Dec.
12, 2011 HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2011-68464 USER INFORMATION:
Name: GERLACH*ROSE M EMPL#:028401 CA#:0363 Address: NUCSA2 Phone#:
254-3194 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSE M 12/09/2011 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION:
"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRMI -
TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 11/30/2011 ADD MANUAL TABLE OF CONTENTS DATE: 12/08/2011 CATEGORY: DOCUMENTS ID:
TEXT 3.8.6 ADD:
REV: 1 REMOVE:
REV:0 TYPE: TRM1 CATEGORY:
ID:
TEXT REMOVE:
DOCUMENTS B3.7.9 REV:1 TYPE: TRM1 ADD:
REV: 2 CATEGORY:
DOCUMENTS ai:DTEXT B3.8.6 REV: 2 TYPE: TRM1 fAt REMOVE:
REV:I
0 CATEGORY: DOCUMENTS TYPE: TRM1 ID:
TEXT LOES ADD:
REV:
70 REMOVE:
REV:69 CATEGORY:
DOCUMENTS TYPE: TRMl ID:
TEXT TOC REMOVE:
REV:20 ADD:
REV: 21 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date:
12/08/2011 Procedure Name TEXT LOES
Title:
LIST OF EFF Rev Issue Date 70 12/08/2011
'ECTIVE SECTIONS Change ID Change Number TEXT TOC
Title:
TEXT 1.1
Title:
TEXT 2.1
Title:
TEXT 2.2
Title:
21 12/08/2011 TABLE OF CONTENTS 0
11/18/2002 USE AND APPLICATION DEFINITIONS 1
02/04/2005 PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS 9
01/13/2011 PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE LDCN 4414 TEXT 3.0 4
05/23/2008
Title:
TECHNICAL REQUIREMENT FOR OPERATION (TRO)
APPLICABILITY & SURVEILLANCE (TRS)
APPLICABILITY TEXT 3.1.1 1
11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT 3.1.2 0
11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT 3.1.3 5
04/16/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0
11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &
CHECK VALVE TEXT 3.2.1 12 01/25/2011
Title:
CORE OPERATING LIMITS REPORT (COLR)
Pae1 o
6RprtDt:1/91 Page.1 of 16 Report Date: 12/09/11
SSES MANUAL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1
Title:
INSTRUMENTATION 0
11/18/2002 RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3
03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2
11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 6
07/09/2010
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0
11/18/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 3
01/13/2011
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1
11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1
10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3
04/17/2008
Title:
OPRM INSTRUMENTATION CONFIGURATION TEXT 3.3.10 1
12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1
10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 0
04/16/2009
Title:
WATER MONITORING INSTRUMENTATION Page 2 of 16 Report Date: 12/09/11 Page 2 of 16 Report Date: 12/09/11
SSES MANUAL
.W Manual Name:
TRMI k
Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.4.1
Title:
REACTOR TEXT 3.4.2
Title:
REACTOR TEXT 3.4.3
Title:
REACTOR TEXT 3.4.4
Title:
REACTOR TEXT 3.4.5
Title:
REACTOR TEXT 3.4.6
Title:
REACTOR TEXT 3.5.1 1
04/26/2006 COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY 1
04/16/2009 COOLANT SYSTEM STRUCTURAL INTEGRITY 1
11/09/2007 COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS 2
04/17/2008 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1
04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1
06/15/2010 RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION 1
02/04/2005
Title:
EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1
11/09/2007
Title:
EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0
11/18/2002
Title:
EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/18/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 1
08/23/2011
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0
11/18/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page 3 of 16 Report Date: 12/09/11 Page 3 of
.16 Report Date: 12/09/11
SSES MANUAL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4 0
11/18/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1
Title:
PLANT TEXT 3. 7.2
Title:
PLANT TEXT 3.7.3.1
Title:
PLANT TEXT 3.7.3.2
Title:
PLANT TEXT 3.7.3.3
Title:
PLANT TEXT 3.7.3.4
Title:
PLANT TEXT 3.7.3.5
Title:
PLANT TEXT 3.7.3.6
Title:
PLANT TEXT 3.7.3.7
Title:
PLANT TEXT 3.7.3.8
Title:
PLANT 0
11/18/2002 SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)
SHUTDOWN 0
11/18/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)
AND GROUND WATER LEVEL 2
04/16/2009 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 3
04/16/2009 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 3
04/16/2009 SYSTEMS C02 SYSTEMS 2
04/16/2009 SYSTEMS HALON SYSTEMS SYSTEMS FIRE SYSTEMS YARD SYSTEMS FIRE SYSTEMS FIRE 2
04/16/2009 HOSE STATIONS 2
04/16/2009 FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1
04/26/2006 RATED ASSEMBLIES 9
11/30/2011 DETECTION INSTRUMENTATION LDCN 1
04/26/2006 3503 TEXT 3.7.4
Title:
PLANT SYSTEMS SOLID RADWASTE SYSTEM Page 4 of 16 Report Date: 12/09/11 Page 4 of
.16 Report Date: 12/09/11
SSES MANUAL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT I TEXT 3.7.5.1
Title:
PLANT TEXT 3.7.5.2
Title:
PLANT TEXT 3.7.5.3
Title:
PLANT TEXT 3.7.6
Title:
PLANT TEXT 3.7.7
Title:
PLANT 0
11/18/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0
11/18/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 1
04/26/2006 SYSTEMS LIQUID HOLDUP TANKS 2
06/27/2008 SYSTEMS ESSW PUMPHOUSE VENTILATION 2
09/05/2008 SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9
Title:
PLANT SYSTEMS CONTROL TEXT 3.7.10
Title:
PLANT SYSTEMS SPENT FU]
TEXT 3.7.11
Title:
STRUCTURAL INTEGRITY 4
06/21/2007 1
08/28/2006 STRUCTURE HVAC 1
12/14/2004 EL STORAGE POOLS (SFSPS) 0 04/16/2009 TEXT 3.8.1
Title:
ELECTRICAL PROTECTIVE TEXT 3.8.2.1
Title:
ELECTRICAL CONTINUOUS 2
04/05/2010 POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 2
11/09/2007 POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
P TEXT 3.8.2.2 2
12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page 5 of U
Report Date: 12/09/11
SSES MANUAL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3
Title:
ELECTRICAL TEXT 3.8.4
Title:
ELECTRICAL TEXT 3.8.5
Title:
ELECTRICAL TEXT 3.8.6
Title:
ELECTRICAL TEXT 3.8.7 1
04/05/2010 POWER DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES 0
11/18/2002 POWER 24 VDC ELECTRICAL POWER SUBSYSTEM 0
11/18/2002 POWER DEGRADED VOLTAGE PROTECTION 1
12/08/2011 POWER EMERGENCY SWITCHGEAR ROOM COOLING 1
06/15/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0
11/18/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/18/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0
11/18/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1
04/26/2006
Title:
MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 2
08/08/2006
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2
06/15/2010
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4 2
04/17/2008
Title:
MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)
Page6 of i~.
Report Date: 12/09/11 Page 6 of 16 Report Date: 12/09/11
SSES MANUAL
.O Manual Name:
TRMI1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.1
Title:
RADIOACTIVE TEXT 3.11.1.2
Title:
RADIOACTIVE TEXT 3.11.1.3
Title:
RADIOACTIVE TEXT 3.11.1.4
Title:
RADIOACTIVE TEXT 3.11.1.5
Title:
RADIOACTIVE TEXT 3.11.2.1
Title:
RADIOACTIVE TEXT 3.11.2.2
Title:
RADIOACTIVE TEXT 3.11.2.3
Title:
RADIOACTIVE FORM TEXT 3.11.2.4
Title:
RADIOACTIVE TEXT 3.11.2.5
Title:
RADIOACTIVE TEXT 3.11.2.6
Title:
RADIOACTIVE TEXT 3.11.3
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1
04/26/2006 LIQUID EFFLUENTS CONCENTRATION 1
04/26/2006 LIQUID EFFLUENTS DOSE 1
04/26/2006 LIQUID WASTE TREATMENT SYSTEM 1
12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2
05/02/2007 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 3
04/26/2006 DOSE RATE 1
04/26/2006 DOSE -
NOBLE GASES 1
04/26/2006 DOSE -
11/18/2002 GASEOUS RADWASTE TREATMENT SYSTEM 3
11/14/2006 VENTILATION EXHAUST TREATMENT SYSTEM 4
09/16/2009 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION 1
04/26/2006 TOTAL DOSE Page 7 of 16 Report Date: 12/09/11 Page 7 of
.16 Report Date: 12/09/11
SSES MANUAL Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.4.1
Title:
RADIOACTIVE TEXT 3.11.4.2
Title:
RADIOACTIVE TEXT 3.11.4.3
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS 4
08/08/2006 MONITORING PROGRAM 2
04/26/2006 LAND USE CENSUS 1
04/26/2006 INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0
11/19/2002
Title:
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2 4
04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4.1
Title:
TEXT 4.2
Title:
TEXT 4.3
Title:
TEXT 4.4
Title:
TEXT 4.5
Title:
TEXT 4.6
Title:
ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0
CONTROLS 0
CONTROLS 08/31/1998 ORGANIZATION 08/31/1998 REPORTABLE EVENT ACTION 0
08/31/1998 CONTROLS SAFETY LIMIT VIOLATION 1
CONTROLS 0
CONTROLS 0
CONTROLS 12/18/2008 PROCEDURES & PROGRAMS 08/31/1998 REPORTING REQUIREMENTS 08/31/1998 RADIATION PROTECTION PROGRAM Page 8 of 16 Report Date: 12/09/11 Page 8 of
.16 Report Date: 12/09/11
SSES MANUAL Manual Name:
TRmI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 4.7 0
08/31/1998
Title:
ADMINISTRATIVE CONTROLS TRAINING TEXT B3.0 4
05/23/2008
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 1
11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT B3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT B3.1.3 3
03/31/2006
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0
11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1
Title:
INSTRUMENTATION TEXT B3.3.2
Title:
INSTRUMENTATION TEXT B3.3.3
Title:
INSTRUMENTATION TEXT B3.3.4
Title:
INSTRUMENTATION TEXT B3.3.5
Title:
INSTRUMENTATION 0
11/19/2002 BASES RADIATION MONITORING INSTRUMENTATION 2
03/31/2011 BASES SEISMIC MONITORING INSTRUMENTATION 3
12/18/2008 BASES METEOROLOGICAL MONITORING INSTRUMENTATION 4
07/09/2010 BASES TRM POST ACCIDENT MONITORING (PAM)
INSTRUMENTATION 2
11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK Page ~
of 16 Report Date: 12/09/11 Page 9 of 16 Report Date: 12/09/11
SSES MANUAL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.6 4
01/13/2011
Title:
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7 1
11/09/2007
Title:
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1
10/22/2003
Title:
INSTRUMENTATION BASES TRM REACTOR PROTECTION SYSTEM (RPS)
INSTRUMENTATION TEXT B3.3.9
Title:
OPRM INSTRUMENTATION 3
04/17/2008 TEXT B3.3.10 3
08/09/2010
Title:
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11 1
10/22/2003
Title:
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0
04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1
Title:
REACTOR TEXT B3.4.2
Title:
REACTOR TEXT B3.4.3
Title:
REACTOR 0
11/19/2002 COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY 1
04/16/2009 COOLANT SYSTEM BASES STRUCTURAL INTEGRITY 1
11/09/2007 COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4
Title:
REACTOR COOLANT TEXT B3.4.5
Title:
11/19/2002 SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0
11/19/2002 SYSTEM BASES REACTOR VESSEL MATERIALS Page i~
of 16 Report Date: 12/09/11 Page 10 of
.16 Report Date: 12/09/11
SSES MANUAL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.4.6 1
06/15/2010
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT B3.5.1 0
11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1
11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1
11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0
11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0
11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 2
04/17/2008
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION LDCN 3933 TEXT B3.6.4 1
12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0
11/19/2002
Title:
PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2 0
11/19/2002
Title:
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS)
GROUND WATER LEVEL TEXT B3.7.3.1 3
06/15/2010
Title:
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2
04/26/2006
Title:
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 11 of 16 Report Date: 12/09/11
SSES MANUAL O
Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.3
Title:
PLANT TEXT B3.7.3.4
Title:
PLANT TEXT B3.7.3.5
Title:
PLANT TEXT B3.7.3.6
Title:
PLANT TEXT B3.7.3.7
Title:
PLANT TEXT B3.7.3.8
Title:
PLANT TEXT B3.7.4
Title:
PLANT TEXT B3.7.5.1
Title:
PLANT TEXT B3.7.5.2
Title:
PLANT TEXT B3.7.5.3
Title:
PLANT TEXT B3.7.6
Title:
PLANT 0
11/19/2002 SYSTEMS BASES C02 SYSTEMS 1
04/26/2006 SYSTEMS BASES HALON SYSTEMS 1
04/26/2006 SYSTEMS BASES FIRE HOSE STATIONS 1
04/26/2006 SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0
11/19/2002 SYSTEMS BASES FIRE RATED ASSEMBLIES 2
11/30/2011 SYSTEMS BASES FIRE DETECTION INSTRUMENTATION 0
11/19/2002 SYSTEMS BASES SOLID RADWASTE SYSTEM 0
11/19/2002 SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0
11/19/2002 SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0
11/19/2002 SYSTEMS BASES LIQUID HOLDUP TANKS 2
06/27/2008 SYSTEMS BASES ESSW PUMPHOUSE VENTILATION 2
01/31/2008 TEXT B3.7.7
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Page 12 of
.16 Report Date: 12/09/11
SSES MANUAL
.* Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.8
Title:
PLANT TEXT B3.7.9
Title:
PLANT TEXT B3.7.10
Title:
PLANT 3
SNUBBERS 06/21/2007 SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 2
12/08/2011 CONTROL STRUCTURE HVAC 1
12/14/2004 SPENT FUEL STORAGE POOLS TEXT B3.7.11
Title:
STRUCTURAL INTEGRITY 1
04/14/2010 TEXT B3.8.1
Title:
ELECTRICAL PROTECTIVE TEXT B3.8.2.1
Title:
ELECTRICAL CONTINUOUS TEXT B3.8.2.2
Title:
ELECTRICAL AUTOMATIC TEXT B3.8.3
Title:
ELECTRICAL TEXT B3.8.4
Title:
ELECTRICAL TEXT B3.8.5
Title:
ELECTRICAL TEXT B3.8.6
Title:
ELECTRICAL TEXT B3.8.7 2
03/10/2010 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0
11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD 1
09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD 0
11/19/2002 POWER BASES DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES 0
11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM 0
11/19/2002 POWER BASES DEGRADED VOLTAGE PROTECTION 2
12/08/2011 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 1
06/15/2009 PROTECTION -
PROTECTION -
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM Page 13 of 16 Report Date: 12/09/11 Page 13 of 16 Report Date: 12/09/11
SSES MANUAL Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.9.1 0
Title:
REFUELING OPERATIONS BASES TEXT B3.9.2 0
Title:
REFUELING OPERATIONS BASES TEXT B3.9.3 0
Title:
REFUELING OPERATIONS BASES TEXT B3.10.1 0
Title:
MISCELLANEOUS BASES SEALED TEXT B3.10.2 1
11/19/2002 DECAY TIME 11/19/2002 COMMUNICATIONS 11/19/2002 REFUELING PLATFORM 11/19/2002 SOURCE CONTAMINATION 03/31/2006
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0
11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.10.4 1
Title:
MISCELLANEOUS BASES LEADING 04/17/2008 EDGE FLOW METER (LEFM)
TEXT B3.11.1.1
Title:
RADIOACTIVE TEXT B3.11.1.2
Title:
RADIOACTIVE TEXT B3.11.1.3
Title:
RADIOACTIVE TEXT B3.11.1.4
Title:
RADIOACTIVE TEXT B3.11.1.5
Title:
RADIOACTIVE 0
11/19/2002 EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION 0
11/19/2002 EFFLUENTS BASES LIQUID EFFLUENTS DOSE 0
11/19/2002 EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM 0
11/19/2002 EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 0
11/19/2002 EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION Page 14 of 16 Report Date: 12/09/11 Page 14 of 16 Report Date: 12/09/11
SSES MANUAL Manual Name:
TRM1 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.2.1 1
12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.3
Title:
RADIOACTIVE EFFLUENTS PARTICULATES FORM 0
BASES 11/19/2002 DOSE -
NOBLE GASES 0
11/19/2002 BASES DOSE -
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.6
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.3
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.1
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.2
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.3
Title:
RADIOACTIVE EFFLUENTS TEXT B3.12.1
Title:
LOADS CONTROL PROGRAM TEXT B3.12.2
Title:
LOADS CONTROL PROGRAM 4
11/14/2006 BASES VENTILATION EXHAUST 1
01/27/2004 BASES RADIOACTIVE GASEOUS TREATMENT SYSTEM EFFLUENT MONITORING 0
11/19/2002 BASES TOTAL DOSE 3
07/09/2010 BASES MONITORING PROGRAM 0
11/19/2002 BASES LAND USE CENSUS 0
11/19/2002 BASES INTERLABORATORY COMPARISON PROGRAM 1
10/04/2007 BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL 1
12/03/2010 BASES HEAVY LOADS REQUIREMENTS Page 15 of 16 Report Date: 12/09/11 Page 15 of 16 Report Date: 12/09/11
SSES MANUAL (9* Manual Name:
TRMI Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 16 of 16 Report Date: 12/09/11 Page 16 of 16 Report Date: 12/09/11
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 1.0 USE A ND APPLICATIO N.......................................................................
