Text

July 12, 2011

Christopher J. Schwarz, Site Vice President

Arkansas Nuclear One

Entergy Operations, Inc.

1448 SR 333

Russellville, AR 72802-0967

SUBJECT: ARKANSAS NUCLEAR ONE - NOTIFICATION OF INSPECTION (INSPECTION

REPORT 05000313/2011004 AND 05000368/2011004) AND REQUEST FOR

INFORMATION

Dear Mr. Schwarz:

On August 15, 2011, inspectors from the U.S. Nuclear Regulatory Commissions (NRC) Region

IV office will begin the on-site portion of the Gas Accumulation Management in Emergency Core

Cooling, Decay Heat Removal, and Containment Spray Systems Temporary Instruction at your

Arkansas Nuclear One facility. These inspections will be performed in accordance with NRC

Temporary Instruction (TI) 2515/177.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

The documents have been divided into two groups.

  • The first group lists information necessary for our initial inspection scoping and in-office

preparation activities. This information should be separated by information request number,

especially if provided electronically (e.g., folder with the information request number). This

information should be available to the inspector no later than August 1, 2011. Upon review of

these documents, the inspectors will select additional documentation for review upon arrival.

By August 5, 2011, the inspector will communicate the initial selected samples.

  • The second group of documents requested is needed to support our onsite inspection

activities. This set of documents should be available to the inspector on August 15, 2011. It

is also requested that corrective action documents and responses to questions developed

during the inspection be provided to the inspector as the documents are generated.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Bob Clark of your licensing organization. If

there are any questions about this inspection or the material requested, please contact the

inspector, Rayomand Kumana, at 817-860-8185 or by email at rayomand.kumana@nrc.gov .

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

Entergy Operations, Inc.

- 2 -

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control

number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of

Practice, a copy of this letter and its enclosure will be available electronically for public

inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web

site at http://www.nrc.gov/reading-rm/adams (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-313; 50-368

License: DPR-51; NPF-6

Enclosure:

Management of Gas Accumulation in Emergency Core Cooling, Decay Heat

Removal, and Containment Spray Systems Temporary Instruction Document Request

Distribution via listserv for Arkansas Nuclear One

Entergy Operations, Inc.

- 3 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

Deputy Regional Administrator (Art.Howell@nrc.gov )

DRP Director (Kriss.Kennedy@nrc.gov )

Acting DRP Deputy Director (Jeff.Clark@nrc.gov )

DRS Director (Anton.Vegel@nrc.gov )

Acting DRS Deputy Director (Robert.Caldwell@nrc.gov )

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

Resident Inspector (Jeff.Rotton@nrc.gov )

Resident Inspector (William.Schaup@nrc.gov )

Acting Branch Chief, DRP/E (Ray.Azua@nrc.gov )

Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov )

Project Engineer, DRP/E (Jim.Melfi@nrc.gov )

Project Engineer, DRP/E (Chris.Smith@nrc.gov )

ANO Administrative Assistant (Gloria.Hatfield@nrc.gov )

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov )

Project Manager (Kaly.Kalyanam@nrc.gov )

Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov )

RITS Coordinator (Marisa.Herrera@nrc.gov )

Regional Counsel (Karla.Fuller@nrc.gov )

Congressional Affairs Officer (Jenny.Weil@nrc.gov )

OEMail Resource

R:\\_REACTORS\\ANO 2011004 TI177 RFI-RJK

ADAMS ML111940267

ADAMS: No 7 Yes

7SUNSI Review Complete

Reviewer Initials: TRF

7Publicly Available

7 Non-Sensitive

Non-publicly Available

Sensitive

SRI/EB1

C/EB1

RKumana

TFarnholtz

/RA/

/RA

07/12/2011

07/12/2011

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY

HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION

DOCUMENT REQUEST

- 1 -

Enclosure

Inspection Report: 05000313/2011004; 05000368/2011004

Inspection Dates:

August 15-26, 2011

Inspection Procedure:

TI 2515/177, Management of Gas Accumulation in Emergency

Core Cooling, Decay Heat Removal, and Containment Spray

Systems

Inspector:

Rayomand Kumana, Project Engineer

(817) 860-8185

rayomand.kumana@nrc.gov

The following information should be sent to the Region IV office in hard copy or electronic

format (ims.certrec.com or compact disc, preferred), in care of Rayomand Kumana to facilitate

the selection of specific items that will be reviewed during the onsite inspection week. The

inspector will select specific items from the information requested below and then request from

your staff additional documents needed during the onsite inspection weeks. Also, we request

that you categorize the documents in your response with the numbered list below. Please

provide requested documentation electronically if possible. If requested documents are large

and only hard copy formats are available, please inform the inspector(s), and provide subject

documentation during the first day of the onsite inspection. If you have any questions regarding

this information request, please call the inspector as soon as possible.

