E-mail from Thomas Farnholtz to Kriss Kennedy.... Ryan Alexander, Subject: Fw: Incident Commander Report
ML12012A152
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/10/2011
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Clark J, Kennedy K, Anton Vegel
NRC/NSIR/DSO/DDSO/SPEB, NRC/RGN-IV/DRP
References
FOIA/PA-2011-0339
Download: ML12012A152 (6)


Text

Alexander, Ryan From: Farnholtz, Thomas Sent: Sunday, July 10, 2011 5:47 PM To: Kennedy, Kriss; Clark, Jeff; Vegel, Anton; Caldwell, Robert; Howell, Linda; Alexander, Ryan Cc: Kirkland, John; Wingebach, Jacob

Subject:

Fw: Incident Commander Report Attachments: 7-10-11 Days.docx Hi -

The Sunday dayshift Incident Commander's Report. No significant changes from this morning.

Thank you and have a good day.

Tom.

Sent from my Blackberry.

From: PALLAS, ALAN S <aDallas(a)ogWd.com>

To: FCS Flood Incident Commander Reports <FCSFboodIncidentCommanderReDortsaoDod.com>; R4 IRC; Farnholtz, Thomas Sent: Sun Jul 10 18:13:12 2011

Subject:

Incident Commander Report

All, Attached is the Incident Commander report.
Thanks, Scott Pallas This e-mail *ns Omaha Public Powe confidential and propri Wormation and is for use only by the i ended rec ient. Unless expJit'lly stated ot e.rwise, this e-mai not a contra ffer, amendment, nor acco ided recipient you ar otified t isclosing, copying, *butinor taking action in reliance on ontents of this information y prohibited.

DA I E:: 1-1 U-ZU1 1 I TIME: U5UU JIG: Scott Pallas I SHIFT: Day Shift UAI~: 7-1-2011MERGEN0U CYct PaLAs CLS IFI SHIFTODySN Notification of Unusual Event (NOUE): Declared 616/11 0800; HU-1, EAL-5 i

Nuclear Safety:

ORAM Color: Green Time to Boil - Cavity: 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> SOPP Shutdown Condition: 1 but elevated risk due to Time to Boil - SFP: 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> Station flooding Industrial Safety:

1) Stay clear of energized, submerged 13.8 kV transformers inside PA
2) The two person rule is in effect for working or traversing in high flood waters.
3) Contact Mike Godfrey and Brian Kramer for all non-routine dayshift switchyard entries.
4) Maintenance Shop cross path secured with red tape due to column sinking. Requires bypassing through the Machine Shop. Safety Glasses required for passage. Safety glasses staged at both doors to the Machine Shop.
5) Do not park in or block reserved parking locations in the parking lot. Also, only on shift staff and personnel directly supporting the flooding efforts/priorities are to park in the new parking lot at the top of the hill. All others are to park at Blair High School and use the shuffle bus.
6) PA Clean-up Spray Team members: Long sleeve shirts and goggles required as designated by supervisor. Normal PPE for all other workers.

Radiological Safety: The portal radiation monitor at the south security exit point has been restored to service. Please ensure you stop and pause in the monitor on your way out of the Protected Area.

PLANT STATUS 345 kV Status: Available 1161 kV Status: Available DG1 Status: Available DG2 Status: Available Significant Bus / MCC Outages: Buses 1B4A Containment Closure Status: Still set for heavy loads Containment Temp: 80 OF Reactor/Cavity Water Level: 1036' 7.5" River Level: 1005' 11' (AOP-01)

Significant Equipment Unavailable: AC-3B, VA-64B, Switchgear Room A/C VA-89/90

SINFCN PRTCE EQUIMEN Areas and Equipment protected for Spent Fuel Pool, Shutdown Cooling, and Containment Closure:

" Room 5 - Spent Fuel Pool Cooling components

  • Room 18 - Raw Water/CCW Heat exchanger AC-1 D

" Room 69 - Component Cooling Water Pump AC-3C

  • East & West Switchgear Room - Bus 1A3

" DG-1 Room 63- Emergency Generator DG-1

" Intake Structure - Raw Water Pump AC-10D, "E" gate/screen, AC-12B RW Strainer, FP-1 B, Diesel Fire Pump, CW-16B

" VA-3A, Containment Filtering Unit

" Room 21 - Shutdown Cooling

" Corridor 26 by Boric Acid Tanks - Boric Acid and Makeup Flow paths (includes MCCs)

" Corridor 4 - Boric Acid and Makeup Flow paths (includes MCCs)

" Containment - Boric Acid and Makeup Flow paths

  • Upper Electrical Penetration Room - Boric Acid and Makeup Flow paths (includes MCCs)

" Switchyard 345 KV Breakers 5 and 6

" Transformers TIA-1 and TIA-2

" Aqua Dam Protected to 6'- Spotter required within 6'. Pump crews and inspections are exempt. IC and SM approval required.

" Continued pumping down the Railroad siding.

" Continued Pumping down the Protected Area.

" Commenced cleaning inside the Protected Area.

" Continued filling Aqua Dams.

" Approved and distributed the cleanup plan.

" Installed the new Admin. Building Aqua Dam Section 7. Filling in progress.

" Small refrigerators delivered to the 161 KV building and the Old Warehouse.

S Continue pump down of the protected area. (NPS)

S Continue pump down of the railroad siding. (CY/RP/OPS)

S Continue Cleanup activities S Monitor water intrusion inside the security building. May need to stage add'l equipment. (NPS)

LEAD WORK EXPECTED TASK GROUP COMPLETION COMMENTS DATE Develop punch list of work to complete in PA IC/Maint. July 11 Drafted after clean-up is complete Coordinator Thermography and loading of energized EM/QC/Ops. July 11 Buses energized on 7/9 and Buses 1B4B & 1B3B-4B available.

Jim Shores needs EM support for pulling new Comm/EM July 11 WR 166809 phone cable into the Security Building Finalize plan/schedule for remaining Bus Eng./Steve Clayton Required NLT WO#. Sr. Mgmt. high priority 1B4A RCA extent of condition inspections July 11 Reseal North Cable Tray Chase in Security Eng/Bill July 14 WR 166763 Need 60 Sand Building Phillips/Maint bags filled and Furmanite material. Prereq work to start on July 11 Install water proof enclosure boxes around Maint. July 15 WO#. After PA Aqua Dam is 13.8 kV transformers in PA installed and dewatering complete Install Temp. Mod. for MCC 4A2 EM July 19 EC#. Parts hold. Breaker scheduled arrival is 7/15 VA-89/90: Remove, restore and elevate SFM July 22 EC 53400 being processed by DEN for the elevated stands.

Transition Plan for Aqua Dam monitoring and TBD July 21 Transition aqua dam monitoring filling, and filling operators to support Ipersonnel.

Flood barriers installed per PE-RR-AE-1 001, with the following deviations:

AE 1007-1 door to Radwaste Building (power door) is removed. NOTE: NO POWER from MCC-4A2.

AE 1007-9 door from RCA to Chemistry is removed.

AE 1007-19 door - normal RP access point is removed.

AE 1011-1 door from Turbine Mezzanine to Coordinator 52 is removed.

AE-28-1011-4 south door switchgear room for emergency switchgear exit AE Intake structure "trash rack" outlet is removed for cell cleaning work.

SD-127, 128 - Maintenance Shop drains to Lift Station #1 - open VD-681, 682 - Switchgear Room HVAC drains to TB Sump - open Other 1007' barriers can be removed to allow work access with authorization from SM. All 1007' barriers will be re-installed when river level reaches 1006' 9" and rising, or when directed by the SM.

  • Level A CR 2011-5414: Loss of 1134A - Owner: Steve Clayton. RCA in progress.
  • Intake Screen sanding in issues - HIT formed under CR 2011-5750 - Ken Erdman lead.
  • Continue alternate switchgear room portable A/C cooling.

o Operating units include: One 5-ton air-cooled, five one-ton air-cooled, two 5-ton water-cooled and one 2-ton water-cooled.

o Ready spares include: One 5-ton air-cooled (staged in room), one 5-ton and two 1-ton air-cooled units in Maint Shop.

o Temperature monitor is now located on the side of the panel as you enter the upper room towards the shutdown panels o Need to monitor and empty condensation water from all air-cooled A/C units. (Maint/SFM)

" Steve Gebers has the lead to transition from Coops to Bartlett personnel for Pump/Berm Watch Team members.

  • Maintenance on failed pumps/generators appears to be due to sand or dirt in the gas. Be cautious that gas cans do not become contaminated with dirt and sand.

" Spare B.5.b Fire Truck from Fort Calhoun Volunteer Fire Dept located onsite. Supply hose in rack along walkway to King Tut blocks.

" Bottled water is stored in a sealand container at the top of the hill. Bring into PA as needed.

" Shift Manager and IC will continue to monitor river levels and utilize AOP-1, EPIP-TSC-2 and PE-RR-AE-1 001 as the a ciple governing documents.

" If communications or ERDS is lost in the Control Room or TSC; Incident Commander is to call NRC Senior Resident Inspector and the NRC operations center (per AOP).

" Use controls in place for boat safety - Need supervisor brief before getting boat keys from Incident Commander.

" Spare gas generators are staged on the Turbine Deck. Spare gas pumps are in the Maintenance Shop.

. . . I