TRM /1.0-1 1.1 D efinitions.........................................................................................
T R M /1.0-2 2.0 P LA N T P R O G RA M S.......................................................................................
2.0-1 2.1 P la nt P ro gra m s..........................................................................................
2.0-1 2.2 Instrument Trip Setpoint Table..........................................................
TRM/2.0-5 3.0 A P PLIC A B ILITY......................................................................................
T R M /3.0-1 3.0 TRO) - TR for Operation (TRO) Applicability................
TRM/3.0-1 3.0 (TRS) - TR Surveillance (TRS) Applicability.................
TRM/3.0-3 3.1 REACTIVITY CONTROL SYSTEMS..........................
TRM/3.1-1 3.1.1 Alternate Rod Injection..............................
TRM/3.1-1 3.1.2 CRD H ousing Support............................................................... 3.1-4 3.1.3 Control Rod Block Instrumentation.ns..m,
....................... 3.1-5 3.1.4 Control Rod Scram Accumulators Instrum C heck V alve...................
TR M /3.1-9 3.2 CORE OPERATING LIMITS REP T
TRM/3.2-1 3.2.1 Core Operating Limits Reprt...
TRM/3.2-1 3.3 INSTRUMENTATION......
........................................................ TRM/3.3-1 3.3.1n_
R a
n ion.....................
TRM/3.3-1 3.3.2 Seismic Monitor strum-ation...................................................
TRM/3.3-4 3.3.3 Meteorological4, ort,@.ing Instrumentation........................................
TRM/3.3-7 3.3.4 TRM Post-Adre-A nt
- t, oring Instrumentation.................................
TRM/3.3-9 3.3.5 Section TRM.3.3-12 3.3.6 TRM Co aolaton Instrumentation......................................
TRM/3.3-13 3.3.7 Tur e
s ed Protection System......
TRM/3.3-17 3.3.8 S e o d..............................................................................
T R M /3.3-19 3.3.9 O __
In rum entation......................................................................
TR M /3.3-22 3.3.10 ea
, circulation Pump MG Set Electrical and M
anical S tops..............................................................................
T R M /3.3-23 3.3.11 lhV Isolation Instrumentation...........................................................
TRM/3.3-25 3.3.12 rater Monitoring Instrumentation.....................................................
TRM/3.3-27 3.4 REACTOR COOLANT SYSTEM.............................................................
TRM/3.4-1 3.4.1 Reactor Coolant System Chemistry...................................................
TRM/3.4-1 3.4.2 N ot U sed...........................................................................................
T R M /3.4-6 3.4.3 High/Low Pressure Interface Leakage Monitors.........................................
3.4-9 3.4.4 Reactor Recirculation Flow and Rod Line Limit.................................
TRM/3.4-12 3.4.5 Reactor Vessel Material Surveillances Program................................
TRM/3.4-13 3.4.6 Reactor Recirculation Single Loop Operation (SLO)
Flow Rate Restriction.......................................................................
TRM /3.4-14 SUSQUEHANNA-UNIT 1 TRM I TOC-1 EFFECTIVE DATE 11/30/2011 SUSQUEHANNA - UNIT 1 TRM / TOC-1 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 3.5 EMERGENCY CORE COOLING AND RCIC..........................................
TRM/3.5-1 3.5.1 ADS Manual Inhibit...........................................................................
TRM/3.5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation.................................
3.5-3 3.5.3 Long Term Nitrogen Supply to ADS...........................................................
3.5-6 3.6 CONTAINMENT...............................................................................................
3.6-1 3.6.1 VENTING or PURGING.....................................................
....... 3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication...........................................................................................
TRM/3.6-2 3.6.3 Suppression Pool Alarm Instrumentation....................................................
3.6-3 3.6.4 Primary Containment Closed System Boundaries.............................
TRM/3.6-6 3.7 PLANT SYSTEMS...........................................................................................
3.7-1 3.7.1 Emergency Service W ater System (Shutdown)..........................................
3.7-1 3.7.2 Ultimate Heat Sink and Ground W ater Level..............................................
3.7-3 3.7.3.1 Fire Suppression W ater Supply System............................................
TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems............................................................
TRM/3.7-8 3.7.3.3 C02 Systems....................................................................................
TRM/3.7-12 3.7.3.4 Halon Systems..................................................................................
TRM/3.7-16 3.7.3.5 Fire Hose Stations.............................................................................
TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses..................................
TRM/3.7-22 3.7.3.7 Fire Rated Assemblies......................................................................
TRM/3.7-24 3.7.3.8 Fire Detection Instrumentation..........................................................
TRM/3.7-26 3.7.4 Solid Radwaste System....................................................................
TRM/3.7-35 3.7.5.1 Main Condenser Offgas Hydrogen Monitor................................................
3.7-38 3.7.5.2 Main Condenser Explosive Gas Mixture.....................................................
3.7-39 3.7.5.3 Liquid Holdup Tanks.........................................................................
TRM/3.7-40 3.7.6 ESSW Pumphouse Ventilation..........................................................
TRM/3.7-41 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation................................................................
TRM/3.7-42 3.7.8 Snubbers...........................................................................................
TRM/3.7-44 3.7.9 Control Structure HVAC....................................................................
TRM/3.7-50 3.7.10 Spent Fuel Storage Pools.................................................................
TRM/3.7-52 3.7.11 Structural Integrity.............................................................................
TRM/3.7-55 SUSQUEHANNA - UNIT 1 TRM / TOC-2 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 3.8 ELECTRICAL POWER..........................................................................
TRM/3.8-1 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices............................................................................
TRM/3.8-1 3.8.2.1 Motor Operated Valves Thermal Overload Protection -
C ontinuous........................................................................................
T R M /3.8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection -
A utom atic..........................................................................................
T R M /3.8-11 3.8.3 Diesel Generator (DG) Maintenance Activities..................................
TRM/3.8-13 3.8.4 24VDC Electrical Power Subsystem..................................................
TRM/3.8-15 3.8.5 Degraded Voltage Protection............................................................
TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling..............................................
TRM/3.8-24 3.8.7 Battery Monitoring and Maintenance Program..................................
TRM/3.8-26 3.9 REFUELING OPERATIONS............................................................................
3.9-1 3.9.1 D ecay T im e................................................................................................
3.9-1 3.9.2 C om m unications........................................................................................
3.9-2 3.9.3 R efueling P latform......................................................................................
3.9-3 3.10 MISCELLANEOUS...................................................................................
TRM/3.10-1 3.10.1 Sealed Source Contamination.............................................................
TRM/3.10-1 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation...............................
3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI).........................
TRM/3.10-7 3.11 RADIOACTIVE EFFLUENTS..................................................................
TRM/3.11-1 3.11.1.2 Liquid Effluents Concentration...........................................................
TRM/3.11-1 3.11.1.2 Liquid Effluents Dose.......................................................................
TRM/3.11-4 3.11.1.3 Liquid Waste Treatment System.......................................................
TRM/3.11-6 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation.................................
3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation................... TRM/3.11-13 3.11.2.1 D ose R ate........................................................................................
T R M /3.11-17 3.11.2.2 Dose - Noble Gases....................
.................. TRM/3.11-20 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form................................................................................
T R M /3.11-21 3.11.2.4 Gaseous Radwaste Treatment System.............................................
TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System..............................................
TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrum entation...................................................................................
T R M /3.11-25 3.11.3 T otal D ose...........................................................................................
T R M /3.11-33 3.11.4.1 Monitoring Program.............................................................................
TRM/3.11-35 3.11.4.2 Land Use Census................................................................................
TRM/3.11-45 3.11.4.3 Interlaboratory Comparison Program..................................................
TRM/3.11-47 SUSQUEHANNA -
UNIT 1 TRM I TOC-3 EFFECTIVE DATE 11/30/2011 SUSQUEHANNA - UNIT 1 TRM / TOC-3 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 3.12 LOADS CONTROL PROGRAM..............................................................
TRM/3.12-1:
3.12.1 Crane Travel - Spent Fuel Storage Pool.................................................
TRM/3.12-1 3.12.2 Heavy Loads Requirements....................................................................
TRM/3.12-3 3.12.3 Light Loads Requirements......................................................................
TRM/3.12-5 4.0 ADMINISTRATIVE CONTROLS......................................................................
4.0-1 4.1 Organization....................................................................................................
4.0-1 4.2 Reportable Event Action..................................................................................
4.0-2 4.3 Safety Limit Violation.......................................................................................
4.0-3 4.4 Procedures and Programs...............................................................................
4.0-4 4.5 Reporting Requirements..................................................................................
4.0-5 4.6 Radiation Protection Program..........................................................................
4.0-7 4.7 T ra in in g............................................................................................................
4.0 -8 SUSQUEHANNA - UNIT 1 TRM / TOC-4 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE B 3.0 A pplica bility................................................................................................
B 3.0-1 B 3.0 (TRO) - TR for Operation (TRO) Applicability.............................................
B 3.0-1 B 3.0 (TRS) - TR Surveillance (TRS) Applicability...............................................
B 3.0-9 B 3.1.1 Alternate Rod Injection......................................................................
TRM/B 3.1-1 B 3.1.2 CRD Housing Support.......................................................................
TRM/B 3.1-4 B 3.1.3 Control Rod Block Instrumentation....................................................
TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and C heck V alve......................................................................................
T R M /B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR)........................................................
B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation................................................
TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation...................................................
TRM/B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation........................................
TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation.................................
TRM/B 3.3-4 B 3.3.5 Section Not Used..............................................................................
TRM/B 3.3-9 B 3.3.6 TRM Containment Isolation Instrumentation......................................
TRM/B 3.3-10 B 3.3.7 Turbine Overspeed Protection System..............................................
TRM/B 3.3-14 B 3.3.8 Section Not Used..............................................................................
TRM/B 3.3-15 B 3.3.9 OPRM Instrumentation......................................................................
