REGULATORY @
FORMATION DISTRIBUTION SY#EM (RIDS)
ACCESSION NBR:8105260558 DOC.DATE: 81/05/19 NOTARIZED: NO FACIL:50-305 Kewaunee Nuclear Power Plant, Wisconsin Public Servic AUTH.NAME AUTHOR AFFILIATION MATHEWS,ER, Wisconsin Public Service Corp.
RECIPNAME RECIPIENT AFFILIATION EISENHUTD.G.
Division of Licensing DOCKET #
05000305
SUBJECT:
Forwards design description of proposed method to provide dedicated shutdown capability in response to Generic Ltrr 81-12 re fire protection modsper 10CFR50.48.Eleven oversize drawings encl.Aperture cards will be in PDR, DISTRIBUTION CODE: A006S COPIES RECEIVED:LTR _L ENCL SIZE:_
TITLE: Fire Protection Information (After Issuance of OP. Lic,)
NOTES:IRE:3 copies all material.
RECIPIENT COPIES ID CODE/NAME LTTR ENCL ACTION:
VARGA,S.
04 7
7 INTERNAL: CHEM ENG BR-A 7 I&E 06 EXTERNAL: ACRS 09 NS1C 05 5
2 5
2 0
1 16 1
05000305 RECIPIENT ID CODE/NAME DIRDIV OF NRC PDR OGC WAMBACH,T, LPDR COPIES LTTR ENCL LIC 1
02 1
1 10 1
03 1
1 JUN 02 1981
<,c C)
TOTAL NUMBER OF COPIES REQUIRED: LTTR EC V, ENCL r
-..~
.1 1
1 1
1 If'
,,,,j NAWfo.S -tb- '.
NRC-81-76 WISCONSIN PUBLIC SERVICE CORPORATION P.O. Box 1200, Green Bay, Wisconsin 54305 co May 19, 1981 Ar1AY Z' Mr. D. G. Eisenhut, Director 7
Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Docket 50-305 Operationg License DPR-43 Kewaunee Nuclear Power Plant Fire Protection Modifications:
References:
- 1) Letter from E. R. Mathews to D. G. Eisenhut dated April 9, 1981.
- 2) Letter from D. G. Eisenhut to All Power Reactor Licensees With Plants Licensed Prior to January 1, 1979 (Generic letter 81-12), dated February 20, 1981.
Reference 1 provided the design description of our proposed method to provide dedicated shutdown capability at the Kewaunee Plant. Reference 1 also provided a schedule for submittal of additional information requested in reference 2.
The attachments to this letter provide the information scheduled for submittal on May 19, 1981. Three copies of the attachments have been included to facilitate your review.
Very truly yours, E. R ahw Senior Vice President Power Supply & Engineering jac S
"3 4.a141; i~4
'?e~
v~/e~i 1~c. 6L)
Attach.
cc -
Mr. Robert Nelson, NRC Resident Inspector RR #1, Box 999, Kewaunee, WI 54216 810520 559
<'5
ATTACHMENT 1
- 1. Information requested in Enclosure 1 to the February 20, 1981 letter.
- b. System design by drawings which show normal and alternate shutdown control-and-power circuits, location of components, and that wiring which is -in the area and the wiring which is out of the area that required-the
-alternative-system.
RESPONSE
The following -drawings-are attached
--and show locations of-compon-ents thiat are-part -
of either the dedicated or the alternate shut down systems.
All cable routing-s-have-not-been determined as of this submittal.
Applicable cable routings will be included in our-next submittal-on= this -subjectwhichis scheduled fcr6/10781.
SK-a-1578 Appendix "R" Shutdown Systems, Screenhouse SK-M-1579 -
Appendix-"R' Shutdown Systems, Turbine &
1
0 Admin. Bldg. Bsmt. Floor SK-a-1580 -
Appendix "R" Shutdown Systems, Turbine t Admin. Bldg. Mezz. Floor SK-M-1581 -
Appendix "R" Shutdown Systems, Reactor &
Aux., Eldg..Bsmt. Floor SK-a-1582 -
Appendix "Rn Shutdown Systems, Reactor &
Aux.
Bldg.
Mezz. Floor SK-M-1583 -
Appendix "R" Shutdown Systems, Reactor &
Aux.
Bldg.
Hiisc. Floors SK-M-1584 Appendix -"R" Shutdow-Systems, Reactcr 8 Aux.
Bldg.
Oper. Floor SK-a-1585 -
Appendix "" Shutdown Systems, Reactor_&
Aux.
Bldg.
Misc. Floor -Plans-The components of both shutdown systems are shown on these drawings and are listed in Table II.
- c.
Demonstrate that changes to safety systems will not degrade safety systems.
e.g.,
new isolation switches and control switches should meet design criteria and.standards in FSAR for electrical equipment in the system that the switch is to be installed; cabinets that the switches are to be mount-2
0 0
ed in should also meet the same criteria (FSAR) as other safety related cabinets and panels; to avoid inadvertent isolation from the control room, the isolaticn switches should be keylocked, or alarmed in the contrcl room if in the "local" or "isolated" position; periodic checks should be made to verify switch is in the proper positicn for normal operation; and a single transfer switch or other new device should not be a source -fr a-single failure to cause loss of redundant safety systems).
B-RESPONSE:
Comonents withib the Oedichted Shut down System (DSS) that are required tc perform an active function -(motors to-rui, valves-to--
change position, etc.) will be provided with a new control system, controlled from a-new Dedi cated Shutdown Panel (DSP).
The DSP will be a second point of control for the DSS, in addition t-Fthe presentcontrol-roo contrcls.
The control circuitry concept to be employed by the DSP is shown on Figures 1.C-1, 1.C-2, and 1.C-3.
Remote/Local isolation switches will-be 3
0 0
provided on the DSP to allow isolation of control circuit elements and cables that cannot be prc tected from common fire hazards due to the plant's arrangement; these common fire hazards are pri marily the Control Room and the Relay Room.
The normal alignment of the isolation switches will be to the Remote, or Control Room control con figuration; in this alignment, the-DSP controls will be inactive. Should a need arise to man the DSP,- these -isolation-switches will be-aligned to the Local configuration; in this alignment,
_--the-Control Room controlsand_cabling become isoated and the DSP-controls-are-made active.
The DSS source breakers and diesel generator will be provided with an identical control system except that the isolation switches and dedicated control switches will be located at the dedicated switch gear buses and at the dedicated diesel generator, which are in the same area as the DSP.
when the isolation switches are aligned to the Local -configuration,_annunication of-this alignment will be provided in the Ccntrol Room.
The dedicated Shutdown Panel, isolation switches,
and dedicated control switches will be procured and installed to the original plant design criteria for engineered safeguards and to IEEE-323 1974.
The Dedicated Shutdown System will not introduce isolation switches or devices that-will be a source of single failure to redundant safety systems.
Failure of a-single-transfer switch-ill not cause loss of redundant safety systems, because t-he-Alternate Shutdown Systesmis-a completely
-separate, redundant backup to the-Dedicated Shut down System.
All isolation switches will be added -to the periodic surveillance procedures to assure proper alignment during normal plant alignment.
- g.
Demonstrate that spare fuses are available for control-circuits where these fuses may be required in supplying power to
--control -circuits used for the-shutdown method and may be blown by the effects of a cable spreading room fire. The spare 5
fuses should be located convenient to the existing fuses. The shutdown procedure should inform the operator to check these fuses.
RESPONSE: Components within the Dedicated Shut down System that are provided with isclation switches contain control circuit elements and cabling that -may be affected by common fire_
hazards in the Control Room and the Relay Room
-(cable-spreading area).
2These effects may include blown fuses for these components.
Spare fuses will be provided and located convenient to the existing fuses and shutdown procedures will instruct the operator to check these fuses after the isolation switches have been aligned to the Local control configuration.
See figure I.C-1, 1.C-2, and 1.C-3 for examples of fuses that will be provided with spares as described above.
Additionally,pilct solenoid operated pneumatic dampers and valves that have isolation switches will have spare fuses located at the new Dedicated Shutdown AC and DC fuse--.
panels, which will be located in the Dedicated 6
Shutdown Panel area.
- k. Demonstrate that the systems available are adequate to perform the necessary shutdown functions. The functions required should be based on previous analyses, if possible (e.g.,
in the FSAF),
such as a lcss of normal a.c._
ower or hlidtTwn on a Group I isolation (EUR).
The-equipment required for the alternate capability should be the same or equivalent to that relied on in the above analysis.,-
RESPONSE
This concern was addressed in Section 3.1 items a-d of our-4/9/81 -letter from-Ew R. -Mathews to D. G. Eisenhut.
- 2.
Information reguested-in Enclosure-2--to-the-Febt any=2O, 1981 letter.
-Item 1. Associated Circuit Informaticn
-a.
-Provide-a table t-hat lists-all equipment-
0 including instrumentation and support system equipment that are required by the alternative or dedicated method of achiev ing and maintaining hot shutdown.
RESPONSE
Table II lists all eguipment re quired.by the Dedicated and theAlternate Shutdown Systems for achieving and maintain ing hot shutdown, including instrumentation and support system equipment.
8
I.
I.
SYSTEM COMECNENT NAME RC Przr. Htr. Bank Przr. Level Transmitters Przr/RC Pressure Transmitters RC Temperature Przr. PORV Przr. PORV Block Valve Letdown Isolation Valves RV Head/Przr.
Vent Valves to PBT R QUIfE DEDICA COMPON BUJ Grp L2140 2 9 I
L209 I
(new)
TE 1512 311041 31108 33660 33663 33658 I.
TABLE II SAFE SHUTDOWN COMPONENTS TED POWER POWER ENT TRAIN SOURCE A
A
!i MCC 1-52G A
A 3
A T
-I I A
DS-DCFP DS-DCFP A
DS-DCFP A
DS-DCFP A
DS-DCFP ALTERNATE COMPONENT BU Grp B L24031 P21080 TE15125 31109 32090 I
I POWER TRAIN B
B B
B B'
B I -
Page 1 5/11/81 SHUTDOWN HOT COLD x
x X
X X
X X
x x
POWER SOURCE MCC 1-62G RR-176 CC 1-628 X x X
U U
O J
J U
U U
j I I.
I I x
I
CCMPCNENT NAME RHR Pump BC Loop Isolation Valves RHR Flow Control Valves RC Loop B Injection Valve Reactor Vessel Injection Valve TABLE II REU EI SAFE SHUTDOWN COMPONENTS DEDICATED POWER! POWER I
COMPONENT TRAIN SOURCE lA A
Bus 1-5 321161 A
(later) 1 3211,7 A
(later) 311141 32118 Al MCC 1-52B I!
ALTERNATE COMPONENT 1 B 32132 32133 31115 32101 POWER TRAIN B
B B
B SYSTEM RHR Page 2 5/11/81 SHUTDOWN HOT COLD x
x x
X (6) x POWER SOURCE Bus 1-6 (later)
(later)
ACC 1-628 (E xt.)
U J.
9 U
J J
O
-j
- I
COMPONENT NAME SI Pump RWST to SI Pump Valve SI Pump Suction Valve Containment Isolation Valve Reactor Vessel Injection Valve Containment Sump B Isolation SI Pump Recirc.
Stop Valves Valv es 1:
11 2102 32103 3210 HCC 1-52F MCC 1-628 (Ext.)
32113 32114 32130 32131 (1)
Valve is locked open at MCC.
SYSTEM SI TABLE II LU41RED SAFE SHT Wtd COMPONENTS 6EDICATED POWER POWER ALTERNATE COMPCNENT TRAIN SOURCE COMPONENT S-I 18 I
32110 I
32108 I
32095 I
32093 POWPR POWER TRAIN SOURCE B
Bus 1-6 B
MCC 1-62E B
MCC 1-62H B
MCC 1-628 (Ext.)
B
.CC 1 1-62B (E xt.)
A IMCC 1-52E
.B jMCC 1-62H A
MCC 1-52F B
MCC 1-62E Page 3 5/11/81 SHUTDOWN HOT COLD x
x x
x X (1) x (1) x X
x x
U
~2 J
X(2) 1(2)
X (1)
X (1)
X (2)
X (2)
I (1)
X (1) i A
B
.1
COMPONENT NAME Charging Pump VCT to Chg. Pump Valve RWST to Chg. Pump Valve Chg. Flow Control Valve Chg. to Loop B. Isol. Valve Letdown Orifice Isol. V4ves Letdown Letdown Letdown Letdown Letdown Letdown Containment Isol. Valve HX Outlet Temp.
Contr. Valve Back Press. Beg.
Valve Divert to VCT 3-Way Valve Divert to Holdup Tks 3-Way Va Bypass Block Valve Letdown Bypass Divert Valve Seal Water Injection Bypass Block Val SYSTEM CVC DEDICATED COMPONENT C
32057 32056 31103 31229 31231 311232 31233 31234 (CC) 31100 31099 31098
-lve 31096 3,1685 31684 ve' 31688 I
POWER TRAIN A
A A!
