Category:Inspection Plan
MONTHYEARIR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 IR 05000298/20220052022-08-18018 August 2022 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298 2022005) ML22179A3152022-06-28028 June 2022 Notification of Post-Approval Site Inspection for License Renewal (Phase 4) (NRC Inspection Report 05000298/2022011) and Request for Information IR 05000298/20210062022-03-0202 March 2022 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2021006) ML21305B8012021-11-0202 November 2021 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection 05000298/2022001 and Request for Information IR 05000298/20210052021-09-0101 September 2021 CNS Mid-Cycle Inspection Plan Transmittal Letter for Cooper Nuclear Station (Report 05000298/2021005) ML21217A1182021-08-0505 August 2021 Notification of Inspection (NRC Inspection Report 05000298/2021004) and Request for Information ML21083A2832021-03-24024 March 2021 Ti 2515/194 Inspection Documentation Request ML20315A3922020-11-10010 November 2020 Email 11-10-2020 - Cooper EP Prog Insp RFI IR 05000298/20200052020-09-0101 September 2020 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2020005) IR 05000298/20190062020-03-0303 March 2020 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2019006) IR 05000298/20190052019-08-30030 August 2019 Updated Inspection Plan for Cooper Nuclear Station - Report 05000298/2019005 IR 05000298/20180062019-03-0404 March 2019 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2018006) IR 05000298/20180052018-08-31031 August 2018 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2018005) IR 05000298/20170062018-03-0101 March 2018 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2017006) ML18023A1102018-01-23023 January 2018 CNS - Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans (05000298/2018010) and Request IR 05000298/20170052017-08-28028 August 2017 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2017005) IR 05000298/20160062017-03-0101 March 2017 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2016006) IR 05000298/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298/2016005) IR 05000298/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Cooper Nuclear Station (NRC Physical Security Inspection Report Number 05000298/2016401) ML16242A3292016-08-31031 August 2016 Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298/2016005) IR 05000298/20150062016-03-0202 March 2016 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2015006) IR 05000298/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298/2015005) IR 05000298/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for Cooper Nuclear Station (NRC Physical Security Inspection Report Number 05000298/2015401) ML15183A3602015-07-0202 July 2015 Notification of Inspection (NRC Inspection Report 05000298/2015003 and Request for Information ML14364A1532014-12-30030 December 2014 Notification of NRC Triennial Heat Sink Performance IR 05000298/2015001 and Request for Information IR 05000298/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298/2014006) IR 05000298/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Cooper Nuclear Station (NRC Physical Security Inspection Report Number 05000298/2014402) IR 05000298/20130012014-03-0404 March 2014 Annual Assessment Letter for the Cooper Nuclear Station (Report 05000298/2013001) IR 05000298/20130062013-09-0303 September 2013 Mid-cycle Assessment Letter for Cooper Nuclear Station (Report 05000298-13-006) IR 05000298/20128012013-03-0404 March 2013 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2012801) IR 05000298/20120062012-09-0404 September 2012 Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298/2012006) ML12243A4372012-09-0404 September 2012 Mid-Cycle Assessment Letter for Cooper Nuclear Station (Report 05000298-12-006) IR 05000298/20120012012-03-0505 March 2012 Annual Assessment Letter for Cooper Nuclear Station (Report Number 05000298/2012001) ML1124306512011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - Cooper Nuclear Station IR 05000298/20110012011-03-0404 March 2011 Annual Assessment Letter for Cooper Nuclear Station (Report 05000298-11-001) ML1024305762010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Cooper Nuclear Station ML0906301572009-03-0404 March 2009 Annual Assessment Letter and Inspection Plan - 2009 - Cooper Nuclear Station ML0824606182008-09-0202 September 2008 2008 Midcycle Assessment Letter Cooper Nuclear Station IR 05000298/20080012008-03-0303 March 2008 Annual Assessment Letter - Cooper Nuclear Station End of Cycle 03-03-2008, (Inspection Report 05000298-08-001) ML0724309262007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - Cooper IR 05000298/20070012007-03-0202 March 2007 Annual Assessment Letter - Cooper Nuclear Station (NRC Inspection Report 05000298-07-001) ML0624306492006-08-31031 August 2006 Midcycle Performance Review and Inspection Plan - Cooper Nuclear Station IR 05000298/20060012006-03-0202 March 2006 Annual Assessment Letter - Cooper Nuclear Station (NRC Inspection Report 05000298-06-001) ML0524300922005-08-30030 August 2005 Midcycle 2005 Performance Review and Inspection Plan - Cooper Nuclear Station 2024-08-22