TRM/B 3.3-17 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops..............................................................................
TRM/B 3.3-18 B 3.3.11 MVP Isolation Instrumentation...........................................................
TRM/B 3.3-20 B 3.3.12 Water Monitoring Instrumentation.....................................................
TRM/B 3.3-22 B 3.4.1 Reactor Coolant System Chemistry............................................................
B 3.4-1 B 3.4.2 N ot U sed...........................................................................................
T R M /B 3.4-2 B 3.4.3 High/Low Pressure Interface Leakage Monitors................................
TRM/B 3.4-4 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit.................................
TRM/B 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program.........................................
B 3.4-6 B 3.4.6 Reactor Recirculation Single Loop Operation (SLO)
Flow Rate Restriction.......................................................................
TRM/B 3.4-7 B 3.5.1 A D S M anual Inhibit....................................................................................
B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation........................ TRM/B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS..................................................
TRM/B 3.5-4 SUSQUEHANNA
- UNIT 1 TRM / TOC-5 EFFECTIVE DATE 11/30/2011 SUSQUEHANNA - UNIT 1 TRM /TOC-5 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE B 3.6.1 VENTING or PURGING....................................................................
TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Ind ica tio n....................................................................................................
B 3.6 -3 B 3.6.3 Suppression Pool Alarm Instrumentation...........................................
TRM/B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries.............................
TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown)..........................................
B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level..............................................
B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System............................................
TRM/B 3.7-3 B 3.7.3.2 Spray and Sprinkler Systems............................................................
TRM/B 3.7-5 B 3.7.3.3 C02 systems....................................................................................
TRM/B 3.7-7 B 3.7.3.4 Halon Systems..................................................................................
TRM/B 3.7-8 B 3.7.3.5 Fire Hose Stations.............................................................................
TRM/B 3.7-10 B 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses..................................
TRM/B 3.7-11 B 3.7.3.7 Fire Rated Assemblies......................................................................
TRM/B 3.7-12 B 3.7.3.8 Fire Detection Instrumentation..........................................................
TRM/B 3.7-14 B 3.7.4 Solid Radwaste System....................................................................
TRM/B 3.7-15 B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor................................................
B 3.7-17 B 3.7.5.2 Main Condenser Explosive Gas Mixture.....................................................
B 3.7-19 B 3.7.5.3 Liquid Holdup Tanks..................................................................................
B 3.7-20 B 3.7.6 ESSW Pumphouse Ventilation..........................................................
TRM/B 3.7-21 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation................................................................
TRM/B 3.7-22 B 3.7.8 S nubbers...........................................................................................
T R M /B 3.7-24 B 3.7.9 Control Structure HVAC....................................................................
TRM/B 3.7-31 B 3.7.10 Spent Fuel Storage Pools.................................................................
TRM/B 3.7-33 B 3.7.11 Structural Integrity.............................................................................
TRM/B 3.7-36 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective D evices............................................................................
TR M /B 3.8-1 B 3.8.2.1 Motor Operated Valves Thermal Overload Protection -
C ontinuous........................................................................................
T R M /B 3.8-3 B 3.8.2.2 Motor Operated Valves Thermal Overload Protection -
A utom atic..........................................................................................
T R M /B 3.8-4 B 3.8.3 Diesel Generator (DG) Maintenance Activities...........................................
B 3.8-5 B 3.8.4 24VDC Electrical Power Subsystem...........................................................
B 3.8-6 B 3.8.5 Degraded Voltage Protection............................................................
TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling..............................................
TRM/B 3.8-17 B 3.8.7 Battery Monitoring and Maintenance Program..................................
TRM/B 3.8-18 B.3.9.1 D ecay T im e................................................................................................
B 3.9-1 B 3.9.2 C om m unications.......................................................................................
B 3.9-2 SUSQUEHANNA-UNITi TRM / TOC-6 EFFECTIVE DATE 11/30/2011 SUSQUEHANNA - UNIT 1 TRM / TOC-6 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE B 3.9.3 R efueling P latform......................................................................................
B 3.9-3 B 3.10.1 Sealed Source Contamination....................................................................
B 3.10-1 B 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation...................... TRM/B 3.10-2 B 3.10.3 Independent Spent Fuel Storage Installation (ISFSI).........................
TRM/B 3.10-4 B 3.11.1.1 Liquid Effluents Concentration....................................................................
B 3.11-1 B 3.11.1.2 Liquid Effluents Dose.................................................................................
B 3.11-4 B 3.11.1.3 Liquid Waste Treatment System................................................................
B 3.11-6 B 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation.................................
B 3.11-7 B 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation.................... TRM/B 3.11-10 B 3.11.2.1 D ose R ate.........................................................................................
T R M /B 3.11-12 B 3.11.2.2 Dose - Noble Gases...................................................................................
B 3.11-16 B 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form.........................................................................................
B 3.11-18 B 3.11.2.4 Gaseous Radwaste Treatment System.............................................
TRM/B 3.11-20 B 3.11.2.5 Ventilation Exhaust Treatment System..............................................
TRM/B 3.11-21 B 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation.................................................................................
TRM/B 3.11-24 B 3.11.3 T otal D ose..................................................................................................
B 3.11-26 B 3.11.4.1 Monitoring Program...........................................................................
TRM/B 3.11-28 B 3.11.4.2 Land Use Census.......................................................................................
B 3.11-34 B 3.11.4.3 Interlaboratory Comparison Program................................................
TRM/B 3.11-36 B.3.12.1 Crane Travel - Spent Fuel Storage Pool...........................................
TRM/B 3.12-1 B.3.12.2 Heavy Loads Requirements..............................................................
TRM/B 3.12-2 B.3.12.3 Light Loads Requirements................................................................
TRM/B 3.12-3 TRMI text TOC 12/1/2011 SUSQUEHANNA - UNIT 1 TRM /TOC-7 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 70 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title TOC 1.0 2.0 TABLE OF CONTENTS USE AND APPLICATION Pages TRM / 1.0-1 through TRM / 1.0-3 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM / 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Pages TRM / 2.0-8 and TRM / 2.0-9 Page TRM /2.0-10 Page TRM / 2.0-11 Page TRM / 2.0-12 Pages TRM / 2.0-13 and TRM / 2.0-14 Page TRM / 2.0-15 Effective Date 11/30/2011 10/04/2002 08/31/1998 01/28/2005 06/25/2002 04/02/1999 03/27/2008 05/15/2008 01/07/2011 02/02/2010 11/15/2004 03/27/2008 11/15/2004 11/15/2005 3.0 APPLICABILITY Page TRM / 3.0-1 Page TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 3.1 3.2 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 Pages TRM / 3.1-2 through TRM / 3.1-5 Page TRM / 3.1-6 Page TRM / 3.1-7 Page TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-54 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Page TRM / 3.3-4 and TRM / 3.3-5 Page TRM / 3.3-6 Page TRM / 3.3-7 Page 3.3-8 Pages TRM / 3.3-9 and TRM / 3.3-9a 04/14/2008 04/12/2007 03/15/2002 11/30/2005 10/31/2007 08/31/1998 03/22/2006 04/07/2009 03/27/2008 02/18/1999 02/18/1999 07/07/1999 01/20/2011 07/16/1999 10/31/2007 03/10/2011 10/31/2007 08/31/1998 06/30/2010 3.3 SUSQUEHANNA - UNIT I TRM / LOES-1 EFFECTIVE DATE 11/30/2011 SUSQUEHANNA - UNIT 1 TRM / LOES-1 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 70 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.4 Page TRM / 3.3-10 Pages TRM / 3.3-11 and TRM / 3.3-11 a Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Pages TRM / 3.3-15 and TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 through TRM / 3.3-21 Page TRM / 3.3-22 Page TRM / 3.3-22a Pages TRM / 3.3-22b through TRM / 3.3-22d Page TRM / 3.3-23 Pages TRM / 3.3-24 and TRM / 3.3-25 Page TRM / 3.3-26 Pages TRM / 3.3-27 and TRM / 3.3-28 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages TRM / 3.4-6 through TRM / 3.4-8 Page TRM / 3.4-9 Page TRM / 3.4-10 Page TRM / 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 Pages TRM / 3.4-14 and TRM / 3.4-15 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Pages TRM / 3.5-4 and TRM / 3.5-5 Pages 3.5-6 and 3.5-7 CONTAINMENT Page 3.6-1 Pages TRM / 3.6-2 and TRM / 3.6-2a Page 3.6-3 Page TRM / 3.6-4 Page 3.6-5 Pages TRM / 3.6-6 through TRM / 3.6-8 10/31/2007 06/30/2010 03/30/2001 01/07/2011 12/14/1998 01/07/2011 06/14/2002 10/31/2007 10/22/2003 03/27/2008 11/15/2004 03/22/2006 12/03/2004 05/16/2003 10/22/2003 04/07/2009 03/31/2006 10/23/1998 04/01/2009 08/31/1998 10/31/2007 08/31/1998 03/27/2008 03/31/2006 06/10/2010 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 08/11/2011 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.5 3.6 SUSQUEHANNA - UNIT 1 TRM / LOES-2 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 70 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.7 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 Page TRM / 3.7-4 Pages TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM / 3.7-12 Page TRM / 3.7.13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM /3.7-17 Page TRM /3.7-18 Page TRM /3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM / 3.7-23 Page TRM / 3.7-24 Pages TRM / 3.7-25 and TRM 3.7-26 Page TRM 3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Pages TRM / 3.7-31 and TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Page TRM / 3.7-34a Page TRM / 3.7-35 Pages TRM / 3.7-36 and TRM / 3.7-37 Pages 3.7-38 and 3.7-39 Page TRM / 3.7-40 Page TRM / 3.7-41 Page TRM / 3.7-41a Page TRM / 3.7-42 Page TRM / 3.7-43 Pages TRM / 3.7-44 through TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 Pages TRM / 3.7-55 through TRM / 3.7-57 08/31/1998 03/31/2006 04/07/2009 08/02/1999 04/07/2009 12/29/1999 08/02/1999 04/07/2009 08/09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 11/24/2011 11/29/2006 08/09/2005 01/13/2010 11/16/2001 09/16/2010 11/16/2001 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 06/20/2008 09/04/2008 08/31/1998 10/05/2006 06/07/2007 10/05/2006 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 SUSQUEHANNA - UNIT 1 TRM / LOES-3 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 70 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 Page TRM / 3.8-2 Pages TRM / 3.8-3 and TRM /3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Page TRM / 3.8-7 Pages TRM / 3.8-8 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Page TRM / 3.8-13 Page TRM / 3.8-14 Pages TRM / 3.8-15 through TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages TRM / 3.8-24 and TRM / 3.8-25 Page TRM / 3.8-26 Page TRM / 3.8-27 Pages TRM / 3.8-28 and TRM / 3.8-29 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 04/02/2002 01/28/2005 03/25/2010 04/02/2002 10/31/2007 12/03/2004 09/03/2004 12/03/2004 03/25/2010 08/31/1998 04/02/2002 08/31/1998 04/02/2002 08/31/1998 06/06/1999 11/30/2011 05/28/2009 11/29/2006 05/28/2009 08/31/1998 03/31/2006 08/31/1998 08/31/1998 08/01/2006 03/22/2006 06/10/2010 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 3.10 3.11 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 and 3.10-3 Pages 3.10-2 and 3.10-3 Page TRM / 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 and 3.11-3 Page TRM /.3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages TRM / 3.11-7 through TRM / 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page TRM / 3.11-13 SUSQUEHANNA - UNIT 1 TRM / LOES-4 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 70 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM /3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM /3.11-25 Pages TRM / 3.11-26 and TRM /3.11-27 Page TRM / 3.11-28 Page TRM / 3.11-29 Pages. TRM / 3.11.30 through TRM / 3.11.32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-43 Page TRM / 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 Page TRM / 4.0-4 Pages TRM / 4.0-5 through TRM / 4.0-8 12/03/2004 09/01/1998 03/31/2006 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 08/01/2006 03/31/2006 08/31/1998 03/31/2006 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 3.12 4.0 SUSQUEHANNA - UNIT 1 TRM / LOES-5 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 70 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.0 B 3.1 B 3.2 B 3.3 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Page TRM / B 3.0-5 Page TRM / B 3.0-6 Page TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Page TRM / B 3.1-5 Pages TRM / B 3.1-6 and TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Page TRM / B 3.3-2 Page TRM / B 3.3-2a Page TRM / B 3.3-3 Page TRM / B 3.3-3a Page TRM / B 3.3-4 Page TRM / B 3.3-5 Page TRM / B 3.3-6 Page TRM / B 3.3-7 Page TRM / B. 3.3-8 Page TRM / B 3.3-9 Pages TRM / B 3.3-10 through TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 and TRM / B 3.3-16 Page TRM / B 3.3-17 Pages TRM / B 3.3-17a through TRM / B 3.3-17c Page TRM / B 3.3-17d 08/31/1998 01/10/2007 04/14/2008 08/31/1998 04/12/2007 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 10/31/2007 08/31/1998 11/15/2005 03/22/2006 02/18/1999 08/31/1998 04/07/2000 03/10/2011 10/31/2007 12/11/2008 10/31/2007 06/30/2010 05/30/2006 06/30/2010 10/30/2007 06/30/2010 10/31/2007 01/07/2011 06/25/2002 10/31/2007 10/31/2007 10/22/2003 03/22/2006 03/22/2006 03/27/2008 SUSQUEHANNA - UNIT 1 TRM / LOES-6 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 70 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.4 B 3.5 B 3.6 Pages TRM / B 3.3-17e and TRM / B 3.3-17f Pages TRM / B 3.3-18 and TRM / B 3.3-19 Page TRM / B 3.3-20 Page TRM / B 3.3-21 Pages TRM / B 3.3-22 and TRM / B 3.3-23 REACTOR COOLANT SYSTEM BASES Page B 3.4-1 Pages TRM / B 3.4-2 and TRM / B 3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 Pages TRM / B 3.4-7 and TRM / B 3.4-8 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 through TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages B.3.6-7 through TRM B B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Page TRM / B 3.7-3 Page TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Page TRM / B 3.7-6 Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Page TRM / B 3.7-10a Page TRM / B 3.7-11 Page TRM / B 3.7-11a Pages TRM / B 3.7-12 through TRM / B 3.7-14 Page TRM / B 3.7-14a 03/22/2006 08/03/2010 10/22/2003 05/16/2003 04/07/2009 08/31/1998 04/01/2009 10/31/2007 10/15/1999 08/31/1998 06/10/2010 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/27/2008 04/04/2007 12/03/2004 12/31/2002 08/31/1998 06/10/2010 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 B 3.7 SUSQUEHANNA - UNIT I TRM / LOES-7 EFFECTIVE DATE 11/30/2011 SUSQUEHANNA - UNIT 1 TRM / LOES-7 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 70 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 Page TRM / B 3.7-21a Page TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM / B 3.7-24 through TRM / B 3.7-28 Pages TRM / B 3.7-29 and TRM / B 3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 Pages TRM / B 3.7-36 through TRM / B 3.7-39 Page TRM / B 3.7-40 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2 Page TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 Pages TRM / B 3.8-17a and TRM / B 3.8-17b Pages TRM / B 3.8-18 through TRM / B 3.8-20 Pages TRM / B 3.8-21 through TRM / B 3.8-24 B 3.8 11/24/2011 02/01/1999 08/31/1998 02/14/2005 06/20/2008 01/30/2008 10/05/2006 06/07/2007 10/05/2006 11/30/2011 03/09/2001 04/15/2003 12/03/2004 07/05/2000 04/01/2009 04/08/2010 04/02/2002 01/28/2005 03/01/2010 04/02/2002 04/02/2002 08/10/2004 04/02/2002 08/31/1998 04/02/2002 11/30/2011 11/30/2011 11/29/2006 05/28/2009 08/31/1998 08/31/1998 03/22/2006 08/23/1999 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 SUSQUEHANNA
- UNIT 1 TRM / LOES-8 EFFECTIVE DATE 11/30/2011 SUSQUEHANNA - UNIT 1 TRM / LOES-8 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 70 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-11a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM/ B 3.11-20 Page TRM / B 3.11-20a Page TRM/ B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11.23 Page TRM / B 3.11.23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 and B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages B 3.11-31 and B 3.11-32 Page TRM / B 3.11-33 Pages TRM / B 3.11-34 and TRM / B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Page TRM / B 3.12-2 Page TRM / B 3.12-3 08/30/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/30/1998 04/02/2002 04/02/2002 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/30/1998 11/30/2005 06/30/2010 08/30/1998 06/30/2010 08/30/1998 02/12/1999 09/19/2007 11/29/2010 02/05/1999 TRMI text LOES 12/1/2011 SUSQUEHANNA - UNIT 1 TRM / LOES-9 EFFECTIVE DATE 11/30/2011
Emergency Switchgear Room Cooling 3.8.6 PPL Rev. 1 3.8 Electrical Power 3.8.6 Emergency Switchgear Room Cooling TRO 3.8.6 Two Emergency Switchgear Room Cooling subsystems shall be OPERABLE.
