UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
612 E. LAMAR
SUITE 400
ARLINGTON,
76011*4005
June 23, 2011
Joseph A. Kowalewski, Vice President, Operations
Entergy Operations, inc.
Waterford Steam E!ectric Station, Unit 3
17265 River Road
Killona, LA 70057-0751
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3-INITIAL
INFORMATION REQUEST FOR NRC TRIENNIAL BASELINE
COMPONENT DESIGN BASES INSPECTION NRC INSPECTION
REPORT 05000382/2011007
Dear Mr. Kowalewski:
On August 22, 2011, the NRC will begin a triennial baseline Component Design Bases
Inspection at the Waterford Steam Electric Station, Unit 3. A six-person team will
perform this inspection using NRC Inspection Procedure 71111.21, "Component Design
Bases Inspection."
The inspection focuses on components and operator actions that have high risk and low
design margins. The samples reviewed during this inspection will be identified during an
information gathering visit and during the subsequent in-office preparation week. In
addition, a number of operating experience issues will also be selected for review.
The inspection will include an information gathering site visit by the team leader and a
senior reactor analyst, and 3-weeks of onsite inspection by the team. The inspection will
consist of four NRC inspectors, one inspector in training, and two contractors, of which
four will focus on engineering and one on operations. The current inspection schedule is
as follows:
Onsite information gathering visit: Week of August 22, 2011
Preparation Week: August 29, 2011
Onsite weeks: September, 52011; September 19, 2011; October 3,2011
The purpose of the information gathering visit is to meet with members of your staff to
identify potential risk-significant components and operator actions. The lead inspector
will also request a tour of the plant with members of your operations staff and
probabilistic safety assessment staff. During the onsite weeks, several days of time will
be needed on the plant-referenced simulator in order to facilitate the development of
operator action-based scenarios. Additional information and documentation needed to
support the inspection will be identified during the inspection, including interviews with
engineering managers, engineers, and probabilistic safety assessment staff.
J.
Kowaleski
- 2 -
experience with these inspections has shown that they are extremely resource
intensive, both for the NRC inspectors and the licensee staff. In order to minimize the
inspection impact on the site and to ensure a productive inspection, we have enclosed a
request for information needed for the inspection. The request has been divided into
three groups. The first group lists information necessary for the information gathering
visit and for general preparation. This information should be available to the regional
office no later than August 15, 2011. Insofar as possible, this information should be
provided electronically to the lead inspector. Since the inspection will be concentrated
on high risk/low margin components, calculations associated with your list of high risk
components should be available to review during the information gathering visit to assist
in our selection of components based on available design margin.
The second group of documents requested is those items that the team will need access
to during the preparation week in order to finalize the samples to be inspected. The third
group lists information necessary to aid the inspection team in tracking issues identified
as a result of the inspection. It is requested that this information be provided to the lead
inspector as the information is generated during the inspection. Additional requests by
inspectors wiii be made throughout aii three onsite weeks for specific documents needed
to complete the review of that component/selection. It is important that all of these
documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
In order to facilitate the inspection, we request that a contact individual be assigned to
each inspector to ensure information requests, questions, and concerns are addressed
in a timely manner.
The lead inspector for this inspection is Wayne C. Sifre. We understand that our
licensing engineer contact for this inspection is Billy Steelman. If there are any
questions about the inspection or the requested materials, please contact the lead
inspector at (817) 860-8193 or via e-mail at ."-~"":c~::c"""~.:;~'"";;~:..="-'-'"
In accordance with 1 0 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter
will be made available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document
system (ADAMS). ADAMS is accessible from the NRC Web site at
- ~;C";;;.=_~.";~~;~'-C;,",;L;;._;';~
.. ;:=;~":L~~:C=="_*_;_:;""'-;';;~ (the Public Electronic Reading Room).
Docket: 50-382
License: NPF-38
-r.?t{Z
Thomas Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
J.
Kowaleski
Component Design Basis Inspection
Document Request
- 3 -
cc: Distribution via ListServ for Waterford Steam Electric Station, Unit 3
INFORMATION REQUEST FOR WATERFORD
ELECTRIC
COMPONENT DESIGN BASES (CDBI) INSPECTION
Inspection Report:
Information Gathering Dates:
On-site Inspection Dates:
Inspection Procedure:
Lead InspectorlTeam Leader:
August 22 - 26, 2011
September 6 - 9, 2011
September 19 - 23, 2011
October 3 - 7,2011
IP 71111.21, "Component Design Bases
Inspection"
Wayne C. Sifre
817-860-8193
VVayne.Sifre@nrc.gov
3
I.
Information Requested Prior to the information Gathering Visit (August 22,
2011)
The following information (Section I of this enclosure) should be sent to the
Region IV office in hard copy or electronic format (ims.certrec.com or compact
disc, preferred), in care of Wayne C. Sifre, by August 15, 2011 to facilitate the
reduction in the items to be selected for a final list during the preparation week of
August 22. 2011. The inspection team will finalize the selected list during the
prep week using the additional documents requested in Section II of this
enclosure. The specific items selected from the lists shall be available and ready
for review on the day indicated in this request. *Please provide requested
documentation electronically in "pdf" files, Excel, or other searchable formats, if
possible. The information should contain descriptive names, and be indexed and
hyperlinked to facilitate ease of use. Information in "lists" should contain enough
information to be easily understood by someone who has knowledge of
pressurized water reactor technology. If requested documents are large and only
hard copy formats are available, please inform the inspector(s), and provide
subject documentation during the first day of the onsite inspection.
