Annual Update of the Application for Renewed Operating Licenses
ML111320545
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 05/11/2011
From: Schimmel M
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-PI-11-034
Download: ML111320545 (2)


Text

Xcel Energy0 MAY 1 1 20H L-PI-11-034 10 CFR 54 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282 and 50-306 License Nos. DPR-42 and DPR-60 Annual Update of the Application for Renewed Operating Licenses

References:

1. Letter from Northern States Power Company, a Minnesota Corporation, to the Nuclear Regulatory Commission, "Prairie Island Nuclear Generating Plant Units 1 and 2 - Application for Renewed Operating Licenses," L-PI-08-024, dated April 11, 2008, ADAMS Accession Number ML081130666.
2. Letter from Northern States Power Company, a Minnesota Corporation, to the Nuclear Regulatory Commission, "Annual Update of the Application for Renewed Operating Licenses,"

L-PI-09-043, dated April 13, 2009, ADAMS Accession Number ML091110324.

3. Letter from Northern States Power Company, a Minnesota Corporation, to the Nuclear Regulatory Commission, "Annual Update of the Application for Renewed Operating Licenses and Supplemental Information Regarding Buried Piping and Tanks Inspection Program and Class 1 Small-Bore Piping Program,"

L-PI-10-081, dated August 12, 2010, ADAMS Accession Number ML102250265.

By letter dated April 11, 2008 (Reference I ) , Nuclear Management Company, LLC (NMC)* submitted an Application for Renewed Operating Licenses (LRA) for the Prairie

  • On September 22, 2008, NMC transferred its operating authority to Northern States Power Company, a Minnesota Corporation (NSPM), doing business as Xcel Energy. By letter dated September 3, 2008, NSPM assumed responsibility for actions and commitments previously submitted by NMC.

1717 Wakonade Drive East Welch, Minnesota 55089-9642 Telephone: 651.388.1 121

Document Control Desk Page 2 Island Nuclear Generating Plant (PINGP) Units 1 and 2. 10 CFR 54.21(b) requires that each year following submittal of the license renewal application, and at least three months before scheduled completion of the NRC review, an amendment to the renewal application must be submitted that identifies any change to the current licensing basis (CLB) of the facility that materially affects the contents of the LRA, including the Updated Safety Analysis Report supplement. Annual updates for 2009 and 2010 were submitted in References 2 and 3, respectively. This letter provides the annual update for 201 1.

A review of the PINGP CLB changes since the last LRA annual update (Reference 3) has been completed. No CLB changes that materially affect the contents of the LRA were identified. Therefore, there is no LRA revision associated with this annual update.

If there are any questions or if additional information is needed, please contact Mr.

Eugene Eckholt, License Renewal Project Manager.

Summary of Commitments This letter contains no new commitments and no revisions to existing PINGP License Renewal commitments as previously submitted.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on MAY 1 1 2011 Mark A. ~ c h i m m e l Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota cc: Administrator, Region Ill, USNRC License Renewal Project Manager, PINGP, USNRC NRR Project Manager, PINGP, USNRC Resident Inspector, PINGP, USNRC Prairie lsland Indian Community, ATTN: Phil Mahowald Minnesota Department of Commerce