Letter Sequence Approval |
---|
|
|
MONTHYEARRS-12-011, Request for Exemption from 10 CFR 50 Appendix R, Section Iii.L2012-02-13013 February 2012 Request for Exemption from 10 CFR 50 Appendix R, Section Iii.L Project stage: Request ML1206000112012-03-19019 March 2012 Request for Exemption from 10 CFR 50, Appendix R, Section Iii. L - Unacceptable with the Opportunity to Supplement Project stage: Approval ML12086A0142012-03-23023 March 2012 Response to Request for Additional Information Regarding the Request for Exemption from 10 CFR 50, Appendix R, Section Iii.L Project stage: Response to RAI RS-12-066, Withdrawal of Request for Exemption from 10 CFR 50, Appendix R, Section Lll.L2012-04-0909 April 2012 Withdrawal of Request for Exemption from 10 CFR 50, Appendix R, Section Lll.L Project stage: Withdrawal ML1210206202012-04-26026 April 2012 Withdrawal of Requested Licensing Action Request for Exemption from 10 CFR 50, Appendix R, Section Iii.L Project stage: Withdrawal 2012-03-23
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML23265A1322023-09-27027 September 2023 – Proposed Alternative Request RV-03 Associated with the Sixth 10-Year Inservice Testing Interval ML23003A1782023-01-12012 January 2023 Authorization and Safety Evaluation for Alternative Request I6R-09 ML23004A1712023-01-0606 January 2023 Authorization and Safety Evaluation for Alternative Request I6R-10, ML22335A5442022-12-20020 December 2022 Authorization and Safety Evaluation for Alternative Request I6R-01, RS-22-099, Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-102022-07-19019 July 2022 Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-10 ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20099D9552020-04-17017 April 2020 Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations ML20036D9622020-02-0404 February 2020 Dresden Nuclear Power Station, Nine Mile Point Nuclear Station, Peach Bottom Atomic Power Station, & Quad Cities Nuclear Power Station - Proposed Alternative to Extend Reactor Pressure Vessel Safety Relief Valve Testing Frequency ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds2019-02-15015 February 2019 Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds JAFP-18-0052, Proposed Alternative to Utilize Code Case N-8792018-05-30030 May 2018 Proposed Alternative to Utilize Code Case N-879 JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-8802018-05-30030 May 2018 Proposed Alternative to Utilize Code Cases N-878 and N-880 ML18022A6162018-01-24024 January 2018 Approval of Alternatives to the ASME Code Regarding Reactor Vessel Penetration N-11B - Relief Request 15R-11, Revision 3 (CAC No. MF9286; EPID L-2017-LLR-0004) (RS-17-014) RS-17-158, Fifth Inservice Inspection Interval Relief Request 15R-162017-11-0707 November 2017 Fifth Inservice Inspection Interval Relief Request 15R-16 ML17073A1212017-06-28028 June 2017 Issuance of Safety Evaluation Inservice Inspection Interval Proposed Alternative (I5R-08) ML17170A0132017-06-26026 June 2017 Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548) ML16230A2372016-09-0606 September 2016 Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) ML15265A1642015-10-30030 October 2015 Request 14R-17 Relief from the Requirements of the ASME Code RS-15-126, Additional Information Supporting Relief Request I4R-17, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fourth Inservice Inspection Interval2015-05-21021 May 2015 Additional Information Supporting Relief Request I4R-17, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fourth Inservice Inspection Interval ML12121A6372012-05-10010 May 2012 Request to Use Code Case N-789 ML1206000112012-03-19019 March 2012 Request for Exemption from 10 CFR 50, Appendix R, Section Iii. L - Unacceptable with the Opportunity to Supplement JAFP-11-0112, Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP2011-10-0303 October 2011 Relief Request (RR-8), Alternative Examination Requirements for Nozzle-to-Vessel Shell Welds and Nozzle Inner Radius Sections Using American Society of Mechanical Engineers Code Case N-702 and BWRVIP-108NP ML0929404362009-11-0303 November 2009 Alternative to Nozzle-to-Vessel Weld and Inner Radius Examinations RS-09-044, Request for Alternative to Nozzle-to-Vessel Weld and Inner Radius Examinations2009-03-13013 March 2009 Request for Alternative to Nozzle-to-Vessel Weld and Inner Radius Examinations ML0813305572008-06-27027 June 2008 Dresden/Quad Cities Relief Requests from 5-Year Test Interval for Main Steam Safety Valves ML0809803112008-04-30030 April 2008 Relief Request to Use Boiling Water Reactor Vessel & Internals Project Guidelines.. ML0723500872007-09-20020 September 2007 Relief, Request for Relief from ASME OM Code 5-year Test Interval Requirements ML0611103302006-05-0808 May 2006 Relief Request CR-28 for Third 10-Year Inservice Inspection Interval SVPLTR 05-0018, Relief Request CR-28, Inservice Inspection Program Relief Regarding Reactor Pressure Vessel Longitudinal Shell Weld Examination Coverage for Third 10-Year Inservice Inspection Interval2005-05-0606 May 2005 Relief Request CR-28, Inservice Inspection Program Relief Regarding Reactor Pressure Vessel Longitudinal Shell Weld Examination Coverage for Third 10-Year Inservice Inspection Interval ML0426005632004-10-19019 October 2004 Amendments, Main Steam Line Relief Valves and Associated Relief Requests. TAC Nos. MC1792, MC1793, MC1794, and MC1795 ML0423003862004-10-0101 October 2004 Relief Request, CR-26 for Third 10-Year Inservice Inspection Interval. TAC No MC3269 and MC3270 ML0423603442004-09-16016 September 2004 Relief Request, CR-27 for Third 10-Year Inservice Inspection Interval. TAC No. MC3268 ML0405603992004-03-25025 March 2004 Relief Request, Third 10-Year Inservice Inspection Interval, for Approval of a Flaw Evaluation for Dresden Nuclear Power Station (Dnps), Unit 2, So That the Affected Weld Could Be Left as Is Without Repair ML0327308692003-10-0202 October 2003 Relief Request for Fourth 10-Year Inservice Testing Interval, MB8741, MB8742, MB8743, MB8744, MB8745, and MB8746 ML0323704802003-09-0404 September 2003 Relief Request, Fourth 10-Year Inservice Inspection Interval RS-03-157, Additional Information Regarding Inservice Testing Program Relief Requests2003-08-0606 August 2003 Additional Information Regarding Inservice Testing Program Relief Requests ML0316110032003-07-0101 July 2003 Relief Request, CR-25 for Third 10-Year Inservice Inspection Interval RS-03-101, Additional Information Regarding Inservice Inspection Program Relief Request I4R-022003-05-29029 May 2003 Additional Information Regarding Inservice Inspection Program Relief Request I4R-02 RS-02-187, Request for Relief from Certain Requirements of 10 CFR 50.55a(g)(4)(ii) Regarding Control Rod Drive Housing Welds (Relief Request Number CR-25)2002-10-25025 October 2002 Request for Relief from Certain Requirements of 10 CFR 50.55a(g)(4)(ii) Regarding Control Rod Drive Housing Welds (Relief Request Number CR-25) ML0225902032002-10-0404 October 2002 Relief Request, PR-22 for Third 10-year Inservice Inspection Interval (MB4030, MB4031) 2023-09-27
[Table view] Category:Letter
MONTHYEARML24303A0712024-11-0404 November 2024 Letter to K. Meshigaud, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0692024-11-0101 November 2024 Letter to J.A. Crawford, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0302024-11-0101 November 2024 Letter to D.G. Lankford, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station RS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision ML24303A0492024-11-0101 November 2024 Letter G. Kakkak, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0552024-11-0101 November 2024 Letter to J. Keys, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station IR 05000237/20254012024-11-0101 November 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000237/2025401 05000249/2025401 ML24303A1462024-11-0101 November 2024 Letter to W. Gravelle, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0992024-11-0101 November 2024 Lett to R. Carter, Principal Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0242024-11-0101 November 2024 Letter to D. Kaskaske, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1422024-11-0101 November 2024 Letter to V. Jefferson, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24291A0252024-11-0101 November 2024 Letter to R. Blanchard Tribal Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0272024-11-0101 November 2024 Letter to D. Rios, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0532024-11-0101 November 2024 Letter to J. Greendeer, President Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0432024-11-0101 November 2024 Letter to E. Elizondo, Sr. Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0512024-11-0101 November 2024 Letter to J. Barrett, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0472024-11-0101 November 2024 Letter to G. Cheatham, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0892024-11-0101 November 2024 Letter to M. J. Wesaw, Chair Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0152024-11-0101 November 2024 Letter to C. Harper, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1442024-11-0101 November 2024 Letter to V. Kitcheyna, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1342024-11-0101 November 2024 Letter to T. Carnes, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1102024-11-0101 November 2024 Letter to R. Gasco, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0132024-11-0101 November 2024 Letter to B. Barnes, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0202024-11-0101 November 2024 Letter to C. Chavers, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0172024-11-0101 November 2024 Letter to B. Peters, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0642024-11-0101 November 2024 Letter to J. Rupnick, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1352024-11-0101 November 2024 Letter to T. Rhodd, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1172024-11-0101 November 2024 Letter to R. Yob, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0602024-11-0101 November 2024 Letter to J. R. Shotton, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24291A0202024-10-31031 October 2024 NRC Letter to J. Loichinger Achp Request for Comments Concerning the Environmental Review of DNPS Units 2 and 3 Subsequent License Renewal Application ML24291A0272024-10-31031 October 2024 NRC Letter to C. Mayer Illinois SHPO Request to Initiate Section 106 Consultation for Subsequent License Renewal of Units 2 and 3 IR 05000237/20240032024-10-29029 October 2024 Integrated Inspection Report 05000237/2024003 and 05000249/2024003 RS-24-102, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-5912024-10-21021 October 2024 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-591 RS-24-103, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-10-21021 October 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24225A2132024-09-26026 September 2024 Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval ML24253A0942024-09-23023 September 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID L-2024-Sle-0002) (Docket Numbers: 50-237 and 50-249) SVPLTR 24-0030, ISFSI Annual Effluent Release Report2024-09-20020 September 2024 ISFSI Annual Effluent Release Report ML24270A0332024-09-20020 September 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report IR 05000237/20244022024-09-19019 September 2024 – Security Baseline Inspection Report 05000237/2024402 and 05000249/2024402 - (Public) ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24215A2912024-08-14014 August 2024 Request for Withholding Information from Public Disclosure Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations IR 05000237/20240022024-08-14014 August 2024 Integrated Inspection Report 05000237/2024002 and 05000249/2024002 IR 05000237/20240102024-08-0909 August 2024 NRC Age-Related Degradation Inspection Report 05000237/2024010 and 05000249/2024010 2024-09-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WMHINGTON, D.C. 20555-0001
'March 19, 2012 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - REQUEST FOR EXEMPTION FROM 10 CFR 50, APPENDIX R, SECTION III.L UNACCEPTABLE WITH THE OPPORTUNITY TO SUPPLEMENT (TAC NO. ME8008)
Dear Mr. Pacillo:
By letter to the U.S. Nuclear Regulatory Commission (NRC or Commission) dated February 13, 2012, Exelon Generation Company, LLC (EGC) submitted a request for exemption for Dresden Nuclear Power Station (DNPS), Units 2 and 3. The request would permanently exempt DNPS from the requirements Title 10 of the Code of Federal Regulations (10 CFR) Part 50,Section III.L, "Alternative and dedicated shutdown capability," paragraph 4. The purpose of this letter is to provide the results of the NRC staffs acceptance review of this exemption request.
