Letter Sequence Request |
---|
|
|
MONTHYEARML11285A0492011-10-0505 October 2011 Application to Eliminate License Condition 2.G Requiring Reporting of Violations of Section 2.C of Operating License (WBN-TS-11-13) Project stage: Request ML11280A2852011-10-17017 October 2011 Acceptance Review Regarding the Proposed License Amendment Request to Eliminate License Condition 2.G Project stage: Acceptance Review ML11285A2512012-01-0606 January 2012 Issuance of Amendment Regarding the Elimination of License Condition 2.G Project stage: Approval 2011-10-05
[Table View] |
|
---|
Category:Letter
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARCNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-23-015, Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08)2023-02-27027 February 2023 Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08) CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-001, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-04-0404 April 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-003, Application to Modify the Allowable Value for Watts Bar Nuclear Plant, Unit 1 Technical Specification Table 3.3.2-1, Function 6.e(1) (WBN-TS-21-010)2022-02-17017 February 2022 Application to Modify the Allowable Value for Watts Bar Nuclear Plant, Unit 1 Technical Specification Table 3.3.2-1, Function 6.e(1) (WBN-TS-21-010) CNL-21-018, Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance .2021-12-0909 December 2021 Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance . CNL-21-062, Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board Cleaning (WBN-TS-19-019)2021-09-29029 September 2021 Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board Cleaning (WBN-TS-19-019) ML21202A2242021-07-0202 July 2021 Tennessee Valley Authority (TVA)- Watts Bar Nuclear Plant (WBN)- NPDES Permit No. TN0020168-Application Request for Permit Renewal CNL-21-038, Application to Revise the Measurement Units for the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for the Containment Vent Isolation Instrumentation and Control Room Emergency Ventilation System Radiation Monitors (W2021-06-0101 June 2021 Application to Revise the Measurement Units for the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for the Containment Vent Isolation Instrumentation and Control Room Emergency Ventilation System Radiation Monitors (WBN CNL-21-045, Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN82021-04-29029 April 2021 Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89- CNL-21-013, Application to Modify Technical Specifications Steam Generator Inspection/Repair Program Provisions and Unit 2 Facility Operating License Condition 2.C.(4) (WBN-TS-20-06)2021-03-11011 March 2021 Application to Modify Technical Specifications Steam Generator Inspection/Repair Program Provisions and Unit 2 Facility Operating License Condition 2.C.(4) (WBN-TS-20-06) CNL-21-015, Expedited Application to Modify Watts Bar Nuclear Plant, Unit 1 Technical Specification 3.7.12, Auxiliary Building Gas Treatment System, for One-Time Exception to Permit Opening of the Auxiliary Building Secondary Containment Enclosure as2021-03-0303 March 2021 Expedited Application to Modify Watts Bar Nuclear Plant, Unit 1 Technical Specification 3.7.12, Auxiliary Building Gas Treatment System, for One-Time Exception to Permit Opening of the Auxiliary Building Secondary Containment Enclosure as N CNL-21-016, License Amendment Request to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level to Accommodate the Replacement Steam Generators (WBN-TS-20-05)2021-03-0202 March 2021 License Amendment Request to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level to Accommodate the Replacement Steam Generators (WBN-TS-20-05) CNL-21-010, Correction of Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology (WBN-TS-19-04) (EPID2021-01-26026 January 2021 Correction of Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology (WBN-TS-19-04) (EPID L CNL-20-104, Expedited Application for Approval to Use an Alternate Method of Determining Probability of Detection for (WBN TS-391-20-024)2020-12-23023 December 2020 Expedited Application for Approval to Use an Alternate Method of Determining Probability of Detection for (WBN TS-391-20-024) CNL-20-093, Supplement to Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 'Containment Leakage Rate Testing Program' (WBN-TS-19-01)2020-12-15015 December 2020 Supplement to Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 'Containment Leakage Rate Testing Program' (WBN-TS-19-01) CNL-20-087, Non-Voluntary Application to Modify Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications Surveillance Requirement 3.6.15.4, Shield Building, (WBN-TS-20-017)2020-12-15015 December 2020 Non-Voluntary Application to Modify Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications Surveillance Requirement 3.6.15.4, Shield Building, (WBN-TS-20-017) CNL-20-078, Supplement to Application to Revise Watts Bar Nuclear Plant (Wbn), Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency and to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sa2020-10-13013 October 2020 Supplement to Application to Revise Watts Bar Nuclear Plant (Wbn), Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency and to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Samp CNL-20-006, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 Containment Leakage Rate Testing Program (WBN-TS-19-01)2020-10-0202 October 2020 Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 Containment Leakage Rate Testing Program (WBN-TS-19-01) CNL-20-058, Tennessee Valley Authority, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Function 6.e of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation (WBN-TS-19-27)2020-08-27027 August 2020 Tennessee Valley Authority, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Function 6.e of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation (WBN-TS-19-27) CNL-20-041, License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016)2020-08-14014 August 2020 License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016) CNL-20-047, Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance2020-07-31031 July 2020 Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance Re CNL-20-063, Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)2020-07-27027 July 2020 Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) CNL-20-053, Application to Revise Watts Bar Nuclear Plant, Unit 1, Technical Specifications for Steam Generator Tube Inspection Frequency & to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection, (WBN-392020-07-17017 July 2020 Application to Revise Watts Bar Nuclear Plant, Unit 1, Technical Specifications for Steam Generator Tube Inspection Frequency & to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection, (WBN-390- CNL-20-040, License Amendment Request to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec (WBN-TS-20-07)2020-07-17017 July 2020 License Amendment Request to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec (WBN-TS-20-07) CNL-20-016, Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23)2020-06-22022 June 2020 Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23) CNL-20-012, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-18-16)2020-05-19019 May 2020 Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-18-16) CNL-20-005, License Amendment Request to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position, (WBN-TS-20-02)2020-04-0303 April 2020 License Amendment Request to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position, (WBN-TS-20-02) CNL-19-115, Non-Voluntary License Amendment Request to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specific2020-03-0202 March 2020 Non-Voluntary License Amendment Request to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specificat CNL-19-084, Second Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program...2020-01-17017 January 2020 Second Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program... CNL-19-051, Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology2020-01-17017 January 2020 Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology CNL-20-004, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01)2020-01-17017 January 2020 Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01) CNL-19-110, Application to Revise Technical Specifications 3.8.1, AC Sources - Operating (WBN-TS-18-10)2019-12-17017 December 2019 Application to Revise Technical Specifications 3.8.1, AC Sources - Operating (WBN-TS-18-10) CNL-19-077, Application to Modify Watts Bar Nuclear Plant (WBN) Unit 1 and Unit 2 Technical Specifications 3.6.15, Shield Building, (WBN-TS-19-10)2019-12-0606 December 2019 Application to Modify Watts Bar Nuclear Plant (WBN) Unit 1 and Unit 2 Technical Specifications 3.6.15, Shield Building, (WBN-TS-19-10) CNL-19-067, Application to Revise Watts Bar Nuclear Plant (WBN) Unit 2 - Technical Specifications for Steam Generator Tube Repair Sleeve (WBN-TS-391-19-13)2019-09-30030 September 2019 Application to Revise Watts Bar Nuclear Plant (WBN) Unit 2 - Technical Specifications for Steam Generator Tube Repair Sleeve (WBN-TS-391-19-13) CNL-19-060, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14)2019-08-29029 August 2019 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14) CNL-19-038, License Amendment Request to Make Miscellaneous Administrative Changes (WBN-TS-19-02)2019-06-0707 June 2019 License Amendment Request to Make Miscellaneous Administrative Changes (WBN-TS-19-02) CNL-19-014, Application to Modify Watts Bar Nuclear Plant Unit 2 Technical Specifications 3.7.8 to Extend the Completion Time for an Inoperable Essential Raw Cooling Water Train on a One-Time Basis (WBN-TS-18-07)2019-02-0707 February 2019 Application to Modify Watts Bar Nuclear Plant Unit 2 Technical Specifications 3.7.8 to Extend the Completion Time for an Inoperable Essential Raw Cooling Water Train on a One-Time Basis (WBN-TS-18-07) CNL-18-118, Application to Revise Technical Specifications Regarding DC Electrical Systems TStf-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 (WBN-TS-18-09)2018-11-29029 November 2018 Application to Revise Technical Specifications Regarding DC Electrical Systems TStf-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 (WBN-TS-18-09) CNL-18-068, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (WBN-TS-17-24)2018-11-29029 November 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (WBN-TS-17-24) CNL-18-119, Application to Revise Watt Bar Nuclear Plant, Units 1 & 2, Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9, Regarding Electrical Power Systems (WBN-TS-1808)2018-11-26026 November 2018 Application to Revise Watt Bar Nuclear Plant, Units 1 & 2, Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9, Regarding Electrical Power Systems (WBN-TS-1808) CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays 2023-09-20
[Table view] |
Text
Tennessee Valley Authority 1101 Market Street, LP 3R Chattanooga, Tennessee 37402-2801 R. M. Krich Vice President Nuclear Licensing October 5, 2011 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No. 50-390
Subject:
Watts Bar Nuclear Plant Unit I - Application to Eliminate License Condition 2.G Requiring Reporting of Violations of Section 2.C of Operating License (WBN-TS-11-13)
In accordance with the provisions of 10 CFR 50.90, "Application for amendment of license, construction permit, or early site permit," the Tennessee Valley Authority (TVA) requests a change (WBN-TS-1 1-13) to Watts Bar Nuclear Plant (WBN), Unit 1, Facility Operating License No. NPF-90.
