Letter Sequence Approval |
---|
|
|
MONTHYEARML1118702722011-07-0707 July 2011 Correction to Safety Evaluation for Relief Request VR-7, One-Time Replacement Frequency Extension Project stage: Approval 2011-07-07
[Table View] |
Similar Documents at Perry |
---|
Category:Letter
MONTHYEARL-24-226, License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 12024-10-31031 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 1 IR 05000440/20240032024-10-30030 October 2024 Integrated Inspection Report 05000440/2024003 and 07200069/2024001 L-24-179, License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 52024-10-21021 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 5 L-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024 License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 ML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML24256A0872024-09-11011 September 2024 Fws to NRC, Concurrence with Endangered Species Act Nlaa Determinations for Perry License Renewal L-24-201, Spent Fuel Storage Cask Registration2024-09-0909 September 2024 Spent Fuel Storage Cask Registration ML24249A0862024-09-0606 September 2024 Letter to Regina Gasco-Bentley, Chairperson_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24166A0172024-09-0606 September 2024 Ltr. to Glenna Wallace, Chief, Eastern Shawnee Tribe of Oklahoma; Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0782024-09-0606 September 2024 Ltr. to Kenneth Meshigaud, Chairperson, _ Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0752024-09-0606 September 2024 Letter to Charles Diebold, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) ML24249A0882024-09-0606 September 2024 Letter to Rickey Armstrong, President_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24250A0412024-09-0606 September 2024 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected ML24249A0762024-09-0606 September 2024 Letter to Douglas Lankford, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr L-24-200, License Renewal Application for Revision to Supplement 4 for Editorial Corrections2024-09-0505 September 2024 License Renewal Application for Revision to Supplement 4 for Editorial Corrections ML24228A1702024-09-0303 September 2024 Ltr to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24228A1712024-09-0303 September 2024 Ltr to Brian Dickens, EPA-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24240A1482024-08-27027 August 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24239A7782024-08-26026 August 2024 Aging Management Audit - Perry Unit 1 - License Renewal Application August 26 2024 L-24-190, Spent Fuel Storage Cask Registration2024-08-26026 August 2024 Spent Fuel Storage Cask Registration IR 05000440/20240052024-08-22022 August 2024 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005) L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000440/20240022024-08-0808 August 2024 Integrated Inspection Report 05000440/2024002 L-24-178, License Renewal Application Revision O - Supplement 42024-08-0808 August 2024 License Renewal Application Revision O - Supplement 4 L-24-189, License Renewal Application for Revision O - Supplement 12024-08-0707 August 2024 License Renewal Application for Revision O - Supplement 1 L-24-171, Spent Fuel Storage Cask Registration2024-07-30030 July 2024 Spent Fuel Storage Cask Registration ML24150A2022024-07-25025 July 2024 Letter to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-License Renewal Scoping Summary Rpt L-24-108, License Renewal Application, Revision 0 - Supplement 32024-07-24024 July 2024 License Renewal Application, Revision 0 - Supplement 3 05000440/LER-2024-003, Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage2024-07-15015 July 2024 Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage IR 05000440/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000440/2024401 L-24-020, License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 22024-06-27027 June 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 2 05000440/LER-2024-002, Reactor Water Clean Up Leak Detection Loss of Safety Function2024-06-27027 June 2024 Reactor Water Clean Up Leak Detection Loss of Safety Function L-24-036, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-27027 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models 05000440/LER-2024-001, Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition2024-06-20020 June 2024 Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition IR 05000440/20240112024-06-17017 June 2024 Fire Protection Team Inspection Report 05000440/2024011 ML24157A3782024-06-0606 June 2024 – Revised Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 