Letter Sequence RAI |
---|
|
|
MONTHYEARML1106004082011-02-25025 February 2011 Technical Specification Change TS-429 - Deletion of Low Pressure Coolant Injection Motor-Generator Sets Project stage: Other ML1107403012011-03-0808 March 2011 E-mail Regarding Licensee'S Request to Hold a pre-application Discussion for Two Future Amendment Requests Project stage: Other ML1109501952011-04-0505 April 2011 Acceptance of Requested Licensing Action Deletion of Low Pressure Coolant Injection Motor-Generator Sets Project stage: Acceptance Review ML11145A0662011-05-27027 May 2011 Brown Ferry Nuclear Plant, Units 2 & 3 - Request for Additional Information Regarding a Request to Eliminate Low Pressure Coolant Injection Pump Motor Generator Sets (TAC ME5796 and ME5799) Project stage: RAI ML11252B1232011-09-0909 September 2011 NRR E-mail Capture - Deletion of Low Pressure Coolant Injection Motor-Generator Sets for Browns Ferry Nuclear Plant (ME5796/7) - RAI Changes Project stage: RAI 2011-04-05
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23332A0042023-11-27027 November 2023 NRR E-mail Capture - Request for Additional Information Related to Proposed Revised Alternative 0-ISI-47 ML23243A9892023-08-29029 August 2023 Inspection Information Request ML23124A0082023-05-0303 May 2023 NRR E-mail Capture - Request for Additional Information Related to Proposed Alternative Requests for the 5th 10-Year Inservice Testing Interval for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML23041A0022023-02-0909 February 2023 NRR E-mail Capture - Request for Additional Information Related to TVA Alternative Request BFN-0-ISI-32 (CNL-22-025) ML22299A0292022-10-26026 October 2022 NRR E-mail Capture - Request for Additional Information for Relief Request BFN-2-ISI-003 Re Weld Examination Coverage ML22292A2722022-10-19019 October 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Adopt TSTF-505 and TSTF-439 for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML22208A2172022-07-15015 July 2022 NRR E-mail Capture - Request for Additional Information Related to TVA Relief Request BFN-21-ISI-02 (CNL-21-081) ML22174A2722022-06-24024 June 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22168A0802022-06-17017 June 2022 NRR E-mail Capture - Request for Confirmation of Information and Additional Information Related to Tva'S Request to Use Control Bay Chiller Cross-Tie ML22160A4742022-06-0303 June 2022 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Re LAR to Use Advanced Framatome Methodologies in Support of Atrium 11 Fuel ML22168A0392022-05-13013 May 2022 NRR E-mail Capture - Draft Request for Confirmation of Information and Additional Information Related to Tva'S Request to Use Control Bay Chiller Cross-Tie ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans ML22047A1612022-02-16016 February 2022 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Expand the SFP Criticality Safety Analysis for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML22025A4132022-01-25025 January 2022 RP Inspection Doc Request ML21343A4232021-12-0909 December 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000259/2022010, 05000260/2022010, and 05000296/2022010) and Request for Information (RFI) ML21173A1042021-06-21021 June 2021 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Regarding Request to TS 3.8.6 ML21041A5422021-02-10010 February 2021 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Regarding Request to Adopt 10 CFR 50.69 ML21041A5432021-02-0505 February 2021 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Draft Request for Additional Information Regarding 10 CFR 50.69 LAR ML21026A1652021-01-26026 January 2021 Document Request for Browns Ferry Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021-02 ML20296A3782020-10-22022 October 2020 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Regarding Request to Incorporate TMRE ML20297A3012020-10-22022 October 2020 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Regarding Request to Adopt TSTF-425 ML20294A3762020-09-23023 September 2020 NRR E-mail Capture - Draft Request for Additional Information - Browns Ferry Nuclear Plant, Units 1, 2, and 3, Request to Adopt TSTF-425 ML20266G4472020-09-22022 September 2020 Notification of Inspection and Request for Information ML20224A4732020-08-11011 August 2020 Requalification Program Inspection Browns Ferry Nuclear ML20195B1302020-07-13013 July 2020 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Regarding Alternative Request No. 0-ISI-47 ML20149K3212020-05-27027 May 2020 RP Inspection Document Request, Browns Ferry 2020-003 ML20254A3032020-05-13013 May 2020 Request for Supporting Information for the Browns Ferry, Units 