The proposed amendment will delete the license condition that requires reporting of violations of other requirements (e.g., conditions listed in Section 2.C) in the operating license. The change is consistent with the notice published in the "Federal Register" on November 4, 2005 (70 FR 67202) as part of the consolidated line item improvement process (CLIIP).
The Enclosure to this letter provides a description of the proposed change and confirmation of applicability.
WVA requests approval of the proposed license amendment by October 1, 2012, with implementation by November 1, 2012.
The WBN Plant Operations Review Committee and the WBN Nuclear Safety Review Board have reviewed this proposed change and determined that operation of WBN in accordance with the proposed change will not endanger the health and safety of the public.
77~T7C) printed on recycled paper
U.S. Nuclear Regulatory Commission Page 2 October 5, 2011 Additionally, in accordance with 10 CFR 50.91(b)(1), TVA is sending a copy of this letter and Enclosure to the Tennessee Department of Environment and Conservation.
There are no regulatory commitments associated with this submittal. Please address any questions regarding this request to Joe Shea, Corporate Licensing Manager, at 423-751-6887.
I declare under penalty of perjury that the foregoing is true and correct. Executed on this 5th day of October 2011.
Respectfully, -
R. M. Krich
Enclosure:
Evaluation of Proposed Change cc (Enclosure):
NRC Regional Administrator - Region II NRC Resident Inspector - Watts Bar Nuclear Plant, Unit 1 NRC Resident Inspector - Watts Bar Nuclear Plant, Unit 2 Director, Division of Radiological Health - Tennessee State Department of Environment and Conservation
ENCLOSURE TENNESSEE VALLEY AUT4HORITY WATTS BAR NUCLEAR PLANT UNIT 1 EVALUATION OF PROPOSED CHANGE
Subject:
Application to Eliminate License Condition 2.G Requiring Reporting of Violations of Section 2.C of Operating License (WBN-TS-1 1-13)
1.0 INTRODUCTION
2.0 DESCRIPTION
OF PROPOSED AMENDMENT
3.0 BACKGROUND
4.0 REGULTORY REQUIREMENTS AND GUIDANCE
5.0 TECHNICAL ANALYSIS
6.0. REGULATORY ANALYSIS 7.0 NO SIGNIFICANT HAZARDS CONSIDERATION 8.0 ENVIRONMENTAL EVALUATION 9.0 PRECEDENT
10.0 REFERENCES
ATTACHMENTS
- 1. Proposed Operating License Changes (Mark-Ups) for WBN, Unit 1
- 2. Proposed Operating License Changes (Final Typed) for WBN, Unit 1 E-1
1.0 INTRODUCTION
The proposed amendment would delete Section 2.G of Facility Operating License No. NPF-90 for Watts Bar Nuclear Plant (WBN), Unit 1, which requires reporting of violations of the requirements in Section 2.C of the facility operating license. The availability of this operating license improvement was announced in the FederalRegister on November 4, 2005 as part of the consolidated line item improvement process (CLIIP).