ML24141A1632024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-116, Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification2024-05-16016 May 2024 Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification L-24-085, Nudear Power Plant, Submittal of Emergency Plan, Revision 622024-05-0606 May 2024 Nudear Power Plant, Submittal of Emergency Plan, Revision 62 L-24-103, Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams2024-05-0202 May 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams ML24117A1222024-04-26026 April 2024 Confirmation of Initial License Examination IR 05000440/20240012024-04-24024 April 2024 Integrated Inspection Report 05000440/2024001 L-24-097, Submittal of 2023 Annual Radiological Effluent Release Report2024-04-22022 April 2024 Submittal of 2023 Annual Radiological Effluent Release Report L-24-096, Submittal of Annual Radiological Environmental Operating Report2024-04-22022 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24095A3282024-04-19019 April 2024 License Renewal Revised Schedule Letter 2024-09-09
[Table view] Category:Safety Evaluation
MONTHYEARML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML23353A0012024-02-21021 February 2024 – Issuance of Amendment No. 202 to Adopt TSTF-276, Revision 2, Revise DG Full Load Rejection Test ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML22284A1442023-02-0303 February 2023 Issuance of Amendment No. 200 Regarding the Revision of Methodology Used for Flood Hazard Analysis ML22348A1372023-01-0505 January 2023 Issuance of Amendment No. 199 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML22252A2212022-09-30030 September 2022 Authorization and Safety Evaluation for Alternative Request IR-063 ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML22187A2592022-07-12012 July 2022 Issuance of Relief Proposed Alternative Request Vr 12, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML22136A1132022-06-21021 June 2022 Issuance of Relief Proposed Alternative Requests VR-10, Revision 0, and VR-11, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval (EPIDs L-2021-LLR-0096; L-2021-LLR-0097) ML21322A2602022-01-10010 January 2022 Issuance of Amendment No. 197 Regarding the Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystem, and TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Oper ML21270A1122021-11-16016 November 2021 Issuance of Amendment No. 196 Regarding Changes to the Emergency Plan ML21271A0782021-11-0505 November 2021 Issuance of Amendment No. 195 Regarding the Adoption of TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling ML21158A2122021-07-12012 July 2021 Issuance of Amendment No. 194 Regarding the Adoption of TSTF-002, Relocate the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control ML21123A2172021-05-0505 May 2021 Issuance of Relief Requests Vr 4, Revision 0, Vr 6, Revision 0, and Vr 8, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval (EPIDs L 2021 Llr 0010, L 2021 Llr 0011, L 2021 Llr 0012 COVID-19 ML21123A2892021-05-0404 May 2021 Issuance of Relief Request Vr 7, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML21081A0702021-04-27027 April 2021 Issuance of Amendment No. 193 Regarding the Adoption of TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML21063A2532021-03-0505 March 2021 Issuance of Relief Request SR-2, Revision 0, from Certain Requirements of the ASME OM Code (EPID L-2021-LLR-0005 (COVID-19)) ML21063A1572021-03-0404 March 2021 Safety Evaluation for Alternative Request SR-2, Revision 0 Related to one-time Extension Snubbers Testing to ASME OM Code for the Fourth 10-year Inservice Interval at Perry Nuclear Power Plant Unit 1, Docket Nos. 50-440 ML21035A1702021-03-0101 March 2021 Issuance of Amendment No. 192, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20363A0062021-01-29029 January 2021 Issuance of Relief Proposed Alternative Request Associated with Fourth 10-Year Inservice Inspection Interval ML20311A6582020-11-10010 November 2020 Issuance of Relief Proposed Alternative Request Associated with Fourth Ten Year Interval Inservice Inspection Interval ML20279A4402020-10-0808 October 2020 Energy Harbor Fleet-Beaver Valley Power Station; Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant - Request to Use a Provision of a Later Edition of the ASME Engineers Boiler and Pressure Vessel Code, Section XI ML20266G2652020-09-24024 September 2020 Correction Letter for Relief Request IR-062 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval ML20252A0262020-09-18018 September 2020 Relief Request IR-062 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval ML20189A0032020-07-10010 July 2020 Relief Request PR-3 for Fourth 10-Year Pump and Valve Inservice Testing Program ML20154K7002020-07-0909 July 2020 Issuance