1, 2, and 3 Seismic Probabilistic Risk Assessment Audit Review ML20054B8592020-02-20020 February 2020 Emergency Preparedness Program Inspection Request for Information ML20014E6552020-01-14014 January 2020 01 RP Inspection Document Request ML19196A0752019-07-12012 July 2019 NRR E-mail Capture - Final RAIs Browns Ferry Nuclear, Units 1, 2, 3 - Application to Revise Technical Specifications to Adopt TSTF-542 Revision 2, Reactor Pressure Vessel Water Inventory Control ML19116A0712019-06-0303 June 2019 Request for Additional Information Related Resubmittal of Proposed Alternative Request No. 1-ISI-27 for the Period of Extended Operation ML18331A5442018-12-0606 December 2018 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus License Amendment Request (EPID L-2018-LLA-0048) - (Non-Proprietary) ML18317A1642018-11-20020 November 2018 Request for Additional Information Regarding Maximum Extended Load Line Limit Plus License Amendment Request (EPID L-2018-LLA-0048) - Non-Proprietary ML18263A1412018-09-11011 September 2018 NRR E-mail Capture - Browns Ferry Unit 1: RAI Associated with Relief Request 1-ISI-28 ML18138A1102018-05-17017 May 2018 Enclosurequest for Additional Information (Letter to E. D. Schrull Request for Additional Information Regarding Tennessee Valley Authority'S Decommissioning Funding Plan Update for Browns Ferry and Sequoyah Isfsis) ML18108A1872018-04-18018 April 2018 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000259/2018411, 05000260/2018411, and 05000296/2018411 ML18057A6372018-02-23023 February 2018 NRR E-mail Capture - Request for Additional Information Related to TVA Fleet Topical Report TVA-NPG-AWA16 - EPIC: L-2016-TOP-0011) ML17216A0062017-08-18018 August 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Related to LAR to Revise Modifications and Implementations Related to NFPA 805 for Fire Protection for Light Water Reactor Generating Plants (CAC Nos. MF9814-MF9816) ML17163A0502017-06-0808 June 2017 NRR E-mail Capture - RAI for Browns Ferry RR 3-ISI-28 CAC No. MF9257 ML17150A0792017-05-23023 May 2017 NRR E-mail Capture - Request for Additional Information Related to TVA Fleet LAR for EAL Change to Adopt NEI-99-01 Rev.6 (CAC Nos. MF9054 - MF9060) ML16288A0182016-10-27027 October 2016 Browns Ferry Nuclear Plant, Units 2 and 3 - RAI Related to Relief Request for the Use of Alternatives to Certain American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section XI Requirements (CAC Nos. MF7795 and MF7796) ML16236A0732016-08-31031 August 2016 Request for Additional Information Related to License Amendment Request to Add New Technical Specification 3.3.8.3 ML16203A0272016-07-25025 July 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (CAC Nos. MF6738, MF6739, and MF6740) ML16187A2932016-07-21021 July 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate (CAC Nos. MF6741, MF6742, and MF6743) ML16194A2292016-07-21021 July 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate ML16154A5442016-06-21021 June 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate ML16146A6352016-06-13013 June 2016 Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate ML16145A1582016-06-0303 June 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate (SBPB-RAI 4) (CAC Nos. MF6741, MF6742, and MF6743) ML16144A6452016-06-0303 June 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Non-proprietary Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate (EMCB-RAI) ML16119A1332016-05-0606 May 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Related to License Amendment Request Regarding Extended Power Uprate (SNPB-RAI) (CAC Nos. MF6741, MF6742, and MF6743) 2023-08-29
[Table view] |
Text
OFFICIAL USE ONLY PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 27,2011 Mr. R. M. Krich Vice President, Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 SUB..IECT: BROWNS FERRY NUCLEAR PLANT, UNIT NOS. 2 AND 3 - REQUEST FOR ADDITIONAL INFORMATION REGARDING A REQUEST TO ELIMINATE LOW PRESSURE COOLANT INJECTION PUMP MOTOR GENERATOR SETS (TAC NOS. ME5796 AND ME5799)
Dear Mr. Krich:
By letter dated February 25, 2011 (Agencywide Documents Access and Management System Accession No. ML110600408), Tennessee Valley Authority (TVA, the licensee) submitted a request for a Technical Specification (TS) change that would delete Browns Ferry Nuclear Plant (BFN), Unit Nos. 2 and 3, TS Surveillance Requirement (SR) 3.5.1.12. The SR 3.5.1.12 requires the verification of the capability to automatically transfer the power supply from the normal source to the alternate source for each Low Pressure Coolant Injection subsystem inboard injection valve and each recirculation pump discharge valve on a 24-month frequency.
