From:
FarnholITIhIodn
.f(,,6 To:
UHmxl Unda
Subject:
Fw: Daily Event Status at Fort Calhoun - Sunday Date:
Sunday, July 03, 2011 8:30:57 AM Linda -
Todays plant status report for Fort Calhoun (Sunday :Juiy31.
Thank:yoUi.
Tom Sent frommiy:Blackberry.
Fromic BERCK, ALLEN -ýaberck~oppd.corn>
To: Bill Pook. <bill@region5-6.orpg; Dan <dan@region5-6.org>; Eric Plautz
<eric.plautz@dougtascounty-ne.gov>; Jeff Theulen <jeffrey.theulen@pottcounty.com>; ]on Schwarz
<jon.sChwarz~nebraskaSgov>; Kirkland, John; Larry Oliver <Ioliver@harrisoncountyia.org>; Laurel Ryan
<laurel.ryan@dhs.gov>; Paul Johnson <paul.johnson@douglascounty-ne.gov>; Whitney Shipley
<whitney.shipley@douglascounty-ne.gov>; 'Rasmusson, Melanie' <MRasmuss@idph.state.ia.us>;
kathy.stodola@iowa.gov <kathy.stodola@iowa.gov>; Farnholtz, Thomas Cc: GEBERS, STEVEN W <sgebers@oppd.com>; DEANGELIS, PETER A <pdeangelis@oppd.com>;
MOELLER, CHRISTOPHER J <cjmoeller@oppd.com>; HANKINS, RHONDA R <rhankins@oppd.com>;
BERCK, ALLEN <aberck@oppd.com>; SILKE, DEENA L <dlsilke@oppd.com>; RELLER, MARK H
<mreller@oppd.com>
Sent: Sun Jul 03 09:05:29 2011
Subject:
Daily Event Status at Fort Calhoun - Sunday Fort Calhoun Flooding Status (changes from yesterday's report are in bold)
- 1. Reactor Status: Shutdown
- 2. Reactor is covered with > 23-ft of cooling water
- 3. Offsite power and Emergency Diesel Generators are available. Both vital buses are energized at this time.
- 4. Spent Fuel Pooling cooling is in service and protected.
- 5. Shutdown cooling is in service and protected
- 6. Current river level is 1006' 4" at Fort Calhoun Station.
- 7. Current Blair gauge level is 32.0 ft., which is a slight decrease in the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Although NWS/USACE predictions are for a continued decrease in river level: over the next 4 days, heavy rains throughout the plains overnight and throughout the day will add considerable flow to the river.
- 8. Early Sunday morning (June 26, 2011), one of the AquaDams that was protecting the plant A
ruptured. The AquaDam was a backup (secondary) flood protection barrier. All primary Sbarriers are intact and are providing adequate protection to the site. The station is on 345 kv k
-power.
Water has not entered any vital equipment, and no personnel were injured. Water has equalized onsite, repair efforts are underway. This section of the AquaDam is expected L..
to be replaced in the next two weeks.
- 10. The site has implemented procedures to protect power supplies and vital equipment. Water is s
onsite, and flood barriers are protecting vital equipment.
- 11. No release of radioactivity has occurred.
Z
- 2.
- 12. Fort Calhoun has declared a Notification of Unusual Event at 08:00 6/6/11.
M
- 13. Backup evacuation route onsite is inundated however the primary route onsite is passable and not expected to be affected.
- 14. Power was removed from::siren 257 and 260 in Pottawattamie Co. IA, which is just on the edge of the 10-mile EPZ south east of the plant. Siren 75, 76 in Desoto National Wildlife
Refuge have no power. Currently the refuge is closed due to flooding. Sirenl east of Fort Calhoun on county road 34 between Fort Calhoun: and Boyer Chute Recreational Area is without power. This area is closed due to flooding. Power was removed to: one additional siren in Washington County - sirens 69 was removed from service due to flooding and may require route alerting for any non-evacuated:residents. Power was removed from Siren 259.
This siren is located in Pottawattamie County on DeSoto Trail, west of *1 1 0 th street. County to verify evacuation route alerting capability if needed. Power has been removed from sirens 143 and 144 in Pottawattamie Co.. IA due to flooding. This area has beenevacuated and is not populated.
- 15. The Reception and Care Center in Fremont is now: official,* replacing B.ellevue.. This has been planned for quite some time, but also provides us :with greate protection for the public, as no evacuation routes to that location are affected at thisbtime.
- 16. At this time no known major evacuation routes are affected without contingency actions planned. Interstate 29 in both directions: frornm Exit:54A (G Avenue) to Exit 71 (1-680 exit): I-680 road closed to traffic because of floodinq. 1-680 is closed in both directions: from before Exit 1130th Street to Exit 62: 1 Old Mormon Bridge Road --- road closed because of flooding. Highway 30 from Blair to Missouri Valley is re-opened; flood barrier work will restart on Tuesday, but does notimpact evacuation routes.
Requested Information f rotm states and caun(Jes::
.1. W0en offsite eVacuation routes are alfaectcd please c~ontac0t emergenc.y plarmnn g.
2.:When the Blair Water plant is affected please contact:emergency planniq,.
- 3. Authorized power outages that affect or could affect siren operablity. p4ease c ontact. eminergen cy.
- planning.
The river flow rate and leVel:have been relatively constant at Blair NE. The Corp of Engineers is releasing Gavin's Point dam at 160,100 cubic feet per second (cfs).
Emergency Planning Contacts at FCS:
Steve Gebers:
- ,Pager:[(b)(6)
Work Phone: 402-53347308...
~iell Phone:
jil:
Allen Berck:..
lpager:L P ifi~
,.,Cell phone:l (b)(6),
Allen D. Berck Supervisor - Emergency Planning Fort Calhoun Station,:
Omaha Public Power District phone: 402-533-60641.
- ..pager: 1(b)(6 email: aberck@oppd.co"m
This e-mail tals Omaha i1Power District's ont Intial and proprietary informatio/and is or use oly by t e intended cipient.
niess explicitly stated otherwis, this e-mail is n t a contr ct offer,,
endment, nor acceptance. If you are not the/fntended r cipie you are n Qtifie at disclosing, copying, distributing or takinglany action i
- lance on the c-Ments of this infor ation is strictly prohibited.