ML111940267
| ML111940267 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 07/12/2011 |
| From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
| To: | Schwarz C Entergy Operations |
| References | |
| IR-11-004 | |
| Download: ML111940267 (6) | |
See also: IR 05000313/2011004
Text
July 12, 2011
Christopher J. Schwarz, Site Vice President
Arkansas Nuclear One
Entergy Operations, Inc.
1448 SR 333
Russellville, AR 72802-0967
SUBJECT: ARKANSAS NUCLEAR ONE - NOTIFICATION OF INSPECTION (INSPECTION
REPORT 05000313/2011004 AND 05000368/2011004) AND REQUEST FOR
INFORMATION
Dear Mr. Schwarz:
On August 15, 2011, inspectors from the U.S. Nuclear Regulatory Commissions (NRC) Region
IV office will begin the on-site portion of the Gas Accumulation Management in Emergency Core
Cooling, Decay Heat Removal, and Containment Spray Systems Temporary Instruction at your
Arkansas Nuclear One facility. These inspections will be performed in accordance with NRC
Temporary Instruction (TI) 2515/177.
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
The documents have been divided into two groups.
- The first group lists information necessary for our initial inspection scoping and in-office
preparation activities. This information should be separated by information request number,
especially if provided electronically (e.g., folder with the information request number). This
information should be available to the inspector no later than August 1, 2011. Upon review of
these documents, the inspectors will select additional documentation for review upon arrival.
By August 5, 2011, the inspector will communicate the initial selected samples.
- The second group of documents requested is needed to support our onsite inspection
activities. This set of documents should be available to the inspector on August 15, 2011. It
is also requested that corrective action documents and responses to questions developed
during the inspection be provided to the inspector as the documents are generated.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Bob Clark of your licensing organization. If
there are any questions about this inspection or the material requested, please contact the
inspector, Rayomand Kumana, at 817-860-8185 or by email at rayomand.kumana@nrc.gov .
UNITED STATES
NUCLEAR REGULATORY COMMISSION
R E GI ON I V
612 EAST LAMAR BLVD, SUITE 400
ARLINGTON, TEXAS 76011-4125
Entergy Operations, Inc.
- 2 -
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control
number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of
Practice, a copy of this letter and its enclosure will be available electronically for public
inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web
site at http://www.nrc.gov/reading-rm/adams (the Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket: 50-313; 50-368
Enclosure:
Management of Gas Accumulation in Emergency Core Cooling, Decay Heat
Removal, and Containment Spray Systems Temporary Instruction Document Request
Distribution via listserv for Arkansas Nuclear One
Entergy Operations, Inc.
- 3 -
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov )
Deputy Regional Administrator (Art.Howell@nrc.gov )
DRP Director (Kriss.Kennedy@nrc.gov )
Acting DRP Deputy Director (Jeff.Clark@nrc.gov )
DRS Director (Anton.Vegel@nrc.gov )
Acting DRS Deputy Director (Robert.Caldwell@nrc.gov )
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
Resident Inspector (Jeff.Rotton@nrc.gov )
Resident Inspector (William.Schaup@nrc.gov )
Acting Branch Chief, DRP/E (Ray.Azua@nrc.gov )
Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov )
Project Engineer, DRP/E (Jim.Melfi@nrc.gov )
Project Engineer, DRP/E (Chris.Smith@nrc.gov )
ANO Administrative Assistant (Gloria.Hatfield@nrc.gov )
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov )
Project Manager (Kaly.Kalyanam@nrc.gov )
Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov )
RITS Coordinator (Marisa.Herrera@nrc.gov )
Regional Counsel (Karla.Fuller@nrc.gov )
Congressional Affairs Officer (Jenny.Weil@nrc.gov )
OEMail Resource
R:\\_REACTORS\\ANO 2011004 TI177 RFI-RJK
ADAMS: No 7 Yes
7SUNSI Review Complete
Reviewer Initials: TRF
7Publicly Available
7 Non-Sensitive
Non-publicly Available
Sensitive
SRI/EB1
C/EB1
RKumana
TFarnholtz
/RA/
/RA
07/12/2011
07/12/2011
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY
HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION
DOCUMENT REQUEST
- 1 -
Enclosure
Inspection Report: 05000313/2011004; 05000368/2011004
Inspection Dates:
August 15-26, 2011
Inspection Procedure:
TI 2515/177, Management of Gas Accumulation in Emergency
Core Cooling, Decay Heat Removal, and Containment Spray
Systems
Inspector:
Rayomand Kumana, Project Engineer
(817) 860-8185
rayomand.kumana@nrc.gov
The following information should be sent to the Region IV office in hard copy or electronic
format (ims.certrec.com or compact disc, preferred), in care of Rayomand Kumana to facilitate
the selection of specific items that will be reviewed during the onsite inspection week. The
inspector will select specific items from the information requested below and then request from
your staff additional documents needed during the onsite inspection weeks. Also, we request
that you categorize the documents in your response with the numbered list below. Please
provide requested documentation electronically if possible. If requested documents are large
and only hard copy formats are available, please inform the inspector(s), and provide subject
documentation during the first day of the onsite inspection. If you have any questions regarding
this information request, please call the inspector as soon as possible.
