1 WBN2Public Resource From:
Boyd, Desiree L [dlboyd@tva.gov]
Sent:
Monday, November 07, 2011 2:05 PM To:
Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:
Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D
Subject:
NRC PM Open Items List 11-08-11.docx Attachments:
NRC PM Open Items List 11-08-11.docx For next phone call.
Thank You,
~*~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN 2 Licensing Support Sun Technical Services dlboyd@tva.gov 423-365-8764
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
569 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF25032036)
Subject:
NRC PM Open Items List 11-08-11.docx Sent Date:
11/7/2011 2:04:40 PM Received Date:
11/7/2011 2:04:45 PM From:
Boyd, Desiree L Created By:
dlboyd@tva.gov Recipients:
"Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>
Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>
Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None Post Office:
TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 254 11/7/2011 2:04:45 PM NRC PM Open Items List 11-08-11.docx 34381 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
Page 1 of 4 NRC PM Open Items List 11/8/11 (423) 751-7777 ID 4233658764#
No.
Description Status Additional Comments Resp Org/Person
- 1.
Cyber Security Plan/Controls and Implementation NRC Table Top/Pilot Feb. 2012 Inspection 4th Qtr 2012 NRC Inspection in 2011 Heinrich/Snyder (Bryan)
Page 2 of 4 No.
Description Status Additional Comments Resp Org/Person
- 2.
Instrumentation RAI List (Knuettel)
- 1. GA/ESI is preparing a report to document the conformance of their CGD program to NRC requirements based on NRC telecom on 8/30/11.
Draft scheduled for 9/9 is now TBD.
- 2. Updates based on schedule received from GA on 09/07/11 following conference call on document schedule.
- 3. Revise GA-ESI procedure for CGI dedication to address NRC comments.
- 4. Draft received for review 9/20/11.
- 5. Non-props & affidavits
- 6. WEC to provide demarcated proprietary, non-proprietary and affidavits for withholding for each item.
- 8. WEC to agreed to produce a test report for the incore IITA.
- 9. WEC has the necessary documentation. WEC to produce a non-proprietary summary report and place the test reports in the WEC Rockville office for NRC audit.
- 10. Submit I&C update letter
- 1. 9/29/11A
- 2. Various -
see status
- 3. 9/26/11A
- 4. 10/4/11
- 5. 11/18/11
- 6. Various -
see status
- 7. 10/24/11A
- 8. 11/18/11
- 9. 10/27/11A
- 10. 11/14/11
- 1. Draft response received and comments sent to GA.
- 2. 04038903-1SP: 10/11/11 A 04038903-2SP: 11/14/11 04038903-4SP: 11/14/11 04038903-QSR: 09/30/11 A Non-props and affidavits due 11/18/11
- 3. OP-7.3-240: Complete
- 4. Create new bridge document 04038800-1SP:
10/11/11A
- 5. Provide NRC non-prop and affidavit for all remaining documents
- 6. WEC to provide the following documents:
WCAP for 0000-ICE-30156 11/9/11 CN-EQT-10-44: 11/9/11 DAR-ME-09-10: 10/11/11 A EQ-EV-62-WBT: 11/16/11 EQLR-171: 11/16/11 EQ-QR-33-WBT: 11/1/11A EQ-QR-64-GEN: 11/16/11 WNA-SD-00250-WBT: 11/2/11 WNA-SD-00248-WBT: 11/2/11 WNA-TP-02988-WBT: 10/26/11 WNA-VR-00279-WBT: Complete WNA-PT-00138-WBT: Complete
- 7. WNA-AR-00189-WBT:10/24/11A
- 8. IITA In-core EQ report
- 9. MI cable 600V test report Produce non-prop summary document A
- 10. Next I&C submittal update Eng/Hilmes (Smith)
- 3.
Exemption to 10CFR50.49 for some Category II cables?
11/14/11 Determine if exemption required. NRC may need to establish a license condition.