[Table view] Category:Letter
MONTHYEARML24250A2052024-10-0808 October 2024 Issuance of Amendment No. 278 Regarding Revision to Technical Specification Table 3.3.2.1-1 and Transfer of Minimum Critical Power Ratio Values to Core Operating Limit Report ML24227A0822024-09-0303 September 2024 Summary of Regulatory Audit in Support of License Amendment Request to Modify the High Pressure Coolant Injection Low Flow Value IR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20240022024-07-25025 July 2024 Integrated Inspection Report 05000298/2024002 ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24197A1462024-07-15015 July 2024 NRC Region IV Ltr to Cooper Nuclear Station Re FEMA Level 1 Finding IR 05000298/20243012024-07-12012 July 2024 NRC Examination Report 05000298/2024301 ML24134A1782024-07-0303 July 2024 Issuance of Amendment No. 276 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil and Starting Air, to Allow for Cleaning, Inspection and Any Needed Repairs During Refuel Outage 33 ML24197A0682024-06-24024 June 2024 FEMA Ltr to Missouri State Emergency Management Agency - Level 1 Finding, 24 June 2024 ML24192A0112024-06-13013 June 2024 2024-06-Post Exam Comments IR 05000298/20244012024-06-0404 June 2024 Security Baseline Inspection Report 05000298/2024401 ML24151A1082024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24137A0942024-05-17017 May 2024 Regulatory Audit Plan in Support of License Amendment Request to Modify Allowable Value Regarding Technical Specification for High Pressure Coolant Injection Pump Discharge Low Flow IR 05000298/20240012024-05-0303 May 2024 Integrated Inspection Report 05000298/2024001 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20240102024-04-24024 April 2024 Comprehensive Engineering Team Inspection Report 05000298/2024010 ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML24093A2282024-04-0202 April 2024 Notice of Enforcement Discretion for Cooper Nuclear Station IR 05000298/20240902024-04-0101 April 2024 – Notice of Violation, NRC Inspection Report 05000298/2024090 IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 IR 05000298/20230042024-02-12012 February 2024 Integrated Inspection Report 05000298/2023004 IR 05000298/20230122024-02-12012 February 2024 NRC Inspection Report 05000298/2023012 ML24033A3092024-02-12012 February 2024 Summary of Regulatory Audit Regarding the Relief Request RC3-02 Regarding Drywell Head Bolting ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23311A1122023-11-0909 November 2023 Project Manager Assignment ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23102A0282023-04-19019 April 2023 U.S. Nuclear Regulatory Commission Presentation at the May 8, 2023, Brownville Village Meeting IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 ML23041A1622023-02-10010 February 2023 Licensed Operator Positive Fitness-for-Duty Test Request for Additional Information IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements IR 05000298/20220032022-10-27027 October 2022 Integrated Inspection Report 05000298/2022003 ML22304A0052022-10-26026 October 2022 Surveillance Capsule Location (Re-insertion Into the Reactor Vessel) IR 05000298/20223022022-10-20020 October 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022302 2024-09-03
[Table view] |
Inspection Report - Cooper - 2012001 |
---|
|
|
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION rch 5, 2012
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR COOPER NUCLEAR STATION (REPORT NUMBER 05000298/2012001)
Dear Mr. OGrady:
On February 15, 2012, the NRC completed its end-of-cycle performance review of Cooper Nuclear Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011 through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The NRC determined the performance at Cooper Nuclear Station during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP)
