MONTHYEARML24009A1152024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 IR 05000443/20234032023-11-0707 November 2023 Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 IR 05000443/20230032023-11-0606 November 2023 Integrated Inspection Report 05000443/2023003 IR 05000443/20230102023-10-19019 October 2023 Triennial Fire Protection Inspection Report 05000443/2023010 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A0522023-10-0202 October 2023 Requalification Program Inspection IR 05000443/20234012023-09-0808 September 2023 Cybersecurity Inspection Report 05000443/2023401 (Cover Letter Only) IR 05000443/20234202023-09-0505 September 2023 Security Baseline Inspection Report 05000443/2023420 IR 05000443/20230052023-08-31031 August 2023 Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000443/20233022023-08-16016 August 2023 Operator Licensing Retake Examination Report 05000443/2023302 IR 05000443/20230022023-08-0808 August 2023 Integrated Inspection Report 05000443/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-104, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-103, Inservice Inspection Examination Report2023-08-0303 August 2023 Inservice Inspection Examination Report ML23192A0782023-07-11011 July 2023 Operator Licensing Retake Examination Approval L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 ML23157A0722023-06-0606 June 2023 Notification of Conduct of a Fire Protection Team Inspection L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000443/20233012023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000443/2023301 L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-05-11011 May 2023 License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves IR 05000443/20230012023-05-11011 May 2023 Integrated Inspection Report 05000443/2023001 ML23129A0312023-05-0909 May 2023 Reactor Operator Retake License Examination ML23117A3652023-05-0404 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report L-2023-053, Core Operating Limits Report for Cycle 232023-04-0505 April 2023 Core Operating Limits Report for Cycle 23 ML23088A1522023-03-29029 March 2023 Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Seabrook 4Q2022 Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML23073A1562023-03-23023 March 2023 Relief Request 4RA-22-01, Relief from the Requirements of the ASME Code L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-03-15015 March 2023 License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-023, Revised Steam Generator Tube Inspection Report2023-03-0303 March 2023 Revised Steam Generator Tube Inspection Report ML23020A1002023-03-0303 March 2023 OEDO-22-00419 - 2.206 Petition for Seabrook Station Structure Concrete Concerns (EPID L-2022-CRS-0000)- Closure Letter 2024-01-29
[Table view] Category:Meeting Summary
MONTHYEARML23187A4432023-07-11011 July 2023 6/27/2023, Annual Assessment Meeting for Seabrook Station - Meeting Summary ML23086B9962023-04-0404 April 2023 Summary of March 7, 2023, Meeting with Nextera Energy Seabrook, LLC Regarding Planned Submittal of License Amendment Request to Revise Emergency Action Level Due to Modification to Containment Fire Detection Equipment ML23088A1522023-03-29029 March 2023 Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Seabrook 4Q2022 Inspection Report ML22144A0022022-09-14014 September 2022 Summary of February 16, and May 18, 2022, Meetings with Nextera Energy/Florida Power & Light Company Regarding Planned Submittal of License Amendment Request for a Common Fleet Emergency Plan ML22146A3422022-06-13013 June 2022 February 23, Summary of Meetings with Nextera Energy Seabrook, LLC Regarding Planned Submittal of License Amendment Request to Update Pressure-Temperature Limits Curves Period of Applicability ML22153A1672022-06-0202 June 2022 Annual Assessment Meeting for Seabrook Station - Meeting Summary ML21336A4072021-12-0707 December 2021 Summary of Conference Call Regarding the Fall 2021 Steam Generator Tube Inspections ML21168A1522021-06-22022 June 2021 Annual Assessment Meeting Summary ML20174A2682020-06-22022 June 2020 June 3, 2020, Seabrook Annual Assessment Summary ML19073A0172019-03-21021 March 2019 Summary of Meeting with Nextera Energy Seabrook, LLC, on Proposed Relief Requests for the Containment Spray System for the Seabrook Station, Unit No. 1 ML19046A3832019-02-26026 February 2019 Meeting Summary of February 13, 2019, Public Meeting in Hampton, New Hampshire Alkali-Silica Reaction License Amendment Request and License Renewal Application ML18136A9052018-05-31031 May 2018 Summary of April 25, 