APPLICABILITY:
Whenever associated emergency switchgear is required to be OPERABLE ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One required Unit 1 A.1 ----------
NOTE ------------...
30 days Emergency Switchgear Applicable only in MODES Room Cooling subsystem 1, 2, or 3 inoperable.
Restore subsystem to OPERABLE status B.
Two required Unit 1 B.1 ----------
NOTE ----------------
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Emergency Switchgear Applicable only in MODES Room Cooling subsystems 1,2, or 3 inoperable.
Restore at least one required subsystem to OPERABLE status AND (continued)
SUSQUEHANNA - UNIT 1 TRM / 3.8-24 EFFECTIVE DATE 11/30/2011
Emergency Switchgear Room Cooling PPL Rev. 1 3.8.6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B.2 ---------
NOTE ----------------
Immediately Applicable only in MODES 4, 5, or OPDRVs, CORE ALTERATIONS, or when handling irradiated fuel in the secondary containment.
Suspend CORE ALTERATIONS, OPDRVs, and handling irradiated fuel in the secondary containment.
AND B.3 ---------
NOTE ----------------
Immediately Applicable only in MODES 4, 5, or OPDRVs, CORE ALTERATIONS, or when handling irradiated fuel in the secondary containment Initiate action to restore one subsystem to OPERABLE status.
C.
Required Action and C.1 Declare affected distribution Immediately associated Completion system inoperable and take Time of Condition A or B Actions required by LCO 3.8.7 not met or LCO 3.8.8.
TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.8.6.1 Administratively verify that the Unit 1 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Emergency Switchgear Room Cooling subsystem are available.
SUSQUEHANNA - UNIT 1 TRM / 3.8-25 EFFECTIVE DATE 11/30/2011
Control Structure HVAC PPL Rev. 2 B 3.7.9 B 3.7.9 Control Structure HVAC BASES TRO Control structure HVAC systems have safety related functions to maintain the required air pressure control in the building and maintain the heating and cooling of support equipment required to mitigate a Loss of Coolant Accident. The Control Structure and Computer Room ventilation fans are required to maintain the habitability envelope at a positive pressure (i.e., >0" wc) and also to perform a heating and/or cooling function. The operation and surveillance requirements of the ventilation fans to maintain the habitability envelope at a positive pressure during CREOAS operation are discussed in TS 3.7.3. The heating and/or cooling function is addressed in this TRO. At least one train of each system is required for these purposes Technical Specification LCOs 3.7.3 and 3.7.4 address operating and surveillance requirements for the Control Room Emergency Outside Air Supply System and the Control Room Floor Cooling System. The Unit 1 Technical Requirement Manual TRO 3.8.6 addresses operating requirements for the Unit 1 Emergency Switchgear Room Cooling System.
The SGTS Room Cooling and Heating systems are essential to maintain the normal and post accident environment of the Control Structure Elevation 806 within acceptable design temperature limits. CREOASS, SGTS, and Control Structure Chilled Water equipment is located on Control Structure Elevation 806.
The Computer Room Floor Cooling System's function is to maintain the computer room environment within acceptable design temperature limits.
The system also maintains the habitability envelope pressure within limits.
The Computer Room Floor Cooling System consists of two independent, redundant subsystems that provide cooling of recirculated computer room air. Each subsystem consists of cooling coils, fans, chillers, compressors, ductwork, dampers and instrumentation and controls to provide computer room temperature control.
The Control Structure Heating and Ventilation System serves all elevations of the control structure except the control room, TSC, and elevation 697'.
The system's function is to maintain temperature and habitability envelope pressure within acceptable limits. The Control Structure Heating and Ventilation System consists of two independent, redundant subsystems that provide (continued)
SUSQUEHANNA - UNIT 1 TRM / B 3.7-31 EFFECTIVE DATE 11/30/2011
Control Structure HVAC B 3.7.9 PPL Rev. 2 B 3.7.9 Control Structure HVAC BASES TRO (continued) cooling of recirculated control structure air. Each subsystem consists of cooling coils, fans, chillers, compressors, ductwork, dampers and instrumentation and controls to provide temperature control.
The Control Structure Chilled Water System functions to transfer heat from the Control Room Floor Cooling System, Computer Room Floor Cooling System, Control Structure Heating and Ventilation System, and the Unit 1 ESGRC units to the ESW system. The Control Structure Chilled Water System consists of two independent, redundant subsystems consisting of a centrifugal compressor, a chilled water pump, one emergency condenser water pump, cooling coils, closed expansion tank, air separator, interconnecting piping, valves and instrumentation and controls.
The Battery Room Exhaust System functions to maintain the battery room design temperature, design pressure, and hydrogen concentration within limits. The Battery Room Exhaust System consists of two independent, redundant subsystems consisting of fans, ductwork, dampers and instrumentation and controls.
ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components. With one of the HVAC subsystems inoperable, the inoperable HVAC subsystem must be restored to OPERABLE status within 30 days. With the unit in this condition, the remaining OPERABLE HVAC subsystem is adequate to perform the cooling and/or heating function. However, the overall reliability is reduced because a single failure in the OPERABLE subsystem results in the loss of the HVAC function. The 30 day Completion Time is based on the consideration that the remaining subsystem can provide the required protection, and the availability of alternate nonsafety cooling methods.
TRS The TRS assures sufficient system functionality to ensure operation when called upon to perform its safety related function.
REFERENCES
- 1.
FSAR Section 9.4.1
- 2.
FSAR Section 9.2.12.1 SUSQUEHANNA - UNIT 1 TRM / B 3.7-32 EFFECTIVE DATE 03/09/2001
Emergency Switchgear Room Cooling PPL Rev. 2 B 3.8.6 B 3.8.6 Emergency Switchgear Room Cooling BASES TRO The Emergency Switchgear Room Cooling (ESRC) system provides heat removal capability for the Unit 1 emergency switchgear (Room designation 1-406 and 1-407) and load center rooms (Room designation 1-507 and 1-510 which contain equipment that is required to operate during the mitigation of a design basis event. The room cooling system provides the primary means to remove heat from the equipment located in these rooms.
(Reference 1)
Two 100% capacity cooling subsystems provide the normal and emergency ventilation for the emergency switchgear and load center rooms.
This requirement does not include equipment used in the normal cooling mode, which serves no post accident function. The equipment required for the 'A' subsystem of the ESRC system is:
'A' Emergency Switchgear Fan - 1V222A
'A' Cooling Coil - 1 E257A
'A' Control Structure Chilled Water (defined in TRM Bases 3.7.9)
The equipment required for the 'B' subsystem of the ESRC system is:
'B' Emergency Switchgear Fan - 1V222B
'B' Cooling Coil - 1 E257B
'B' Control Structure Chilled Water (defined in TRM Bases 3.7.9)
Additionally, the associated ductwork, dampers and associated instrumentation and controls are also required.
Each Unit 1 ESRC subsystem provides cooling for the Unit 1 emergency switchgear and load center rooms which contain equipment from different electrical divisions (e.g., the 'A' ESRC subsystem cools both division I and II electrical equipment). Note that the Unit 1 emergency switchgear and load center rooms also contain common equipment.
ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
These actions are based on the relative impact of ESRC operability on the ability of the equipment in the Unit 1 Emergency Switchgear and Load Center Rooms to perform their safety function.
(continued)
SUSQUEHANNA - UNIT 1 TRM / B 3.8-17 EFFECTIVE DATE 11/30/2011
Emergency Switchgear Room Cooling B 3.8.6 PPL Rev. 2 B 3.8.6 Emergency Switchgear Room Cooling BASES ACTIONS (continued)
With one required Emergency Switchgear Room Cooling subsystem inoperable (Condition A) in MODES 4 or 5, during OPDRVs, CORE ALTERATIONS, or when handling irradiated fuel in the secondary containment, no action is provided or need be taken in response to the condition. With one ESRC subsystem inoperable in Modes 1, 2 or 3, the inoperable ESRC subsystem must be restored to OPERABLE status within 30 days. With the unit in this condition, the remaining OPERABLE ESRC subsystem is adequate to perform the cooling function. However, the overall reliability is reduced since a single failure in the OPERABLE subsystem results in a loss of the cooling function. The 30 day completion time is based on the consideration that the remaining subsystem can provide the required protection, and the availability of alternate non safety cooling methods.
With two required Unit 1 Emergency Switchgear Room Cooling subsystems inoperable (Condition B), one subsystem must be restored to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in Modes 1, 2 or 3. This 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> completion time is based on temperature rise calculations which show that switchgear functionality will not be impacted by a loss of switchgear room cooling during this timeframe. In Modes 4 or 5, CORE ALTERATIONS, OPDRVs and handling irradiated fuel within secondary containment should be suspended immediately. This will reduce challenges to systems supported by the ESRC systems needed to mitigate the consequences of a fuel handling event. Additionally, action should be taken to restore one ESRC subsystem to OPERABLE status to eliminate the potential loss of electrical equipment due to sustained high temperatures.
LCO 3.8.7 is entered in the event that the Required Action and associated Completion Time of Condition A or B are not met in MODES 1, 2 or 3.
LCO 3.8.8 is entered in the event that the Required Action and associated Completion Time of Condition B are not met in MODES 4 or 5, or during OPDRVs, CORE ALTERATIONS, or when handling irradiated fuel in the secondary containment. Note that some common equipment is located in the Unit 1 switchgear and load center rooms. If Unit 1 LCO 3.8.7 or LCO 3.8.8 is entered, Unit 2 operation will be impacted due to common systems being inoperable. Therefore, loss of one or both Unit 1 ESRC subsystems requires entry into Unit 2 TRM 3.8.6 "Emergency Switchgear Room Cooling."
(contined)
SUSQUEHANNA - UNIT 1 TRM / B 3.8-17a EFFECTIVE DATE 11/30/2011
Emergency Switchgear Room Cooling B 3.8.6 PPL Rev. 2 B 3.8.6 Emergency Switchgear Room Cooling BASES TRS The TRSs are defined to be performed at the specified Frequency to ensure that the systems are maintained OPERABLE.
REFERENCE
- 1.
FSAR Section 9.4.2.2 SUSQUEHANNA - UNIT 1 TRM / B 3.8-17b EFFECTIVE DATE 11/30/2011
Dec.
