ML111740690

From kanterella
Jump to navigation Jump to search
Initial Information Request for NRC Triennial Baseline Component Design Bases Inspection NRC Inspection Report 05000382/2011007
ML111740690
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/23/2011
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Kowalewski J
Entergy Operations
References
IR-11-007
Download: ML111740690 (7)


See also: IR 05000382/2011007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

612 E. LAMAR

SUITE 400

ARLINGTON,

76011*4005

June 23, 2011

Joseph A. Kowalewski, Vice President, Operations

Entergy Operations, inc.

Waterford Steam E!ectric Station, Unit 3

17265 River Road

Killona, LA 70057-0751

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3-INITIAL

INFORMATION REQUEST FOR NRC TRIENNIAL BASELINE

COMPONENT DESIGN BASES INSPECTION NRC INSPECTION

REPORT 05000382/2011007

Dear Mr. Kowalewski:

On August 22, 2011, the NRC will begin a triennial baseline Component Design Bases

Inspection at the Waterford Steam Electric Station, Unit 3. A six-person team will

perform this inspection using NRC Inspection Procedure 71111.21, "Component Design

Bases Inspection."

The inspection focuses on components and operator actions that have high risk and low

design margins. The samples reviewed during this inspection will be identified during an

information gathering visit and during the subsequent in-office preparation week. In

addition, a number of operating experience issues will also be selected for review.

The inspection will include an information gathering site visit by the team leader and a

senior reactor analyst, and 3-weeks of onsite inspection by the team. The inspection will

consist of four NRC inspectors, one inspector in training, and two contractors, of which

four will focus on engineering and one on operations. The current inspection schedule is

as follows:

Onsite information gathering visit: Week of August 22, 2011

Preparation Week: August 29, 2011

Onsite weeks: September, 52011; September 19, 2011; October 3,2011

The purpose of the information gathering visit is to meet with members of your staff to

identify potential risk-significant components and operator actions. The lead inspector

will also request a tour of the plant with members of your operations staff and

probabilistic safety assessment staff. During the onsite weeks, several days of time will

be needed on the plant-referenced simulator in order to facilitate the development of

operator action-based scenarios. Additional information and documentation needed to

support the inspection will be identified during the inspection, including interviews with

engineering managers, engineers, and probabilistic safety assessment staff.

J.

Kowaleski

- 2 -

experience with these inspections has shown that they are extremely resource

intensive, both for the NRC inspectors and the licensee staff. In order to minimize the

inspection impact on the site and to ensure a productive inspection, we have enclosed a

request for information needed for the inspection. The request has been divided into

three groups. The first group lists information necessary for the information gathering

visit and for general preparation. This information should be available to the regional

office no later than August 15, 2011. Insofar as possible, this information should be

provided electronically to the lead inspector. Since the inspection will be concentrated

on high risk/low margin components, calculations associated with your list of high risk

components should be available to review during the information gathering visit to assist

in our selection of components based on available design margin.

The second group of documents requested is those items that the team will need access

to during the preparation week in order to finalize the samples to be inspected. The third

group lists information necessary to aid the inspection team in tracking issues identified

as a result of the inspection. It is requested that this information be provided to the lead

inspector as the information is generated during the inspection. Additional requests by

inspectors wiii be made throughout aii three onsite weeks for specific documents needed

to complete the review of that component/selection. It is important that all of these

documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

In order to facilitate the inspection, we request that a contact individual be assigned to

each inspector to ensure information requests, questions, and concerns are addressed

in a timely manner.

The lead inspector for this inspection is Wayne C. Sifre. We understand that our

licensing engineer contact for this inspection is Billy Steelman. If there are any

questions about the inspection or the requested materials, please contact the lead

inspector at (817) 860-8193 or via e-mail at ."-~"":c~::c"""~.:;~'"";;~:..="-'-'"

In accordance with 1 0 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter

will be made available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at

~;C";;;.=_~.";~~;~'-C;,",;L;;._;';~

.. ;:=;~":L~~:C=="_*_;_:;""'-;';;~ (the Public Electronic Reading Room).

Docket: 50-382

License: NPF-38

-r.?t{Z

Thomas Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

J.

Kowaleski

Component Design Basis Inspection

Document Request

- 3 -

cc: Distribution via ListServ for Waterford Steam Electric Station, Unit 3

INFORMATION REQUEST FOR WATERFORD

ELECTRIC

COMPONENT DESIGN BASES (CDBI) INSPECTION

Inspection Report:

Information Gathering Dates:

On-site Inspection Dates:

Inspection Procedure:

Lead InspectorlTeam Leader:

05000382/2011007

August 22 - 26, 2011

September 6 - 9, 2011

September 19 - 23, 2011

October 3 - 7,2011

IP 71111.21, "Component Design Bases

Inspection"

Wayne C. Sifre

817-860-8193

VVayne.Sifre@nrc.gov

3

I.

Information Requested Prior to the information Gathering Visit (August 22,

2011)

The following information (Section I of this enclosure) should be sent to the

Region IV office in hard copy or electronic format (ims.certrec.com or compact

disc, preferred), in care of Wayne C. Sifre, by August 15, 2011 to facilitate the

reduction in the items to be selected for a final list during the preparation week of

August 22. 2011. The inspection team will finalize the selected list during the

prep week using the additional documents requested in Section II of this

enclosure. The specific items selected from the lists shall be available and ready

for review on the day indicated in this request. *Please provide requested

documentation electronically in "pdf" files, Excel, or other searchable formats, if

possible. The information should contain descriptive names, and be indexed and

hyperlinked to facilitate ease of use. Information in "lists" should contain enough

information to be easily understood by someone who has knowledge of

pressurized water reactor technology. If requested documents are large and only

hard copy formats are available, please inform the inspector(s), and provide

subject documentation during the first day of the onsite inspection.

