NRC Bulletin 2011-01 Mitigating Strategies Sixty-Day Response
ML11193A266
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 07/08/2011
From: Price J A
Dominion, Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
11-290F, BL-11-001
Download: ML11193A266 (3)


Text

Dominion Nuclear Connecticut, Inc.5000 Dominion Boulevard, Glen Allen, Virginia 23060 Dom inionf Web Address: www.dom.com SECURITY RELATED INFORMATION

-WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 July 8, 2011 10 CFR 50.54(f)U.S. Nuclear Regulatory Commission Serial No.: 11-290F Attention:

Document Control Desk NLOS/GDM RO One White Flint North Docket Nos.: 50-336/423 11555 Rockville Pike License Nos.: DPR-65 Rockville, MD 20852-2738 NPF-49 DOMINION NUCLEAR CONNECTICUT.

INC. (DNC)MILLSTONE POWER STATION UNITS 2 AND 3 NRC BULLETIN 2011-01 MITIGATING STRATEGIES SIXTY-DAY RESPONSE On May 11, 2011, the U.S. Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, "Mitigating Strategies." The NRC issued this Bulletin to achieve the following objectives:

1. To require that addressees provide a comprehensive verification of their compliance with the regulatory requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(hh)(2), 2. To notify addressees about the NRC staff's need for information associated with licensee mitigating strategies under 10 CFR 50.54(hh)(2) in light of the recent events at Japan's Fukushima-Daiichi facility in order to determine if 1) additional assessment of program implementation is needed, 2) the current inspection program should be enhanced, or 3) further regulatory action is warranted,and
3. To require that addressees provide a written response to the NRC in accordance with 10 CFR 50.54(f).The NRC requested two separate licensee submittals in response to the Bulletin as follows: 1) within 30-days from the date of the Bulletin confirm continued compliance with 10 CFR 50.54(hh)(2), and 2) within 60-days from the date of the Bulletin provide requested information associated with their mitigation strategies programs for 10 CFR 50.54(hh)(2).

The DNC 30-day response for Millstone Power Station (MPS)Units 2 and 3 was submitted to the NRC on June 9, 2011 (Serial No. 11-290B).Pursuant to the provisions of 10 CFR 50.54(f), the 60-day response to provide information regarding MPS Units 2 and 3 mitigating strategies under 10 CFR 50.54(hh)(2) is provided in the attachment to this letter. The attachment contains Security-Related information that should be withheld from public disclosure in accordance with the requirements of 10 CFR 2.390.Security Related Information

-Withhold Under 10 CFR 2.390 Attachment Contains Security-Related Information; Upon Separation this Cover Letter is Decontrolled SECURITY RELATED INFORMATION

-WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 Serial No. 11-290F Docket Nos. 50-336, 423 Page 2 of 3 The 60-day response includes information that addresses measures that are currently in place, as well as additional planned actions with expected completion dates. The additional planned actions are considered voluntary enhancements.

If there are any questions concerning this letter, please contact Mr. Gary D. Miller at (804) 273-2771.Sincerely, J. a rice V ffi resident -Nuclear Engineering COMMONWEALTH OF VIRGINIA ))COUNTY OF HENRICO )The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by J. Alan Price, who is Vice President

-Nuclear Engineering, of Dominion Nuclear Connecticut, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.Acknowledged before me this g day of 1Ly ,2011.My Commission Expires: If( 3 091 VICKI L. HULL CommonwuaU of MIrgka c 140542.Comnision Expirus May 31, 2014 Notary Public Commitments made by this letter: None.

Attachment:

Sixty-Day Response to NRC Bulletin 2011-01, Mitigating Strategies Security Related Information

-Withhold Under 10 CFR 2.390 Attachment Contains Security-Related Information; Upon Separation this Cover Letter is Decontrolled SECURITY RELATED INFORMATION

-WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 Serial No. 11-290F Docket Nos. 50-336, 423 Page 3 of 3 cc: U. S. Nuclear Regulatory Commission Region I Regional Administrator 475 Allendale Road King of Prussia, PA 19406-1415 NRC Senior Resident Inspector Millstone Power Station C. J. Sanders (without attachment)

NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 B-1A 11555 Rockville Pike Rockville, MD 20852-2738 Security Related Information

-Withhold Under 10 CFR 2.390 Attachment Contains Security-Related Information; Upon Separation this Cover Letter is Decontrolled