IR 05000272/2011008

From kanterella
(Redirected from ML111300464)
Jump to navigation Jump to search
IR 05000272/2011008 and 05000311/2011008; 04/05/2011 - 04/29/2011; Salem Nuclear Generating Station, Unit Nos. 1 and 2; Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event
ML111300464
Person / Time
Site: Salem  PSEG icon.png
Issue date: 05/13/2011
From: Doerflein L
Engineering Region 1 Branch 2
To: Joyce T
Public Service Enterprise Group
References
IR-11-008
Download: ML111300464 (24)


Text

UNITED STATES N UCLEAR REGU LATORY COMMISSION W

REGION I

475 ALLENDALE ROAD

SUBJECT:

SALEM NUCLEAR GENERATING srATtoN, uNlr Nos. 1 AND 2 - NRc TEMPORARY INSTRUCTION 25151183 INSPECTION REPORT 050002721201 1008 and 0500031 1/201 1008

Dear Mr. Joyce:

On April 29,2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Salem Nuclear Generating Station, Unit Nos. 1 and 2, using Temporary lnstruction 25151183, "Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event." The enclosed inspection report documents the inspection results which were discussed on April 29, 2011, with Mr. Eilola and other members of your staff.

The objective of this inspection was to promptly assess the capabilities of Salem Nuclear Generating Station to respond to extraordinary consequences similar to those that have recenily occurred at the Japanese Fukushima Daiichi Nuclear Station. The results from this inspection, along with the results from this inspection performed at other operating commercial nuclear plants in the United States will be used to evaluate the United States nuclear industry's readiness to safely respond to similar events. These results will also help the NRC to determine if additional regulatory actions are warranted.

All of the potential issues and observations identified by this inspection are contained in this report, The NRC's Reactor Oversight Process will further evaluate any issues to determine if they are regulatory findings or violations. Any resulting findings or violations will be documented by the NRC in a separate report. You are not required to respond to this letter. ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencyuide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.qov/readinq-rmiadams.html (the Public Electronic Reading Room).

Sincerely,

-l( i\ ln A

\ Xal^ll^,- / .' Lu A!*,lV.g-,*-

Lawrence T. Doerflein, Chief /

Engineering Branch 2 t Division of Reactor Safety Docket Nos.: 50-272;50-31 1 License Nos.: DPR-70; DPR-75

Enclosure:

lnspection Report 0500027 21201 1 008 and 0500031 1 1201 1 008

REGION I Docket Nos: 50-272,50-311 License Nos: DPR-70, DPR-75 Report No: 050002721201 1 008 and 0500031 1 1201 1008 Licensee: PSEG Nuclear LLC (PSEG)

Facility: Salem Nuclear Generating Station, Unit Nos. 1 and 2 Location: P.O. Box 236 Hancocks Bridge, NJ 08038 Dates: Aprif 5, 2011 through April 29,2011 lnspector: P. McKenna, Resident Inspector, Salem Units 1 and 2 Approved by: Lawrence T. Doerflein, Chief Engineering Branch 2 Division of Reactor Safety Enclosure

SUMMARY OF FINDINGS

lR 0500027212011008 and 0500031112011008; 04/0512011 -0412912011;Salem Nuclear

Generating Station, Unit Nos. 1 and 2; Temporary Instruction 25151183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event.

This report covers an announced Temporary Instruction (Tl) inspection. The inspection was conducted by a resident inspector. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.

INSPECTION SCOPE

The intent of the Tl is to provide a broad overview of the industry's preparedness for events that may exceed the current design basis for a plant. The focus of the Tl was on

(1) assessing the licensee's capability to mitigate consequences from large fires or explosions on site,
(2) assessing the licensee's capability to mitigate station blackout (SBO) conditions,
(3) assessing the licensee's capability to mitigate internal and external flooding events accounted for by the station's design, and
(4) assessing the thoroughness of the licensee's walkdowns and inspections of important equipment needed to mitigate fire and flood events to identify the potential that the equipment's function could be lost during seismic events possible for the site. lf necessary, a more specific followup inspection will be performed at a later date.