Hilmes (Stockton)
Page 3 of 4 No.
Description Status Additional Comments Resp Org/Person
- 4.
Complete Implementation (Hemmer)
Pump Relocation 5/30/12 Bldg Plan 11/14/11 Inspection -
June 2012 Table update -
TBD Substantial building to complete and equipment in May.
Provide document of mitigating equipment and location for unit 2.
Hemmer (Smith)
- 5.
Fire Protection Report Questions regarding OMA
- 1. 10/25-27/11 2.9/30/11A 3.9/30/11A
- 4. 10/31/11A
- 5. 11/30/11
- 6. 9/30/11A
- 7. 11/16/11
- 1. Audit
- 2. Group 7 RAI response
- 3. Receive Group 8 RAIs - if needed
- 4. Response to Group 8 plus 2Qs on 9/30/11 letter
- 5. Submit As-designed U1/U2 FPR
- 6. Fire Protection Program Audit Frequency - add to group 7 response
- 7. Follow-up meeting ENG/Hilmes (Arent)
- 6.
Tech Spec Revisions from latest T/S markup and NRC Review comments
- 1. 11/18/11
- 2. 12/15/11
- 3. 11/18/11
- 4. 11/18/11
- 5. 10/31/11A
- 1. CSST A & B - discretionary
- 2. I-131 DEI
- 3. Diesel Generator Frequency
- 5. List of Unit 1 Changes Licensing/Elton (Bryan)
- 5. Shea
- 7.
ACRS 12/15/11 Chapter 15 (T&A and dose), Chapters 11 & 12, Attachment HH?
Arent/Bryan
- 8.
SSER 22/23/24/25 Open Items
Response
As needed The expanded HH list and status is covered periodically.
Licensing
- 9.
Transient Analysis issues Boron dilution RAI response 11/18/11 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132.
ENG/Koontz WEC/Morgan
- 10.
FSAR A107 11/18/11 Current target date for A107 is 11/18/11.
Lic/Stockton
Page 4 of 4 No.
Description Status Additional Comments Resp Org/Person
- 11.
Develop list of planned License Conditions, Exemptions and Relief Requests (Arent)
- 1. 11/18/11
- 2. TBD
- 3. TBD
- 1.
Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0
- 2.
NRR to review current exemptions
- 3.
Verify required notifications made NRR/TVA (Bryan)
- 12.
Verify Tech Spec Setpoints match calcs TS certification
- 1. TBD
- 2. Feb 2012
- 1. SSDs are complete. Six changes to the TSs will be submitted to NRC
- 2. TS certification Eng/Hilmes (Bryan)
- 13.
Issue two Unit Offsite Dose Calculation Manual (Beach) Review TS Chapter 5 programs also 3/1/12 Determine actual need date Chemistry/
Woods (Bryan)
- 14.
Issue Unit 2 Completion Letter (Arent) 8/1/12 Licensing
- 15.
Submit final as-constructed FSAR figures 7/1/12 Licensing/
Stockton
- 16.
TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
Licensing (Gordon)
- 17.
ASME N-801 & N-802 code cases 11/30/11 NRC response to relief request submitted 9/1/11.
- 18.
ASME Section III N-3 report 8/1/12
- 19.
EP Drill Open Items
- a. Duty Specialist
Deutchmendy (Bryan)
- 0.
Discretionary Actions
- 1.
Letter to terminate Part 30/40 License after receipt of Part 50 License 4/1/12 Licensing (Arent)
- 2.
Combined U1/U2 FSAR (Stockton) 3/1/13 Licensing
- 3.
Status of GSI 199 Eastern Seismicity (Arent)
Fall 2011 No action pending upcoming Generic Letter TVA/NRR
- 4.
Letter to notify NRC when Vital Area Boundary returned to original location Jan. 2012 Security Plan Update - Boundary to be restored.
Lic/Arent