of Amendment No. 190 Regarding Fire Protection Program Licensing Basis ML20099A1022020-05-22022 May 2020 Issuance of Amendment No. 188, Regarding Revision to Technical Specifications to Adopt TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML20118C1672020-05-22022 May 2020 Issuance of Amendment No. 189, Regarding Special Heavy Lifting Device Nondestructive Examination Frequency ML19305B1312019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Enclosure 6, Non-Proprietary Safety Evaluation, Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML19163A0232019-08-14014 August 2019 Issuance of Amendment No. 186 Concerning Changes to Emergency Response Organization ML19028A0302019-04-11011 April 2019 FENOC - Beaver Valley Power Station, Unit 1 & 2; Davis-Besse Nuclear Power Station Unit 1; and Perry Nuclear Power Plant Unit 1 - Approval of Certified Fuel Handler Training and Retraining Program ML19072A0122019-03-15015 March 2019 Correction to License Amendment No. 184 Related to Adoption of Technical Specification Task Force Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control ML19072A0852019-03-15015 March 2019 Correction to Request for Alternatives Related to Inservice Testing Program for the Fourth 10 Year Inservice Testing Interval ML19029A0902019-02-25025 February 2019 Request for Alternatives Related to Inservice Testing Program for the Fourth 10-Year Inservice Testing Interval (EPID Nos. L-2018-LLR-0092, 0093, 0094, 0095, and 0096) ML19022A3242019-02-25025 February 2019 Issuance of Amendment No. 185 Concerning Extension of Containment Leakage Test Frequency ML19037A0412019-02-25025 February 2019 Request for Alternative to Use ASME Code Case N-831 ML18292A8162018-12-12012 December 2018 Issuance of Amendment No. 184 Concerning Adoption of Technical Specification Task Force Traveler 542, Rev. 2, Reactor Pressure Vessel Water Inventory Control ML18199A2802018-08-23023 August 2018 Issuance of Amendment No. 183, Adopt Technical Specification Task Force Traveler TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement ML18179A4672018-07-30030 July 2018 FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules ML18157A0842018-06-25025 June 2018 Issuance of Amendment No. 181 Concerning Adoption of TS Task Force Traveler TSTF-306-A, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration (CAC No. MG0150; EPID L-2017-LLA-0286) ML18110A1332018-05-16016 May 2018 Unit No. 1 - Issuance of Amendment No. 180 Concerning Changes to Technical Specifications Regarding Implementation of the Alternative Source Term (CAC No. MF9818; EPID L-2017-LLA-0241) ML18023A6252018-01-29029 January 2018 Approval of Alternative to Use BWRVIP Guidelines in Lieu of Certain ASME Code Requirements (CAC No. MG0149; EPID 2017-LLR-0112) (L-17-183) ML18004A1222018-01-22022 January 2018 FENOC-Beaver Valley, Davis-Besse, and Perry - Alternative for the Use of ASME Code Case N-513-4 (CAC Nos. MG0120, MG0121, MG0122, and MG0123; EPID L-2017-LLR-0088) ML17325B6902018-01-18018 January 2018 Issuance of Amendment Concerning Adoption of Technical Specification Task Force (TSTF) Traveler 400-A, Revision 1, Clarify SR on Bypass of DG Automatic Trips (CAC No. MF9855, EPID L-2017-LLA-0246) (L-17-089) ML17257A0982017-10-19019 October 2017 Issuance of Amendment Concerning Revisions to the Environmental Protection Plan (CAC No. MF9652; EPID L-7017-LLA-0226) (L-17-043) ML17270A0302017-10-16016 October 2017 Approval of Alternative to Use ASME Code Case N-513-4 for Repair of Emergency Service Water System Piping (CAC No. MG0130; EPID L-2017-LLR-0080)(L-17-278) ML17193A3822017-07-18018 July 2017 Correction to Safety Evaluation for License Amendment No. 177 2024-09-13
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555-0001 July 7, 2011 Mr. Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97,10 Center Road Perry. OH 44081-0097
SUBJECT:
PERRY NUCLEAR POWER PLANT, UNIT NO.1 - CORRECTION TO SAFETY EVALUATION FOR RELIEF REQUEST VR-7, ONE-TIME REPLACEMENT FREQUENCY EXTENSION (TAC NO. ME6612)
Dear Mr. Bezilla:
By letter dated November 19, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML103200668), the U.S. Nuclear Regulatory Commission (NRC) staff issued a safety evaluation (SE) related to the NRC's authorization of a proposed alternative in lieu of American Society of Mechanical Engineers Operations and Maintenance of Nuclear Plants Code requirements for testing of Class 2 and 3 thermal relief valves for the third 10-year inservice testing program interval for the Perry Nuclear Power Plant, Unit No. 1 (PNPP). The NRC's SE was in response to FirstEnergy Nuclear Operating Company's (FENOC's) request VR-7 dated June 13, 2010 (ADAMS Accession No. ML102020259) for PNPP.
