Category:Letter
MONTHYEARML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20243012024-08-26026 August 2024 NRC Examination Report 05000275/2024301; 05000323/2024301 IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application DCL-24-054, LCO 3.0.3 Completion Time Limits2024-05-17017 May 2024 LCO 3.0.3 Completion Time Limits DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage ML24127A2042024-05-0202 May 2024 02May2024 Ltr - California Coastal Commission to Pg&E, Coastal Development Permit Needed for Pg&E’S Proposed Relicensing of Diablo Canyon Nuclear Power Plant DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report L-24-004, Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007)2024-04-30030 April 2024 Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007) DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 IR 05000275/20240012024-04-23023 April 2024 Integrated Inspection Report 05000275/2024001 and 05000323/2024001 ML24114A2032024-04-22022 April 2024 Request for Information for EP Program and Performance Indicator Verification Inspection (Wolf Creek Nuclear Generating Station) Inspection Report 05000482/2024003 ML24106A2882024-04-18018 April 2024 License Renewal Application Environmental Review RCIs and RAIs ML24106A2892024-04-18018 April 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of March 2024 Audit Regarding the Environmental Review of the License Renewal Application DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24108A1122024-04-15015 April 2024 License Amendment Request 24-02 Request for Approval of DCPP Early Warning System to Meet 10 CFR 73.55(i)(2) and 10 CFR 73.55(e)(9)(vi)(A) DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant ML24082A2592024-03-25025 March 2024 Notice of Enforcement Discretion for Diablo Canyon Power Plant, Unit 2 (EPID L-2024-LLD-0002) - March 25, 2024 ML24081A0462024-03-22022 March 2024 Audit Summary in Support of the License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability ML24081A4052024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability 2024-09-09
[Table view] |
Text
UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU I TE 400 AR LI N GTON , TEXAS 76011-4125 July 5, 2011 Ms. Susan Harvey North County Watch P.O. Box 455 Templeton, CA 93465
Dear Ms. Harvey:
Thank you for participating in our public meeting process. The publics active involvement in the NRCs processes helps us not only fulfill our mission of keeping you safe, but it also helps us do our jobs openly and transparently.
The NRC remains convinced that U.S. nuclear power plants are designed and operated in a manner that protects public health and safety. All U.S. nuclear power plants are built to withstand external hazards, including earthquakes, flooding, and tsunamis, as appropriate.
Even those plants that are located in areas with low and moderate seismic activity are designed for safety in the event of such a natural disaster. Each plant is designed to withstand the possible ground movement that is appropriate for its location, given the earthquake sources that may affect the site. Ground movement is a function of both the magnitude of the earthquake and the distance from the fault to the specific site. The seismic responses of the structures, systems, and components associated with these facilities are site-specific, based on either identified faults and tectonic capabilities in the area or the regions seismic zone activity, whichever can generate stronger ground motion. The Diablo Canyon plant is located in a region that experiences higher levels of seismic activity than most of the United States and is designed accordingly.
The events that occurred in Japan are the result of a combination of highly unlikely natural disasters. These include the fifth-largest earthquake in recorded history and the resulting devastating tsunami. This earthquake occurred on a subduction zone, a tectonic plate boundary where one tectonic plate is pushed under another plate and creates enough stress in the Earths crust to produce earthquakes of the largest magnitude. Subduction zone earthquakes are also required to produce the kind of massive tsunami seen in Japan. In the continental United States, the only subduction zone is the Cascadia region, off the coast of northern California, Oregon and Washington, and this is the only U.S. location that could generate a continental earthquake and tsunami as large as the March 11 event in Japan.
Outside of the Cascadia subduction zone, earthquakes are not expected to exceed a magnitude of approximately 8.5.
S. Harvey In addition to the NRCs usual inspection activities, since the events at Fukushima the agency has twice inspected all U.S. nuclear power plants specifically for issues related to emergency procedures and resources. Both inspections showed U.S. plants are prepared to use those emergency measures to keep the public safe. Temporary Instruction 2515/183 provided instructions for NRC inspectors to perform independent assessments of measures, that would be used to help keep the reactors and spent fuel pools safe even after the sudden loss of significant areas of the plants. The results of these inspections indicated that although some deficiencies were identified and subsequently corrected, the licensees plans would still ensure that critical cooling functions would be provided. The individual inspection reports are available at theNRCs public website at the following link:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/follow-up-rpts.html.
Temporary Instruction (TI) 2515/184 provided instructions for NRC inspectors to examine the plants severe accident management guidelines (SAMGs), which are meant to reduce the severity of situations where a reactor core has been damaged. The inspectors were told to determine: (i) that the severe accident management guidelines (SAMGs) are available and how they are being maintained, and (ii) the nature and extent of licensee implementation of SAMG training and exercises. The results of these inspections also indicated that although some deficiencies were identified they have either been corrected or entered into Correction Action Programs and the identified deficiencies did not preclude any critical mitigation functions from being performed. Individual inspection reports associated with the inspections are also available on the NRCs public website: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/SAMGs.html.
In addition, the NRC issued Bulletin 2011-01 requiring all holders of operating licenses for nuclear power reactors to provide a comprehensive verification of their compliance with the regulatory requirements associated with mitigating strategies for beyond design basis events.
The 30-day licensee responses to Bulletin 2011-01 reviewed to date, have identified no cases where mitigating equipment was not available or the mitigation strategies were not workable.
The NRC established a senior level task force to conduct both short- and long-term analysis of the lessons that can be learned from the situation in Japan. The task force is examining all the available information from Japan to understand the events implications for the United States.
They are performing a systematic and methodical review to see if there are changes that should be made to NRC programs and regulations. This will undoubtedly lead to the identification of issues that warrant further study in the longer term. The task force is scheduled to provide a report to the Commission in this month (July 2011), identifying the results of its review and providing recommendations for short-term actions, if necessary, and longer-term study. The NRC will assess all of the available information and evaluate whether enhancements to U.S.
nuclear power plants are warranted.
The NRC remains convinced that U.S. nuclear power plants are designed and operated in a manner that protects public health and safety. The implementation of the defense-in-depth principles by the NRC and industry, conservative decision making, use of risk insights, the results of the recent TI inspections and continuous routine inspections performed by the NRCs Resident Inspectors, industry initiatives and actions coordinated through the Institute of Nuclear
S. Harvey Power Operations, robust corrective programs, and an absence of complacency in responding to the events at Fukushima provides for further assurance that the U.S. nuclear power plants continue to remain safe.
Sincerely,
/RA/
Anton Vegel, Director Division of Reactor Safety
S. Harvey S:\DRS\TSB\Letters\North County Watch.doc ADAMS No : Yes : SUNSI Review Complete Reviewer Initials: haf Category B.1 : Publicly Available : Non-sensitive Category A Non-publicly Available Sensitive RIV:TSB/SRE C:RPBB RSLO PAO RC HAFreeman GBMiller WAMaier VLDricks KDFuller
/RA/ /RA/ NOT REQUIRED /RA/ /RA/
06/27/2011 07/01/2011 / /2011 07/05/2011 07/05/2011 NRR/DLR/RPB1 NRR/DORL/LPL4 D:DRS BMPham MTMarkey AVegel Via E-Mail Via E-Mail /RA/
06/30/2011 07/01/2011 07/05/2011 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax