Request for Inspection Procedure (IP) 95002, Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area
ML110980241
Person / Time
Site: Fort Calhoun 
Issue date: 04/07/2011
From: Reinhart J
Omaha Public Power District
To: Collins E
NRC Region 4
References
EA-10-084, IR-10-008, LlC-11-0013
Download: ML110980241 (2)


Text

-~

DjjjjD Omaha Public PowerDI8IItcI 444 South 16 th Street Mall Omaha, NE 68102-2247 LlC-11-0013 April 7, 2011 Mr. E. E. Collins, Jr.

Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 612 East Lamar Blvd, Suite 400 Arlington, TX 76011-8064

References:

1.

Docket No. 50-285

2.

Letter from NRC (E. E. Collins) to Omaha Public Power District (OPPD), "Final Significance Determination for a Yellow Finding and Notice of Violation, NRC Inspection Report 05000285/2010008, Fort Calhoun Station," dated October 6,2010. (NRC-10-0080) (EA 10-084)

3.

Letter from NRC (E.E. Collins) to Omaha Public Power District (OPPD), "Assessment Followup Letter -

Fort Calhoun Station.

Dated October 7, 2010.

4.

Letter from Omaha Public Power District (J. A. Reinhart) to NRC Document Control Desk (DCD),

"NRC Inspection Report 05000285/2010008, Reply to a Notice of Violation (NOV); EA-10 084," dated November 5,2010. (LlC-10-0098)

Subject:

Request for Inspection Procedure (IP) 95002, "Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area."

Reference 2 transmitted a Ye,low Finding to Omaha Public Power District (OPPD) concerning the failure to have adequate procedures to protect against a design basis flooding event. Reference 3 announced that an IP 95002 supplemental inspection would be conducted at Fort Calhoun Station (FCS) to assess the OPPD actions to correct the Finding.

In response to References 2 and 3 FCS performed a root cause analysis and developed a corrective action plan to address the Yellow Finding. FCS has completed interim corrective actions to protect the station from a design basis flooding event. Additionally, OPPD will be providing a revision to the yellow finding response (Reference 4) prior to the Nuclear Regulatory Commission (NRC), IP 95002 supplemental inspection.

Employment with Equal Opportunity

U. S. Nuclear Regulatory Commission LlC-11-0013 Page 2 Based on the completed causal analysis, corrective action plans, and interim corrective actions, OPPD respectfully requests the NRC conduct the supplemental inspection, IP 95002, for the Yellow Finding documented in Reference 2.

This letter contains no commitments.

. ~. Reinhart Site Vice President Fort Calhoun Station JAR/dkg c:

L. E. Wilkins, NRC Project Manager J. C. Kirkland, NRC Senior Resident Inspector Document Control Desk