Subsequently, FENOC notified the NRC of a statement in the SE that required clarification.
Request VR-7 was authorized for the 2011 PNPP refueling outage (beginning April 19, 2011);
however, the SE indicated authorization through April 2011. A corrected SE is enclosed. A marginal line indicates the area of change.
The corrections do not change the conclusions reached by the associated SE.
If you have any questions, please contact the PNPP Project Manager, Michael Mahoney at 301-415-3967.
acob I. Zimmerman, Chief Plant Licensing Branch 111-2 Division of Operating Reactor licenSing Office of Nuclear Reactor Regulation Docket No. 50-440
Enclosure:
Corrected Safety Evaluation cc w/enclosure: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELIEF ALTERNATIVE REQUEST VR-7 RELATED TO THE INSERVICE TESTING PROGRAM, THIRD 10-YEAR INTERVAL FIRSTENERGY NUCLEAR OPERATING COMPANY PERRY NUCLEAR POWER PLANT DOCKET NO. 50-440
1.0 INTRODUCTION
By letter to the U.S. Nuclear Regulatory Commission (NRC), dated July 13, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102020259),
FirstEnergy Nuclear Operating Company (FENOC), the licensee, submitted Relief Request (RR)
VR-7 applicable to the third 10-year inservice testing (1ST) program interval at the Perry Nuclear Power Plant, Unit 1 (PNPP). The PNPP third 10-year 1ST program interval began on May 18, 2009, and ends on May 17,2019. The licensee requested authorization to use an alternative test/replacement interval other than the one required by the American Society of Mechanical Engineers (ASME), Code for Operation and Maintenance of Nuclear Power Plants (OM Code).
The licensee requested authorization to extend the test/replacement interval for PNPP relief valves 1E12-F0005, 1E12-F0025C, 1E21-F0031, 1E22-F0014, 1P45-F0517, 1P45-F0543A, and 1P45-F0543B, beyond 10 years, on a one-time basis, until the April 2011 refueling outage.
SpeCifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(a)(3)(ii),
the licensee requested to use the proposed alternative in VR-7 since complying with the current ASME OM Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
2.0 REGULATORY EVALUATION
"Inservice Testing Requirements," 10 CFR 50.55a(f) requires, in part, that ASME Class 1,2, and 3 components must meet the requirements of the ASME OM Code and applicable addenda, except where alternatives have been authorized pursuant to paragraphs (a)(3){i) or (a}(3}(ii).
In proposing alternatives, a licensee must demonstrate that the proposed alternative provides an acceptable level of quality and safety, or compliance would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Section 50.55a
-2 of 10 CFR Part 50 allows the NRC to authorize alternatives to ASME OM Code requirements upon making necessary findings. The NRC's findings with respect to authorizing the alternative to the ASME OM Code are given below.
3.0 TECHNICAL EVALUATION
3.1 Licensee's Alternative Request VR-7 The applicable ASME OM Code edition and addenda for PNPP is the 2001 Edition through the 2003 Addenda.
ISTC-5240, "Safety and Relief Valves,>> states that, "Safety and relief valves shall meet the inservice test requirements of Mandatory Appendix I."
Mandatory Appendix 1,1-1390, "Test Frequency, Class 2 and 3 Pressure Relief Devices That Are Used for Thermal Relief Application," states that, 'Tests shall be performed on all Class 2 and 3 relief devices used in thermal relief application every 10 years, unless performance data indicate more frequent testing is necessary. In lieu of tests, the Owner may replace the relief devices at a frequency of every 10 years, unless performance data indicate more frequent replacements are necessary."
