ML111360093

From kanterella
Jump to navigation Jump to search
G20110306/LTR-11-0252/EDATS: SECY-2011-0263 - Ltr. to Joni Gray, Request Presentation by the NRC Concerning the Potential Risks Posed by the Diablo Canyon Plant
ML111360093
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/12/2011
From: Anton Vegel
Division of Reactor Safety IV
To: Gray J
Santa Barbara County, CA, Board of Supervisors
References
G20110306, LTR-11-0252, SECY-2011-0263
Download: ML111360093 (2)


Text

UNITED STATES NUC LE AR RE G ULATO RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU I TE 400 AR LI N GTON , TEXAS 76011-4125 May 12, 2011 Joni Gray, Chair Board of Supervisors County Administration Building 105 East Anapamu Street Santa Barbara, CA 93101

Dear Ms. Gray:

This is in response to your April 12, 2011, letter in which you requested a presentation by the NRC to the Santa Barbara County Board of Supervisors. The purpose of the presentation would be to explain the seismic risks known to the Diablo Canyon Power Plant and the design of the facility. You also asked that the NRC describe the facilitys capability to address the types of problems experienced at the Fukushima Power Plant.

We can accommodate your request during the week of June 13, 2011. The NRCs primary responsibility is to ensure the adequate protection of the public health and safety of the American people. Toward that end, we have been very closely monitoring the activities in Japan and reviewing all currently available information. Review of this information, combined with our ongoing inspection and licensing oversight, give us confidence that all U.S. plants continue to operate safety. I look forward to meeting with you and the other board members.

Sincerely,

/RA/

Anton Vegel, Director Division of Reactor Safety

Joni Gray, Chair Board of Supervisors bcc:

J. Weil, Congressional Affairs Specialist W. Mair, Regional State Liaison Officer V. Dricks, Sr. Public Affairs Officer L. Uselding, Public Affairs Officer K. Kennedy, Director, Division Reactor Projects T. Pruett, Deputy Director, Division Reactor Projects G. Miller, Branch Chief, Division of Reactor Projects S:\DRS\TSB\Joni Gray Letter.docx ADAMS No : Yes : SUNSI Review Complete Reviewer Initials: haf Category B.1  : Publicly Available  : Non-sensitive Category A Non-publicly Available Sensitive RIV:TSB/SRE RSLO PAO D:DRS HAFreeman WAMaier VDricks AVegel

/RA/ /RA/ /RA/ /RA/

5/10/2011 5/11/2011 5/11/2011 5/11/2011 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax