC staff dis you and your staff in a conference c indicated that the response to the RA the LAR.

Please don't hesitate to contact me Sincerely, Terry A. Beltz, Senior Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-3049 Terry.Beltz@nrc.gov 27, 2012 4:50 PM ames' nessy@nexteraenergy.com'; Connolly, James Nuclear Plant, Units 1 and 2 - Requests for Additiona re: License Amendment Request dated April 26, 2012 d ME8489) mergency LAR (TAC Nos ME8488 and ME8489).docx 180739 xtEra Energy Point Beach, LLC (the licensee) su dated April 26, 2012, (ADAMS Accession No.

questing an emergency license amendment to Re and DPR-27 for the Point Beach Nuclear Plant, mission staff (NRC) in the Electrical Engineering B nt Performance & Testing Branch, and Technical of Nuclear Reactor Regulation has reviewed the i ed that additional information is required to contin scussed draft requests for additional information (

call. The final RAIs are attached to this e-mail. Y AIs would be provided to the NRC staff in a supp if you have any questions or concerns.

al 2 (TAC Nos.

bmittal of a enewed Units 1 and

Branch, information nue its (RAIs) with You plement to