2.0 DESCRIPTION
OF PROPOSED AMENDMENT Consistent with the CLIIP Notice of Availability (70 FR 67202), the proposed amendment consists of deleting Section 2.G of Facility Operating License No. NPF-90. The current requirements of the license condition are as follows:
2.G Except as otherwise provided in the Technical Specifications (Appendix A to this license) or Environmental Protection Plan (Appendix B to this license), TVA shall report any violations of the requirements contained in Section 2.C of this license in the following manner: initial notification shall be made within twenty-four (24) hours to the NRC Operations Center via the Emergency Notification System with written follow-up within 30 days in accordance with the procedures described in 10 CFR 50.73 (b), (c), and (e).
The existing conditions in Section 2.C that are subject to the current report requirement consist of the following:
2.C This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect, and is subject to the additional conditions specified or incorporated below.
(1) Maximum Power Level TVA is authorized to operate the facility at reactor core power levels not in excess of 3459 megawatts thermal.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A as revised through Amendment No. 86 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. TVA shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Safety Parameter Display System (SPDS) (Section 18.2 of SER Supplements 5 and 15)
Prior to startup following the first refueling outage, TVA shall accomplish the necessary activities, provide acceptable responses, and implement all proposed corrective actions related to having the Watts Bar Unit 1 SPDS operational.
E-2
(4) Vehicle Bomb Control Program (Section 13.6.9 of SSER 20)
During the period of the exemption granted in paragraph 2.D.(3) of this license, in implementing the power ascension phase of the approved initial test program, TVA shall not exceed 50% power until the requirements of 10 CFR 73.55(c)(7) and (8) are fully implemented. TVA shall submit a letter under oath or affirmation when the requirements of 73.55(c)(7) and (8) have been fully implemented.
(5) Reactor Vessel Fracture Toughness Testing Supplemental fracture toughness testing (J-R) will be performed in accordance with a testing procedure that has been previously reviewed and approved by the NRC staff on Surveillance Capsule W specimens (removed from Cycle 3 Refueling Outage) and Capsule X specimens (to be removed from Cycle 5 Refueling Outage). The supplemental test results will be included in the report to be submitted in accordance with 10 CFR 50, Appendix H requirements for each Capsule specimen and will include an evaluation of the effects on TVA's equivalent margins analysis which was submitted October 15, 1993 and approved by NRC in Supplemental Safety Evaluation Report (SSER) 14.
(6) Mitigation Strategy License Condition Develop and maintain strategies for addressing large fires and explosions and that include the following key areas:
(a) Fire fighting response strategy with the following elements:
- 1. Pre-defined coordinated fire response strategy and guidance
- 2. Assessment of mutual aid fire fighting assets
- 3. Designated staging areas for equipment and materials
- 4. Command and control
- 5. Training of response personnel (b) Operations to mitigate fuel damage considering the following:
- 1. Protection and use of personnel assets
- 2. Communications
- 3. Minimizing fire spread
- 4. Procedures for implementing integrated fire response strategy
- 5. Identification of readily-available pre-staged equipment
- 6. Training on integrated fire response strategy
- 7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
- 1. Water spray scrubbing
- 2. Dose to onsite responders (7) The licensee shall implement and maintain all Actions required by Attachment 2 to NRC Order EA-06-137, issued June 20, 2006, except the last action that requires incorporation of the strategies into the site security plan, contingency plan, emergency plan and/or guard training and qualification plan, as appropriate.
E-3
(8) Upon implementation of Amendment No. 70 adopting TSTF-448, Revision 3, the determination of control room envelope (CRE) unfiltered air inleakage as required by SR 3.7.10.4, in accordance with TS 5.7.2.20.c.(i), the assessment of CRE habitability as required by Specification 5.7.2.20.c.(ii), and the measurement of CRE pressure as required by Specification 5.7.2.20.d, shall be considered met following implementation:
(a) The first performance of SR 3.7.10.4, in accordance with Specification 5.7.2.20.c.(i), shall be within the specified Frequency of 6 years, plus the 18-month allowance of SR 3.0.2, as measured from April 5, 2004, the date of the most recent successful tracer gas test, as stated in the August 4, 2004, letter response to Generic Letter 2003-01, or within the next 18 months if the time period since the most recent successful tracer gas test is greater than 6 years.