INSPECTION RESULTS

All of the potential issues and observations identified by this inspection are contained in this report. The NRC's Reactor Oversight Process will further evaluate any issues to determine if they are regulatory findings or violations. Any resulting findings or violations will be documented by the NRC in a separate report.

03.01 Assess the licensee's capability to mitigate conditions that result from beyond design basis events, typically bounded by security threats, committed to as part of NRC Security Order Section B.S.b issued February 25, 2002, and severe accident management guidelines and as required by Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh). Use Inspection Procedure (lP) 71111.05T, "Fire Protection (Triennial)," Section 02.03 and 03.03 as a guideline. lI lP 71111.05T was recently performed at the facility the inspector should review the inspection results and findings to identify any other potential areas of inspection. Particular emphasis should be placed on strategies related to the spent fuel pool. The inspection should include, but not be limited to, an assessment of any licensee actions to:

Licensee Action Describe what the licensee did to test or inspect equipment.

a. Verify through test or Licensee actions included the inventory of equipment (active and passive) utilized for inspection that implementation of B.5.b actions and any additional equipment used in Severe Accident equipment is available Management Guidelines (SAMG). Portable equipment such as pumps and generators were run to and functional. Active verify readiness. The license identified surveillances/tests/preventive maintenance tasks and equipment shall be performance frequencies for other identified B.5.b and SAMG equipment, and reviewed the results tested and passive of recent tests.

equipment shall be walked down and inspected. lt is not Describe inspector actions taken to confirm equipment readiness (e.9., observed a test, reviewed expected that test results, discussed actions, reviewed records, etc.).

permanently installed equipment that is tested under an existing The inspector assessed the licensee's capabilities by conducting a review of the licensee's regulatory testing walkdown activities. In addition, the inspector independently walked down and inspected all B.5.b program be retested.

contingency response equipment staged at the site. The type of equipment examined included:

interior fire water supply piping and hose stations; portable pump and associated suction and This review should be discharge hoses, adapters, and tools; portable AC/DC power supplies; and equipment lockers and done for a reasonable associated tools. The inspector evaluated the staging/storage location of B.5.b related equipment sample of mitigating to ensure the survivability and availability of equipment. In addition, the inspector also reviewed strategies/eq uipment.

and discussed with responsible site personnel the results of any field testing of equipment performed to validate its applications in postulated scenarios.

Discuss general results including corrective actions by licensee.

All active and passive 8.5.b and SAMG equipment was verified in place by the licensee. The licensee documented minor issues and possible enhancements and entered them into their Corrective Action Program (CAP). The inspector noted one minor issue with the recurring preventive maintenance of B.5.b fire hoses and the licensee entered it into their CAP.

Based on the reviews conducted, the inspector concluded that the required mitigation equipment is available and functional.

Describe the licensee's actions to verify that procedures are in place and can be executed (e.9.,

Licensee Action walkdowns, demonstrations, tests, etc.).

b. Verify through The licensee identified the procedures utilized to mitigate the consequences of a 8.5.b related walkdowns or event and severe accidents. Licensee personnelwere then dispatched to walk down all demonstration that applicable procedures to verify the ability of the procedure to be executed. The licensee walked procedures to implement down a total of 41 procedures.

the strategies associated with 8.5.b and 10 CFR 50.54(hh) are in place Describe inspector actions and the sample strategies reviewed. Assess whether procedures were and are executable.

in place and could be used as intended.

Licensees may choose not to connect or The inspector assessed the licensee's capabilities by conducting a review of the licensee's operate permanently walkdown activities. In addition, the inspector selected a sample of procedures walked down by installed equipment the licensee and walked those down with licensed and non-licensed operators to assess: the during this verification. adequacy and completeness of the procedures/guidelines; familiarity of operators with the procedure objectives and specific guidance; staging and compatibility of equipment; and the This review should be practicality of the operator actions prescribed by the procedures, consistent with the postulated done for a reasonable scenarios. A few of the procedures selected by the inspector included procedures that had sample of mitigating suggestions for improvement as of a result of the 2008 NRC Tl-171 8.5.b Phase 2 and 3 strategies/eq uipment.

Mitigating Strategy inspection.