I. Information Requested By August 1, 2011

1. List of corrective action program documents (with a short description) associated with

GL 2008-01, voids in piping, and pressure transients for the previous three years.

2. List of changes (with a short description and tracking number) to the final safety

evaluation report (FSAR), technical specifications, technical specification bases, and

technical requirement manual associated with the resolution of GL 2008-01.

3. List of calculations associated with GL 2008-01, including calculations that have been

changed or created in response to GL 2008-01 (with a short description of the

calculation and the change).

4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the

affected system locations (e.g. identify the source, conditions, and expected void

locations). Also include a short description of how each gas intrusion mechanism has

been addressed (e.g. plant hardware modification, procedure change).

5. List of the suction piping sections identified as susceptible to gas accumulation (the list

should identify the corresponding system).

MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY

HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION

DOCUMENT REQUEST

- 2 -

Enclosure

6. List of the discharge piping sections identified as susceptible to gas accumulation (the

list should identify the corresponding system).

7. Copies of isometric drawings of the High Pressure Injection System (HPI), Decay Heat

Removal / Low Pressure Injection System (DH/LPI), Core Flood (CF), and Containment

Spray System (BS) (hard-copies are preferred).

8. Copies of piping and instrumentation diagrams (P&IDs) of the High Pressure Injection

System (HPI), Decay Heat Removal / Low Pressure Injection System (DH/LPI), Core

Flood (CF), and Containment Spray System (BS) (hard-copies are preferred). Please

highlight any components that were part of hardware modifications installed as part of

the resolution of GL 2008-01 and all high point vents that are monitored during void

surveillances.

9. Copies of program documents and procedures developed to implement the resolution of

GL 2008-01.

10. List of actions that were completed in response to GL 2008-01.

11. Copies of the modification packages for hardware modifications as part of the resolution

of GL 2008-01.

12. Design basis documents of the High Pressure Injection System (HPI), Decay Heat

Removal / Low Pressure Injection System (DH/LPI), Core Flood (CF), and Containment

Spray System (BS).

13. Design basis documents of keep-full systems of the High Pressure Injection System

(HPI), Decay Heat Removal / Low Pressure Injection System (DH/LPI), Core Flood (CF),

and Containment Spray System (BS).

14. System walkdown reports associated with the resolution of GL 2008-01.

15. If applicable, provide a list of inaccessible locations where plant walkdowns of the High

Pressure Injection System (HPI), Decay Heat Removal / Low Pressure Injection System

(DH/LPI), Core Flood (CF), and Containment Spray System (BS) have not been

completed. Include an explanation of why each area is considered inaccessible.

16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the

results of the last two surveillances for the High Pressure Injection System (HPI), Decay

Heat Removal / Low Pressure Injection System (DH/LPI), Core Flood (CF), and

Containment Spray System (BS). Include copies of procedures used for detecting and

determining void volumes if not already included in the surveillance procedures.

17. Copies of procedures used for filling and venting.

MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY

HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION

DOCUMENT REQUEST

- 3 -

Enclosure

18. Copies of trends of periodic venting results.

19. Copies of the engineering evaluations performed for all identified voids.

20. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the

justification for any deviation from the void acceptance criteria established by the Office

of Nuclear Reactor Regulation (NRR).

21. Copy of any void transport analyses.

22. Copy of vortexing calculations associated with systems under the scope of GL 2008-01.

23. Copies of self-assessments associated with the implementation of the GL 2008-01

program.

II. Information Requested By August 15, 2011

24. Copies of the selected corrective action program documents.

25. Copies of the selected licensing and design basis document changes.

26. Copies of the selected calculations.

27. Copies of training documents and attendance records that ensure that personnel are

aware of gas-related concerns.

28. Copies of corrective action program implementing procedures.

29. Electronic copies of the current technical specifications, technical specification bases,

final safety analysis report, and technical report manual.

Inspector Contact Information:

Rayomand Kumana

Project Engineer

(817) 860-8185

rayomand.kumana@nrc.gov

Mailing Address:

US NRC Region IV

Attn: Rayomand Kumana

612 E. Lamar Blvd., Suite 400

Arlington, TX 76011-4125