ML11118A002

From kanterella
Jump to navigation Jump to search
NRR E-mail Capture - Acceptance Review Results: Request for Relief 3-ISI-26
ML11118A002
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 04/27/2011
From: Gratton C
Division of Operating Reactor Licensing
To: Matthews T
Tennessee Valley Authority
References
Download: ML11118A002 (2)


Text

1 NRR-PMDAPEm Resource From:

Gratton, Christopher Sent:

Wednesday, April 27, 2011 8:22 AM To:

Matthews, Thomas C IV Cc:

Boyle, Patrick; Lingam, Siva

Subject:

Acceptance review results: Request for relief 3-ISI-26 Mr. Mathews:

By letter dated March 21, 2011, the Tennessee Valley Authority requested relief from weld examination coverage requirements specified in American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 2001 Edition, 2003 Addenda as amended by Title 10 of the Code of Federal Regulations (10 CFR), Section 50.55a(b)(2)(xv)(A)(2), for one full penetration welds due to access limitations caused by design. The request was for Browns Ferry Nuclear Plant, Unit 3, for the third ten-year inspection interval, which ends November 18, 2015. The request was made pursuant to 10 CFR 50.55a(g)(5)(iii) and was identified as Request for Relief 3-ISI-26.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this request for approval. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review consistent with 10 CFR 50.55a(g)(5)(iii), and make an independent assessment regarding the acceptability of the proposed action in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-1055.

Christopher Gratton Senior Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Hearing Identifier:

NRR_PMDA Email Number:

13 Mail Envelope Properties (Christopher.Gratton@nrc.gov20110427082100)

Subject:

Acceptance review results: Request for relief 3-ISI-26 Sent Date:

4/27/2011 8:21:40 AM Received Date:

4/27/2011 8:21:00 AM From:

Gratton, Christopher Created By:

Christopher.Gratton@nrc.gov Recipients:

"Boyle, Patrick" <Patrick.Boyle@nrc.gov>

Tracking Status: None "Lingam, Siva" <Siva.Lingam@nrc.gov>

Tracking Status: None "Matthews, Thomas C IV" <tcmatthews@tva.gov>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2040 4/27/2011 8:21:00 AM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: