ML111450250
| ML111450250 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 05/25/2011 |
| From: | Constellation Energy Group, Environmental Defense Fund |
| To: | NRC Region 1 |
| Dentel, G RGN-I/DRP/BR1/610-337-5233 | |
| References | |
| Download: ML111450250 (4) | |
Text
R.E. Ginna Nuclear Power Plant CONFIDENTIAL. PROPRIETARY CENG INFORMATION. DISTRIBUTION/USE PROHIBITED WITHOUT CENG PERMISSION Nuclear Power Plant Safe, reliable and continuously improving
Safety drives all work at Ginna Our comprehensive focus on safety includes:
- Nuclear safety; our plant
- Industrial safety; our workers
- Public safety; our families and neighbors Continuous improvement is our way of work 2
CONFIDENTIAL. PROPRIETARY CENG INFORMATION. DISTRIBUTION/USE PROHIBITED WITHOUT CENG PERMISSION p
y
- Learn from industry best practices
- Challenge ourselves through assessments
- Learn from inspections
- Channel this information to improve our safety margins
Important Plant Improvements continue at Ginna Interim spent fuel storage facility Turbine driven auxiliary feedwater pump steam admission and control valve upgrades Fuel handling manipulator crane upgrades Adoption of the most recent industry guidance for 3
CONFIDENTIAL. PROPRIETARY CENG INFORMATION. DISTRIBUTION/USE PROHIBITED WITHOUT CENG PERMISSION Adoption of the most recent industry guidance for Emergency Action Levels Replacement of the main generator Fuel pool cooling capabilities
The safety and health of the public and our employees always comes first The independent Nuclear Regulatory Commission inspects and monitors our nuclear power plant daily.
Safety is always our #1 priority 4
Ginna has multiple robust back-up safety systems, including an automatic safe shutdown mechanism.
Nuclear power plants are safe places to work and have among the lowest industrial accident rates in the United States.
CONFIDENTIAL. PROPRIETARY CENG INFORMATION. DISTRIBUTION/USE PROHIBITED WITHOUT CENG PERMISSION.