I. Information Requested By August 1, 2011
1. List of corrective action program documents (with a short description) associated with
GL 2008-01, voids in piping, and pressure transients for the previous three years.
2. List of changes (with a short description and tracking number) to the final safety
evaluation report (FSAR), technical specifications, technical specification bases, and
technical requirement manual associated with the resolution of GL 2008-01.
3. List of calculations associated with GL 2008-01, including calculations that have been
changed or created in response to GL 2008-01 (with a short description of the
calculation and the change).
4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the
affected system locations (e.g. identify the source, conditions, and expected void
locations). Also include a short description of how each gas intrusion mechanism has
been addressed (e.g. plant hardware modification, procedure change).
5. List of the suction piping sections identified as susceptible to gas accumulation (the list
should identify the corresponding system).
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY
HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION
DOCUMENT REQUEST
- 2 -
Enclosure
6. List of the discharge piping sections identified as susceptible to gas accumulation (the
list should identify the corresponding system).
7. Copies of isometric drawings of the High Pressure Injection System (HPI), Decay Heat
Removal / Low Pressure Injection System (DH/LPI), Core Flood (CF), and Containment
Spray System (BS) (hard-copies are preferred).
8. Copies of piping and instrumentation diagrams (P&IDs) of the High Pressure Injection
System (HPI), Decay Heat Removal / Low Pressure Injection System (DH/LPI), Core
Flood (CF), and Containment Spray System (BS) (hard-copies are preferred). Please
highlight any components that were part of hardware modifications installed as part of
the resolution of GL 2008-01 and all high point vents that are monitored during void
surveillances.
9. Copies of program documents and procedures developed to implement the resolution of
10. List of actions that were completed in response to GL 2008-01.
11. Copies of the modification packages for hardware modifications as part of the resolution
of GL 2008-01.
12. Design basis documents of the High Pressure Injection System (HPI), Decay Heat
Removal / Low Pressure Injection System (DH/LPI), Core Flood (CF), and Containment
Spray System (BS).
13. Design basis documents of keep-full systems of the High Pressure Injection System
(HPI), Decay Heat Removal / Low Pressure Injection System (DH/LPI), Core Flood (CF),
and Containment Spray System (BS).
14. System walkdown reports associated with the resolution of GL 2008-01.
15. If applicable, provide a list of inaccessible locations where plant walkdowns of the High
Pressure Injection System (HPI), Decay Heat Removal / Low Pressure Injection System
(DH/LPI), Core Flood (CF), and Containment Spray System (BS) have not been
completed. Include an explanation of why each area is considered inaccessible.
16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the
results of the last two surveillances for the High Pressure Injection System (HPI), Decay
Heat Removal / Low Pressure Injection System (DH/LPI), Core Flood (CF), and
Containment Spray System (BS). Include copies of procedures used for detecting and
determining void volumes if not already included in the surveillance procedures.
17. Copies of procedures used for filling and venting.
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY
HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION
DOCUMENT REQUEST
- 3 -
Enclosure
18. Copies of trends of periodic venting results.
19. Copies of the engineering evaluations performed for all identified voids.
20. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the
justification for any deviation from the void acceptance criteria established by the Office
of Nuclear Reactor Regulation (NRR).
21. Copy of any void transport analyses.
22. Copy of vortexing calculations associated with systems under the scope of GL 2008-01.
23. Copies of self-assessments associated with the implementation of the GL 2008-01
program.
II. Information Requested By August 15, 2011
24. Copies of the selected corrective action program documents.
25. Copies of the selected licensing and design basis document changes.
26. Copies of the selected calculations.
27. Copies of training documents and attendance records that ensure that personnel are
aware of gas-related concerns.
28. Copies of corrective action program implementing procedures.
29. Electronic copies of the current technical specifications, technical specification bases,
final safety analysis report, and technical report manual.
Inspector Contact Information:
Rayomand Kumana
Project Engineer
(817) 860-8185
rayomand.kumana@nrc.gov
Mailing Address:
US NRC Region IV
Attn: Rayomand Kumana
612 E. Lamar Blvd., Suite 400
Arlington, TX 76011-4125