(b) The first performance of the periodic assessment of CRE habitability, Specification 5.7.2.20.c.(ii), shall be within 3 years, plus the 9-month allowance of SR 3.0.2, as measured from April 5, 2004, the date of the most recent successful tracer gas test, as stated in the August 4, 2004 letter response to Generic Letter 2003-01, or within the next 9 months if the time period since the most recent successful tracer gas test is greater than 3 years.
(c) The first performance of the periodic measurement of CRE pressure, Specification 5.7.2.20.d, shall be within 18 months, plus the 138 days allowed by SR 3.0.2, as measured from May 10, 2007, the date of the most recent successful pressure measurement test, or within 138 days if not performed previously.
3.0 BACKGROUND
The background for this application is adequately addressed by the NRC Notice of Availability published on November 4, 2005 (70 FR 67202) and the Notice of Opportunity to Comment published on August 29, 2005 (70 FR 51098).
4.0 REGULATORY REQUIREMENTS AND GUIDANCE The applicable regulatory requirements and guidance associated with this application are adequately addressed by the NRC Notice of Availability published on November 4, 2005 (70 FR 67202) and the Notice of Opportunity to Comment published on August 29, 2005 (70 FR 51098).
5.0 TECHNICAL ANALYSIS
TVA has reviewed the safety evaluation (SE) published on August 29, 2005, as part of the CLIIP Notice of Opportunity to Comment.TVA has concluded that the justifications presented in the SE prepared by the NRC staff are applicable to WBN, Unit 1 and justify this amendment of the facility operating license for WBN, Unit 1.
E-4
6.0 REGULATORY ANALYSIS
A description of this proposed change and its relationship to applicable regulatory requirements and guidance was provided in the NRC Notice of Opportunity to Comment published on August 29, 2005 (70 FR 51098).
7.0 NO SIGNIFIGANT HAZARDS CONSIDERATION TVA has reviewed the proposed no significant hazards consideration determination published on August 29, 2005 (70 FR 51098), as part of the CLIIP Notice of Opportunity to Comment. TVA has concluded that the proposed determination presented in the notice is applicable to WBN, Unit 1 and the determination is hereby incorporated by reference to satisfy the requirements of 10 CFR 50.91 (a).
8.0 ENVIRONMENTAL EVALUATION TVA has reviewed the environmental evaluation included in the model SE published on August 29, 2005 (70 FR 51098), as part of the CLIIP Notice of Opportunity to Comment. TVA has concluded that the NRC staff's findings presented in that evaluation are applicable to WBN, Unit 1 application.
9.0 PRECEDENT This application is being made in accordance with the CLIIP. TVA is not proposing variations or deviations from the changes described in the NRC staff's model SE published on August 29, 2005 (70 FR 51098).
10.0 REFERENCES
- 1. FederalRegister Notice of Opportunity to Comment on Model Safety Evaluation on Elimination of Typical License Condition Requiring Reporting of Violations of Section 2.C of Operating License Using the Consolidated Line Item Improvement Process, August 29, 2005 (70 FR 51098).
- 2. FederalRegister Notice of Availability of Model Application Concerning Elimination of Typical License Condition Requiring Reporting of Violations of Section 2.C of Operating License Using the Consolidated Line Item Improvement Process, November 4, 2005 (70 FR 67202)
E-5
ATTACHMENT I Proposed Operating License Changes (Mark-Ups) for WBN, Unit I
5a
.Deleted.
G. Excsept as othor::iso providod in the Technical Specifications (Appendix A to thi imeenc3) or Envieronmontal Protoction Plan (Appendix 1Bto thics ticonse), TVA shall roport any Yiolations of the reqUiromon~tG containod in Soction 2.C of this liconce intho folloWing m7annAOr iNita notificationR Ahall bo made Iithin or(1 Iot ho-Urc to the NRC Oporations Contor. via the Emoregoncy Noetifiation SyctomI with WARiffolloW up within 30 days i accordance with tho procoduros6 eocioin 10 CFR 50.73 (b), (G), and (e).
H. The licensee shall have and maintain financial protection of such types and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
Revised by letter dated August 9, 2007 land Amendment No.
ATTACHMENT 2 Proposed Operating License Changes (Final Typed) for WBN, Unit I
5a G. Deleted.
H. The licensee shall have and maintain financial protection of such types and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
Revised by letter dated August 9, 2007 and Amendment No.