MONTHYEARML11179A0322011-06-20020 June 2011 R. E. Ginna, Request for Extension of Fire Protection Enforcement Discretion Project stage: Request ML1120004642011-07-28028 July 2011 Commitment to Submit a License Amendment Request to Transition to 10 CFR 50.48(c), National Fire Protection Association Standard NFPA 805, and Request to Extend Enforcement Discretion - Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, Project stage: Other 2011-06-20
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 IR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 ML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0012024-10-0909 October 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24240A1112024-08-27027 August 2024 Registration of Use of Casks to Store Spent Fuel ML24240A2462024-08-27027 August 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 ML24234A0922024-08-21021 August 2024 Requalification Program Inspection NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24198A0442024-07-16016 July 2024 Inservice Inspection Report ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 05000317/LER-2024-001, Submittal of LER 2024-001-01 for Calvert Cliffs Nuclear Power Plant, Unit 1, Condition Prohibited by Technical Specifications Due to Safety Injection Check Valve Not Full Closed2024-07-0202 July 2024 Submittal of LER 2024-001-01 for Calvert Cliffs Nuclear Power Plant, Unit 1, Condition Prohibited by Technical Specifications Due to Safety Injection Check Valve Not Full Closed ML24177A1832024-06-25025 June 2024 Inservice Inspection Report IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling ML24161A0012024-06-0909 June 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24150A0522024-05-29029 May 2024 Operator Licensing Examination Approval ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 2024-09-06
[Table view] |
Text
Mary G. Korsnick Office 410-470-5133 Chief Nuclear Officer, Fax 443-213-6739 SVP - Chief Operations Officer E-mail: Maria.Korsnick@cengllc.com CENG_
a joint venture of O1n--V *geDF June 20, 2011 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant UnitNos. I & 2; Docket Nos. 50-317 & 50-318 Nine Mile Point Nuclear Station Unit No. 1; Docket No. 50-220 R. E. Ginna Nuclear Power Plant Docket No. 50-244 Requestfor Extension of Fire Protection EnforcementDiscretion
REFERENCES:
(a) SECY 11-0061, dated April 29," 2011, A Requesi to Revise the Interim Enforcement Discretion Policy for Fire Protection Issues on 10 CFR 50.48(c) to Allow Licensees to Submit License AmendmentRequests in a Staggered Approach (R1N 3150-AG48).
(b) Staff Requirements Memorandum, dated *June 10, .2011, Staff Requirements - SECY-11-0061 - A Request to Revise the Interim Enforcement Policy for Fire Protection Issues on 10 CFR 50.48(c) to Allow Licensees to Submit License Amendment Requests in a Staggered Approach (R1N 3150-AG48)
(c) Letter from J. T. Carlin (Ginna LLC) to Document Control Desk (NRC),
dated September 26, 2008, Request for Extension of Enforcement Discretion for a Revised Date of 10 CFR 50.48(c) License Amendment Request Submittal (d) Letter from K. J. Polson (NMPNS)'to Document Control Desk (NRC),
dated January 16, 2009, Request for Extension of Enforcement Discretion for a Revised Date of 10 CFR 50,48(c) License Amendment Request Submittal (e) Letter from G. H. Gellrich (CCNPP) to ,Documefit Control Desk (NRC) dated January 28, 2010, Request for Extension of Enforcement Discretion for, a Revised Date of 10 CFR 50.48(c) LicenseAmendment Request Submittal Constellation Energy Nuclear Group, LLC 100 Constellation Way, Suite 200C, Baltimore, MD 21202 4)D0-
Document Control Desk June 20, 2011 Page 2 In accordance with Reference (a), as approved by the Nuclear Regulatory Commission (NRC) in Reference (b), Calvert Cliffs Nuclear Power Plant, R.E. Ginna Nuclear Power Plant, and Nine Mile Point Nuclear Station will submit license amendment requests (LARs) to implement 10 CFR 50.48(c) on the following schedule:
Nine Mile Point Nuclear Station, Unit 1 - June 29, 2012' R. E. Ginna Nuclear Power Plant - March 29, 2013 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - September 30, 2013 This is a change to the schedules submitted in References (c) through (e). These dates are regulatory commitments.
In each case, we request that enforcement discretion be extended to correspond to the LAR submittal commitment date. In addition, we request that, once the LAR is submitted, enforcement discretion would continue until the NRC dispositions the LAR to transition to NFPA 805. It is our intention to continue to pursue activities needed to complete the transition while we are preparing the license amendment requests.
It is our understanding that the Staff expects submittal dates by July 1 in each fiscal year. The Calvert Cliffs submittal date is after July 1 in fiscal year 2013. The time is needed because Calvert Cliffs is the most complex of the plants owned by Constellation Energy Nuclear Group. A submittal by July 1, 2013 would require diverting resources from the Ginna submittal, which will be in the preceding March. In our opinion, this is the best schedule that will provide time required to ensure the development of quality evaluations and license amendment requests for Ginna and Calvert Cliffs.
Should you have any questions concerning this letter, or require additional information, please contact Bruce Montgomery at 410-470-3777 or Bruce.Montgomery@cengllc.com.
Sincerely, Mary G. Korsnick MGK/EMT/bjd cc: D. V. Pickett, NRC R. V. Guzman, NRC W. M. Dean, NRC Resident Inspector, NRC (Calvert Cliffs)
Resident Inspector, NRC (Ginna)
Resident Inspector, NRC (Nine Mile Point)
S. Gray, Maryland DNR