1.

An excel spreadsheet of equipment basic events (with definitions) including

importance measures sorted by risk achievement worth (RAW) and Fussell-

Vesely (FV) from your internal events probabilistic risk assessment (PRA).

Include basic events with RAW value of 1.3 or greater.

2.

Provide a list of the top 500 cut-sets from your PRA.

')

1"' __ ;_ ..... _,c no A

fl_~~_. ___ __ "'_1.- __ 1,_ If __ -.I :.1.-_ 1_", __ .1. nn h

-. .. __ ,...._.

v.

vvt-J,t:;;:, v, ,,~ ;:'Y;:'lt:;111 IIUlt:;UUUI\\;:', dilU LIlt:; IdlC;:,t r rv-\\ ;:'UI! II Iidl Y

document.

- 1 -

Enclosure

4.

An

spreadsheet

PRA

or

operator actions from your site specific PSA sorted by RAW and

Provide copies of your human reliability worksheets for these items.

5.

If you have an external events or fire PSA model, provide the information

requested in items 1-4 for external events and fire.

6.

Any pre-existing evaluation or list of components and associated

calculations with low design margins, (i.e., pumps ciosest to the design limit

for flow or pressure, diesel generator close to design required output, heat

exchangers close to rated design heat removal, etc.).

7.

List of high risk maintenance rule systems/components and functions;

based on engineering or expert panel judgment.

8.

A list of operating experience evaluations for the last 2 years.

9.

A list of all time-critical operator actions in procedures.

10.

A list of permanent and temporary modifications sorted by component

identified in Item 1.

11.

List of current "operator work arounds/burdens."

12.

A list of the design ca!culations, which provide the design margin

information for components included in Item 1. (Calculations should be

available during the information gathering visit).

13.

List of root cause evaluations associated with component failures or design

issues initiated/completed in the last 5 years.

14.

Current management and engineering organizational charts.

15.

Waterford Steam Electric Station, Unit 3 IPEEE, if available electronically.

16.

Mechanical piping drawings for:

Engineered safety features

Emergency core cooling systems

Emergency diesel generators

17.

Electrical one-line drawings for:

Offsite power/switchyard supplies

Normal AC power systems

r _______ .. I\\. ,",/f""\\,", __ *** ___ ** _J. ____

~_I . . -1: __

I::.IIICI !::JCII .... Y rlvl LJv fJUWCI :::'Y:::'LCI I I:::' II II,;IUUII l!::l

120VAC power, and

125VDC/24VDC safety class systems

18.

List of any common-cause failures of components in the last 3 years.

2

Enclosure

19.

An electronic copy of the Design Bases Documents.

20.

An electronic copy of the System Health notebooks.

21.

System Description Manuals with simplified drawings of plant systems.

22.

List of system acronyms.

II.

Information Requested to be Available on First Day of Preparation Week

(August 29)

1.

List of condition reports (corrective action documents) associated with

each of the selected components for the last 5 years.

2.

The corrective maintenance history associated with each of the selected

components for the last 2 years.

3.

Copies of calcuiations associated with each of the selected components

(if not previously provided), excluding data files. Please review the

calculations and also provide copies of reference material (such as

drawings, engineering requests, and vendor letters).

4.

Copies of operability evaluations associated with each of the selected

components and plans for restoring operability, if applicable.

5.

Copies of selected operator work-around evaluations associated with

each of the selected components and plans for resolution, if applicable.

6.

Copies of any open temporary modifications associated with each of the

selected components, if applicable.

7.

Trend data on the selected electrical/mechanical components'

performance for last 3 years (for example, pumps' performance including

in-service testing, other vibration monitoring, oil sample results, etc., as

applicable).

8.

A copy of any internal/external self-assessments and associated

corrective action documents generated in preparation for the inspection.

9.

A copy of engineering/operations related audits completed in the last 2

years.

10.

List of motor operated valves (MOVs) in the program, design margin and

risk ranking.

11.

List of ali oPerated valves (AOVs) in the valve program, design and risk

ranking.

12.

Structure, system and components in the Maintenance Rule (a)(1)

category.

- 3 -

Enclosure

13.

Site top 10 issues list.

1

Procedures used to accomplish operator actions associated with the

basic events in your PRA.

15.

List of licensee contacts for the inspection team with pager or phone

numbers.

III.

Information Requested to be provided throughout the inspection.

1.

Copies of any corrective action documents generated as a result of the

team's questions or queries during this inspection.

2.

Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the

inspection to each team member).

3.

Reference materials (available electronically and as needed during all

onsite weeks):

General set of plant drawings

I PE/PRA report

Procurement documents for components selected

Plant procedures (normal, abnormal, emergency, surJeiliance, etc.)

Technical Specifications

Updated Final Safety Analysis Report

Vendor manuals

Inspector Contact Information:

Wayne C. Sifre

Senior Reactor Inspector

(817) 817-8193

Wayne.Sifre@nrc.gov

Mailing Address:

US NRC, Region IV

Attn: Wayne C. Sifre

612 East Lamar Blvd, Ste 400

Arlington, TX 76011

-4-

Enclosure