Letter Sequence Meeting |
---|
|
|
MONTHYEARML1113703982011-05-20020 May 2011 Notice of Forthcoming Pre-Application Meeting with Licensee for Prairie Island Nuclear Generation Plant, Units 1 and 2, to Discuss Proposed Technical Specification and Licensing Basis Changes to Diesel Fuel Oil System Project stage: Meeting ML1117804242011-06-22022 June 2011 June 22, 2011, Meeting Handout #1 - NRC Meeting Diesel Fuel Oil LAR for Prairie Island Ngp Project stage: Meeting ML1120701572011-06-22022 June 2011 June 22, 2011, Meeting Handout #2 - Proposed Technical Specification Changes for Prairie Island Ngp Diesel Fuel Oil LAR Project stage: Meeting ML1122005212011-08-10010 August 2011 6/22/2011 Summary of Pre-Application Meeting Regarding the Diesel Fuel Oil System License Amendment Request Project stage: Meeting ML1134301022011-12-16016 December 2011 Acceptance Letter Regarding Relief Requests PR-01, VR-01, and VR-02 for Fifth Inservice Testing Interval Project stage: Acceptance Review 2011-05-20
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24149A1632024-05-29029 May 2024 Summary of the May 8, 2024 Public Outreach to Discuss the NRC 2023 End-of-Cycle Plant Performance Assessment of Prairie Island Nuclear Generating Plant, Units 1 and 2 ML24088A1012024-03-29029 March 2024 Summary of March 6, 2024, Public Meeting with NSPM Regarding Planned LAR to Modify Technical Specifications Definitions and Incorporate Plant-Specific Methods for Response Time Testing for Prairie Island Nuclear Plant, Units 1 & 2 ML24043A0952024-02-21021 February 2024 Summary of January 31, 2024, Public Meeting with Xcel Energy to Discuss Amendment Application for Prairie Island Independent Spent Fuel Storage Installation ML23184A0862023-07-11011 July 2023 6/23/2023 Summary of Pre Application Public Meeting with Xcel Energy on Prairie Island ISFSI Amendment Application ML23179A2102023-06-28028 June 2023 Summary of June 5, 2023, Public Meeting with Northern States Power Company Regarding Neutron Fluence Values for Reactor Pressure Vessel Welds ML23157A0232023-06-0606 June 2023 Summary of the May 24, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Prairie Island Nuclear Generating Plant, Units 1 and 2 ML23123A3942023-05-15015 May 2023 Summary of Public Meeting with Northern States Power Company Regarding Planned License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water System ML22130A7172022-05-10010 May 2022 Summary of the May 3, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Monticello and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML21294A0442021-11-0808 November 2021 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a License Amendment to Extended the Allowed Outage Time for the Vertical Motor Driven Cooling Water System Pump ML21229A1692021-08-23023 August 2021 Summary of August 11, 2021, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a Planned License Amendment Allow Bypass Testing of the Power Range Nuclear Instrumentation System Channels ML21167A1842021-06-16016 June 2021 Summary of the June 9, 2021, Public Outreach to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML21137A1042021-05-20020 May 2021 Summary of May 6, 2021, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a Planned License Amendment to Transition to a 24 Month Operating Cycle ML21040A4612021-02-11011 February 2021 Summary of February 3, 2021, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a Planned License Amendment to Combine the Emergency Plans and Create a Common Emergency Operations Facility ML20296A2382020-11-0303 November 2020 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to the License Amendment to Adopt TSTF-505 Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20274A2442020-10-16016 October 2020 Summary of 9/23/2020 Meeting with Northern States Power Co., Doing Business as Xcel Energy, on Potential License Exemption Request Related to Biennal Emergency Preparedness Exercise for Prairie Island Nuclear Generating Plant, Units 1 & 2 ML20216A6452020-08-0303 August 2020 Summary of the July 16, 2020, Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of the Prairie Island Generating Plant ML20114E2302020-04-23023 April 2020 Meeting Summary from Call with S. Beimers Mnshpo and NRC January 2020 Prairie Island ISFSI EA ML20111A1322020-04-21021 April 2020 April 9, 2020, Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request Related to Adopt TSTF-569 at Prairie Island Nuclear Generating Plant, Unit 1 and 2 ML20057D3912020-03-0909 March 2020 Summary of February 18, 2020, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Ament Request Related to Low Temperature Overpressurization Protection ML19347D1592020-01-0707 January 2020 Summary of December 12, 2019, Meeting with Northern States Power Co., Doing Business as Xcel Energy, and Tennessee Valley Authority Planned License Amendment Requests for Prairie Island, Units 2 and 2, and Watts Bar, Units 1 and 2 ML19289A5322019-10-28028 October 2019 Summary of September 26, 2019, Teleconference with Northern States Power Company on Potential License Amendment Request to Adopt TSTF-505, Revision 2 ML19210D5432019-08-20020 August 2019 Summary of Teleconference with Northern States Power Company on Potential License Amendment Request to Adopt Probabilistic Risk Assessment Model ML19136A0272019-05-15015 May 2019 Memorandum to C. Regan Summary of March 28, 2019, Public Meeting with Xcel Energy to Discuss Seismic Consideration for a Proposed License Amendment Increasing the Amount of Special Nuclear Material Authorized for Storage at Prairie Island I ML19058A4672019-03-11011 March 2019 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to the Amendment Request to Modify Renewed Facility Operating License Paragraph 2.C(4)(c) ML18065A5582018-03-12012 March 2018 Summary of February 20, 2018, Teleconference with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request to Adopt TSTF-425 ML17341A1292017-12-11011 December 2017 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Changes to the Security Plans at the Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML17261B0362017-09-25025 September 2017 Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential Digital Feedwater Modifications at Prairie Island Nuclear Generating Plant, Units 1 and 2 ML17235B1802017-08-23023 August 2017 Summary of Open House to Discuss the 2016 End-Of-Cycle Plant Performance Assessment of Prairie Island ML17209A1192017-07-17017 July 2017 Summary of July 17, 2017, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request Related to Heavy Lifting Devices L-PI-17-014, Summary of Public Meeting and Plan for NRC Request for Additional Information Regarding License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes (CAC Nos. MF7121...2017-04-19019 April 2017 Summary of Public Meeting and Plan for NRC Request for Additional Information Regarding License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes (CAC Nos. MF7121... ML17093A6012017-04-0606 April 2017 March 9, 2017, Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to the Spent Fuel Pool Criticality License Amendment Request ML17034A1202017-02-0909 February 2017 Summary of January 24, 2017, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential Revision to the Emergency Action Level ML16111B1912016-04-28028 April 2016 Summary of Meeting with Northern States Power Company, a Minnesota Corporation, Doing Business as Xcel Energy, on National Fire Protection Association (NFPA) 805 License Amendment Request ML15271A2072015-10-0202 October 2015 July 9, 2015 Summary of Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, U.S, Nuclear Regulatory Commission and Northern States Power Company- Minnesota to Discuss Flood Analysis Associated with Monticello Nuclear ML15141A5092015-05-21021 May 2015 Meeting Summary with Public to Discuss the Results of the 2014 Problem Identification and Resolution Inspection for Prairie Island Nuclear Generating Plant ML15107A0592015-05-15015 May 2015 Summary of the April 14, 2015, Public Meeting with Xcel Energy and Westinghouse to Discuss a Future License Amendment Request Regarding the Use of Ifba Rods in Nuclear Fuel at the Prairie Island Nuclear Generating Plant ML15131A4482015-05-0707 May 2015 Reactor Oversight Process Task Force FAQ Log - April 16, 2015 ML14220A2832014-09-0808 September 2014 Summary of August 5, 2014, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, NRC, and Northern States Power Company - Minnesota to Discuss Flooding Analysis Associated with Monticello and Prairie Island Nuclear Gen ML14223A8012014-08-11011 August 2014 Public Meeting Summary to Discuss the 2013 Performance of Prairie Island Nuclear Generating Plant Units 1 and 2 ML14227A8852014-07-0202 July 2014 E-mail P Longmire, NRC, Re e-mail Fr Samuel Chesnutt, Xcel Energy, Re Meeting Summary for the June 16, 2014 Prairie Island ISFSI License Renewal Application RAI Discussion ML14153A0252014-06-20020 June 2014 Meeting Summary - Public Meeting on May 16, 2014, to Discuss Xcel Energy'S Flood Hazard Reevaluation Extension Request for the Monticello and Prairie Island Nuclear Generating Plants ML14168A0182014-05-16016 May 2014 Xcel Energy Responses to NRC Questions Regarding Flood Hazard Reevaluation Report Extension Requests ML14056A4942014-03-10010 March 2014 Summary of the February 19, 2014, Pre-Application Meeting to Discuss the Diesel Generator Voltage and Frequency Limits License Request ML13210A3022013-07-29029 July 2013 Summary of Public Meeting with Northern States Power Company to Discuss the 2012 Prairie Island Nuclear Generating Plant End-of-Cycle Performance Assessment ML13171A2472013-06-20020 June 2013 7/11/2013 - Notice of Public Meeting to Discuss 2012 End-Of-Cycle Performance Assessment for Prairie Island Nuclear Generating Plant, Units 1 and 2 ML13004A3722013-01-11011 January 2013 December 6, 2012, Summary of Meeting to Discuss the Licensee'S Proposed FLEX Strategy in Response to NRC Order EA-12-049 ML12326A9702012-11-21021 November 2012 Summary of October 24, 2012, Meeting with the Northern States Power Company, D/B/A Excel Energy Regarding Security Requirements and Changes Pertaining to Prairie Island TAC L24689 W/ Encl 1 (Attendees) and Encl 2 (Agenda) ML12292A4202012-11-0707 November 2012 September 27, 2012 - Summary of Pre-Application Meeting to Discuss the Diesel Generator Voltage and Frequency Limits License Amendment Request ML12214A2332012-07-31031 July 2012 July 17, 2012 Summary of Public Meeting to Discuss the Prairie Island Nuclear Generating Plant, Units 1 and 2, End-of-Cycle Plant Performance Assessment ML12121A5842012-05-17017 May 2012 Meeting Summary with Northern States Power Co, to Discuss the National Fire Protection Association Standard 805 (NFPA 805) License Amendment Request 2024-05-29
[Table view] |
Text
\.t.p.l\ RfGu<.q UNITED STATES
~"
",. .. .....0",... NUCLEAR REGULATORY COMMISSION
~ ('> WASHINGTON, D.C. 20555"()001
<< 0
\j; :
~'</ ~
ill August 10, 2011
"J ...
0 LICENSEE: Northern States Power Company - Minnesota (NSPM)
FACILITY: Prairie Island Nuclear Generating Plant, Units 1 and 2 (PINGP)
SUBJECT:
SUMMARY
OF JUNE 22, 2011, PRE-APPLICATION MEETING TO DISCUSS THE DIESEL FUEL OIL SYSTEM LICENSE AMENDMENT REQUEST (TAC NOS. ME6171 AND ME6172)
On June 22, 2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Northern States Power Company, a Minnesota corporation (NSPM, the licensee), at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the technical details associated with NSPM's pending license amendment request (LAR) for a diesel fuel oil license basis addition and Technical Specification (TS) 3.8.3 revision. A notice for this meeting was issued on May 20, 2011, and is available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML111370398. The licensee's meeting slides and preliminary proposed TS changes can be found in ADAMS Accession Nos. ML111780424 and ML112070157, respectively.
The licensee's presentation to the NRC staff included a discussion of the existing diesel fuel oil systems for PINGP, Units 1 and 2, the TSs and current license basis for the system, the proposed TS and bases changes, and the proposed scope of the LAR.