Al A
A Al A
A A,
A A
A ALTERNATE POWER COMPONENT TRAIN TABLE 'II SHUTDPOWN COMPONENTS POWER SOURCE POWER SOURCE MCC 1-52E MCC 1-528 MCC 1-52E DS-DCFP DS-DCFP DS-DCFP DS-DCFP DS-DCFP DS-DCFP DS-DCFP DS-DCFP ES-DCFPi DS-DCFP SHUTDOWN HOT COLD x
x x
x x
x x
x X(3)
X X(3)
X(3)
X(3)
X(3)
I X
x K
x X(4)
X (3)
X(4)
X(4)
Page 4 5/11/81 I
I I
Ii I
.1.
Ii.
U U
J U
U
COMPONENT NAME Seal Water Return Iso.
.Valve, RCP RCP Seal Water Return Containment Isol.
Excess Letdown Loop A Isol. Valve Excess Letdown Flow Control Valve Excess Letdown Divert to RCET 3-Way Aux. Spray to Pressurizer IA 1B Val ves Valve SYSTEM CVC (Cont.)
II EOJIRF ID SAFE DEDICATED COMP ONENT 3123 8 31238 32115 31230 TABLE II SHUTDCW COMPONENTS ALTERNATE COAPONENT 32124 31236 31090(7) 31235.
POWER
,TRAIN B
B B
B Page 5 5/ 11/81 POWER SOWER TRAIN SOURCE A
DS-DCFP A
DS-DCFP A
MCC 1-528 DS-DCFP SHUTDOWN HOT-COLD X
X X
X X
X X(3)
'X Ix X
X()
X(3 POWER SOURCE "cc: 1-62B R8-174 MCC 1-62B RR-74
-I
- 1 J
I.
~1~TABLE Il IREUR EDi fAVE SHUTD CWN COMPONENTS DEIIDICATED POWER! POWER ALTERNATE POWER POWER SHUTDOWN SYSTEM COMPONENT NAME C6ThPONENT TRAIN SOURCE COMPONENT TRAIN SOURCE HOT COID AFW AFW Pumps 1 A A
Bus 1-51 lB B
Bus 1-6 X
X AFW Pump Disch.
Flow Control Valves 313 15' A
DS-DCFP 31316.
B
!RR-176 X
X AFW Pump Disch. Cross-over Valves 3202 7 A'
BRA-103 32038 B
IRB-103 X
X AFi Pump Aux. Lube Oil Pump 1 A A
MCC l-5?C 1B B.
MCC 1-62C X
X Page 6 5/11/81
-I J
'F F
J J
J J
-I J
J J
J
'-I
-'I
Page 7 L
I5/11/81 REOUIRED SAFE SHUTDO N COMPONENTS[
DEDICATED POWER POWER ALTERNATE, POWER POWER SHUTDOWN SYSTEM COMPONENT NAME
'COMPCNENT TRAIN SOURCE COMPONENT TRAIN SOURCE HOT COLD MS Steam Gen. Bloud. Isol. Valve 32077' A
MCC 1-52B 32079 B
MCC 1-62F X
X Steam Gen. Level Transmitter, SG 1A L2 01 A
L24043 B
8i SG 11 L24014 A
L24048 B
Steam Gen. Pressure Transmitters, SG 1Ai P210951 A
I I
(new)
B x
x SG 18 (new)
A P21098 B
Steam Gen.
'31170, A'
DS-DCFP 31174 1
RR-173 X
X
'I I
I
COMPONENT NAME CC Pumps CC HX Outlet Valves CC Pump Disch.
Hdr. Press Transitter CC Flow Transmitter RHR BX Valves Excess Letdown HI Valve BCP Cooling Water Header Valve' RCP Cooling Water Supply Valves, RCP Cooling Water Return Valves, RCP Therm. Barrier Isol. Valves, RCP RC P RCP BCP RCP RCP DiEDICATED COMPONENT I lA F 32121 I
AF F:
F'27082 I'
32119 1AI 1 B.
1A I
lA 1
F SYSTEM CC POWEB TRAIN A
A A
A F
F TABLE II ESHUTDOWN COMPONENTS POWER ALTERNATE SOURCE COMPONENT Bus 1-51 1B MCC 1-528 32122(1)
(New)
MCC 1-528 32120(6)
- 32082, I
32088 32084 32085 32086 32087 F
31127 31128 POWER POWER TRAIN SOURCE' B
Bus 1-6 I B
iMCC 1-62B B
MCCI 1-62E A
MCC 1-528 A
HICC 1-52?
A MCC 1-52F B
MCC 1-62E A
MCC 1-52F B
[CCI 1-62E A
RR-171 B
1RR-176 SHUTDOWN HOT COLD X
X X
F X
X X
X X
X (6)
X(1) 1(1)
X(1)
I(1)
X(1)
X(1)
X(1)
X(1)
X (1)
X (1)
X (1)
X (1)
X (1)
I(1)
U U
U
~O~
U U
U U
'I Page 8 5/11/81
COMPONENT NAME SW Pumps SW Strainers Strainer Backwash Valves TB SN Rdr. Isol. Valves AB SW Hdr. Isol. Valves SW to CC BX Valves SW Hdr. Press. Transmitters D-G Cooling Wtr.
HI Valves SW Hdr. Isol. Valves Containment fan Coil SW Valves TABLE II REgIRED SAFE SHUTDCW DEDICATED POWER COffPONENT TRAIN lAl A
1'A2 A
1A1 A
1A2 A
31153 A
311154 A
31084 A
32011 A
32009 I
A P21005 A,
31088 A
31038 A
32060 I
A 32061 i A
N COMPONENTS SYSTEM SW POWER SOURCE Bus 1-51 Bus 1-51 MCC 1-52D MCC 1-52D BRA-105 BRA-1051 DS-ACFP MCC 1-52A MCC 1-52B BRA-104 DS-ACFP MCC 1-5'2E MCC 1-52E ALTERNATE COMPONENT IB1 182 181 IB2 31155 31156 31085 32012 32010 P21006 31089 31040 32058 32059 Page 9 5/11/81 POWER TRAIN B
B B
B' B'
B,
B B8(5)
B(
B B
B B
B POWER SOURCE Bus 1-6 Bus 1-6
'MCC 1-62L MCC 1-62D BBB-105 BRBL 105 RR-175 MCC 1-62A MCC 1-62E IBRB-104 RR-1 75 MCC 1-62E
,MCC 1-62E SHnTDOWN HOT COLD x x x
X X
x X
x X
x x
x x
x x
X(6)
X X
x x
x x
x x
X X
-~1 O
J J
J l
SYSTEM CCMPONENT NAME DGM Diesel Generator D-G Start-up Air Compressor Fuel Oil X-Fer Pump TABLE II IRED SAFE SHUTDOWN COMPONENTS DEDICATED POWER POWER ALTERNATE POWER POWER SHUTDOWN COMPONENT TRAIN SOURCE COMPONENT TRAIN SOURCE HOT COLD A
A 1B B
X X
1A A
MCC 1-52A 1B B
MCC 1-62A X
X 1A A
MCC 1-52A 1B B
'MCC 1-62A x
X I
I Page 10 5/11/81 I
j J
J
~2 j
J J
-J
-J J
SYSTEn COMPONENT NAME RBV Containment Fan Coils TABLE II R E 0UJRPE SAfE SHUTDOWN COMPONENIS DEDI ATED POWER POWER ALTERNATE POWER COMPONENT TRAIN SOURCE COMPONENT TRAIN ICA Bus 1-51 1A B
1D Bus 1-51 1B B
I
)
Page 11 5/11/81 K)
POWER SOURCE' Bus 1-61 Bus 1-6 1 SHUTDOWN HOT COLD X
y x
x J
J l.J Ij J1
SYSTEM TAV I:
TABLE I
RE Oj!UFl SAP F E SHUTDOWN COMPONENTS DEDICATED POWER POWER C0 MPONENT TRAIN SOURCE I 1A A
MCC 1-52C 33371 B
RR-173 1 A Al MCC 1-5 A 3.3287 B
RR-173' TA A
MCC 1-52A 3004 A
DS-DCFP 314011 A
DS-DCFP I
COMPONENT NAME Batt am Fan Coils Batt Rm Fan Coil SW Valves Turbine Rm Fan Coils Turbine Rm Fan Coil SW Valves D-G Vent Supply Fans D-G Rm.
Return Dampers D-G Em.
Outlet Dampers D-G Em.
Outside Air Dampers Screenhouse Exh.
Fans Screenhouse Exh.
Dampers Batt R.
Exhaust Fans AFW Pump 1A Fan Coil AFW Pump lA Fan Coil SW Valve A 1 A'
A" A,
A MCC 1-52D DS-DCFP MCC 1-52C MCC 1-52A DS-DCFP ALTERNATE COMPONENT 1B 33372 1B 33288 1B 34045 34012 34073 18 34075 IB 1A 34074 IA (New)l (New),
Page 12 5/11/81 J
U POWER TRAIN B,
B B
13 B
B B
N/A B
B B
POWER SOURCE
'1-62 C 88-1731 MCC1 1-52E RB-173 MCC 1-62A RR-176 I
MCC 1-62C SHUTDOWN HOT COLD X
X, X
X X
X 4
X X
x X
X X
X x
X X
X X
X X
X X
I X
U U
U U
0
SYSTEM COMPONENT NAME ACA HHR Pump Pit Fan Coils BHR Pump Pit Fan Coils SW Valves AB Bsmt. Fan Coils AB Bsmt. Fan Coils SW Valves AB Mezz. Fan Coils AB Hezz. Fan Coils SW V41ves TABLE II BEQUIRED SAFE SHUTDOWN COMPONEN1S D DICATE6 POWER POWER ALTERNATE POWER POWER S
Cht IPONENT TRAIN SOURCE COMPONENT TRAIN SOURCE HO I A A
MCC 1-52E IB B
ACC,1-62E 33303 A
RR-170 33304 B
RE-175
( ev)
A MCC 1-52E 1B B
MCC 1-62E X
(New)
A R-170 33302 B
K A
MCC 1-5 E (New)
B x
331307
'A BR-170 (New)
B iR-7 POERPOE TRAISUC B
C,
IiI HUTDOWN T
COLD x
x K x
x K
Page 13 5/11/81 9
K)
J
.9 9
-J 9
-J 1) 1 II
SYSTEM COMPCNENT NAME ACC Control Room A/C Chill Control Room A/C Chill Control Room A/C Unit A/C Unit 3-Way Mixing Condenser Service Wate Recirc. Isolation Dampe Fresh Air Intake Damper Belay Room Exhaust Damp Relay Room Supply Dampe Non-Accident Fresh Air Steam Exclusicn Boundar Steam Exclusion Boundar I,
I TABLE I
F:E'SAFE SHUTDObw!
DEDICATED POWER C01". PON EN T
- TRAIN, S
e r er Pump Yalve rValve ri er Damper y Damper y Damper N COMPONENTS POWER ALTERNATE OURCE COMPONENT 1B 18 I
32144*
31130 32374 32368 34084 34085 34007 34061 34062 Page 14 5/11/81 POWER TRAIN B
B B
B N/A B
B A
A B
A B
POWER SOUhIRCE MCC 1-62F MCC 1-C.2F MCC 1-6 2F RR-175 BRB-115 RB-115 PRA-119 BR A-119;18-173 RR-1 0 RR-175
- 1. J J
J j
J SHUTDOWN HOT COLD X
X X
I x
- x.
XX XX X
X X
I X
X X
X(6)
X (6)
X (6)
-J
-J
-4' I I I-)
SYSTEM COMPONENT NAME FP Fire Pump D-G Rm. CO Valve 2
Relay Rm. CO Valve 2
TABLE !II
- EglID, SAFIE SH1TD'CW 92PNN DEDICATED POWER POWER ALTERNATE POWER POWER ChMPONENT TRAIN SOURCE COMPONENT TRAIN SOURCE A
A Bus 1-52 1B B
Bus 1-62 313631 A
BRA-119 31364 8
BaB-1123 31660 A
BRA-119
- I I
II,
-'I U
Page 15 5/11/81 SHUTDOWN HOT COLD X
X X
x U
U U
-I U
J U
'U I
J I.J U
SYSTEM COMPONENT NAME AS Instrument Air Compressors Service Water Supply Valves TABLE II RTIIPED SAFE SHUTDCHN COMPONENTS D DICATED POWER POWER COMPONENT TRAIN SOURCE 1
'A 1-52A 333 4 A
1-52A ALTERNATE POWER COMPONENT TRAIN 18B 1B B
33023 B
Page 16 5/11/81 POWER SOURCE 1-62A 1-6 A SHUTDOWN HOT COLD x
X x
x
-'I
-I
TABLE I
I E
CCPONENT NAME Battery Battery Charger 125 V DC Panels Inverters Inverter Distr. Cabinets 125 V DC Fuse Panels Instr.