Discuss general results including corrective actions by licensee.

The licensee verified that all 8.5.b and 10 CFR 50.54(hh) procedures were in place and were executable. The licensee documented a few minor issues and possible enhancements and entered them into their CAP. The inspector did not identify any further issues and noted that suggestions for procedural improvement from the 2008 Tl-171 inspection had been implemented.

Based on these reviews, the inspector concluded that procedures to implement the strategies associated with 8.5.b and 10 CFR 50.54(hh) were in place and were executable.

Describe the licensee's actions and conclusions regarding training and qualifications of operators Licensee Action and support staff.

c. Verify the training and The licensee verified that the training and qualifications of operators and all emergency response qualifications of organization positions were current for activities related to 8.5.b and SAMGS. This review operators and the identified the number of personnel in each of the required positions and identified the associated support staff needed to required qualifications. Both 8.5.b and SAMG training is conducted every two years for operators implement the and every six years for emergency response personnel.

procedures and work instructions are current for activities related to Security Order Section Describe inspector actions and the sample strategies reviewed to assess training and 8.5.b and severe qualifications of operators and support staff.

accident management guidelines as required by 10 cFR 50.54 (hh).

The inspectors examined the training material provided to the site personnel to be tasked with implementing the B.5.b mitigation SAMG strategies. The inspectors assessed the licensee's training and qualification activities by conducting a review of training and qualification materials and records related to B.5.b and SAMG event response.

Discuss general results including corrective actions by licensee.

No deficiencies were identified, with one exception. The licensee identified one issue regarding the 6-year continuing training frequency requirement for non-operations personnel qualified as a SAMG evaluator (similarly qualified licensed operators receive this training every two years). A CAP notification was written to address this issue.

Based upon the inspector's review of formal training and interviews, the inspector concluded that overall B.5.b and SAMG training was appropriate.

Describe the licensee's actions and conclusions regarding applicable agreements and contracts Licensee Action are in place.

d. Verify that any Licensee actions included the identification of all applicable contracts and agreements committed applicable agreements to be in place for the mitigation of a 8.5.b related event. The licensee verified that the contracts and contracts are in and agreements were current, and documented whether or not the contracts/agreements were place and are capable of capable of meeting the mitigation strategy.

meeting the conditions needed to mitioate the consequences of these events.

For a sample of mitigating strategies involving contracts or agreements with offsite entities, describe inspector actions to confirm agreements and contracts are in place and current (e.9.,

confirm that offsite fire assistance agreement is in place and current).

This review should be done for a reasonable The inspector verified that the licensee had in place current memoranda of understanding (MOU)sample of mitigating or a formal agreement with off-site agencies to provide assistance in mitigation strategies. The strategies/eq uipment. inspector selected a sample of MOUs for detailed review to verify consistency between the MOU and the associated mitigation strategy. Additionally, the inspector interviewed licensee personnel to discuss local and state emergency response.

Discuss general results including corrective actions by licensee.

No deficiencies were identified. The inspector concluded that applicable agreements and contracts are in place and are capable of meeting the conditions needed to mitigate the consequences of these events.

Document the corrective action report number and briefly summarize problems noted by the Licensee Action licensee that have significant potential to prevent the success of any existing mitigating strategy.

e. Review any open l l Several CAP notifications and orders were reviewed during this inspection, and are listed in the corrective action l l attachment to this report. The inspector concluded that there was not a significant adverse impact documents to assess l l on the 8.5.b strategy mitigating capabilities.

problems with mitigating strategy implementation identified by the licensee. Assess the impact of the problem on the mitigating capability and the remaining capability that is not impacted.

03.02 Assess the licensee's capability to mitigate station blackout (SBO) conditions, as required by 10 CFR 50.63, "Loss of All Alternating Current Power," and station design, is functional and valid. Refer to Tl 25151120, "lnspection of lmplementation of Station Blackout Rule Multi-Plant Action ltem A-22" as a guideline. lt is not intended that Tl 25151120 be completely reinspected.

