10 CFR 74.13(a) 10 CFR 72.76(a)
ZA L A subsidiary of Pinnacle West Capital Corporation John H. Hesser Mail Station 7605 Palo Verde Nuclear Vice President Tel: 623-393-5553 PO Box 52034 Generating Station Nuclear Engineering Fax: 623-393-6077 Phoenix, Arizona 85072-2034 102-06499-JHH/CJS March 30, 2012 ATTN: Document Control Desk Director of Nuclear Material Safety and Safeguards
-U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Docket No. STN 50-529 Request Extension of Submittal Date for Special Nuclear Material, Balance Report Arizona Public Service Company (APS) is required by 10 CFR 72.76(a) and 10 CFR 74.13(a) to compile special nuclear material (SNM) balance reports within 60 days of the beginning of the physical inventory required by 10 CFR 72.72(b) and 10 CFR 74.19(c).
10 CFR 74.13(a) also contains the provision that "[t]he Commission may permit a license;et'osubmit the-reports at other times when-good-cause is shown."
APS requests approval to delay the submittal of the 2011 annual Unit 2 SNM balance and physical inventory reports to April 27, 2012. The additional delay in SNM balance reporting is requested because the refueling outage for PVNGS Unit 3 is currently in progress and Nuclear-Fuel Management personnel who compile the report are currently involved in the outage. The Unit 1 and 3 reports were submitted March 26 and March 2, 2012, respectively.
No commitments are being made to the NRC by this letter. Should you need further information-regarding-this request, please-contact Russell A. Stroud, Licensing-Section Leader, at (623) 393-5111.
Sincerely, JHH/CJS/hsc A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- San Onofre & South Texas o Wolf Creek
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Request Extension of Submittal Date for Unit 2 Special Nuclear Material Balance Report Page 2 cc:
E. E. Collins Jr.
B. K. Singal L. K. Gibson J. R. Hall M. A. Brown NRC Region IV Regional Administrator NRC NRR Project Manager for PVNGS NRC NRR Project Manager NRC NRR Senior Project Manager NRC Senior Resident Inspector for PVNGS