2017, Meeting with Florida Power & Light Company/Nextera Energy Regarding Planned Submittal of Exemption Requests to Support Closure of NRC Generic Safety Issue 191/NRC Generic Letter 2004-02 ML18135A2462018-05-31031 May 2018 Summary of April 24, 2018, Meeting with Florida Power & Light Company/Nextera Energy Regarding Planned Submittal of License Amendment Request to Adopt Standard Technical Specification 3.0.6 ML18142A2932018-05-21021 May 2018 2018 Annual Assessment Meeting Summary ML17340A1862017-12-14014 December 2017 Summary of November 17, 2017, Meeting with NextEra Energy Regarding License Amendment Request on Alkali Silica Reaction - Requests for Additional Information (CAC No. MF8260; EPID L-2016-LLA-0007) ML17310B2062017-11-20020 November 2017 Summary of September 20, 2017, Meeting with Florida Power & Light Company and NextEra Energy Regarding Closure of NRC Generic Safety Issue 191/NRC Generic Letter 2004-02 ML17278A7482017-10-13013 October 2017 Summary of August 24, 2017, Meeting with NextEra Energy Regarding License Amendment Request on Alkali Silica Reaction (CAC No. MF8260; EPID L-2016-LLA-0007) ML17216A1732017-09-0707 September 2017 Notice of Meeting with Florida Power & Light Company and NextEra Energy to Discuss Closing Out Generic Safety Issue-191 and Generic Letter 2004-02 ML17172A1322017-06-20020 June 2017 Summary of Annual Assessment Meeting for Seabrook Station, Unit 1, Held on 6/7/2017 ML17137A0292017-06-0505 June 2017 Summary of Meeting Held on May 9, 2017, Between the USNRC Staff and NextEra Representatives to Discuss the Seabrook License Renewal Application (CAC No. ME4028) ML16341B9022017-03-0707 March 2017 03/07/2016 Summary of Telecon Held on Between the U.S. Nuclear Regulatory Commission and NextEra Energy Seabrook Concerning Request for Additional Information Pertaining to the Seabrook Station License Renewal Application ML16342C4672017-03-0101 March 2017 12/01/2016 Summary of Teleconference Between the U.S. Nuclear Regulatory Commission and NextEra Energy Seabrook Concerning Requests for Additional Information Pertaining to the Seabrook Station License Renewal Application ML16204A2612016-07-29029 July 2016 June 15, 2016 Summary of Pre-Submittal Meeting with NextEra Energy Regarding Proposed License Amendment on Alkali Silica Reaction for the Seabrook Station, Unit No. 1 ML16190A1812016-07-0808 July 2016 Summary of Public Annual Assessment Meeting ML16168A4122016-06-15015 June 2016 Slides for Public Meeting with NextEra Energy Regarding Seabrook Station ASR License Amendment ML16146A1762016-06-0808 June 2016 April 28, 2016, Summary of Public Meeting with NextEra Energy Seabrook, LLC Regarding Aging Management of Alkali-Silica Reaction Pertaining to the License Renewal of Seabrook Station, Unit 1 ML15343A1862016-01-0707 January 2016 License Renewal Call Summary - December 3, 2015 ML15357A3262015-12-23023 December 2015 Memo-Seabrook Conference Call on Dec. 22, 2015-with NextEra Concerning a Request for Additional Information Pertaining to Seabrook Station Operability Determinations for the Alkali-Silica Reaction (ASR)-affected Containment Enclosure Buildi ML15328A1392015-12-0404 December 2015 November 23, 2015, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Nextera Energy Seabrook, LLC, Concerning Requests for Additional Information Pertaining to the Seabrook Station ML15190A0872015-07-0707 July 2015 June 18, 2015, Summary of Meeting - Seabrook Annual Assessment ML14190B0132014-07-0909 July 2014 June 24, 2014, Summary of Annual Assessment Meeting Regarding Seabrook Station ML14035A2362014-01-30030 January 2014 Seabrook, Unit 1 - Summary of Meeting Between the U.S. Nuclear Regulatory Commission and NextEra Regarding the Status of Alkali-Silica Reaction Testing Program ML13352A5112013-12-27027 December 2013 13-12-18 Seabrook Conference Call Re SAMA RAI ML13133A2412013-06-12012 June 2013 5/9/2013 - Summary of Meeting with NextEra Energy Seabrook, LLC on Pre-Submittal of a Fixed Incore Detector License Amendment Request ML13158A1972013-06-0707 June 2013 5/30/2013 Summary of Teleconference Between NRC Staff and NextEra Energy Staff Regarding Decommissioning Funding Status Report for Seabrook ML13099A2582013-04-0909 April 2013 3/27/2013: Seabrook - Summary of Annual Assessment Meeting with NextEra Energy ML13066A4882013-03-21021 March 2013 Summary of Meeting Held on February 21, 2013, Between the NRC and NextEra Energy Seabrook, LLS Regarding License Renewal Application, Seabrook Station ML13004A1782013-01-0404 January 2013 December 11, 2012 Summary of Meeting Regarding Status of Degraded