Correction to Amendment No. 301 Regarding Technical Specification Requirements for Snubbers
ML112660414
Person / Time
Site: Salem PSEG icon.png
Issue date: 09/29/2011
From: Richard Ennis
Plant Licensing Branch 1
To: Joyce T
Public Service Enterprise Group
Ennis R, NRR/DORL, 415-1420
References
TAC ME4796
Download: ML112660414 (3)


Text

"-<.,,,,11 REGUj _

UNITED STATES

""'I" NUCLEAR REGULATORY COMMISSION

"'~

~O~

/!!

(1 WASHINGTON, D.C. 20555-0001

<C 0

Iii

~

r;;

September 29, 2011

~

~

"?

,</>0 Jf-***i<

Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear LLC P.O. Box 236, N09 Hancocks Bridge, NJ 08038

SUBJECT:

SALEM NUCLEAR GENERATING STATION, UNIT NO.1 - CORRECTION TO AMENDMENT NO. 301 REGARDING TECHNICAL SPECIFICATION REQUIREMENTS FOR SNUBBERS (TAC NO. ME4796)

Dear Mr. Joyce:

On August 25, 2011, the Nuclear Regulatory Commission (NRC) issued Amendment Nos. 301 and 284 to Renewed Facility Operating License Nos. DPR-70 and DPR-75 for the Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2, in response to your application dated October 4,2010, as supplemented by letters dated April 7, 2011, and May 23, 2011. The amendments modified the Technical Specification requirements for snubbers due to revisions to the inservice inspection program.

On September 23, 2011, the PSEG Nuclear LLC staff notified the NRC staff that one of the license pages revised by Salem Unit No.1 Amendment No. 301 was in error. Specifically, on page 3 of the license, License Conditions 2.B.(5) and 2.B.(6) were incorrectly shown as License Conditions 2.B.(1) and 2.B.(2). This error was inadvertently introduced due to automatic numbering of the paragraphs in the file used for the recent license renewal. The corrected license page 3 is enclosed.

Please replace page 3 of Renewed License No. DPR-70 with the enclosed page. The NRC staff regrets any inconvenience this may have caused.

If you have any questions, please contact me at 301-415-1420.

Sincerely, m~

Richard B. Ennis, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-272

Enclosure:

Salem Unit No.1 license page 3 cc w/encl: Distribution via ListServ

- 3 instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5)

PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6)

PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30 and 70, to possess but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level PSEG Nuclear LLC is authorized to operate the facility at a steady state reactor core power level not in excess of 3459 megawatts (one hundred percent of rated core power).

(2)

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 301, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications, and the Environmental Protection Plan.

(3)

Deleted Per Amendment 22, 11-20-79 (4)

Less than Four Loop Operation PSEG Nuclear LLC shall not operate the reactor at power levels above P-7 (as defined in Table 3.3-1 of Specification 3.3.1.1 of Appendix A to this renewed license) with less than four (4) reactor coolant loops in operation until safety analyses for less than four loop operation have been submitted by the licensees and approval for less than four loop operation at power levels above P-7 has been granted by the Commission by Amendment of this renewed license.

(5)

PSEG Nuclear LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Renewed License No. DPR-70 Amendment No. 301

'.. ML112660414 OFFICE LPL1-2/PM LPL1-2/LA LPL1-2/BC NAME REnnis ABaxter HChernoff DATE 9/26/11 9/27/11 9/29/11