12, 2011 HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2011-68399 USER INFORMATION:
Name:GERLACH*ROSE M Address: NUCSA2 Phone#:
254-3194 TRANSMITTAL INFORMATION:
EMPL#:028401 CA#:0363 TO:
GERLACH*ROSE M 12/09/2011 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION:
"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
10 TRM2 TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 11/30/2011 ADD MANUAL TABLE OF CONTENTS DATE: 12/08/2011 CATEGORY:
DOCUMENTS ID:
TEXT 3.8.6 REMOVE:
REV:O TYPE: TRM2 ADD:
REV: 1 CATEGORY:
DOCUMENTS ID:
TEXT B3.7.9 ADD:
REV: 2 REMOVE:
REV:I TYPE: TRM2 CATEGORY:
TEXT 4MOVE:
DOCUMENTS B3.8.6 REV:1 TYPE: TRM2 ADD:
REV: 2
CATEGORY:
DOCUMENTS TYPE: TRM2 ID:
TEXT LOES ADD:
REV:
71 REMOVE:
REV:70 CATEGORY:
DOCUMENTS TYPE: TRM2 ID:
TEXT TOC ADD:
REV: 21 REMOVE:
REV:20 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:
J Procedure Name TEXT LOES
Title:
LIST OF EF 2/08/2011 Rev Issue Date 71 12/08/2011 FECTIVE SECTIONS Change ID Change Number TEXT TOC
Title:
21 12/08/2011 TABLE OF CONTENTS TEXT 1.1 0
11/19/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1
Title:
TEXT 2.2
Title:
1 02/04/2005 PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS 10 01/13/2011 PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 4
05/23/2008
Title:
APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO)
APPLICABILITY TEXT 3.1.1 1
11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT 3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT 3.1.3 4
05/14/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 9
04/20/2011
Title:
CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)
LDCN 4712 Page 1 of 15 Report Date: 12/09/11 Page 1 of 15 Report Date: 12/09/11
SSES MANUITAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1
Title:
INSTRUMENTATION 0
11/19/2002 RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3
03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2
11/09/2007
Title:
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 6
07/09/2010
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0
11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 3
01/13/2011
Title:
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1
11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1
10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3
05/14/2009
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1
12/14/2004
Title:
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1
10/22/2003
Title:
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 0
04/16/2009
Title:
WATER MONITORING INSTRUMENTATION Page 2.
of 15 Report Date: 12/09/11 Page 2 of
.15 Report Date: 12/09/11
SSES MANUJAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1
Title:
REACTOR TEXT 3.4.2
Title:
REACTOR TEXT 3.4.3
Title:
REACTOR TEXT 3.4.4
Title:
REACTOR TEXT 3.4.5
Title:
REACTOR TEXT 3.4.6
Title:
REACTOR TEXT 3.5.1 1
04/26/2006 COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY 1
04/16/2009 COOLANT SYSTEM STRUCTURAL INTEGRITY 1
11/09/2007 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS) 2 05/14/2009 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1
04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 0
07/20/2010 RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION 1
02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1
11/09/2007
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0
11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 1
08/23/2011
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Pae3 of1 eor ae 1/91 Page 3 of
.15 Report Date: 12/09/11
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.6.4 0
11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1
Title:
PLANT TEXT 3.7.2
Title:
PLANT TEXT 3.7.3.1
Title:
PLANT TEXT 3.7.3.2
Title:
PLANT TEXT 3.7.3.3
Title:
PLANT TEXT 3.7.3.4
Title:
PLANT TEXT 3.7.3.5
Title:
PLANT TEXT 3.7.3.6
Title:
PLANT TEXT 3.7.3.7
Title:
PLANT TEXT 3.7.3.8
Title:
PLANT TEXT 3.7.4
Title:
PLANT 0
11/19/2002 SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) 0 11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)
AND GROUND 2
04/16/2009 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 3
04/16/2009 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 3
04/16/2009 SYSTEMS C02 SYSTEMS SHUTDOWN qATER LEVEL 2
SYSTEMS HALON SYSTEMS 04/16/2009 2
04/16/2009 SYSTEMS FIRE HOSE STATIONS 2
04/16/2009 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1
04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES 10 11/30/2011 SYSTEMS FIRE DETECTION INSTRUMENTATION 1
04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM Page 4 of 15 Report Date: 12/09/11 Page 4 of 15 Report Date: 12/09/11
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.1
Title:
PLANT TEXT 3.7.5.2
Title:
PLANT TEXT 3.7.5.3
Title:
PLANT TEXT 3.7.6
Title:
PLANT 0
11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0
11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 1
04/26/2006 SYSTEMS LIQUID HOLDUP TANKS 2
06/27/2008 SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2
09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8
Title:
PLANT SYSTEMS SNUBBERS 7
12/03/2010 TEXT 3.7.9 1
08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11
Title:
PLANT SYSTEMS 1
10/02/2009 TEXT 3.8.1 2
02/04/2005
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES LDCN 4775 TEXT 3.8.2.1 2
11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT 3.8.2.2 2
12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page 5 of 15 Report Date: 12/09/11
SSES MANUAL~
Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.3
Title:
ELECTRICAL TEXT 3.8.4
Title:
ELECTRICAL TEXT 3.8.5
Title:
ELECTRICAL TEXT 3.8.6
Title:
ELECTRICAL TEXT 3.8.7 1
04/05/2010 POWER DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES 1
02/04/2005 POWER 24 VDC ELECTRICAL SUBSYSTEM 0
11/19/2002 POWER DEGRADED VOLTAGE PROTECTION 1
12/08/2011 POWER EMERGENCY SWITCHGEAR ROOM COOLING 2
10/22/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1
Title:
REFUELING OPERATIONS 0
11/19/2002 DECAY TIME TEXT 3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1
04/26/2006
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1
04/09/2007
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2
06/15/2010
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.11.1.1 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION Page 6 of 15 Report Date: 12/09/11 Page 6 of 15 Report Date: 12/09/11
SSES MANUAL
.1 Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.2
Title:
RADIOACTIVE TEXT 3.11.1.3
Title:
RADIOACTIVE TEXT 3.11.1.4
Title:
RADIOACTIVE TEXT 3.11.1.5
Title:
RADIOACTIVE TEXT 3.11.2.1
Title:
RADIOACTIVE TEXT 3.11.2.2
Title:
RADIOACTIVE TEXT 3.11.2.3
Title:
RADIOACTIVE FORM TEXT 3.11.2.4
Title:
RADIOACTIVE TEXT 3.11.2.5
Title:
RADIOACTIVE TEXT 3.11.2.6
Title:
RADIOACTIVE TEXT 3.11.3
Title:
RADIOACTIVE TEXT 3.11.4.1
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1
04/26/2006 LIQUID EFFLUENTS DOSE 1
04/26/2006 LIQUID WASTE TREATMENT SYSTEM 1
12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2
05/02/2007 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 3
04/26/2006 EFFLUENTS DOSE RATE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1
04/26/2006 DOSE -
NOBLE GASES 1
04/26/2006 DOSE -
11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM 3
11/14/2006 VENTILATION EXHAUST TREATMENT SYSTEM 4
09/16/2009 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION 1
04/26/2006 TOTAL DOSE 3
04/26/2006 MONITORING PROGRAM Page7 of i5~
Report Date: 12/09/11 Page 7 of 15 Report Date: 12/09/11
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.2 2
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1
Title:
LOADS CONTROL PROGRAM TEXT 3.12.2
Title:
LOADS CONTROL PROGRAM TEXT 3.12.3
Title:
LOADS CONTROL PROGRAM 0
11/19/2002 CRANE TRAVEL-SPENT FUEL STORAGE POOL 4
04/17/2008 HEAVY LOADS REQUIREMENTS 0
11/19/2002 LIGHT LOADS REQUIREMENTS TEXT 4. 1
Title:
TEXT 4. 2
Title:
TEXT 4. 3
Title:
TEXT 4. 4
Title:
TEXT 4. 5
Title:
TEXT 4. 6
Title:
TEXT 4. 7
Title:
0 09/27/2003 ADMINISTRATIVE CONTROLS ORGANIZATION ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0
09/27/2003 CONTROLS REPORTABLE EVENT ACTION 0
09/27/2003 CONTROLS SAFETY LIMIT VIOLATION 1
12/18/2008 CONTROLS PROCEDURES & PROGRAMS 0
09/27/2003 CONTROLS REPORTING REQUIREMENTS 0
09/27/2003 CONTROLS RADIATION PROTECTION PROGRAM 0
09/27/2003 CONTROLS TRAINING Page 8 of 15 Report Date: 12/09/11 Page 8 of
.15 Report Date: 12/09/11
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.0 4
05/23/2008
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)
APPLICABILITY TEXT B3.1.1 1
11/09/2007
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT B3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT B3.1.3 3
04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0
11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1
Title:
INSTRUMENTATION TEXT B3.3.2
Title:
INSTRUMENTATION TEXT B3.3.3
Title:
INSTRUMENTATION TEXT B3.3.4
Title:
INSTRUMENTATION TEXT B3.3.5
Title:
INSTRUMENTATION TEXT B3.3.6
Title:
INSTRUMENTATION 0
11/19/2002 BASES RADIATION MONITORING INSTRUMENTATION 2
03/31/2011 BASES SEISMIC MONITORING INSTRUMENTATION 2
11/09/2007 BASES METEOROLOGICAL MONITORING INSTRUMENTATION 4
07/09/2010 BASES TRM POST ACCIDENT MONITORING (PAM)
INSTRUMENTATION 2
11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK 4
01/13/2011 BASES TRM ISOLATION ACTUATION INSTRUMENTATION Page 9 of 15 Report Date: 12/09/11 Page 9 of
.15 Report Date: 12/09/11
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.7
Title:
INSTRUMENTATION TEXT B3.3.8
Title:
INSTRUMENTATION TEXT B3.3.9
Title:
INSTRUMENTATION TEXT B3.3.10
Title:
INSTRUMENTATION TEXT B3.3.11
Title:
INSTRUMENTATION TEXT B3.3.12 1
11/09/2007 BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1
10/22/2003 BASES TRM RPS INSTRUMENTATION 3
05/14/2009 BASES LPRM UPSCALE ALARM INSTRUMENTATION 2
08/09/2010 BASES REACTOR RECIRCULATION PUMP MG SET STOPS 1
10/22/2003 BASES MVP ISOLATION INSTRUMENTATION 0
04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1
Title:
REACTOR TEXT B3.4.2
Title:
REACTOR TEXT B3.4.3
Title:
REACTOR TEXT B3.4.4
Title:
REACTOR TEXT B3.4.5
Title:
REACTOR TEXT B3.4.6 0
11/19/2002 COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY 1
04/16/2009 COOLANT SYSTEM BASES STRUCTURAL INTEGRITY 1
11/09/2007 COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR 0
11/19/2002 COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0
11/19/2002 COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS 0
07/20/2010
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION Pae1 o
5ReotDae 2/91 Page 10 of
.15 Report Date: 12/09/11
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.1
Title:
ECCS AND RC:
TEXT B3.5.2
Title:
ECCS AND RC TEXT B3.5.3
Title:
ECCS AND RC TEXT B3.6.1
Title:
CONTAINMENT TEXT B3.6.2
Title:
CONTAINMENT INDICATION TEXT B3.6.3
Title:
CONTAINMENT TEXT B3.6.4
Title:
CONTAINMENT TEXT B3.7.1
Title:
PLANT SYSTEM TEXT B3.7.2
Title:
PLANT SYSTEIM TEXT B3.7.3.1
Title:
PLANT SYSTEMd 0
11/19/2002 IC BASES ADS MANUAL INHIBIT 1
11/09/2007 IC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION 1
11/09/2007 IC BASES LONG TERM NITROGEN SUPPLY TO ADS 0
11/19/2002 BASES VENTING OR PURGING 0
11/19/2002 BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION 1
04/19/2007 BASES SUPPRESSION POOL ALARM INSTRUMENTATION 1
12/14/2004 BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES 0
11/19/2002 IS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN) 0 11/19/2002 IS BASES ULTIMATE HEAT SINK (UHS)
GROUND WATER LEVEL 3
06/15/2010 IS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM 2
04/26/2006
[S BASES SPRAY AND SPRINKLER SYSTEMS 0
11/19/2002
[S BASES C02 SYSTEMS TEXT B3.7.3.2
Title:
PLANT TEXT B3.7.3.3
Title:
PLANT SYSTEM SYSTEM Page 11 of 15 Report Date: 12/09/11 Page 11 of 15 Report Date: 12/09/11
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.4
Title:
PLANT TEXT B3.7.3.5
Title:
PLANT TEXT B3.7.3.6
Title:
PLANT TEXT B3.7.3.7
Title:
PLANT TEXT B3.7.3.8
Title:
PLANT TEXT B3.7.4
Title:
PLANT TEXT B3.7.5.1
Title:
PLANT TEXT B3.7.5.2
Title:
PLANT TEXT B3.7.5.3
Title:
PLANT TEXT B3.7.6
Title:
PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 1
HALO]
04/26/2006 N SYSTEMS 1
04/26/2006 FIRE HOSE STATIONS 1
04/26/2006 YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0
11/19/2002 FIRE RATED ASSEMBLIES 2
11/30/2011 FIRE DETECTION INSTRUMENTATION 0
11/19/2002 SOLID RADWASTE SYSTEM 0
11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0
11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURI 0
11/19/2002 LIQUID HOLDUP TANKS 2
06/27/2008 ESSW PUMPHOUSE VENTILATION 2
01/31/2008 E
TEXT B3.7.7
Title:
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 3
06/21/2007
Title:
PLANT SYSTEMS BASES SNUBBERS Page 12 o f 1ý5 Report Date: 12/09/11
SSES MANUJAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.9 2
12/08/2011
Title:
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11
Title:
STRUCTURAL TEXT B3.8.1
Title:
ELECTRICAL PROTECTIVE TEXT B3.8.2.1
Title:
ELECTRICAL CONTINUOUS TEXT B3.8.2.2
Title:
ELECTRICAL AUTOMATIC TEXT B3.8.3
Title:
ELECTRICAL TEXT B3.8.4
Title:
ELECTRICAL TEXT B3.8.5
Title:
ELECTRICAL TEXT B3.8.6
Title:
ELECTRICAL TEXT B3.8.7 2
04/14/2010 INTEGRITY 2
03/10/2010 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0
11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD 1
09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD 0
11/19/2002 POWER BASES DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES 0
11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM 0
11/19/2002 POWER BASES DEGRADED VOLTAGE PROTECTION 2
12/08/2011 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 1
06/15/2009 PROTECTION -
PROTECTION -
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME Page 13 of 15 Report Date: 12/09/11 Page 13 of 15 Report Date: 12/09/11
SSES MANUAL
._ Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0
Title:
MISCELLANEOUS BASES SEALED 11/19/2002 SOURCE CONTAMINATION TEXT B3.10.2 1
04/10/2007
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0
11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.11.1.1 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.1.3
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.1.4
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.1.5
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION 0
BASES 0
BASES 0
BASES 11/19/2002 LIQUID EFFLUENTS DOSE 11/19/2002 LIQUID WASTE TREATMENT SYSTEM 11/19/2002 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 0
11/19/2002 BASES RADIOACTIVE LIQUID PROCESS MONITORING TEXT B3.11.2.1 1
12/14/2004
Title:
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -
NOBLE GASES Page 14 of 15 Report Date: 12/09/11 Page 14 of
.15 Report Date: 12/09/11
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.3 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES DOSE -
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.5
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.6
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.3
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.1
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.2
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.3
Title:
RADIOACTIVE EFFLUENTS TEXT B3.12.1
Title:
LOADS CONTROL PROGRAM TEXT B3.12.2
Title:
LOADS CONTROL PROGRAM TEXT B3.12.3
Title:
LOADS CONTROL PROGRAM 0
11/19/2002 BASES GASEOUS RADWASTE TREATMENT SYSTEM 4
11/14/2006 BASES VENTILATION EXHAUST TREATMENT SYSTEM 1
01/27/2004 BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING 0
11/19/2002 BASES TOTAL DOSE 3
07/09/2010 BASES MONITORING PROGRAM 0
11/19/2002 BASES LAND USE CENSUS 0
11/19/2002 BASES INTERLABORATORY COMPARISON PROGRAM 1
10/04/2007 BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL 1
12/03/2010 BASES HEAVY LOADS REQUIREMENTS 0
11/19/2002 BASES LIGHT LOADS REQUIREMENTS Paej f1 eotDt:1/91 Page 15 of
.15 Report Date: 12/09/11
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 1.0 USE A N D A PPLICATIO N............................................................................