Alternative testing was requested for the following components:
Thermal Relief Valves Class Code 1E12-F0005 Residual Heat Removal (RHR) Shutdown Cooling Suction Relief 2 1E12-F0025C - RHR Loop C Injection Line Relief 2 1E21-F0031 - Low Pressure Core Spray Pump Suction Line Relief 2 1E22-F0014 High Pressure Core Spray (HPCS) Waterleg Pump Suction Line Relief 2 1P45-F0517 HPCS Room Cooler Emergency Service Water (ESW) Relief 3 1P45-F0543A - ESW Loop A Line Relief 3 1P45-F0543B - ESW Loop B Line Relief 3 The licensee is requesting authorization to extend the test interval for PNPP relief valves 1E12 F0005, 1E12-F0025C, 1E21-F0031, 1E22-F0014, 1P45-F0517, 1P45-F0543A, and 1P45 F0543B beyond 10 years on a one-time basis (approximately 3 months) until the April 2011 refueling outage.
The start of the PNPP 2011 refueling outage, originally scheduled to begin on February 21, 2011 , was rescheduled and now will commence on April 18, 2011. As a result, seven thermal relief valves (1E12-F0005, 1E12-F0025C, 1E21-F0031, 1E22-F0014, 1P45-F0517, 1P45 F0543A, and 1P45-F0543B) scheduled for replacement during the outage, will exceed their Code mandated 10-year replacement frequency dates ranging from February 28 through March 12, 2011.
-3 The licensee's justification for extending the test/replacement interval for relief valves 1E 12 F0005, 1E12-F0025C, 1E21-F0031, 1E22-F0014, 1P45-F0517, 1P45-F0543A,and 1P45-F0543B beyond 10 years is stated below:
There are no planned plant shutdowns or system specific outages of sufficient duration prior to the start of the rescheduled 2011 refueling outage to complete the necessary thermal relief valve replacements. Requiring a plant shutdown or system specific outage of sufficient duration solely to replace these valves within their Code mandated 10-year replacement frequency results in an adverse impact on plant operation (unplanned plant shutdown) or requires entry into multiple Technical Specifications limiting conditions of operation.
In lieu of the 10-year replacement frequency requirements of 1-1390, FENOC proposes the replacement frequency of the listed valves to be extended one time to account for the rescheduled start of PNPP's refueling outqge. The short duration extension through the end of the refueling outage would allow PNPP to avoid implementing an unplanned plant shutdown or system specific outage of sufficient duration solely to replace these valves within their Code mandated 1O-year replacement frequency.
Upon NRC approval of the 10 CFR 50.55a alternative request VR-11 on May 16, 2003 (ADAMS Accession No. ML031150313), PNPP re-categorized these valves from pressure relief valves to thermal relief valves and extended their replacement intervals to 10 years. Since re categorization of these valves in 2003, more frequent replacement frequencies (less than 10 years) has not been necessary. Prior to re-categorization of these valves, starting from initial plant operation in 1987, 28 of 29 as-found set pressure tests were satisfactory within the as found set pressures of ASME Code Section 1/1 (1974 Edition through 1975 Addenda),
Subsections NC/ND-3612.3, "Allowance for Variations from Design Conditions," criteria for their respective systems. As such, based on past performance, the short duration replacement frequency extensions for these valves do not significantly impact acceptable levels of quality and safety.
3.2 NRC Staff Evaluation The licensee has proposed an alternative in lieu of the reqUirements found in 2001 Edition through 2003 Addenda of the ASME OM Code Section ISTC-5240 and Appendix I, Section 1 1390. Specifically, the licensee proposes to extend the 1O-year test and/or replacement interval for a period not to exceed 3 months on a one-time basis for thermal relief valves 1E 12-F0005, 1E12-F0025C, 1E21-F0031 , 1E22-F0014, 1P45-F0517, 1P45-F0543A, and 1P45-F0543B. This will allow these valves to be tested and/or replaced during the next PNPP refueling outage scheduled to begin on April 18, 2011.