Concrete on Seabrook Station, Unit 1, ML12278A2502012-11-0101 November 2012 Summary of Telephone Conference Call Held Between NRC and NextEra Seabrook, Concerning the RAIs Pertaining to the Seabrook Station, LRA ML12264A6482012-10-16016 October 2012 8/31/2012, Telecon Summary Between NRC and NextEra Seabrook ML12242A5612012-09-18018 September 2012 Summary of Telephone Conference Call Held on August 28, 2012, Between NRC and NextEra Sebrook, LLC, Concerning the Drai Pertaining to the Seabrook, LRA ML12339A2742012-09-13013 September 2012 Concrete Summary 4-12 ML12195A1112012-07-31031 July 2012 Summary of Telephone Conference Call Held on July 3, 2012, Between the NRC and NextEra Energy Seabrook, LLC, Concerning the Draft Request for Additional Information Pertaining to the Seabrook Station, LRA Er ML12165A5952012-06-22022 June 2012 Summary of Telephone Conference Call Held on May 16, 2012, Between the U.S. Nuclear Regulatory Commission and NextEra Energy Seabrook, LLC, Concerning the Response to Request for Additional Information Pertaining to the Seabrook Station LRA ML12164A9012012-06-22022 June 2012 Summary of Telephone Conference Call Held on 5/24/12, Between the NRC and NextEra Energy Seabrook, LLC Concerning the Drai Pertaining to the Seabrook Station LRA ML12164A7562012-06-22022 June 2012 Summary of Telephone Conference Call Between NRC and NextEra Seabrook ML12165A7422012-06-21021 June 2012 Summary of Telephone Conference Call Held on April 10, 2012, Between NRC and Energy Seabrook, LLC, Concerning the Response to Request for Additional Information Pertaining to the Seabrook Station LRA ML12142A0422012-05-21021 May 2012 Summary of Public Meeting to Discuss the Nrc'S Annual Assessment of Nextera'S Safety Performance at Seabrook in 2011 ML12054A7662012-03-26026 March 2012 022312, Telecon Summary Between NRC and NextEra Seabrook, Discussing RAIs Response ML12066A1392012-03-20020 March 2012 Summary of Telephone Conference Call Held on March 1, 2012 Between the NRC and NextEra Energy Seabrook Llc., Concerning the Drai Pertaining to the Seabrook Station, LRA Environmental Review 2023-07-11
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555-0001 October 13, 2011 LICENSEE: NextEra Energy Seabrook, LLC FACILITY: Seabrook Station
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON SEPTEMBER 21, 2011, BElWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND NEXTERA ENERGY SEABROOK, LLC, CONCERNING CLARIFICATION OF INFORMATION PERTAINING TO THE SEABROOK STATION LICENSE RENEWAL APPLICATION (TAC NO. ME4028)
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of NextEra Energy Seabrook, LLC (NextEra or the applicant), held a telephone conference call on September 21, 2011, to obtain clarification on information contained in the Seabrook Station license renewal application (LRA). The telephone conference call was useful in clarifying the applicant's information in the LRA. provides a listing of the participants and Enclosure 2 contains a summary of the issues discussed during the call with the applicant.
The applicant had an opportunity to comment on this summary.
Rick Plasse, Project Manager Projects Branch 1 Division of License' Renewal Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosures:
As stated cc w/encls: Listserv
TELEPHONE CONFERENCE CALL SEABROOK STATION LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS September 21, 2011 PARTICIPANTS AFFILIATIONS Rick Plasse U.S. Nuclear Regulatory Commission (NRC)
Roger Kalikian NRC Ching Ng NRC Bo Pham NRC Richard Cliche NextEra Energy Seabrook, LLC. (NextEra)
Bob McCormack NextEra Ed Carley NextEra Ali Kodal NextEra Henry Mentel NextEra Dennis Bem is NextEra Paul Willoughby NextEra ENCLOSURE 1
TELEPHONE CONFERENCE CALL SEABROOK STATION LICENSE RENEWAL APPLICATION Draft Follow~up RAI In response to request for additional information (RAJ) 3.1.1-60~2, by letter dated February 3, 2011, on page 9 of 92, the applicant stated, "The flux thimble tube no longer provides a function of pressure boundary hence, it has no license renewal function, and it will be removed from scope."
In response to follow-up RAI 3.1.1-60-01102, by letter dated April 22, 2011, on page 6 of 43, the applicant stated, "When the incore detector assembly is inserted, the thimble housing tube (outer tube) provides the reactor coolant system (RCS) pressure boundary to keep the incore detector assembly internal volume dry." The letter further stated that, "The thimble calibration tube (inner tube), although considered a RCS pressure boundary, is not in contact with reactor coolant."
Following the August 3,2011, teleconference discussion on the above topic, the staff still seeks clarification as to where exactly the applicant is taking credit for the RCS pressure boundary for the incore detector assemblies in the applicant's license renewal application and how it is dispositioned under 10 CFR 54.
Response
NextEra provided clarification of the thimble tube design configuration, provided a description of the RCS pressure boundary, and described the associated aging management programs.
NextEra agreed to provide this detailed information in a subsequent RAI response.
Follow-up Draft RAI 4.3.1-c
Background:
By letter dated April 22, 2011, the applicant responded to RAI 4.3-1 b stating that the pressure boundary portion of the ASME Class 1 valves were designed, analyzed, and qualified for service (including fatigue) in accordance with the rules of American Society of Mechanical Engineers (ASME) Code Section III Subsection NB-3500. Updated Final Safety Analysis Report (UFSAR) Table 5.2-1 identifies the code edition and addenda applicable to the design of the following types of Class 1 valves: pressurizer safety valves, motor-operated valves, manual valves, control valves, and pressurizer spray valves in the reactor coolant systems. UFSAR Table 5.2-10 also identifies the valves that are included in the reactor coolant pressure boundary.
Issue:
The staff noted that, in the 1971 and later editions of the ASME Section III Code, paragraphs NB-3545.3 and NB-3550 required fatigue analyses for valves that have an inlet piping connection larger than 4 inches nominal pipe size unless the exemption reqUirements of ENCLOSURE 2
2 NB-3222.4(d) are met. The staff also noted that the 1968 Draft ASME Pump and Valve Code Sections 452 and 454 included applicable time-dependent cyclic or fatigue assessment criteria to be performed jf the inlet piping connection is larger than 4 inches nominal pipe size. It is not clear to the staff if the fatigue analyses for these Class 1 valves were performed in accordance with the requirements of the applicable ASME codes.
Request:
- Identify all the Class 1 valves that did not have a fatigue analysis performed as part of the design-basis and their associated design code. In addition, justify why a fatigue analysis was not required for these Class 1 valves in accordance with the ASME Section III Code or the ASME Draft Pump and Valve Code, with reference to the applicable sections of the design code.
- If a fatigue analysis was performed as part of the design-basis for Class 1 valves, justify the conclusion that the fatigue analyses for these Class 1 valves do not need to be identified as a time-limited aging analysis in accordance with 10 CFR 54.21(c)(1).
Response
Following discussion of the draft RAI, the applicant stated that they understood what was being requested and would be able to respond.
October 13, 2011.
LICENSEE: NextEra Energy Seabrook, LLC FACILITY: Seabrook Station
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON SEPTEMBER 21, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND NEXTERA ENERGY SEABROOK, LLC, CONCERNING CLARIFICATION OF INFORMATION PERTAINING TO THE SEABROOK STATION LICENSE RENEWAL APPLICATION (TAC NO. ME4028)
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of NextEra Energy Seabrook, LLC (NextEra or the applicant), held a telephone conference call on September 21, 2011, to obtain clarification on information contained in the Seabrook Station license renewal application (LRA). The telephone conference call was useful in clarifying the applicanfs information in the LRA. provides a listing of the participants and Enclosure 2 contains a summary of the issues discussed during the call with the applicant.
The applicant had an opportunity to comment on this summary.
IRA Arlhur Cunanan fori Rick Plasse, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosures:
As stated cc w/encls: Listserv DISTRIBUTION:
See next page ADAMS Accession No.: ML11284A016 OFFICE LA:DLR* PM:RPB1 :DLR I
BC:RPB1 :DLR I NAME SFigueroa RPlasse DMorey (ACunanan for)
DATE 10/11/11 10/12/11 10/13/11 OFFICIAL RECORD COpy
Memorandum to NextEra Energy Seabrook, LLC from R Plasse dated October 13, 2011
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON SEPTEMBER 21, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND NEXTERA ENERGY SEABROOK, LLC, CONCERNING CLARIFICATION OF INFORMATION PERTAINING TO THE SEABROOK STATION LICENSE RENEWAL APPLICATION (TAC NO. ME4028)
DISTRIBUTION:
HARDCOPY:
DLRRF E*MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrOlrRarb Resource RidsNrrDlrRapb Resource RidsNrrOlrRasb Resource RidsNrrOlrRerb Resource RidsNrrDlrRpob Resource MWentzel RPlasse DMorey OWrona EMiller ICouret, OPA EOacus,OCA MSpencer, OGC WRaymond, RI OTifft, RI NMcNamara, RI NSheehan, RI OScrenci, RI JJohnson, RI ABurritt, RI