1.0-1 1.1 D efinitions.....................................................................................
T R M /1.0-2 2.0 PLA NT PRO G RA M S...................................................................................
2.0-1 2.1 P lant P rogram s.....................................................................................
2.0-1 2.2 Instrument Trip Setpoint Table.....................................................
TRM/2.0-5 3.0 A P P LIC A B ILITY.................................................................................
TR M /3.0-1 3.0 (TRO) - TR for Operation (TRO) Applicability...............................
TRM/3.0-1 3.0 (TRS) - TR Surveillance (TRS) Applicability........................
T M/3.0-3 3.1 REACTIVITY CONTROL SYSTEMS......................
TRM/3.1-1 3.1.1 Alternate Rod Injection....................................................
M/3.
3.1.2 CRD Housing Support 3.1-4 3.1.3 Control Rod Block Instrumentation....................
........... 3.1-5 3.1.4 Control Rod Scram Accumulators lnstrumentatioiLe and...
Check Valve.....................................,..-...
..................... TRM/3.1-9 3.2 CORE OPERATING LIMITS REPORT."...;
3.......
2-1 3.2.1 Core Operating Limits Report......
3.2-1 3.3 INSTRUM ENTATION................
TRM/3.3-1 3.3.1 Radiation Monitoring Instru Mentiton..........................................
TRM/3.3-1 3.3.2 Seismic Monitoring Instrumr tio TRM/3.3-4 3.3.3 Meteorological Mon ite:rg Instr5umentation...................................
TRM/3.3-7 3.3.4 TRM Post-Accident-;Mofiteying Ihstrumentation...................... TRM/3.3-9 3.3.5 Section Not Used' TRM/3.3-12 3.3.6 TRM Containnenetli.lation Instrumentation TRM/3.3-13 3.3.7 TurbineOversPeed, otction System.........................................
TRM/3.3-17 3.3.8ction,4N o ttuse *:*,........................................................................
TRM /3.3-19 3.3.9 O PRM I nstru
-ntation..............................................................
TRM/3.3-21 3.3.10 Reactolecir'!Olation Pump MG Set Electrical and M echanicalr:-Stops.........................................................................
TR M /3.3-22 3.3.11 rI1VP Isdlation Instrumentation......................................................
TRM/3.3-24 3.3.12 Water oonitoring Instrumentation.................................................
TRM/3.3-26 3.4 REACTOR COOLANT SYSTEM..........................................................
TRM/3.4-1 3.4.1 Reactor Coolant System Chemistry.......................................................
3.4-1 3.4.2 N ot U sed........................................................................................
T R M /3.4-6 3.4.3 High/Low Pressure Interface Leakage Monitors....................................
3.4-9 3.4.4 Reactor Recirculation Flow and Rod Line Limit............................
TRM/3.4-12 3.4.5 Reactor Vessel Material Surveillances Program...........................
TRM/3.4-13 3.4.6 Reactor Recirculation Single Loop Operation (SLO)
Flow Rate Restriction....................................................................
TRM /3.4-14 SUSQUEHANNA - UNIT 2 TRM / TOC-1 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 3.5 EMERGENCY CORE COOLING AND RCIC......................................
TRM/3.5-1 3.5.1 ADS Manual Inhibit.......................................................................
TRM/3.5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation............................ 3.5-3 3.5.3 Long Term Nitrogen Supply to ADS......................................................
3.5-6 3.6 C O N TA IN M E N T..........................................................................................
3.6-1 3.6.1 VENTING or PURGING.........................................................................
3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication.....................................................................................
T R M /3.6-3 3.6.3 Suppression Pool Alarm Instrumentation...............................................
3.6-4 3.6.4 Primary Containment Closed System Boundaries........................ TRM/3.6-7 3.7 PLANT SYSTEMS..............................................................................
TRM/3.7-1 3.7.1 Emergency Service Water System (Shutdown)............................ TRM/3.7-1 3.7.2 Ultimate Heat Sink and Ground Water Level.........................................
3.7-3 3.7.3.1 Fire Suppression Water Supply System.......................................
TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems.......................................................
TRM/3.7-8 3.7.3.3 C02 systems................................................................................
TRM/3.7-12 3.7.3.4 Halon Systems.............................................................................
TRM/3.7-16 3.7.3.5 Fire Hose Stations........................................................................
TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses.............................
TRM/3.7-22 3.7.3.7 Fire Rated Assemblies..................................................................
TRM/3.7-24 3.7.3.8 Fire Detection Instrumentation......................................................
TRM/3.7-26 3.7.4 Solid Radwaste System................................................................
TRM/3.7-34 3.7.5.1 Main Condenser Offgas Hydrogen Monitor...........................................
3.7-37 3.7.5.2 Main Condenser Explosive Gas Mixture.......................................
TRM/3.7-38 3.7.5.3 Liquid Holdup Tanks.....................................................................
TRM/3.7-39 3.7.6 ESSW Pumphouse Ventilation..............................................................
3.7-40 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation...........................................................
TRM/3.7-41 3.7.8 Snubbers......................................................................................
TRM/3.7-43 3.7.9 Control Structure HVAC................................................................
TRM/3.7-49 3.7.10 Spent Fuel Storage Pools (SFSPs)..............................................
TRM/3.7-51 3.7.11 Structural Integrity.........................................................................
TRM/3.7-54 3.8 ELECTRICAL POW ER.......................................................................
TRM/3.8-1 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices........................................................................
TRM/3.8-1 3.8.2.1 Motor Operated Valves Thermal Overload Protection -
C ontinuous...................................................................................
T R M /3.8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection -
A utom atic......................................................................................
T R M /3.8-11 3.8.3 Diesel Generator (DG) Maintenance Activities.............
TRM/3.8-13 SUSQUEHANNA UNIT 2 TRM / TOC-2 EFFECTIVE DATE 11/30/2011 SUSQUEHANNA - UNIT 2 TRM / TOC-2 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 3.8.4 24VDC Electrical Power Subsystem.............................................
TRM/3.8-15 3.8.5 Degraded Voltage Protection.......................................................
TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling.........................................
TRM/3.8-24 3.8.7 Battery Monitoring and Maintenance Program..............................
TRM/3.8-26 3.9 REFUELING OPERATIONS........................................................................
3.9-1 3.9.1 D ecay T im e...........................................................................................
3.9-1 3.9.2 C om m unications....................................................................................
3.9-2 3.9.3 R efueling P latform.................................................................................
3.9-3 3.10 MISCELLANEOUS.............................................................................
TRM/3.10-1 3.10.1 Sealed Source Contamination......................................................
TRM/3.10-1 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation.......................... 3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI).................... TRM/3.10-7 3.10.4 Section Not Used..........................................................................
TRM/3.10-8 3.11 RADIOACTIVE EFFLUENTS..............................................................
TRM/3.11-1 3.11.1 Liquid Effluents.............................................................................
TRM/3.11-1 3.11.1.1 Liquid Effluents Concentration......................................................
TRM/3.11-1 3.11.1.2 Liquid Effluents Dose...................................................................
TRM/3.11-4 3.11.1.3 Liquid Waste Treatment System..................................................
TRM/3.11-6 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation............................ 3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation............... TRM/3.11-13 3.11.2 Gaseous Effluents........................................................................
TRM/3.11-17 3.11.2.1 D ose R ate.....................................................................................
T R M /3.11-17 3.11.2.2 Dose - Noble Gases.....................................................................
TRM/3.11-20 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form...........................................................................
T R M /3.11-21 3.11.2.4 Gaseous Radwaste Treatment System........................................
TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System.........................................
TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrum entation.............................................................................
T R M /3.11-25 3.11.3 Total D ose....................................................................................
T R M /3.11-33 3.11.4 Radiological Environmental Monitoring.........................................
TRM/3.11-35 3.11.4.1 Monitoring Program......................................................................
TRM/3.11-35 3.11.4.2 Land Use Census.........................................................................
TRM/3.11-45 3.11.4.3 Interlaboratory Comparison Program............................................
TRM/3.11-47 3.12 LOADS CONTROL PROGRAM.
............. TRM/3.12-1 3.12.1 Crane Travel - Spent Fuel Storage Pool.......................................
TRM/3.12-1 3.12.2 Heavy Loads Requirements.........................................................
TRM/3.12.3 3.12.3 Light Loads Requirements............................................................
TRM/3.12-5 SUSQUEHANNA-UNIT2 TRM / TOC-3 EFFECTIVE DATE 11/30/2011 SUSQUEHANNA - UNIT 2 TRM /TOC-3 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 4.0 ADMINISTRATIVE CONTROLS..................................................................
4.0-1 4.1 Organization..........................................................................................
4.0-1 4.2 Reportable Event Action........................................................................
4.0-2 4.3 Safety Limit Violation.............................................................................
4.0-3 4.4 Procedures and Programs.....................................................................
4.0-4 4.5 Reporting Requirements........................................................................
4.0-5 4.6 Radiation Protection Program................................................................
4.0-7 4.7 Training..................................................................................................
4.0-8 SUSQUEHANNA
- UNIT 2 TRM / TOC-4 EFFECTIVE DATE 11/30/2011 SUSQUEHANNA - UNIT 2 TRM / TOC-4 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE B 3.0 (TRO) - TR for Operation (TRO) Applicability......................................
B 3.0-1 B 3.0 (TRS) - TR Surveillance (TRS) Applicability.........................................
B 3.0-9 B 3.1.1 Alternate Rod Injection............................
TRM/B 3.1-1 B 3.1.2 CRD Housing Support.........................................................................
B 3.1-4 B 3.1.3 Control Rod Block Instrumentation..............................................
TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve.........................................................................
TRM/B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR).................................................
B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation..........................................
TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation.............................................
TRM/B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation..................................
TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation........................... TRM/B 3.3-4 B 3.3.5 Section Not Used.........................................................................
TRM/B 3.3-9 B 3.3.6 TRM Containment Isolation Instrumentation................................
TRM/B 3.3-10 B 3.3.7 Turbine Overspeed Protection System........................................
TRM/B 3.3-14 B 3.3.8 Section Not Used.........................................................................
TRM/B 3.3-15 B 3.3.9 OPRM Instrumentation................................................................
TRM/B 3.3-18 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops........................................................................
TRM/B 3.3-20 B 3.3.11 MVP Isolation Instrumentation.....................................................
TRM/B 3.3-22 B 3.3.12 Water Monitoring Instrumentation................................................
TRM/B 3.3-24 B 3.4.1 Reactor Coolant System Chemistry.....................................................
B 3.4-1 B 3.4.2 N ot U sed......................................................................................
T R M /B 3.4-2 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit........................... TRM/B 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program..................................
B 3.4-6 B 3.4.6 Reactor Recirculation Single Loop Operation (SLO)
Flow Rate Restriction....................................................................
TRM/B3.4-7 B 3.5.1 A D S M anual Inhibit..............................................................................