1.
An excel spreadsheet of equipment basic events (with definitions) including
importance measures sorted by risk achievement worth (RAW) and Fussell-
Vesely (FV) from your internal events probabilistic risk assessment (PRA).
Include basic events with RAW value of 1.3 or greater.
2.
Provide a list of the top 500 cut-sets from your PRA.
')
1"' __ ;_ ..... _,c no A
fl_~~_. ___ __ "'_1.- __ 1,_ If __ -.I :.1.-_ 1_", __ .1. nn h
-. .. __ ,...._.
v.
vvt-J,t:;;:, v, ,,~ ;:'Y;:'lt:;111 IIUlt:;UUUI\\;:', dilU LIlt:; IdlC;:,t r rv-\\ ;:'UI! II Iidl Y
document.
- 1 -
Enclosure
4.
An
spreadsheet
or
operator actions from your site specific PSA sorted by RAW and
Provide copies of your human reliability worksheets for these items.
5.
If you have an external events or fire PSA model, provide the information
requested in items 1-4 for external events and fire.
6.
Any pre-existing evaluation or list of components and associated
calculations with low design margins, (i.e., pumps ciosest to the design limit
for flow or pressure, diesel generator close to design required output, heat
exchangers close to rated design heat removal, etc.).
7.
List of high risk maintenance rule systems/components and functions;
based on engineering or expert panel judgment.
8.
A list of operating experience evaluations for the last 2 years.
9.
A list of all time-critical operator actions in procedures.
10.
A list of permanent and temporary modifications sorted by component
identified in Item 1.
11.
List of current "operator work arounds/burdens."
12.
A list of the design ca!culations, which provide the design margin
information for components included in Item 1. (Calculations should be
available during the information gathering visit).
13.
List of root cause evaluations associated with component failures or design
issues initiated/completed in the last 5 years.
14.
Current management and engineering organizational charts.
15.
Waterford Steam Electric Station, Unit 3 IPEEE, if available electronically.
16.
Mechanical piping drawings for:
Engineered safety features
Emergency core cooling systems
17.
Electrical one-line drawings for:
Offsite power/switchyard supplies
Normal AC power systems
r _______ .. I\\. ,",/f""\\,", __ *** ___ ** _J. ____
- ~_I . . -1: __
I::.IIICI !::JCII .... Y rlvl LJv fJUWCI :::'Y:::'LCI I I:::' II II,;IUUII l!::l
120VAC power, and
125VDC/24VDC safety class systems
18.
List of any common-cause failures of components in the last 3 years.
2
Enclosure
19.
An electronic copy of the Design Bases Documents.
20.
An electronic copy of the System Health notebooks.
21.
System Description Manuals with simplified drawings of plant systems.
22.
List of system acronyms.
II.
Information Requested to be Available on First Day of Preparation Week
(August 29)
1.
List of condition reports (corrective action documents) associated with
each of the selected components for the last 5 years.
2.
The corrective maintenance history associated with each of the selected
components for the last 2 years.
3.
Copies of calcuiations associated with each of the selected components
(if not previously provided), excluding data files. Please review the
calculations and also provide copies of reference material (such as
drawings, engineering requests, and vendor letters).
4.
Copies of operability evaluations associated with each of the selected
components and plans for restoring operability, if applicable.
5.
Copies of selected operator work-around evaluations associated with
each of the selected components and plans for resolution, if applicable.
6.
Copies of any open temporary modifications associated with each of the
selected components, if applicable.
7.
Trend data on the selected electrical/mechanical components'
performance for last 3 years (for example, pumps' performance including
in-service testing, other vibration monitoring, oil sample results, etc., as
applicable).
8.
A copy of any internal/external self-assessments and associated
corrective action documents generated in preparation for the inspection.
9.
A copy of engineering/operations related audits completed in the last 2
years.
10.
List of motor operated valves (MOVs) in the program, design margin and
risk ranking.
11.
List of ali oPerated valves (AOVs) in the valve program, design and risk
ranking.
12.
Structure, system and components in the Maintenance Rule (a)(1)
category.
- 3 -
Enclosure
13.
Site top 10 issues list.
1
Procedures used to accomplish operator actions associated with the
basic events in your PRA.
15.
List of licensee contacts for the inspection team with pager or phone
numbers.
III.
Information Requested to be provided throughout the inspection.
1.
Copies of any corrective action documents generated as a result of the
team's questions or queries during this inspection.
2.
Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the
inspection to each team member).
3.
Reference materials (available electronically and as needed during all
onsite weeks):
General set of plant drawings
I PE/PRA report
Procurement documents for components selected
Plant procedures (normal, abnormal, emergency, surJeiliance, etc.)
Technical Specifications
Updated Final Safety Analysis Report
Vendor manuals
Inspector Contact Information:
Wayne C. Sifre
Senior Reactor Inspector
(817) 817-8193
Wayne.Sifre@nrc.gov
Mailing Address:
US NRC, Region IV
Attn: Wayne C. Sifre
612 East Lamar Blvd, Ste 400
Arlington, TX 76011
-4-
Enclosure