Bus Transfer Switch Instr.
Bus Transformer Instr.
Bus Distr. Cabinets 120 V AC Fuse Panels SYSTEM EDC ALTERNATE POWER DiDICATED' COMPONENT FlA 1A ESA-102 BRA-103 BRA-104 BPA-11 1 BRA-112 BRA-114 D
BRA-107 BRA-106 BRA-15O DS-ACFP
.1 F POWER POWER TRAINI SOURCE A
A MCC 1-52C A
Battery lA A
BRA-1021 A
BRA-102 A
BRA-1040 A
BRA-104 A
A BRA-111 ERA-112 A
BRA-103' A
MCC 1-52C A
BRA-107' A
BRA-106 A
BRA-10 5 F
F F
COMPONENT 1B 1B BRB-102 BRB-103 BR-104 BBB-111 BRB-112 BRB-109 BRB-113 BRB-114 BRB-115 RR-176 RR-174 BRB-107 BRB-106 BRB-105 RER-173 RR-175 BRB-123 TRAIN B
B B
B B
B B
B B
B B
B B
B B
B B
B Page 17 5/11/81 SHUTDOWN
-I 1)
POWER SOURCE F
MCC 1-6,2C Battery 1B BRB-102 BRB-102 BRB-104 BBB-104 BRB-103 I RB-111 BRB-ill2 BRB-109 BRB-103 BRB-103 CC 1-62C BRB 1071 BRB-106 1
I BRB-105 BRB-105 BRB-' 105 HOT x
x x
x x
x x
x x
x x
x x
x x
x x
x COLD x
X, x
x X'
x x
x x
x x
x x
x I
x J
J
'-I
-I J
J J
SYSTEM COMPONENT NAME EHV 4160 V Bus I,
pTABLE iI IOEJ ff SA FE SHUTDOWN COMPONENTS DEDICIATED POWER POWER ALTERNATE POWER P
Chf'PONENT TRAIN SOURCE COMPONENT TRAIN S
1 5 A
Diesel 1A 1-6 B
D II I,
Page 18 5/11/81
- j OWER SHUTDOWN OURCE HOT COLD iesel 1B X
X J
-'I O j I
J J
I I
'-4 I
~/
-/
-I
I' SYSTEM COMPONENT NAME ELY 480 V BUses 480 V MCC's REQUIRED SAFE SHUTDOWN COMPONENTS I'
I DEDICATED POWER POWER ALTERNATE POWER POWER I
COMPONENT TRAIN SOURCE COMPONENT TRAIN SOURCE 1-51 l
'A Bus 1-5 1-61 B
Bus 1-6 1-52 A
Bus 1-51 1-62 B
Bus 1-6 I
1-52A A
Bus 1-52 1-62A B
Bus, 1-62 1-52B A
Bus 1-52 1-62B B
'Bus 1-62 1-52B (Ext.)
A Bus 1-52 1-62B (Ext.)
B Bus I-('2 I-52C A
Bus 1-52 1-62C Bus 1-62 1-52A
& !1' Bus 1-5 1-62A' B
Bus 1-62 1-52 A
Bus 1-52 1-62E B
'Bus 1-62 1-62F B
Bus 1-62 1-52G
'A Bus 1-5 1-62GB Bus 1-62
'I I
'B Bs 1-62E B
B 1-Page 19 5/11/81 J
SHUTDOWN HOT
-COLD x
x x
x x
x x
.X X.
x x
x x
X x
x x
X I
X X
X
-'I
-d J
-J Ui j
U
-j
I Page 20 K
I 5/11/81
~fEQ~iHE9D SAUR SHOTDOi4N COMIPONENTS Notes:
(1)
Normally Open otr operated Valve(s).
To remain full open for respectie shutdown Hot/Cold.
(2)
Normally Closed Motor Opnrated Valve (s)i.,To rem I in fully closed for rsectivesudw c/od (3)
Air actuated fail closed valves with;: f unc t io n t o be closed for the res pec ti ve shutdown (hot/cold)
(4)
Air actuated fail open valves with functiont be open for the respective shutdown (hot/cold) period.
(I3)
(5)
Vlei okdoe tMC NormVally itope hotor Oproated Valers).
to rmain'oea d ful op noespume ie~b shutdo n
e lot/Col.
A