B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation.................. TRM/B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS....................................................
B 3.5-4 B 3.6.1 VENTING or PURGING...............................................................
TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position In d ic a tio n.............................................................................................
B 3.6 -3 B 3.6.3 Suppression Pool Alarm Instrumentation.............................................
B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries....................... TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown)...................................
B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level.......................................
B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System......................................
TRM/B 3.7-3 SUSQUEHANNA - UNIT 2 TRM / TOC-5 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 21 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE B 3.7.3.2 Spray and Sprinkler Systems......................................................
TRM/B 3.7-5 B 3.7.3.3 C02 Systems..............................................................................
TRM/B 3.7-7 B 3.7.3.4 Halon Systems............................................................................
TRM/B 3.7-8 B 3.7.3.5 Fire Hose Stations.......................................................................
TRM/B 3.7-10 B 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses............................ TRM/B 3.7-11 B 3.7.3.7 Fire Rated Assemblies.................................................................
TRM/B 3.7-12 B 3.7.3.8 Fire Detection Instrumentation.....................................................
TRM/B 3.7-14 B 3.7.4 Solid Radwaste System...............................................................
TRM/B 3.7-15 B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor.........................................
B 3.7-17 B 3.7.5.2 Main Condenser Explosive Gas Mixture..............................................
B 3.7-19 B 3.7.5.3 Liquid Holdup Tanks............................................................................
B 3.7-20 B 3.7.6 ESSW Pumphouse Ventilation....................................................
TRM/B 3.7-21 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation..........................................................
TRM/B 3.7-22 B 3.7.8 Snubbers.....................................................................................
TRM/B 3.7-24 B 3.7.9 Control Structure HVAC...............................................................
TRM/B 3.7-31 B 3.7.10 Spent Fuel Storage Pools............................................................
TRM/B 3.7-33 B 3.7.11 Structural Integrity........................................................................
TRMIB 3.7-36 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices.......................................................................
TRM/B 3.8-1 B 3.8.2.1 Motor Operated Valves Thermal Overload Protection -
Continuous..................................................................................
TRM/B 3.8-3 B 3.8.2.2 Motor Operated Valves Thermal Overload Protection -
A utom atic.....................................................................................
T R M /B 3.8-4 B 3.8.3 Diesel Generator (DG) Maintanence Activities............................ TRM/B 3.8-5 B 3.8.4 24VDC Electrical Power Subsystem............................................
TRM/B 3.8-6 B 3.8.5 Degraded Voltage Protection......................................................
TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling........................................
TRM/B 3.8-17 B 3.8.7 Battery Monitoring and Maintenance Program............................. TRM/B 3.8-18 B.3.9.1 D ecay T im e.........................................................................................
B 3.9-1 B 3.9.2 Communications..................................................................................
B 3.9-2 B 3.9.3 Refueling Platform...............................................................................
B 3.9-3 B 3.10.1 Sealed Source Contamination.............................................................
B 3.10-1 B 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation........................
B 3.10-2 B 3.10.3 Independent Spent Fuel Storage Installation (ISFSI)................... TRM/B 3.10-4 B 3.10.4 Section Not Used.........................................................................
TRM/B 3.10-6 B 3.11.1.1 Liquid Effluents Concentration.............................................................
B 3.11-1 B 3.11.1.2 Liquid Effluents Dose..........................................................................
B 3.11-4 B 3.11.1.3 Liquid Waste Treatment System.........................................................
B 3.11-6 B 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation..........................
B 3.11-7 B 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation.............. TRM/B 3.11-10 SUSQUEHANNA - UNIT 2 TRM / TOC-6 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
PPL Rev. 21 SECTION B 3.11.2.1 B 3.11.2.2 B 3.11.2.3 B 3.11.2.4 B 3.11.2.5 B 3.11.2.6 B 3.11.3 B 3.11.4.1 B 3.11.4.2 B 3.11.4.3 B 3.12 B.3.12.1 B.3.12.2 B.3.12.3 TITLE PAGE Dose Rate....................................................................................
TRM/B 3.11-12 Dose - Noble Gases............................................................................
B 3.11-16 Dose - Iodine, Tritium, and Radionuclides in Particulate Form..................................................................................
B 3.11-18 Gaseous Radwaste Treatment System.......................................
TRM/B 3.11-20 Ventilation Exhaust Treatment System........................................
TRM/B 3.11-21 Radioactive Gaseous Effluent Monitoring Instrumentation............................................................................
TRM/B 3.11-24 Total Dose...........................................................................................
B 3.11-26 Monitoring Program.....................................................................
TRM/B 3.11-28 Land Use Census................................................................................
B 3.11-34 Interlaboratory Comparison Program...........................................
TRM/B 3.11-36 LOADS CONTROL PROGRAM...................................................
TRM/B 3.12-1 Crane Travel - Spent Fuel Storage Pool.....................................
TRM/B 3.12-1 Heavy Loads Requirements........................................................
TRM/B 3.12-2 Light Loads Requirements............................................................
TRM/B 3.12-3 TRM2 Text TOC 12/112011 SUSQUEHANNA - UNIT 2 TRM /TOC-7 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 71 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC 1.0 TABLE OF CONTENTS USE AND APPLICATION Page TRM / 1.0-1 Page TRM / 1.0-2 Page TRM / 1.0-3 2.0 3.0 3.1 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Pages TRM / 2.0-8 and TRM / 2.0-9 Page TRM / 2.0-10 Page TRM / 2.0-11 Page TRM / 2.0-12 Pages TRM / 2.0-13 and TRM / 2.0-14 Page TRM / 2.0-15 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1--
Pages TRM / 3.1-2 through TRM / 3.1-5 Page TRM / 3.1-6 Page TRM / 3.1-7 Page TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-54 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Pages TRM / 3.3-4 and TRM / 3.3-5 Page TRM / 3.3-6 Page TRM 3.3-7 Page 3.3-8 11/30/2011 08/31/1998 10/04/2002 08/31/1998 08/31/1998 01/28/2005 06/25/2002 04/12/1999 04/15/2009 05/15/2008 01/07/2011 02/02/2010 11/15/2004 04/15/2009 11/15/2004 11/15/2005 04/14/2008 03/15/2002 11/30/2005 10/31/2007 08/31/1998 03/27/2007 04/15/2009 03/27/2007 02/18/1999 02/18/1999 08/31/1998 04/12/2011 07/16/1999 10/31/2007 03/10/2011 10/31/2007 08/31/1998 3.2 3.3 SUSQUEHANNA
- UNIT 2 TRM / LOES-1 EFFECTIVE DATE 11/30/2011 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 71 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Pages TRM / 3.3-9 and TRM / 3.3-9a Page TRM / 3.3-10 Pages TRM / 3.3-11 and TRM / 3.3-11 a Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Pages TRM / 3.3-15 and TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page TRM / 3.3-21 Page TRM / 3.3-21a Pages TRM /3.3-21b through TRM / 3.3-21d Page TRM / 3.3-22 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 Pages TRM / 3.3-26 and TRM / 3.3-27 Effective Date 3.4 3.5 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages TRM / 3.4-6 through TRM / 3.4-8 Page 3.4-9 Page 3.4-10 Page 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 Page TRM / 3.4-14 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 and 3.6-2 Pages TRM / 3.6-3 and TRM / 3.6-3a Page 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 06/30/2010 10/31/2007 06/30/2010 03/30/2001 01/07/2011 12/14/1998 01/07/2011 06/14/2002 10/31/2007 10/22/2003 04/15/2009 11/15/2004 03/27/2007 12/03/2004 05/16/2003 10/22/2003 04/07/2009 03/31/2006 10/23/1998 04/01/2009 08/31/1998 10/31/2007 08/31/1998 04/17/2009 03/31/2006 07/15/2010 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 08/11/2011 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.6 SUSQUEHANNA-UNIT 2 TRM I LOES-2 EFFECTIVE DATE 11/30/2011 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 71 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Page TRM / 3.7-4 Page TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM / 3.7-12 Page TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM / 3.7-23 Page TRM / 3.7-24 Pages TRM / 3.7-25 and TRM / 3.7-26 Page TRM / 3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Page TRM / 3.7-31 Page TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM / 3.7-39 Page TRM / 3.7-40 Page TRM / 3.7-40a Page TRM / 3.7-41 Page TRM / 3.7-42 Pages TRM / 3.7-43 through TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM I 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 Page TRM / 3.7-55 Page TRM / 3.7-56 07/29/1999 08/31/1998 03/31/2006 04/07/2009 08/02/1999 04/07/2009 01/21/2000 08/02/1999 04/07/2009 08/09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 11/24/2011 11/29/2006 01/13/2010 11/30/2005 11/16/2001 09/16/2010 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 06/20/2008 09/04/2008 08/31/1998 10/05/2006 06/07/2007 11/29/2010 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 09/25/2009 04/01/2009 SUSQUEHANNA
- UNIT 2 TRM / LOES-3 EFFECTIVE DATE 11/30/2011 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 71 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Page TRM / 3.8-13 Page TRM / 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages TRM / 3.8-24 and TRM / 3.8-25 Pages TRM / 3.8-25a and TRM / 3.8-25b Page TRM / 3.8-26 Page TRM / 3.8-27 Page TRM / 3.8-28 Page TRM / 3.8-29 04/02/2002 01/28/2005 01/31/2005 04/02/2002 10/31/2007 08/10/2004 12/03/2004 03/25/2010 08/31/1998 01/28/2005 04/02/2002 02/01/1-999 04/02/2002 02/01/1999 06/06/1999 11/30/2011 11/30/2011 05/28/2009 11/29/2006 05/28/2009 10/20/2009 08/31/1998 03/31/2006 08/30/1998 03/27/2007 06/10/2010 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 3.10 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 through 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page TRM / 3.11-13 Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 12/03/1004 09/01/1998 03/31/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 71 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 and TRM / 3.11-27 Page TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 Page TRM / 4.0-4 Pages TRM / 4.0-5 through TRM / 4.0-8 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 3.12 4.0 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev,. 71 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Page TRM / B 3.0-5 Page TRM / B 3.0-6 Page TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 B 3.1 B 3.2 B 3.3 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Page TRM / B 3.3-2 Page TRM / B-3.3-2a Pages TRM / B 3.3-3 and TRM / B 3.3-3a Page TRM / B 3.3-4 Page TRM / B 3.3-5 Page TRM / B 3.3-6 Page TRM / B 3.3-7 Page TRM / B 3.3-8 Page TRM / B 3.3-9 Pages TRM / B 3.3-10 through TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 through TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a and TRM / B 3.3-19b Page TRM / B 3.3-19c Pages TRM / B 3.3-19d and TRM / B 3.3-19e Pages TRM / B 3.3-20 and TRM / B 3.3-21 Page TRM / B 3.3-22 Page TRM / B 3.3-23 Pages TRM / B 3.3-24 and TRM / B 3.3-25 08/31/1998 01/10/2007 04/14/2008 08/31/1998 04/12/2007 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 10/31/2007 08/31/1998 03/27/2007 02/18/1999 08/31/1998 04/07/2000 03/10/2011 10/31/2007 10/31/2007 06/30/2010 05/30/2006 06/30/2010 10/31/2007 06/30/2010 10/31/2007 01/07/2011 06/25/2002 10/31/2007 06/14/2002 10/22/2003 03/27/2007 03/27/2007 04/17/2009 03/27/2007 08/03/2010 10/22/2003 05/16/2003 04/07/2009 SUSQUEHANNA
- UNIT 2 TRM / LOES-6 EFFECTIVE DATE 11/30/2011 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 71 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.4 B 3.5 B 3.6 REACTOR COOLANT SYSTEM BASES Page TRM / B 3.4-1 Pages TRM / B 3.4-2 and TRM / B3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 Page TRM / B 3.4-7 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 and TRM / B 3.5-3a Page B 3.5-4 Page TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Page TRM / B 3.7-3 Page TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Pages TRM / B 3.7-6 and TRM / B 3.7-6a Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Pages TRM / B 3.7-10a through TRM / B 3.7-11a Pages TRM / B 3.7-12 through TRM / B 3.7-14 Page TRM / B 3.7-14a Page TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 Page TRM / B 3.7-21a Pages TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM / B 3.7-24 through TRM / B 3.7-29 08/31/1998 04/01/2009 10/31/2007 10/15/1999 08/31/1998 07/15/2010 08/31/1998 10/31/2007 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/29/2007 04/04/2007 12/03/2004 12/31/2002 08/31/1998 06/10/2010 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 01/09/2004 11/24/2011 02/01/1999 08/31/1998 02/14/2005 06/20/2008 01/30/2008 10/05/2006 B 3.7 SUSQUEHANNA-UNIT 2 TRM / LOES-7 EFFECTIVE DATE 11/30/2011 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 71 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.8 B.3.9 Page TRM / B 3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 Pages TRM / B 3.7-36 and TRM / B 3.7-37 Page TRM / B 3.7-38 Page TRM / B 3.7-39 Page TRM / B 3.7-40 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2 Page TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 Pages TRM / B 3.8-17a and TRM / B 3.8-17b Pages TRM / B 3.8-18 through TRM / B 3.8-20 Pages TRM / B 3.8-21 through TRM / B 3.8-24 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 06/07/2007 10/05/2006 11/30/2011 03/09/2001 04/15/2003 12/03/2004 07/05/2000 04/01/2009 09/25/2009 04/01/2009 04/08/2010 04/02/2002 01/28/2005 03/01/2010 04/02/2002 04/02/2002 04/02/2002 08/10/2004 08/31/1998 04/02/2002 11/30/2011 11/30/2011 11/29/2006 05/28/2009 08/31/1998 10/23/1998 08/31/1998 03/27/2007 08/23/1999 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 04/02/2002 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-11 a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a SUSQUEHANNA - UNIT 2 TRM / LOES-8 EFFECTIVE DATE 11/30/2011 SUSQUEHANNA - UNIT 2 TRM / LOES-8 EFFECTIVE DATE 11/30/2011
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 71 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11-23 Page TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages TRM / B 3.11-31 and TRM / B 3.11-32 Page TRM / B 3.11-33 Pages TRM / B 3.11-34 and TRM / B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Page TRM / B 3.12-2 Page TRM / B 3.12-3 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/31/1998 11/30/2005 06/30/2010 08/31/1998 06/30/2010 08/31/1998 02/12/1999 09/19/2007 11/29/2010 02/05/1999 TRI12 text LOES.doc 12/1/2011 SUSQUEHANNA
- UNIT 2 TRM / LOES-9 EFFECTIVE DATE 11/30/2011 SUSQUEHANNA - UNIT 2 TRM / LOES-9 EFFECTIVE DATE 11/30/2011
Control Structure HVAC PPL Rev. 2 B 3.7.9 B 3.7.9 Control Structure HVAC BASES TRO Control structure HVAC systems have safety related functions to maintain the required air pressure control in the building and maintain the heating and cooling of support equipment required to mitigate a Loss of Coolant Accident. The Control Structure and Computer Room ventilation fans are required to maintain the habitability envelope at a positive pressure (i.e., > 0" wc) and also to perform a heating and/or cooling function. The operation and surveillance requirements of the ventilation fans to maintain the habitability envelope at a positive pressure during CREOAS operation are discussed in TS 3.7.3. The heating and/or cooling function is addressed in this TRO. At least one train of each system is required for these purposes.
Technical Specification LCOs 3.7.3 and 3.7.4 address operating and surveillance requirements for the Control Room Emergency Outside Air Supply System and the Control Room Floor Cooling System. The Unit 2 Technical Requirement Manual TRO 3.8.6 addresses operating requirements for the Unit 1 Emergency Switchgear Room Cooling System.
The SGTS Room Cooling and Heating systems are essential to maintain the normal and post accident environment of the Control Structure Elevation 806 within acceptable design temperature limits.
CREOASS, SGTS, and Control Structure Chilled Water equipment is located on Control Structure Elevation 806.
The Computer Room Floor Cooling System's function is to maintain the computer room environment within acceptable design temperature limits. The system also maintains the habitability envelope pressure within limits. The Computer Room Floor Cooling System consists of two independent, redundant subsystems that provides cooling of recirculated computer room air. Each subsystem consists of cooling coils, fans, chillers, compressors, ductwork, dampers and instrumentation and controls to provide computer room temperature control.
The Control Structure Heating and Ventilation System serves all elevations of the control structure except the control room, TSC, and elevation 697'. The system's function is to maintain temperature and habitability envelope pressure within acceptable limits. The Control Structure Heating and Ventilation System consists of two independent, redundant subsystems that provides cooling of recirculated control structure air. Each subsystem consists of cooling coils, fans, chillers, compressors, ductwork, dampers and instrumentation and controls to provide temperature control.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.7-31 EFFECTIVE DATE 11/30/2011
Control Structure HVAC B 3.7.9 PPL Rev. 2 B 3.7.9 Control Structure HVAC BASES (continued)
TRO (continued)
The Control Structure Chilled Water System functions to transfer heat from the Control Room Floor Cooling System, Computer Room Floor Cooling System, Control Structure Heating and Ventilation System, and the Unit 1 ESGRC units to the ESW system. The Control Structure Chilled Water System consists of two independent, redundant subsystems consisting of a centrifugal compressor, a chilled water pump, one emergency condenser water pump, cooling coils, closed expansion tank, air separator, interconnecting piping, valves and instrumentation and controls.
The Battery Room Exhaust System functions to maintain the battery room design temperature, design pressure, and hydrogen concentration within limits. The Battery Room Exhaust System consists of two independent, redundant subsystems consisting of fans, ductwork, dampers and instrumentation and controls.
ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components. With one of the HVAC subsystems inoperable, the inoperable HVAC subsystem must be restored to OPERABLE status within 30 days. With the unit in this condition, the remaining OPERABLE HVAC subsystem is adequate to perform the cooling and/or heating function. However, the overall reliability is reduced because a single failure in the OPERABLE subsystem results in the loss of the HVAC function. The 30 day Completion Time is based on the consideration that the remaining subsystem can provide the required protection, and the availability of alternate nonsafety cooling methods.
TRS The TRS assures sufficient system functionality to ensure operation when called upon to perform its safety related function.
REFERENCES
- 1.
FSAR Section 9.4.1
- 2.
FSAR Section 9.2.12.1 SUSQUEHANNA - UNIT 2 TRM / B 3.7-32 EFFECTIVE DATE 03/09/2001
Emergency Switchgear Room Cooling PPL Rev. 1 3.8.6 3.8 Electrical Power 3.8.6 Emergency Switchgear Room Cooling TRO 3.8.6 Two Emergency Switchgear Room Cooling subsystems shall be OPERABLE.
APPLICABILITY:
Whenever associated emergency switchgear is required to be OPERABLE ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One required Unit 2 A.1 ---------
NOTE ----------
30 days Emergency Switchgear Applicable only in MODES Room Cooling subsystem 1, 2, or 3.
Restore subsystem to OPERABLE status.
B.
Two required Unit 2 B.1 ---------
NOTE -----------
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Emergency Switchgear Applicable only in MODES Room Cooling subsystems 1, 2, or 3.
Restore at least one required subsystem to OPERABLE status.
AND (continued)
SUSQUEHANNA - UNIT 2 TRM / 3.8.24 EFFECTIVE DATE 11/30/2011
Emergency Switchgear Room Cooling PPL Rev. 1 3.8.6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B.2 ---------
NOTE-----------
Immediately Applicable only in MODES 4, 5, or OPDRVs, CORE ALTERATIONS, or when handling irradiated fuel in the secondary containment.
Suspend CORE ALTERATIONS, OPDRVs, and handling irradiated fuel in the secondary containment.
AND B.3 ---------
NOTE-----------
Immediately Applicable only in MODES 4, 5, or OPDRVs, CORE ALTERATIONS, or when handling irradiated fuel in the secondary containment.
Initiate action to restore one subsystem to OPERABLE status.
C.
Required Action and C.1 Declare affected distribution Immediately associated Completion system inoperable and take Time of Condition A or B Actions required by - Unit 2 not met LCO 3.8.7 or LCO 3.8.8.
D. One required Unit 1 D.1 ----------
NOTE -----------
30 days Emergency Switchgear Applicable only in Unit 2 Room Cooling MODES 1, 2, or 3.
subsystem inoperable.
Restore subsystem to OPERABLE status.
(continued)
SUSQUEHANNA - UNIT 2 TRM / 3.8.25 EFFECTIVE DATE 11/30/2011
Emergency Switchgear Room Cooling PPL Rev. 1 3.8.6 ACTIONS (continued)
CONDITION I
REQUIRED ACTION ICOMPLETION TIME E.
Two required Unit 1 Emergency Switchgear Room Cooling subsystems inoperable.
E. 1 ----------
NOTE Applicable only in Unit 2 MODES 1, 2, or 3.
Restore at least one required subsystem to OPERABLE status.
AND E.2 ---------
NOTE Applicable only in Unit 2 MODES 4, 5, or OPDRV's, CORE ALTERATIONS, or when handling irradiated fuel in the secondary containment.
Suspend CORE ALTERATIONS, OPDRVs, and handling irradiated fuel in the secondary containment.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Immediately Immediately (continued)
AND E.3 NOTE Applicable only in Unit 2 MODES 4, 5, or OPDRV's, CORE ALTERATIONS, or when handling irradiated fuel in the secondary containment.
Initiate action to restore one subsystem to OPERABLE status.
SUSQUEHANNA - UNIT 2 TRM / 3.8.25a EFFECTIVE DATE 11/30/2011
Emergency Switchgear Room Cooling PPL Rev. 1 3.8.6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME F.
Required Action and F.1 Declare affected distribution Immediately associated Completion system inoperable and take Time of Condition D or E actions required by Unit 1 LCO not met.
3.8.7 or LCO 3.8.8.
TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.8.6.1 Administratively verify that the Unit 2 Emergency 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Switchgear Room Cooling Fans (2V222) are available.
TRS 3.8.6.2 Verify that the Emergency Switchgear Room Cooler 92 days Chiller (2K210) will run for at least 60 minutes.
TRS 3.8.6.3 Verify each Emergency Switchgear Room Cooler 24 months Chiller (2K210) has the capability to maintain the design temperature of the emergency switchgear and load center rooms.
SUSQUEHANNA - UNIT 2 TRM / 3.8.25b EFFECTIVE DATE 11/30/2011
Emergency Switchgear Room Cooling PPL Rev. 2 B 3.8.6 B 3.8.6 Emergency Switchgear Room Cooling BASES TRO The Emergency Switchgear Room Cooling (ESRC) system provides heat removal capability for the Unit 2 emergency switchgear (Room designation 11-406 and 11-407) and load center rooms (Room designation 11-507 and 11-510) which contain equipment that is required to operate during the mitigation of a design basis event. The room cooling system provides the primary means to remove heat from the equipment located in these rooms.
(Reference 1)
Two 100% capacity cooling subsystems provide the normal and emergency ventilation for the emergency switchgear and load center rooms.
This requirement does not include equipment used in the normal cooling mode, which serves no post accident function. It includes the Switchgear Room Cooling Direct Expansion (DX) Units. The equipment required for the
'A' subsystem of the ESRC system is:
'A' Emergency Switchgear Fan - 2V222A
'A' Cooling Coil - 2E296A DX Unit and Associated Equipment - 2K210A Note that the 'A' DX unit transfers heat to the 'A' ESW subsystem (Technical Specification 3.7.2).
The equipment required for the 'B' subsystem of the ESRC system is:
'B' Emergency Switchgear Fan - 2V222B
'B' Cooling Coil - 2E296B DX Unit and Associated Equipment - 2K210B Note that the 'B' DX unit transfers heat to the 'B' ESW subsystem (Technical Specification 3.7.2).
Additionally, the associated ductwork, dampers and associated instrumentation and controls are also required.
Each Unit 2 ESRC subsystem provides cooling for the Unit 2 emergency switchgear and load center rooms, which contain equipment from different electrical divisions (e.g., the 'A' ESRC subsystem cools both Division I and II electrical equipment). Unlike the Unit I ESRC system, no common equipment is cooled by the Unit 2 ESRC system.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.8-17 EFFECTIVE DATE 11/30/2011
Emergency Switchgear Room Cooling PPL Rev. 2 B 3.8.6 B 3.8.6 Emergency Switchgear Room Cooling BASES ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
These actions are based on the relative impact of ESRC operability on the ability of the equipment in the Unit 2 Emergency Switchgear and Load Center to perform their safety function. Similar actions for the Unit 1 ESRC system is included in the Unit 2 TRM, since the Unit I ESRC system cools common equipment.
With one required Emergency Switchgear Room Cooling subsystem inoperable (Condition A) in MODES 4 or 5, during OPDRVs, CORE ALTERATIONS, or when handling irradiated fuel in the secondary containment, no action is provided or need be taken in response to the condition. With one ESRC subsystem inoperable in Modes 1, 2 or 3, the inoperable ESRC subsystem must be restored to OPERABLE status within 30 days. With the unit in this condition, the remaining OPERABLE ESRC subsystem is adequate to perform the cooling function. However, the overall reliability is reduced since a single failure in the OPERABLE subsystem results in a loss of the cooling function. The 30 day completion time is based on the consideration that the remaining subsystem can provide the required protection, and the availability of alternate non safety cooling methods.
With two required Unit 2 Emergency Switchgear Room Cooling subsystems inoperable (Condition B), one subsystem must be restored to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in Modes 1, 2 or 3. This 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> completion time is based on temperature rise calculations which show that switchgear functionality will not be impacted by a loss of switchgear cooling for this timeframe. In Modes 4 or 5, CORE ALTERATIONS, OPDRVs and handling irradiated fuel within secondary containment should be suspended immediately. This will reduce challenges to systems supported by the ESRC systems needed to mitigate the consequences of a fuel handling event. Additionally, action should be taken to restore one ESRC subsystem to OPERABLE status to eliminate the potential loss of electrical equipment due to sustained high temperatures.
(continued)
SUSQUEHANNA - UNIT 2 TRM / B 3.8-17a EFFECTIVE DATE 11/30/2011
Emergency Switchgear Room Cooling B 3.8.6 PPL Rev. 2 B 3.8.6 Emergency Switchgear Room Cooling BASES ACTIONS (continued)
LCO 3.8.7 is entered in the event that the Required Action and associated Completion Time of Condition A or B are not met in MODES 1, 2 or 3.
LCO 3.8.8 is entered in the event that the Required Action and associated Completion Time of Condition B are not met in MODES 4 or 5, or during OPDRVs, CORE ALTERATIONS, or when handling irradiated fuel in the secondary containment. Note that some common equipment is located in the Unit 1 switchgear and load center rooms. If Unit I LCO 3.8.7 or LCO 3.8.8 is entered, Unit 2 operation will be impacted due to common systems being inoperable. Therefore, loss of one or both Unit 1 ESRC subsystems requires entry into Unit 2 TRM 3.8.6 "Emergency Switchgear Room Cooling." Note that the rooms cooled by the Unit 2 ESRC system do not contain Unit 1 or Common system equipment. Therefore, entry into Unit 1 TRO 3.8.6 is not required if the Unit 1 ESRC subsystems are OPERABLE even if the Unit 2 ESRC system is INOPERABLE.
TRS The TRSs are defined to be performed at the specified Frequency to ensure that the systems are maintained OPERABLE.