NRC Bulletin 2011-01 Mitigating Strategies Sixty-Day Response
ML11192A212
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/08/2011
From: Price J A
Dominion, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
11-290H, BL-11-001
Download: ML11192A212 (3)


Text

SECURITY RELATED INFORMATION

-WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 July 8, 2011 10 CFR 50.54(f)U.S. Nuclear Regulatory Commission Serial No.: 11-290H Attention:

Document Control Desk NL&OS/GDM RO 11555 Rockville Pike Docket Nos.: 50-280/281 Rockville, Maryland 20852-2738 License Nos.: DPR-32/37 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

SURRY POWER STATION (SPS) UNITS 1 AND 2 NRC BULLETIN 2011-01 MITIGATING STRATEGIES SIXTY-DAY RESPONSE On May 11, 2011, the U.S. Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, "Mitigating Strategies." The NRC issued this Bulletin to achieve the following objectives:

1. To require that addressees provide a comprehensive verification of their compliance with the regulatory requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(hh)(2), 2. To notify addressees about the NRC staff's need for information associated with licensee mitigating strategies under 10 CFR 50.54(hh)(2) in light of the recent events at Japan's Fukushima-Daiichi facility in order to determine if 1) additional assessment of program implementation is needed, 2) the current inspection program should be enhanced, or 3) further regulatory action is warranted, and 3. To require that addressees provide a written response to the NRC in accordance with 10 CFR 50.54(f).The NRC requested two separate licensee submittals in response to the Bulletin as follows: 1) within 30-days from the date of the Bulletin confirm continued compliance with 10 CFR 50.54(hh)(2), and 2) within 60-days from the date of the Bulletin provide requested information associated with their mitigation strategies programs for 10 CFR 50.54(hh)(2).

The Dominion 30-day response for Surry Power Station (SPS)Units 1 and 2 was submitted to the NRC on June 10, 201.1 (Serial No. 11-290D).Pursuant to the provisions of 10 CFR 50.54(f), the 60-day response to provide information regarding SPS Units 1 and 2 mitigating strategies under 10 CFR 50.54(hh)(2) is provided in the attachment to this letter. The attachment contains Security-Related information that should be withheld from public disclosure in accordance with the requirements of 10 CFR 2.390. The pages have been marked accordingly with the notation, "Security-Related Information

-Withhold Under 10 CFR 2.390." Security Related Information

-Withhold Under 10 CFR 2.390 Attachment Contains Security-Related Information; Upon Separation this Cover Letter is Decontrolled SECURITY RELATED INFORMATION

-WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 Serial No. 11-290H Docket Nos. 50-280/281 Page 2 of 3 The 60-day response includes information that addresses measures that are currently in place, as well as additional planned actions with expected completion dates. The additional planned actions are considered voluntary enhancements.

If there are any questions concerning this letter, please contact Mr. Gary D. Miller at (804) 273-2771.Sincerely, J. A Price Vic Pr lsident -Nuclear Engineering COMMONWEALTH OF VIRGINIA ))COUNTY OF HENRICO )The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by J. Alan Price, who is Vice President

-Nuclear Engineering, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.Acknowledged before me this day of / 2011.My Commission Expires: A. 3 'VICKI L. HULL Notary Public .]1 Commonwulth of VginIa 1 140542 Notary Public 3 My Commission Expires May 31. 2014 Commitments made by this letter: None.

Attachment:

Sixty-Day Response to NRC Bulletin 2011-01, Mitigating Strategies Security Related Information

-Withhold Under 10 CFR 2.390 Attachment Contains Security-Related Information; Upon Separation this Cover Letter is Decontrolled SECURITY RELATED INFORMATION

-WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 Serial No. 11-290H Docket Nos. 50-280/281 Page 3 of 3 cc: U.S. Nuclear Regulatory Commission

-Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector Surry Power Station K. R. Cotton NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Security Related Information

-Withhold Under 10 CFR 2.390 Attachment Contains Security-Related Information; Upon Separation this Cover Letter is Decontrolled