Relief valves 1E12-F0005, 1E12-F0025C, 1E21-F0031, 1E22-F0014, 1P45-F0517, 1P45 F0543A, and 1P45-F0543B are being used in a thermal relief application which is defined as a relief device whose only overpressure protection function is to protect isolated components, systems, or portions of systems from fluid expansion caused by changes in fluid temperature.
The relief valves at PNPP have had a favorable maintenance history with minimal performance
-4 issues. After nearly 23 years of service, only one set pressure test was found to exceed recommended ASME piping system allowable design values. Industry experience indicates that the failure rates of thermal relief valves are low and additional degradation of these components would not be expected to occur during the additional test interval extension period. Therefore, the NRC staff finds that PNPP's proposed alternative provides reasonable assurance of operational readiness.
Based on the review of the information provided by the licensee and industry experience with these types of valves, the NRC staff finds that allowing approximately 3 months extension to the OM Code 10-year test interval requirementforthermal relief valves 'IE12-F0005, 1E12-F0025C, 1E21-F0031, 1E22-F0014, 1P45-F0517, 1P45-F0543A, and 1P45-F0543B still provides reasonable assurance of the operational readiness of these valves. Compliance with the specified ASME OM Code requirements would result in a hardship or unusual difficulty without a compensating increase in the level of quality and safety.
4.0 CONCLUSION
Based on the above evaluation, the NRC staff has concluded that the licensee's proposed alternative in request VR-7 provides reasonable assurance that thermal relief valves 1E12 F0005, 1E12-F0025C, 1E21-F0031, 1E22-F0014, 1P45-F0517, 1P45-F0543A, and 1P45 F0543B are operationally ready. The RR is authorized for the third 10-year 1ST interval, which commenced on May 12, 2009 and ends on May 17, 2019.
Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(a)(3)(ii), and is in compliance with the ASME OM Code's requirements. Therefore, pursuant to 10 CFR 50.55a(a)(3)(ii), the NRC staff authorizes the use of VR-7 at PNPP for the 2011 refueling outage, scheduled to begin on April 18, 2011.
All other ASME OM Code requirements for which relief was not specifically requested and approved in the subject request for relief remain applicable.
Principal Contributor: Michael Farnan Date of issuance: November 19, 2010 Revised by letter dated July 7,2011
July 7,2011 Mr. Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY -A290 P.O. Box 97,10 Center Road Perry,OH 44081-0097 SUB~IECT: PERRY NUCLEAR POWER PLANT, UNIT NO.1 - CORRECTION TO SAFETY EVALUATION FOR RELIEF REQUEST VR-7, ONE-TIME REPLACEMENT FREQUENCY EXTENSION (TAC NO. ME6612)
Dear Mr. Bezilla:
By letter dated November 19, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML103200668), the U.S. Nuclear Regulatory Commission (NRC) staff issued a safety evaluation (SE) related to the NRC's authorization of a proposed alternative in lieu of American Society of Mechanical Engineers Operations and Maintenance of Nuclear Plants Code requirements for testing of Class 2 and 3 thermal relief valves for the third 10-year inservice testing program interval for the Perry Nuclear Power Plant, Unit No.1 (PNPP). The NRC's SE was in response to FirstEnergy Nuclear Operating Company's (FENOC's) request VR-7 dated June 13,2010 (ADAMS Accession No. ML102020259) for PNPP.
Subsequently, FENOC notified the NRC of a statement in the SE that required clarification.
Request VR-7 was authorized for the 2011 PNPP refueling outage (beginning April 19, 2011);
however, the SE indicated authorization through April 2011. A corrected SE is enclosed. A marginal line indicates the area of change.
If you have any questions, please contact the PNPP Project Manager, Michael Mahoney at 301-415-3967.
Sincerely, IRA by J. S. Wiebe fori Jacob I. Zimmerman, Chief Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440
Enclosure:
Corrected Safety Evaluation cc w/enclosure: Distribution via Listserv DISTRIBUTION: