ML121010230
| ML121010230 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs, Nine Mile Point, Ginna |
| Issue date: | 04/17/2012 |
| From: | George Wilson Plant Licensing Branch 1 |
| To: | Korsnick M Constellation Energy Nuclear Group |
| pickett , NRR/DORL, 415-1364 | |
| References | |
| TAC ME7882, TAC ME7883, TAC ME7884, TAC ME7885, TAC ME7886 | |
| Download: ML121010230 (2) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 17, 2012 Ms. Maria G. Korsnick Chief Nuclear Officer Senior Vice President - Chief Operations Officer Constellation Energy Nuclear Group, LLC 100 Constellation Way, Suite 200C Baltimore, MD 21202
SUBJECT:
CONSTELLATION ENERGY QUALITY ASSURANCE TOPICAL REPORT, REVISION 6 - CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2, NINE MILE POINT NUCLEAR STATION, UNIT NOS. 1 AND 2, R.E.
GINNA NUCLEAR POWER PLANT (TAC NOS. ME7882, ME7883, ME7884, ME7885, AND ME7886)
Dear Ms. Korsnick:
By letter dated December 16, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML120110301), Constellation Energy Nuclear Group, LLC (CENG) submitted the Constellation Energy Quality Assurance Topical Report (QATR), Revision 6. By telephone conference call on February 1, 2012, the Nuclear Regulatory Commission (NRC) staff requested clarification of paragraphs B.4.5 and BA.6 concerning procurement control over commercial grade calibration services.
By letter dated February 29, 2012 (ADAMS ML12065A186), CENG proposed deleting paragraph B.4.6 and modifying paragraph B.4.5 in Revision 7 to the QATR. The NRC staff has reviewed the proposed modifications and finds them acceptable for inclusion.
Sincerely,
~~~
George A. Wilson, Chief Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-220,50-317,50-318, 50-244, and 50-410 cc: Distribution via Listserv
April 17, 2012 Ms. Maria G. Korsnick Chief Nuclear Officer Senior Vice President - Chief Operations Officer Constellation Energy Nuclear Group, LLC 100 Constellation Way, Suite 200C Baltimore, MD 21202
SUBJECT:
CONSTELLATION ENERGY QUALITY ASSURANCE TOPICAL REPORT, REVISION 6 - CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2, NINE MILE POINT NUCLEAR STATION, UNIT NOS. 1 AND 2, R.E.
GINNA NUCLEAR POWER PLANT (TAC NOS. ME7882, ME7883, ME7884, ME7885, AND ME7886)
Dear Ms. Korsnick:
By letter dated December 16, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML120110301), Constellation Energy Nuclear Group, LLC (CENG) submitted the Constellation Energy Quality Assurance Topical Report (QATR), Revision 6. By telephone conference call on February 1, 2012, the Nuclear Regulatory Commission (NRC) staff requested clarification of paragraphs B.4.5 and B.4.6 concerning procurement control over commercial grade calibration services.
By letter dated February 29, 2012 (ADAMS ML12065A186), CENG proposed deleting paragraph B.4.6 and modifying paragraph B.4.5 in Revision 7 to the QATR. The NRC staff has reviewed the proposed modifications and finds them acceptable for inclusion.
Sincerely, Ira!
George A. Wilson, Chief Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-220, 50-317, 50-318, 50-244, and 50-410 cc: Distribution via Listserv Distribution:
PUBLIC LPL1-1 RIF RidsNrrDorlLpL1-1 RidsNrrPMCalvertCliffs RidsNrrPMREGinna RidsNrrPMNineMilePoint RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsNrrLASLittle JOrtega-Luciano GDentel, R1 RidsRegion'l MailCenter RidsNroDcipCqab ADAMS Accession No. M L 121010230 OFFICE LPL 1-1/PM LPL1-1/LA NROIDCIP/CQAB/BC LPL1-1/BC NAME DPickett SLittie KKavanagh GWilson DATE 04/12/12 04/12/12 04/13/12 04/17/12 OFFICIAL RECORD COpy