The inspection should include, but not be limited to, an assessment of any licensee actions to:

Describe the licensee's actions to verify the adequacy of equipment needed to mitigate an SBO Licensee Action event.

a. Verify through The licensee reviewed procedures used for mitigating SBO events to identify the required walkdowns and equipment for walkdowns. The licensee then conducted walkdowns of this equipment to ensure it inspection that all was adequate and properly staged. Equipment included but was not limited to the SBO air required materials are compressor, portable diesel generator battery chargers, and the Salem Unit 3 gas turbine adequate and properly generator.

staged, tested, and maintained.

Describe inspector actions to verify equipment is available and useable.

The inspector assessed the licensee's capability to mitigate SBO conditions by conducting a review of the licensee's walkdown activities. ln addition, the inspector selected a sample of equipment utilized/required for mitigation of a SBO and conducted independent walkdowns of that equipment to verify that the equipment was properly aligned and staged.

Discuss general results including corrective actions by licensee.

The licensee and inspector reviews verified that SBO equipment was ready to respond to a SBO condition. Minor discrepancies were identified, and the licensee initiated the appropriate CAP notifications. They are listed in the Supplemental Information Attachment of this report. The inspector reviewed the associated CAP notifications, and determined the licensee's initial response, including their assessment and prioritization were appropriate.

Licensee Action Describe the licensee's actions to verify the capability to mitigate an SBO event.

b. Demonstrate through The licensee performed a walkdown of the procedures used to combat an SBO condition to walkdowns that demonstrate that the procedures were executable.

procedures for response to an SBO are executable.

Describe inspector actions to assess whether procedures were in place and could be used as intended.

The inspector assessed the licensee's SBO capabilities by conducting a review of the licensee's walkdown activities. In addition, the inspector selected several sections of the procedures walked down by the licensee and conducted walkdowns to independently verify the licensee's conclusions.

Discuss general results including corrective actions by licensee.

The licensee documented minor issues and possible enhancements and entered them into their CAP. No additional deficiencies were identifled by the inspector.

03.03 Assess the licensee's capability to mitigate internal and external flooding events required by station design. Refer to lP 71111.01, "Adverse Weather Protection," Section 02.04, "Evaluate Readiness to Cope with External Flooding" as a guideline. The inspection should include, but not be limited to, an assessment of any licensee actions to verify through walkdowns and inspections that all required materials and equipment are adequate and properly staged. These walkdowns and inspections shall include verification that accessible doors, barriers, and penetration seals are functional.

Describe the licensee's actions to verify the capability to mitigate existing design basis flooding Licensee Action events.

Verify through The licensee performed walkdowns and inspections of permanent plant equipment to ensure that walkdowns and accessible doors, barriers, penetration seals, drains, and sumps were functional. The licensee inspection that all verified by walkdown and inspection that all required material and portable equipment was required materials are properly staged. Regarding the portable equipment, the licensee's walkdowns ensured it was adequate and properly properly staged and would remain functionalfollowing a safe shutdown earthquake event. The staged, tested, and rooms and structures that were considered in the review included those required by design basis maintained.

to mitigate the consequences of a flooding event, both internal and external.

Describe inspector actions to verify equipment is available and useable. Assess whether procedures were in place and could be used as intended.

The inspector assessed the licensee's capabilities to mitigate flooding by conducting a review of the licensee's walkdown activities. In addition, the inspector conducted independent walkdowns of selected flood mitigation equipment to assess the licensee's flood mitigating capabilities. The inspector also conducted a walkdown of several flood penetration seals with licensee staff to verify the licensee's procedure and inspection criteria. The licensee's flood mitigation procedures were reviewed to verify usability. The inspector assessed these procedures to be usable as intended.

Discuss general results including corrective actions by licensee.

The inspector concluded that all required materials are adequate and properly staged, tested, and maintained to respond to an internal or external flood within the plant's design basis. While no operability or significant concerns were identified, the licensee and the inspector identified several minor issues, which the licensee entered into their CAP. The associated CAP notifications are listed in the Supplemental Information Attachment of this report. The inspector reviewed the associated CAP notifications and determined that the licensee's initial responses, including their assessment and prioritization, were appropriate.