The NRC staff queried the licensee throughout the presentation. The licensee stated that they also intend to request to adopt TS Task Force (TSTF)-501, concerning the relocation of the diesel fuel oil storage volumes from the TSs to the TS Bases, with this LAR.
No regulatory decisions were made during this meeting. No members of the public were in attendance. Public Meeting Feedback forms were not received. A list of attendees is included as an enclosure.
Please direct any inquiries to me at 301-415-4037, or thomas. wengert@nrc.gov.
Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATTENDEES JUNE 22. 2011. PRE-APPLICATION MEETING WITH NORTHERN STATES POWER COMPANY - MINNESOTA PRAIRIE ISLAND NUCLEAR GENERATING PLANT FUTURE LICENSE AMENDMENT REQUEST CONCERNING DIESEL FUEL OIL SYSTEM NAME ORGANIZATION D. Vincent Xcel Energy C. Lethgo Xcel Energy T. Wengert NRC/NRRlDORL M. Hamm NRC/NRRlDIRS S. Jones NRC/NRR/DSS R. Mathew NRC/NRR/DE R. Wolfgang NRC/NRRlDCI ACRONYMS NRC - U.S. Nuclear Regulatory Commission NRR - Office of Nuclear Reactor Regulation DCI - Division of Component Integrity DE - Division of Engineering DIRS - Division of Inspection and Regional Support DORL - Division of Operating Reactor licensing DSS - Division of Safety Systems Enclosure
August Ie, 2011 LICENSEE: Northern States Power Company - Minnesota (NSPM)
FACILITY: Prairie Island Nuclear Generating Plant, Units 1 and 2 (PINGP)
SUBJECT:
SUMMARY
OF JUNE 22,2011, PRE-APPLICATION MEETING TO DISCUSS THE DIESEL FUEL OIL SYSTEM LICENSE AMENDMENT REQUEST (TAC NOS. ME6171 AND ME6172)
On June 22,2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Northern States Power Company, a Minnesota corporation (NSPM, the licensee), at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the technical details associated with NSPM's pending license amendment request (LAR) for a diesel fuel oil license basis addition and Technical Specification (TS) 3.8.3 revision. A notice for this meeting was issued on May 20, 2011, and is available in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML111370398. The licensee's meeting slides and preliminary proposed TS changes can be found in ADAMS Accession Nos. ML111780424 and ML112070157, respectively.
The licensee's presentation to the NRC staff included a discussion of the existing diesel fuel oil systems for PINGP, Units 1 and 2, the TSs and current license basis for the system, the proposed TS and bases changes, and the proposed scope of the LAR.
The NRC staff queried the licensee throughout the presentation. The licensee stated that they also intend to request to adopt TS Task Force (TSTF)-501, concerning the relocation of the diesel fuel oil storage volumes from the TSs to the TS Bases, with this LAR.
No regulatory decisions were made during this meeting. No members of the public were in attendance. Public Meeting Feedback forms were not received. A list of attendees is included as an enclosure.
Please direct any inquiries to me at 301-415-4037, or thomas.wengert@nrc.gov.
Thomas J. Wengert, Senior Project Manager IRA!
Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306
Enclosure:
list of Attendees cc w/encl: Distribution via listserv DISTRIBUTION:
PUBLIC LPL3-1 R/F RidsRgn3MailCenter Resource RidsAcrsAcnw_MailCTR Resource CSteger. NRR DMerzke. EDO Region III RidsNrrDorlLpl3-1 Resource RWolfgang, NRR RidsNrrPMPrairie Island Resource MHamm, NRR RidsNrrLABTully Resource SJones. NRR RidsOgcRp Resource RMathew,OGC ADAMS Accession Nos.: PKG Meeting Notice: ML111370398 Meeting Summary: ML112200521; Slides' ML111780424', Handout* ML112070157 OFFICE NRR/DORULPL3-1/PM NRR/DORULPL3-1/LA NRRIDORULPL3-1/BC NAME TWengert BTully/Rohrer IfI RPascarelii DATE 08/10/11 08/09/11 08/10/11 OFFICIAL RECORD COpy