Based on our review of your submittal, the Nuclear Regulatory Commission (NRC) staff finds that a response to the enclosed request for additional information (RAI) is needed before we can complete the review.
This request was discussed with Mr. Tom Mathews of your staff on May 12, 2011, and it was agreed that a response would be provided within 30 days from this date. During the call, the NRC staff provided the following clarifications about the questions contained in the RAI:
- For RAI IV-3: For the sensitivity studies, please provide figures analogous to Figures 6.1, 6.2, 6A, 6.5, and 6.8-6.19 from ANP-2908(P). For both the lower- and upper-lower plenum components, provide plots of liquid mass and mass flow rates at the component boundaries as functions of time. For the renodalized lower plenum component (TVA has proposed to renodalize only the upper lower plenum), please also provide plots of two-phase level and fluid quality as functions of time. The quality plots could be generated for the inlet and exit nodes only.
OFFICIAL USE ONLY PROPRIETARY INFORMATION
OFFICIAL USE ONLY PROPRIETARY INFORMATION R. Krich - 2
- For RAI V: The NRC staff expects that the break nodalization will reflect the limiting postulated bottom head drain line break that is reflective of BFN configuration. If the reactor water cleanup line has check valves downstream of the recirculation loops, their presence should be reflected in the break nodalization.
If you have any questions, please contact me at (301) 415-1055.
Christopher Gratton, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-260 and 50-296
Enclosure:
Request for Additional Information cc wI enclosure: Distribution via Listserv OFFICIAL USE ONLY PROPRIETARY INFORMATION
OFFICIAL USE ONLY PROPRIETARY INFORMATION REQUEST FOR ADDITIONAL INFORMATION REGARDING ANP-2908(P),
"BROWNS FERRY UNITS 1, 2, AND 3 105% OLTP LOCA BREAK SPECTRUM ANALYSIS" REQUEST TO ELIMINATE LOW PRESSURE COOLANT INJECTION MOTOR GENERATOR SETS TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNITS 2 AND 3 DOCKET NO. 50-260 AND 50-296 By letter dated February, 25, 2011, Tennessee Valley Authority, the licensee for Browns Ferry Nuclear Plant (BFN), Unit Nos. 1, 2, and 3, requested approval of a license amendment supporting the deletion of low pressure coolant injection motor generator sets at BFN Units 2 and
- 3. The Nuclear Regulatory Commission (NRC) staff requires the following additional information regarding ANP-2908(P), "Browns Ferry Unit Nos. 1, 2, and 3 105% OLTP [Original Licensed Thermal Power] LOCA [Loss-of-Coolant Accident] Break Spectrum Analysis," which supports the license amendment request, to complete its review.
I. Results - 0.25 fe SF-BATTIBB Top-Peaked Axial
- 1) Identify the reactor scram signal.
2} Explain whether main steam line isolation is modeled, the source of the isolation signal, the time of isolation, and the effect that steamline isolation has on the accident sequence.
- 3) The NRC staff's own analyses, as well as additional data gathered by the staff during the BFN power uprate reviews, have indicated that steady-state bundle exit void fractions are quite high. For core conditions matching the small break LOCA initial conditions, provide steady-state void fraction as a function of assembly elevation for a hot channel from XCOBRA and indicate the limiting plane analyzed in HUXY. Justify any significant discrepancies between XCOBRA and the RELAX/HUXY model.
- 4) Provide a plot of upper plenum liquid mass with higher resolution from 0-10000 Ib from the period between 300 seconds and the end of the transient. Provide similar plots (Le.,
increased resolution at the region of interest) of liquid mass for the core average, bypass, and hot channel regions and the lower plenum.
Enclosure OFFICIAL USE ONLY PROPRIETARY INFORMATION
OFFICIAL USE ONLY PROPRIETARY INFORMATION
-2
- 5) Identify the primary sources of increased lower plenum liquid mass from 350-450 seconds.
- 6) Provide a higher resolution plot of hot channel inlet flow rate from 350-500 seconds.
Trace the zero line through the plot.
- 7) Explain the phenomena causing the ((
)) drop in temperature of the hot channel coolant. What are the sources and directions of liquid flow in this time period?
- 8) Explain what causes (( )) in the 50-75 second timeframe.
