November 1, 2011
Mr. Mark E. Reddemann
Chief, Executive Officer
Energy Northwest
P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968
SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF INSPECTION
(INSPECTION REPORT 05000397/2011005) AND REQUEST FOR
INFORMATION
Dear Mr. Reddemann:
On December 5, 2011, the NRC will begin the on-site portion of the Gas Accumulation
Management in Emergency Core Cooling, Decay Heat Removal, and Containment Spray
Systems Temporary Instruction at your Columbia Generating Station. This inspection will be
performed in accordance with NRC Temporary Instruction (TI) 2515/177.
Experience has shown that this inspection is resource intensive, both for the NRC inspectors
and your staff. In order to minimize the impact to your on-site resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
The documents have been divided into two groups.
- The first group lists information necessary for our initial inspection scoping and in-office
preparation activities. This information should be separated by information request number,
especially if provided electronically (e.g., folder with the information request number). This
information should be available to the inspector no later than November 28, 2011. Upon
review of these documents, the inspectors will select additional documentation for review
upon arrival. By December 1, 2011, the inspector will communicate the initial selected
samples.
- The second group of documents requested is needed to support our on-site inspection
activities. This set of documents should be available to the inspector on December 5, 2011.
It is also requested that corrective action documents and responses to questions developed
during the inspection be provided to the inspector as the documents are generated.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Cherie Sonoda of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the inspector, Ron Cohen, at 509-845-1369 or by email at ronald.cohen@nrc.gov.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
R E GI ON I V
612 EAST LAMAR BLVD, SUITE 400
ARLINGTON, TEXAS 76011-4125
Energy Northwest
- 2 -
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of
Practice, a copy of this letter and its enclosure will be available electronically for public
inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web
site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/ R. M. Latta for
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket: 50-397
License: NPF-21
Enclosure:
Management of Gas Accumulation in Emergency Core Cooling, Decay Heat
Removal, and Containment Spray Systems Temporary Instruction Document
Request
cc w/encl:
Distribution via ListServ for Columbia Generating Station
Energy Northwest
- 3 -
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Tom.Blount@nrc.gov)
Senior Resident Inspector (jeremy.groom@nrc.gov)
Resident Inspector (mahdi.hayes@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)
Project Engineer, DRP/A (Christopher.Henderson@nrc.gov)
Site Administrative Assistant (Crystal.Myers@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Mohan.Thadani@nrc.gov)
Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
No
Yes
SUNSI Review Complete
Reviewer Initials: MRY
Category B.1
Publicly Available
Non-sensitive
Category A
Non-publicly Available
Sensitive
KEYWORD: A.X
Sensitive - XXX
RIV:DRS\\RI
C:EB1
M. Young
T. Farnholtz
/RA/
/RA/ RLatta for
10/31/11
11/1/11
OFFICIAL RECORD COPY
T=Telephone E=E-mail F=Fax
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY
HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION
DOCUMENT REQUEST
- 1 -
Enclosure
Inspection Report: 05000397/2011005
Inspection Dates:
December 5 - 14, 2011
Inspection Procedure:
TI 2515/177, Management of Gas Accumulation in Emergency
Core Cooling, Decay Heat Removal, and Containment Spray
Systems
Inspector:
Ronald Cohen, Reactor Inspector
(509) 845-1369
ronald.cohen@nrc.gov
The following information should be sent to Ronald Cohen (address at the end) in hard copy or
electronic format (ims.certrec.com or compact disc preferred) to facilitate the selection of
specific items that will be reviewed during the on-site inspection week. The inspector will select
specific items from the information requested below and then request from your staff additional
documents needed during the on-site inspection weeks. Also, we request that you categorize
the documents in your response with the numbered list below. Please provide requested
documentation electronically if possible. If requested documents are large and only hard copy
formats are available, please inform the inspector and provide subject documentation during the
first day of the on-site inspection. If you have any questions regarding this information request,
please call the inspector as soon as possible.
I. Information Requested By November 28, 2011
1. List of corrective action program documents (with a short description) associated with
GL 2008-01, voids in piping, and pressure transients for the previous three years.
2. List of changes (with a short description and tracking number) to the final safety analysis
report (FSAR), technical specifications, technical specification bases, and technical
requirements manual associated with the resolution of GL 2008-01.
3. List of calculations associated with GL 2008-01, including calculations that have been
changed or created in response to GL 2008-01 (with a short description of the
calculation and the change).
4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the
affected system locations (e.g., identify the source, conditions, and expected void
locations). Also include a short description of how each gas intrusion mechanism has
been addressed (e.g., plant hardware modification, procedure change).
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY
HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION
DOCUMENT REQUEST
- 2 -
Enclosure
5. List of the suction piping sections identified as susceptible to gas accumulation (the list
should identify the corresponding system).
6. List of the discharge piping sections identified as susceptible to gas accumulation (the
list should identify the corresponding system).
7. Copies of isometric drawings of the plant systems within scope of GL 2008-01 (hard
copies are preferred).
8. Copies of piping and instrumentation diagrams (P&IDs) of the plant systems within
scope of GL 2008-01 (hard copies are preferred). Please highlight any components that
were part of hardware modifications installed as part of the resolution of GL 2008-01 and
all high point vents that are monitored during void surveillances.
9. Copies of program documents and procedures developed to implement the resolution of
10. List of actions that were completed in response to GL 2008-01.
11. Copies of the modification packages for hardware modifications as part of the resolution
of GL 2008-01.
12. Design basis documents of the plant systems within scope of GL 2008-01.
13. Design basis documents of keep-full systems of the plant systems within scope of
14. System walkdown reports associated with the resolution of GL 2008-01.
15. If applicable, provide a list of inaccessible locations where plant walkdowns of the plant
systems within scope of GL 2008-01 have not been completed. Include an explanation
of why each area is considered inaccessible.
16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the
results of the last two surveillances for the plant systems within scope of GL 2008-01.
17. Copies of procedures used for filling and venting.
18. Copies of trends of periodic venting results.
19. Copies of the engineering evaluations performed for all identified voids.
20. Basis for the void acceptance criteria (e.g., calculation). If applicable, provide the
justification for any deviation from the void acceptance criteria established by the
Office of Nuclear Reactor Regulation (NRR).
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY
HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION
DOCUMENT REQUEST
- 3 -
Enclosure
21. Copies of any void transport analyses.
22. Copies of vortexing calculations associated with systems under the scope of
23. Copies of self-assessments associated with the implementation of the GL 2008-01
program.
II. Information Requested By December 5, 2011
24. Copies of the selected corrective action program documents.
25. Copies of the selected licensing and design basis document changes.
26. Copies of the selected calculations.
27. Copies of training modules and attendance records that ensure that personnel are aware
of gas-related concerns.
28. Copies of corrective action program implementing procedures.
29. Electronic copies of the current technical specifications, technical specification bases,
final safety analysis report, and technical requirements manual.
Inspector Contact Information:
US NRC Region IV
Attn: Ronald Cohen
612 E. Lamar Blvd., Suite 400
Arlington, TX 76011-4125