Action Matrix because one inspection finding had low to moderate (i.e., White) safety significance, while all other findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). The White finding involved the failure to verify that procedure steps to safely shut down the plant in the event of a fire would actually reposition three motor-operated valves to the required positions, while addressing a previous finding that involved the same procedure steps. On December 2, 2011, the NRC completed Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area. The NRC concluded that your staff performed an acceptable evaluation of the White finding. You identified the cause and took corrective action to prevent recurrence. The NRC considers this finding closed. Because that finding is no longer considered an Action Matrix input, at the beginning of the current quarter, performance at Cooper Nuclear Station was within the Licensee Response Column of the Action Matrix. Therefore, the NRC plans to conduct only ROP baseline inspections at your facility. The NRC identifies a substantive cross-cutting issue (SCCI) to communicate a concern with the licensees performance in a cross-cutting area and to encourage the licensee to take appropriate actions before more-significant performance issues emerge.
In our assessment letter dated March 4, 2011 (ML110620053), the NRC opened an SCCI in the human performance area associated with the decision-making component related to the use of conservative assumptions in decision-making H.1(b). To address this theme, your staff implemented corrective actions emphasizing that decision-making reflects safety first, encouraging your staff to cultivate a questioning attitude, improving monitoring and oversight of decision-making, implementing case-study training with involved departments, and establishing measurable objectives to monitor the effectiveness of that training. The NRC noted that since full implementation of these corrective actions, only one finding with an H.1(b) cross-cutting aspect has been identified. The NRC considers that these results demonstrate sustainable performance improvements that are evidenced by effective implementation of an appropriate corrective action plan that has resulted in no safety-significant inspection finding and a notable reduction in the overall number of inspection findings with the same common theme. On the basis of these results, the NRC is closing this SCCI.
The NRC identified a cross-cutting theme in the Work Practices component of the Human Performance area. Specifically, the theme consisted of six findings with a cross-cutting aspect in communicating and using human-error prevention techniques and/or proceeding in the face of uncertainty H.4(a). The NRC determined that an SCCI does not exist because the NRC does not have a concern with your staffs scope of effort and progress in addressing the cross-cutting theme. The NRC noted that you had acknowledged this theme by initiating Condition Report CR-CNS-2011-08283 in July, 2011, completing the associated investigation in October, 2011, implementing corresponding corrective actions in November, 2011, and scheduling an associated self-assessment effectiveness review in March, 2012.
The NRC also identified a cross-cutting theme in the Corrective Action component of the Problem Identification and Resolution area. The theme consists of seven findings with a cross-cutting aspect in the thoroughness of problem evaluation such that the resolutions address causes and extent of condition P.1(c). The NRC determined that an SCCI exists because the NRC has a concern with your staffs scope of effort and progress in addressing this cross-cutting theme. Specifically, your staff did not develop corrective actions to address identified concerns involving the utilization of resources to perform problem evaluations. The SCCI in P.1(c) will remain open until your staff demonstrates sustainable performance improvements as evidenced by effective implementation of an appropriate corrective action plan that results in no safety significant inspection finding and a notable reduction in the overall number of inspection findings with the same common theme. The NRC will monitor your staffs effort and progress in addressing the SCCI by inspecting your response to this theme after you notify us, in writing, of your readiness for inspection.
The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If you have any questions regarding this letter, please contact Vince Gaddy at 817-200-1144.
Sincerely,
/T. Pruett for/
Kriss M. Kennedy, Director Division of Reactor Projects Docket: 50-298 License: DRP-46 Enclosure: Cooper Nuclear Station Inspection/Activity Plan cc: w/enclosure via Electronic Distribution