03.04 Assess the thoroughness of the licensee's walkdowns and inspections of important equipment needed to mitigate fire and flood events to identify the potential that the equipment's function could be lost during seismic events possible for the site. Assess the licensee's development of any new mitigating strategies for identified vulnerabilities (e.9., entered it in to the corrective action program and any immediate actions taken). As a minimum, the licensee should have performed walkdowns and inspections of important equipment (permanent and temporary) such as storage tanks, plant water intake structures, and fire and flood response equipment; and developed mitigating strategies to cope with the loss of that important function. Use lP 71111.21, "Component Design Basis Inspection," Appendix 3, "Component Walkdown Considerations," as a guideline to assess the thoroughness of the licensee's walkdowns and inspections.

Describe the licensee's actions to assess the potential impact of seismic events on the availability Licensee Action of equipment used in fire and flooding mitigation strategies.

a. Verify through The licensee developed an attribute list for the inspection of important equipment needed to walkdowns that all mitigate fire and flood events to indentify the potential that the equipment's function could be lost required materials are during seismic events possible for the site. The licensee then performed walkdowns and adequate and properly inspections of temporary and permanent plant equipment needed to mitigate fire and flood events staged, tested, and to ensure that the failure/rupture of these or surrounding structures, systems, or components maintained.

would not degrade the capability of the credited system to perform design basis functions.

For portable equipment, the licensee's assessment included reviewing potential vulnerabilities related to associated procedures for equipment usage and equipment storage (to protect it from a seismic event). Regarding permanently installed fire protection equipment, the licensee's review evaluated its seismic classification and associated procedures used to operate the system for fighting fires.

Describe inspector actions to verify equipment is available and useable. Assess whether procedures were in place and could be used as intended.

The inspector conducted multiple walkdowns, both independently and in conjunction with licensee personnel, of important equipment needed to mitigate fire and flood events to identify the potential that the equipment's function could be lost during a seismic event. This equipment included, but was not limited to:

.

all major 8.5.b contingency response equipment staged throughout the site; o portions of the installed fire protection and suppression equipment in various plant areas;

.

the installed fire pumps and their controls; and o watertight doors, roof hatches and floor plugs at the plant's intake structure and other exterior/building areas.

The inspector reviewed the licensee's flood and fire mitigation procedures to assess usability. The results of the inspector's reviews aligned with the licensee's conclusions that there were a number of seismic vulnerabilities, as described below. The inspector determined that the licensee meets the current licensing and design basis for 8.5.b, fire protection, and flooding.

Discuss general results including corrective actions by licensee. Briefly summarize any new mitigating strategies identified by the licensee as a result of their reviews.

The licensee's reviews for this issue determined that non safety-related structures, systems, and components, in general, were not considered to be seismically qualified. This included the majority of the fire protection system, including the installed fire pumps and the fresh water storage tanks. The licensee also determined that firefighting equipment staged to respond to B.S.b events was stored in buildings that were not seismically qualified, as a seismic event and B.5.b event have not previously been assumed to occur coincidentally. The licensee also determined that the portable fire protection equipment storage areas in the Nuclear Operations Support Facility and the Turbine Building were also not seismically qualified.

The inspector confirmed that the vulnerabilities were properly entered and characterized in the CAP. Potential corrective actions and/or any associated mitigating strategies were under review at the close of this inspection.

Meetinos 4OAO Exit Meetinq The lnspector presented the inspection results to Mr. Eilola and other members of licensee management at the conclusion of the inspection on April 29,2011. Proprietary information reviewed by the inspector during the inspection was returned to the licensee.

The Inspector verified the inspection report does not contain proprietary information.

A-1

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee

H. Berrick, Regulatory Assurance
E. Eilola, Plant Manager
C. Fricker, Site Vice President
J. Garecht, Operations Director
A. Johnson, Manager Design Engineering
J. Kandasamy, Manager Salem Regulatory Assurance
J. Konovalchick, Operations Shift Manager
E. Powell, Shift Operations Manager
L. Rajkowski, Engineering Director
B. Thomas, Senior Compliance Engineer
E. Villar, Regulatory Assurance

Other

E. Rosenfeld, New Jersey Department of Environmental Protection

LIST OF DOCUMENTS REVIEWED