- 9) Justify the selection of fuel channel nodalization.
- 10) Provide information concerning the thermal-hydraulic characteristics of the bypass region (mixture level, liquid mass, quality).
II. Results - Break Spectrum, SF-BATTIBA, Pump Discharge
- 1) Explain why the predicted peak centerline temperature (PCT) ((
)) interval for the mid-peaked spectrum.
- 2) Explain similar trends on the top-peaked spectrum on the (( )) intervals, and on the (( )) intervals.
- 3) Provide plots analogous to Figures 6.1 - 6.19 of ANP-2908(P) for each of the break sizes identified in 1 and 2 above to reinforce the discussion. Also provide tabulated sequences of events.
III. Results - Break Spectrum, SF-BATTIBB Explain why the mid- and top-peaked power shape PCTs are inverted for the 0.45 ft2 break.
Provide plots for the (( )) breaks and justify the coarseness of the break spectrum. Also provide tabulated sequences of events.
IV. Initial Conditions and Input Parameters 1} The emergency core cooling system fluid temperature has been reduced from 125 OF in previous analyses to 120 of. Explain and provide a justification for this change.
2} Provide a copy of ANP-2912(P}, Revision 0, "Browns Ferry Units 1,2 and 3105% OLTP LOCA Parameters Document," which is referenced in ANP-2908(P).
3} Provide a nodalization sensitivity study of the lower plenum for the PCT-limiting case.
V. Adequacy of Analyzed Break Spectrum Title 10 of the Code of Federal Regulations, Section 50.46, requires emergency core cooling system (ECCS) cooling performance to be calculated for a number of postulated LOCAs of OFFICIAL USE ONLY PROPRIETARY INFORMATION
OFFICIAL USE ONLY PROPRIETARY INFORMATION
- 3 different sizes, locations, and other properties sufficient to provide assurance that the most severe postulated LOCAs are calculated. At the time EXEM-BWR 2000 was approved, ECCS research suggested that the large break LOCA was generally limiting for bOiling-water reactors, and there appears to be little consideration of post-power uprate plant operation.
Since the ECCS research was compiled and documented in NUREG-1230, operating experience has shown that the small break scenario can, in fact, result in a more limiting event. Because the small break accident is limiting, ANP-2908(P) includes a number of explicitly analyzed ancillary line breaks, since these breaks are smaller in size. The general trend is a liquid blow down at high pressure until the break uncovers, followed by a depressurization of the reactor coolant system caused by steam exiting the break. The analysis results indicate that, absent any emergency core cooling, the steam flow pressure reduction is a dominant mechanism in the event, especially in the cases that delay the automatic depressurization system actuation.
Please provide an analysis of the rupture of the bottom head drain line, the accident sequence for which would not benefit from the pressure reduction associated with break uncovery, to demonstrate that the initial heatup would not contribute to the limiting PCT.
VI. Fuel Thermal Conductivity Degradation Explain whether and how the RODEX2 fuel centerline temperature inputs to the RELAXlHUXY analyses are corrected for issues identified in NRC Information Notice 2009-23, "Nuclear Fuel Thermal Conductivity Degradation." If they are not corrected, explain why not.
OFFICIAL USE ONLY PROPRIETARY INFORMATION
OffiCIAL USE ONLY PROPRIETARY INfORMATION R. Krich - 2
- For RAI V: The NRC staff expects that the break nodalization will reflect the limiting postulated bottom head drain line break that is reflective of BFN configuration. If the reactor water cleanup line has check valves downstream of the recirculation loops, their presence should be reflected in the break nodalization.
If you have any questions, please contact me at (301) 415-1055.
Sincerely, IRA!
Christopher Gratton, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-260 and 50-296
Enclosure:
Request for Additional Information cc wI enclosure: Distribution via Listserv Distribution:
PUBLIC RidsNrrDorlLpl2-2 Resource LPU2-2 RlF RidsNrrPMBrownsFerry Resource RidsNrrLABClayton Resource RidsOgcRp Resource RidsNrrDssSrxb Resource RidsNrrDorlDpr Resource RidsRgn2MailCenter Resource RidsNrrAcrsAcnw_MailCTR Resource NRRlSRXB/BC NRRlLPL2-2/BC NRRlLPL2-2/PM TUlses DBroaddus CGratton 05/24/11 05/26/11 05/27/11 OFFICIAL RECORD COpy OffiCIAL USE ONLY PROPRIETARY INfORMATION