ML11131A118

From kanterella
Jump to navigation Jump to search
License Renewal Application Review
ML11131A118
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 08/02/2011
From: David Wrona
License Renewal Projects Branch 2
To: Simon B, Muzzey E
State of MA, Massachusetts Historical Commission, State of NH, Div of Historical Resources
Wentzel, M J
Shared Package
ML11131A159 List:
References
NUREG-1437, Supp 46
Download: ML11131A118 (5)


Text

.;:,V

\..t."" REGU/ _

~;,

UNITED STATES

",.;:. / Oil... NUCLEAR REGULATORY COMMISSION

~ C"I WASHINGTON, D.C. 20555-0001

<< 0 t;  :

~ ~ August 2, 2011

~ ~

"'-? ..,.0

        • '"

Ms. Brona Simon, Executive Director and State Historic Preservation Officer Massachusetts Historical Commission 220 Morrissey Boulevard Boston, MA 02125

SUBJECT:

SEABROOK STATION LICENSE RENEWAL APPLICATION REVIEW

Dear Ms. Simon:

The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing an application to renew the operating license for Seabrook Station (Seabrook) Unit 1, which is located in Rockingham County, New Hampshire (NH), 13 miles south of Portsmouth, NH. Seabrook is operated by NextEra Energy Seabrook, LLC. As part of its review of the proposed action, the NRC staff has prepared a site-specific Supplemental Environmental Impact Statement (SEIS) to its "Generic Environmental Impact Statement for License Renewal of Nuclear Plants," NUREG-1437. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological and cultural properties from extended operation and possible refurbishment activities associated with license renewal. Pursuant to 36 CFR 800. 8(c) , we are requesting your comments on the enclosed draft supplement and on our preliminary conclusions regarding historic properties.

The NRC staff has determined that the area of potential effect (APE) for a license renewal action is the area at the power plant site and its immediate environs that may be impacted by post-license renewal land disturbing operation or projected refurbishment activities associated with the proposed action. The staff views the APE for the Seabrook license renewal as including the Seabrook site and the immediate environs.

The NRC staff has conducted an environmental audit at the site and has reviewed historic and archaeological records. The NRC staff also contacted five Native American Tribes identified as having potential interest in the proposed undertaking. To date, no comments have been received.

In the context of the National Environmental Policy Act of 1969, under which the draft environmental impact statement was prepared, the NRC staff's preliminary determination is that the impact of license renewal on historical and archaeological resources is small, and additional mitigation is not warranted. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff's preliminary determination is that no historic properties will be adversely affected by the proposed action.

B. Simon -2 Please note that the period for public comment expires on October 26. 2011. If your office requires additional time. or if there are any other questions regarding this correspondence.

please have your representative contact the Environmental Project Manager. Mr. Michael Wentzel. at 301-415-6459 or bye-mail at michael.wentzel@nrc.gov.

Sincerely, mv~

David J. Wrona. Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

As stated cc w/o encl: Listserv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 2, 2011 Ms. Elizabeth H. Muzzey, Director and State Historic Preservation Officer New Hampshire Division of Historical Resources 19 Pillsbury Street Concord, NH 03301-3570

SUBJECT:

SEABROOK STATION LICENSE RENEWAL APPLICATION REVIEW

Dear Ms. Muzzey:

The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing an application to renew the operating license for Seabrook Station (Seabrook) Unit 1, which is located in Rockingham County, New Hampshire (NH), 13 miles south of Portsmouth, NH. Seabrook is operated by NextEra Energy Seabrook, LLC. As part of its review of the proposed action, the NRC staff has prepared a site-specific Supplemental Environmental Impact Statement (SEIS) to its "Generic Environmental Impact Statement for License Renewal of Nuclear Plants," NUREG-1437. The SEIS includes analyses of relevant environmental issues, including potential impacts to historic, archeological and cultural properties from extended operation and possible refurbishment activities associated with license renewal. In accordance with our letter to you dated July 16, 2010, a copy of the draft supplement is enclosed. Pursuant to 36 CFR 800.8(c}, we are requesting your comments on the enclosed draft supplement and on our preliminary conclusions regarding historic properties.

As stated in our letter dated July 16, 2010, the NRC staff has determined that the area of potential effect (APE) for a license renewal action is the area at the power plant site and its immediate environs that may be impacted by post-license renewal land disturbing operation or projected refurbishment activities associated with the proposed action. The staff views the APE for the Seabrook license renewal as including the Seabrook site and the immediate environs.

The NRC staff has conducted an environmental audit at the site and has reviewed historic and archaeological records. The NRC staff also contacted five Native American Tribes identified as having potential interest in the proposed undertaking. To date, no comments have been received.

In the context of the National Environmental Policy Act of 1969, under which the draft environmental impact statement was prepared, the NRC staff's preliminary determination is that the impact of license renewal on historical and archaeological resources is small, and additional mitigation is not warranted. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff's preliminary determination is that no historic properties will be affected adversely by the proposed action.

E. Muzzey -2 Please note that the period for public comment expires on October 26, 2011. If your office requires additional time, or if there are any other questions regarding this correspondence, please have your representative contact the Environmental Project Manager, Mr. Michael Wentzel, at 301-415-6459 or bye-mail at michael.wentzel@nrc.gov.

David J. Wrona, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

As stated cc w/encl: Listserv

E. Muzzey -2 Please note that the period for public comment expires on October 26, 2011. If your office requires additional time, or if there are any other questions regarding this correspondence, please have your representative contact the Environmental Project Manager, Mr. Michael Wentzel, at 301-415-6459 or bye-mail at michael.wentzel@nrc.gov.

Sincerely, IRA L Regner forI David J. Wrona, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

As stated cc wlo encl: Listserv DISTRIBUTION: MWentzel HARDCOPY: RPlasse DLR RF BPham DWrona E-MAIL: EMilier PUBLIC ICouret,OPA RidsNrrDlr Resource EDacus,OCA RidsNrrDlrRpb'1 Resource MSpencer, OGC RidsNrrDlrRpb2 Resource WRaymond, RI RidsNrrDlrRarb Resource DTifft, RI RidsNrrDlrRapb Resource NMcNamara, RI RidsNrrDlrRasb Resource NSheehan, RI RidsNrrDlrRerb Resource DScrenci, RI RidsNrrDlrRpob Resource JJohnson, RI RidsNrrDraApla Resource ABurritt, RI ADAMS Accession Nos.:

1. Letter: ML11131A118
2. Supplement 46 to "Generic Environmental Impact Statement for License Renewal of Nuclear Plants," (Part 1 of 2) ML11213A024
3. Supplement 46 to "Generic Environmental Impact Statement for License Renewal of Nuclear Plants," (Part 2 of 2) ML11213A203
4. Packa e: ML11131A159 OFFICE PM:RPB1 :DLR LADLR
  • BC:RPB2:DLR NAME MWentzel IKing DWrona (LRegner for) r------r-----------

TE 06/07/2011 11 08/02/2011 OFFICIAL RECORD COpy