MONTHYEARML24289A2052024-10-0909 October 2024 E-mail with Responses to Clarification Questions on Response to Request for Additional Information on the Phase 1 Final Status Survey Reports ML24025A1792024-01-23023 January 2024 State Consultation Response e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment– (License No. DPR-40, Docket No. 50-285) ML24024A2242024-01-22022 January 2024 State Consultation e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment- (License No. DPR-40, Docket No. 50-285) ML23311A0862023-11-0505 November 2023 Letter to M Morales Re Ft Calhoun License Termination Section 7 Determination for Ipac 2022-0029456 ML23038A1882023-01-31031 January 2023 Request for Additional Time to Respond to Request for Additional Information on License Amendment Request for Approval of License Termination Plan (License No. DPR-40, Docket No. 50-285) ML22222A1192022-08-0808 August 2022 Email Section 106 NHPA- Ft Calhoun Station License Termination Plan ML21069A2482021-03-10010 March 2021 Umax, 07200054, 05000361, 05000362, FSAR Revision 4 for San Onofre ISFSI ML21335A3352021-01-25025 January 2021 January 25, 2021 e-mail from J. Parrott, NRC to C. Cameron, OPPD Use of Resrad Model to Represent Well Water Concentrations in a Basement Substructure (License No. DPR-40, Docket No. 50-285) ML20204B0782020-07-22022 July 2020 Donna Gilmore Email Holtec Umax Materials (07200054, 05000361, 05000362) ML20113F0622020-04-22022 April 2020 E-mail Results of Acceptance Review of OPPD Request for Exemption from 10 CFR 20, App G, Section Iii.E (License No. DPR-40, Docket No. 50-285) ML20100J2272020-03-26026 March 2020 E-mail Notification to the State of Nebraska on the Issuance of the License Amendment for Revised Security Plans to Reflect an ISFSI-only Configuration (License No. DPR-40, Docket Nos. 50-285 and 72-54) ML20100L7232020-03-15015 March 2020 Email: Town of Desoto National Register of Historic Places Eligibility ML19353C3612019-12-11011 December 2019 E-mail to State of Nebraska Informing of the Pending Revision to the Emergency Plan to Reflect Independent Spent Fuel Storage Installation Only Status (License DPR-40, Docket Nos. 50-285 and 72-054) ML19309F1112019-10-11011 October 2019 ISFSI-Only Tech Specs ML19241A1812019-08-21021 August 2019 Request for Additional Information on Proposed Changes to the FCS Emergency Plan and Emergency Action Level Scheme to Reflect an ISFSI-only Status ML19175A0212019-06-19019 June 2019 Acceptance Review - License Amendment Request to Revise Security and Safeguards Requirements to Reflect ISFSI-Only Configuration ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19126A2802019-05-0101 May 2019 Acceptance Review - License Amendment Request for ISFSI-Only EP and EAL Scheme ML18100A2712018-04-0909 April 2018 04-09-18 OPPD E-Mail (FCS Permanently Defueled Emergency Plan Implementation) ML17236A3462017-08-24024 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Permanently Defueled TS (MF9567) ML17236A3442017-08-24024 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun Exemption from 10 CFR 140.11(a)(4), Off-site Primary and Secondary Liability Insurance (MF9664) ML17234A4692017-08-22022 August 2017 NRR E-mail Capture - Final RAI for Fort Calhoun LAR Regarding Removal of Dry Cask Loading Limits (MF9831) ML17194A9732017-07-13013 July 2017 NRR E-mail Capture - Final RAI for Fort Calhoun Ultimate Strength Design for Aux. Bldg LAR (MF8525) ML17191B0212017-07-10010 July 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review of Modification of LC 3.C to Delete Commission-approved CSP ML17184A0042017-06-30030 June 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review of Removal of Dry Cask Loading Limits ML17139C8342017-05-19019 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Partial Exemption from Record Retention Requirements ML17139C5082017-05-19019 May 2017 NRR E-mail Capture - (External_Sender) Need Corrected Page 6 for LIC-17-0043 ML17144A0132017-05-19019 May 2017 NRR E-mail Capture - Fort Calhoun PSDAR - Findings and Concerns ML17142A0202017-05-19019 May 2017 NRR E-mail Capture - (External_Sender) Need Corrected Page 6 to TQ-DC-FC-101 ML17139B6762017-05-18018 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Exemption from 10 CFR 140.11(a)(4), Off-Site Liability Insurance ML17139B6782017-05-18018 May 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review Exemption from 10 CFR 50.54(w)(1), On-Site Property Damage Insurance ML17136A1692017-05-16016 May 2017 NRR E-mail Capture - (External_Sender) OPPD FCS Decommissioning Financial Reports ML17115A4722017-04-25025 April 2017 NRR E-mail Capture - (External_Sender) Corrected Page 18 to TQ-DC-FC-201 ML17114A3112017-04-24024 April 2017 NRR E-mail Capture - Fort Calhoun - Acceptance Review TS Changes to Align for Decommissioning ML17112A0362017-04-20020 April 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Permanently Defueled EP and EAL Scheme Change LAR ML17090A3942017-03-31031 March 2017 NRR E-mail Capture - Fort Calhoun - Final RAI Regarding Administrative Control TS Change LAR (MF8437) ML17082A0022017-03-22022 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final Nsir/Dpr RAI Regarding Proposed Emergency Planning Exemption ML17081A0192017-03-21021 March 2017 NRR E-mail Capture - Fort Calhoun Station - Final RAI Regarding Proposed Emergency Planning Exemption ML17052A0272017-02-15015 February 2017 NRR E-mail Capture - Fort Calhoun Station, Unit No. 1 - Acceptance of Requested Amendment Revise Permanently Defueled Emergency Plan and EAL Scheme ML17033A9692017-02-0202 February 2017 NRR E-mail Capture - Fort Calhoun Station - Final Request for Additional Information Concerning Post-Shutdown Eplan Amendment ML16351A0432016-12-15015 December 2016 NRR E-mail Capture - (External_Sender) Fort Calhoun Station Offsite Response Organizations ML16350A0392016-12-15015 December 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8858) Fort Calhoun, Unit 1 - License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection Program ML16334A3002016-11-29029 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8525) Fort Calhoun, Unit 1 - License Amendment Request LAR-16-04 to Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements ML16333A2312016-11-28028 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8843)Fort Calhoun, Unit 1, Request for Rescission of Interim Compensatory Measure B.1.a from EA-02-026, Order for Interim Safeguards and Security Compensatory Measures. ML16333A0992016-11-28028 November 2016 NRR E-mail Capture - Acceptance Review (CAC No. MF8452), Fort Calhoun, Unit 1 - Request for Exemption from Specific Provisions in 10 CFR 73.55 ML16286A0812016-10-12012 October 2016 NRR E-mail Capture - Acceptance Review Fort Calhoun Station, Unit 1, License Amendment Request 16-03, Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning ML16278A0292016-10-0303 October 2016 NRR E-mail Capture - Acceptance Review Fort Calhoun Station Radiological Emergency Response Plan (RERP) for Decommissioning ML16257A0262016-09-12012 September 2016 NRR E-mail Capture - (External_Sender) OPPD Slides for 9/13/16 Pre-Application Meeting on Class 1 Structures ML16207A0182016-07-22022 July 2016 NRR E-mail Capture - Acceptance Review ML16137A0092016-05-16016 May 2016 NRR E-mail Capture - Acceptance Review CAC No. MF7574 2024-10-09
[Table view] |
Text
An-R Alexander, Ryan From: Farnholtz, Thomas gGo Sent: Sunday, July 10, 2011 11:05AM To: Kennedy, Kriss; Clark, Jeff; Vegel, Anton; Caldwell, Robert; Howell, Linda; Alexander, Ryan Cc: Kirkland, John; Wingebach, Jacob; Haire, Mark
Subject:
FW: Approved cleanup plan and controls Attachments: cleanup.pdf Hi -
FYI. The cleanup plan for the area inside the AquaDam. They are already making pretty good progress on the concrete areas adjacent to the buildings. Access to the yard without waiter.s is expanding rapidly.
In talking to some of the plant personnel it appears that the installation of the AquaDam was a major morale boaster.
Regards.
Tom.
From: PALLAS, ALAN S [1]
Sent: Sunday, July 10, 2011 10:36 AM To: FCS Flood Incident Commander Reports; R4 IRC; Farnholtz, Thomas
Subject:
Approved cleanup plan and controls
- All, Attached is the approved cleanup plan for the general area within the Protected Area.
- Thanks, Scott Pallas This e-mail c Omaha Public Powe istri 's confidential and prieta-rnformation and is for use only by the int ided recipi nt. Unless expl. itly stated o erwise, this ýXail is not a cc tract offer, amendment, nor accept ce. If you are ot the int ed recipient youre notif that disclosing, co i distributing or taking any a tion in reliance o e tents of this informatio strictly prohibited.
1
Protected Area Clean-up Plan The purpose of this document is to clean the concrete walkways and structures on the inside of the aqua-berm to ensure a safe working environment for station personnel. The area will consist of concrete surfaces from the maintenance shop dock on the north side of the plant to the T-1 transformer on the south side. This document is expected to be used after the inside area of the aqua-berm has been dewatered. The clean-up will require the use of potable water, shovels and push brooms.
Personal Precautions:
- a. Standard PPE requirement for all personnel involved (safety glasses, gloves and water proof boots).
- b. Be aware of slip and trip hazards.
- c. If personnel are on the outside (river side) of the aqua dam or on the aqua dam the two man rule is in effect and life jackets must be worn. A walking stick must be used to avoid submerged objects and open manholes.
- d. Perform a safety walk down of the area to be cleaned.
- e. If ingestion of foreign material or odor control is a concern, contact the Incident Commander for recommended controls. Nuisance dust masks may be worn at the discretion of the worker.
Job Site Precautions:
- a. A clean-up supervisor will be in direct over site of cleaning activities.
- b. A six foot standoff distance from the aqua dams shall be maintained by personnel and equipment that could damage or puncture the dams. A spotter must be present during cleanup activities within six feet of the aqua-dam.
- c. Entrance into the standoff distance requires a pre-job brief and spotter for cleaning and use of tools that will not cause a tear or puncture.
- d. No plant components or equipment will be cleaned during this activity.
- e. Do not aim the hose nozzle in the direction of personnel, flood control equipment (generators/pump engines) or spray water directly at or near electrical equipment.
- f. Chemicals shall not be used unless approved by Chemistry and contact Aqua Dam personnel for acceptability. Safety precautions per the MSDS shall be followed if used
Procedure:
- a. Obtain permission from the Shift Manager prior to using potable water.
- b. The Crew Lead will perform a pre-job brief to assign personnel duties and review job precautions.
- c. Walk down area and place all submerged pumps and hose on the maintenance shop loading dock for refurbishment. Place all garbage and small debris in trash bags for removal from the site that could be made airborne by the use of high pressure water and damage the aqua-dam.
- d. Cleanup activities will be per skill of the craft.
- e. Wash and broom down areas in the direction of the north east corner or south east corners of the aqua dam to the low point areas.
- f. Spray down the plant structure as directed by the cleanup supervisor.
- g. Pump down low point areas as needed to remove water and ground residue.
The purpose of this document is to provide a safe walkway and work environment for personnel. If further deep cleaning is needed, then a work request will need to be written and a more extensive cleaning plan for equipment and cleaning materials will be required.
Approved:
Shift Manager Date Incident Commander Date