The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Pursuant to 10 CFR 50.12, the Commission may, upon application by an interested person or upon its own initiative, grant exemptions from the requirements of 10 CFR Part 50 when (1) the exemptions are authorized by law, will not present an undue risk to public health or safety, and are consistent with the common defense and security; and (2) when special circumstances are present. These circumstances include the special circumstances that application of the regulation is not necessary to achieve the underlying purpose of the rule.
The NRC staff has reviewed your application and concluded that the information delineated in the enclosure to this letter is necessary to enable the NRC staff to make an independent assessment regarding the acceptability of the exemption request in terms of regulatory requirements and the protection of the public health and safety and the environment.
In order to make the application complete, the NRC staff requests that EGC supplement the application to address the information request in the enclosure by March 19,2012 (13 days after email date below). This will enable the NRC staff to complete its detailed technical review. If the information responsive to the NRC staff's request is not received by the above date, the application will not be accepted for review pursuant to 10 CFR 2.101, and the NRC staff will cease its review activities associated with the application. If the application is subsequently accepted for review, you will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
M. Pacilio -2 The information requested and the associated time frame were e-mailed to Joseph Bauer of your staff on March 2, 2012.
If you have any questions, please contact the Dresden Nuclear Power Station, Units 2 and 3, Project Manager, Joel Wiebe, at (301) 415-6606.
Sincerely, el Wiebe, Senior Project Manager lant Licensing Branch 111-2 ivision of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket Nos. 50-237 and 50-249
Enclosure:
Request for Supplemental Information cc: Distribution via Listserv
REQUEST FOR SUPPLEMENTAL INFORMATION DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 DOCKET NOS. 50-237 AND 50-249 In reviewing Exelon Generation Company's (EGG) submittal dated February 13, 2012, related to an exemption for Dresden Nuclear Power Station, Units 2 and 3 (DNPS), the NRC staff has determined that the following information is needed to complete its review:
Supplemental information required:
- 1. Provide a summary of the analysis used to determine that adequate time is available to ensure reliability in accordance with Section 4.2.2 of NUREG 1852. Include additional uncertainties and variability in the time required for manual actions that were considered.
In Part II of the submittal, "Bases for Exemption Request" section NUREG-1852 Guidance, the licensee cited NUREG-1852 as being germane to the subject exemption request with respect to feasibility and reliability criteria for competing manual actions similar to safe shutdown (SSD) activities.
NUREG-1852, Section 3.2.2, "Analysis Showing Adequate Time Available to Ensure Reliability" as referenced by the licensee, addresses the reliability of the operator manual actions. It states in part that adequate time should be available to account for uncertainties that may be encountered by the operator manual actions. In lieu of directly accounting for sources of uncertainty, the extra time should be sufficient to make up for uncertainties in estimates of the time available and the time it takes to diagnose and execute operator manual actions. For this exemption, reliability considerations for the travel to return to the plant are relevant.
- 2. Provide information concerning when, in a fire event, the operators would be directed to return to the plant (e.g., fire alarm sounding in an SSD-related fire area, verification of actual fire in a fire area containing SSD equipment, when a control room evacuation is required and procedure (and timeline) entry is required, or some other time.)
Enclosure
The information requested and the associated time frame were e-mailed to Joseph Bauer of your staff on March 2, 2012.
If you have any questions, please contact the Dresden Nuclear Power Station, Units 2 and 3, Project Manager, Joel Wiebe, at (301) 415-6606.
SincerelY,/RAJ Joel Wiebe, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-237 and 50-249
Enclosure:
Request for Supplemental Information cc: Distribution via Listserv ADAMS Accession No. ML120600011 NRR-028 *via email OFFICE LPL3-2/PE LPL3-2/PM* LPL3-2/LA DRAlAFPB LPL3-2/BC LPL3-2/PM NAME PHernandez JWiebe SRohrer AKlein JZimmerman JWiebe IMMahoney for DATE 02/29/12 02/29/12 02/29/12 03/01/12 03/16/12 03/19/12 OFFICIAL RECORD COpy