ML12107A185

From kanterella
Jump to navigation Jump to search
Agenda for May 8, 2012, Meeting with TSTF
ML12107A185
Person / Time
Site: Technical Specifications Task Force
Issue date: 04/20/2012
From: Michelle Honcharik
Licensing Processes Branch (DPR)
To:
Honcharik M
Shared Package
ML12107A415 List:
References
Download: ML12107A185 (2)


Text

Agenda for Technical Specification Task Force (TSTF) and U.S. Nuclear Regulatory Commission (NRC) Meeting May 8, 2012 9:30 a.m. - 3:30 p.m.

I. Administrative (9:30 a.m. - 9:45 a.m.) (NRC)

A. Introductions B. Agenda Review C. Other Administrative Issues II. Process Issues (9:45 a.m. - 10:00 a.m.)

A. Status of Issuance of Standard Technical Specification Revision 4 (NRC)

B. Status of TSTF July 5, 2011, Letter Requesting NRC Revise Part 9900 Technical Guidance, "Operability Determinations & Functionality Assessments for Resolution of Degraded or Nonconforming Conditions Adverse to Quality or Safety" (NRC)

C. Development Status of NRC Office Instruction LIC-601, Improved Technical Specification Conversion Amendment Review Procedures (NRC)

III. Issues with Previously Approved Travelers (10:00 a.m. - 10:30 a.m.)

A. Status of Response to TSTF March 28, 2012, Letter Regarding Errata Correction to TSTF-510, Rev. 2, "Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection" (NRC)

B. NRC Concerns with TSTF-412-A, Revision 3, "Provide Actions for One Steam Supply to Turbine Driven AFW/EFW [auxiliary feedwater/emergency feedwater]

Pump Inoperable," approved July 17, 2007 (NRC)

IV. Designated Time for Public Comments (10:30 a.m.)

BREAK V. Active Traveler Review Status (10:45 a.m. - 12:00 p.m.)

A. Discuss Status of All Travelers Currently Under NRC Staff Review (All)

B. TSTF Traveler Review Priority (TSTF)

LUNCH ENCLOSURE

VI. Technical Issues (1:00 p.m. - 2:15 p.m.)

A. Revisions to NRC Operating Experience Smart Sample (OpESS) 2012/02, "Technical Specification Interpretation and Operability Determination" (NRC)

B. Industry Questions on Enforcement Guidance Memorandum (EGM) 12-001, "Dispositioning Noncompliance with Administrative Controls Technical Specifications Programmatic Requirements that Extend Test Frequencies and Allow Performance of Missed Tests" (All)

C. Status of Development of a Traveler to Revise Operation with the Potential to Drain the Reactor Vessel Requirements (OPDRV) Requirements (TSTF)

1) OPDRV Inspector Guidance and Generic Communications (NRC)
2) Status of BWROG Letter Requesting Changes to the EGM (NRC)
3) Status of RIS on OPDRV EGM (NRC)

D. Status of TSTF-493 Implementation Guidance (NRC)

E. Managing Spent Fuel Storage as It Pertains to Pool Designs (NRC)

VII. Future Planning (2:15 p.m. - 3:00 p.m.)

A. Proposed Dates for TSTF/NRC Quarterly Meetings in 2012 (All)

1) August 7 and 8
2) November 7 and 8 B. Future Traveler submittals: (TSTF)
1) TSTF-536, Combustion Engineering Digital Plant Surveillance Requirements (May 2012)
2) TSTF-540, Provide Completion Times in Lieu of Immediate Shutdown, Risk-Informed Technical Specifications Task Force (RITSTF) Initiative 6) for Boiling Water Reactor Plants (Summer 2012)
3) Westinghouse Plant RITSTF Initiative 6b VIII. Designated Time for Public Comments (3:00 p.m. - 3:15 p.m.)

IX. Closing Remarks (3:15 p.m. - 3:30 p.m.) (All)

X. Adjourn (3:30 p.m.)