Letter Sequence Approval |
---|
|
|
MONTHYEARML11228A2082011-08-10010 August 2011 ISFSI - Proposed Change to Technical Specifications Project stage: Request ML11287A0472011-10-12012 October 2011 Enclosunotice of Consideration of Issuance of Amendment to Facility Operating License (DPR-3), Proposed No Significant Hazards Determination, and Opportunity for a Hearing (TAC No. L24561) Project stage: Other ML11287A0262011-10-12012 October 2011 R. Mitchell Letter Yankee Atomic Electric Company Notice of Consideration of Issuance of Amendment to Facility Operating License (DPR-3), Proposed No Significant Hazards Determination, and Opportunity for a Hearing (TAC No. L24561) Project stage: Other ML1202606802012-01-24024 January 2012 Enclosure 2: Safety Evaluation (R. Mitchell Letter Yankee Atomic Electric Company - Issuance of Amendment to the Operating License No. DPR-3 Regarding the Physical Security Plant (TAC No. L24561)) Project stage: Approval ML1202606742012-01-24024 January 2012 Enclosure 1a: Yaeca a 159 License Page 3 (R. Mitchell Letter Yankee Atomic Electric Company - Issuance of Amendment to the Operating License No. DPR-3 Regarding the Physical Security Plant (TAC No. L24561)) Project stage: Approval ML1202606692012-01-24024 January 2012 Enclosure 1: Amendment No. 159 to DPR-3 (R. Mitchell Letter Yankee Atomic Electric Company - Issuance of Amendment to the Operating License No. DPR-3 Regarding the Physical Security Plant (TAC No. L24561)) Project stage: Approval ML1202606582012-01-24024 January 2012 R. Mitchell Letter Yankee Atomic Electric Company - Issuance of Amendment to the Operating License No. DPR-3 Regarding the Physical Security Plant (TAC No. L24561) Project stage: Approval ML12031A0832012-01-26026 January 2012 Yankee, Biweekly Notice Memo, Notice of Issuance of Amendment Revises License Condition C(3), Physical Protection. Project stage: Approval ML12075A0632012-03-15015 March 2012 Enclosusafety Evaluation Report (R. Mitchell Letter Yankee Atomic Electric Company - Issuance of Corrected Safety Evaluation Report for Amendment No. 159 to Operating License No. DPR-3 (TAC No. L24561)) Project stage: Approval ML12075A0562012-03-15015 March 2012 R. Mitchell Letter Yankee Atomic Electric Company - Issuance of Corrected Safety Evaluation Report for Amendment No. 159 to Operating License No. DPR-3 (TAC No. L24561) Project stage: Approval 2012-01-24
[Table View] |
|
---|
Category:Safety Evaluation
MONTHYEARML13228A2412013-08-15015 August 2013 Letter to R. Mitchell Revised Response to Exemption Request for Portions of Title 10 of the Code of Federal Regulations Part 50 Appendix E, and Section 50.47 of Title 10 of the Code of Federal Regulations for the Yankee Rowe Plant (TAC L246 ML12228A3932012-09-21021 September 2012 Safety Evaluation by the Office of Nuclear Reactor Regulation Application for the Direct Transfer of Control 1.7303% Interest in the License ML1213004722012-06-15015 June 2012 Order Approving Application Regarding Merger of Central Vermont Public Service Corporation and Gaz Metro Limited Partnership and Resultant Indirect Transfer of License ML12165A5082012-06-15015 June 2012 MS3-Threshold Attachment ML1213004962012-06-15015 June 2012 Safety Evaluation/Application for the Indirect Transfer of Control 1.7303% Interest in the License for Millstone Power Station, Unit 3; Docket No. 50-423 from Central Vermont Public Service Corporation to Gaz Metro Limited Partnership ML1202606802012-01-24024 January 2012 Enclosure 2: Safety Evaluation (R. Mitchell Letter Yankee Atomic Electric Company - Issuance of Amendment to the Operating License No. DPR-3 Regarding the Physical Security Plant (TAC No. L24561)) ML1132701272011-12-20020 December 2011 Enclosure 2 - Safety Evaluation Report ML11327A0292011-12-20020 December 2011 Safety Evaluation Report - Safety Evaluation Indirect Transfer of Control Related to the Merger of Northeast Utilities and Nstar Maine Yankee Atomic Power Company ML0718305152007-08-10010 August 2007 Wayne Norton Ltr Yankee Nuclear Power Station - Release of Land from Part 50 License ML0602504922006-01-10010 January 2006 Alice C. Carson Ltr Approval of Revised Disposal Procedures in Accordance with 10 CFR Part 20.2002 ML0434504492004-12-22022 December 2004 Denial of Request for Further Exemption from the Financial Protection Requirements of 10 CFR 140, 11(A)(4) and Related Amendment to Indemnity Agreement No. B-17 for the Yankee Nuclear Power Station (TAC No. L52600) ML0311104162003-04-21021 April 2003 Yankee Nuclear Power Station - Issuance of Amendment No. 157 Deletion of Operational and Administrative Requirements Following Fuel Transfer to ISFSI 2013-08-15
[Table view] |
Text
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR MATERIALS SAFETY AND SAFEGUARDS RELATED TO AMENDMENT NO. 159 TO FACILITY OPERATING LICENSE NO. DPR-3 CONNECTICUT YANKEE ATOMIC POWER COMPANY YANKEE NUCLEAR POWER STATION DOCKET NO.50-029
1.0 INTRODUCTION
By application dated August 10, 2011, (Agencywide Document and Access Management System (ADAMS) Accession No. ML11228A208) Yankee Atomic Electric Company (YAEC, the licensee) requested changes to the Yankee Nuclear Power Station Operating License (OL) No.
DPR-3.
The proposed amendment would change the title of the Physical Security Plan in the Yankee Nuclear Power Station Amended Facility OL, Section 3 Physical Protection, from the Yankee Nuclear Power Station Security Plan, which includes the Contingency Plan and the Guard Training and Qualification Plan, to the Physical Security Plan for Yankee Rowe Independent Spent Fuel Storage Installation.
2.0 BACKGROUND
Yankee Nuclear completed the transfer of their spent fuel to the independent spent fuel storage installation (ISFSI) in 2003. In 2007, decommissioning of the reactor site was completed, and a portion of the site was released from the license.
3.0 EVALUATION The proposed change is administrative in nature. The Yankee Nuclear Power Station Security Plan is the current NRC-approved Physical Security Plan. The proposed change does not reduce the commitments in the Physical Security Plan or adversely affect operation of the ISFSI.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Massachusetts State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
This amendment involves a change in an administrative requirement. Accordingly, this amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10)(ii). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: J. Goshen Date: January 24, 2012