UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 5, 2011 Mr. Larry Meyer Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - LICENSE AMENDMENT REQUEST FOR REVISING TECHNICAL SPECIFICATION OPERATING LIMITS TO INCLUDE MEASUREMENT UNCERTAINTY (TAC NOS. ME5906 AND ME5907)
Dear Mr. Meyer:
By letter dated March 23,2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110830009), NextEra Energy Point Beach, LLC, submitted a license amendment request proposing to replace non-conservative values for five operating limits in the Technical Specifications for Point Beach Nuclear Plant, Units 1 and 2, with conservative values that incorporate measurement uncertainty.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 ofthe Code of Federal Regulations (10 CFR), an amendment to the license (including the technical speCifications) must fully describe the changes requested and following, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
L. Meyer
- 2 If you have any questions regarding this matter, 1 may be reached at (301) 415-3049.
Sincerely, 4 1JW
~erry A. Beltz, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301 cc: Distribution via ListServ
L. Meyer
- 2 If you have any questions regarding this matter, I may be reached at (301) 415-3049.
Sincerely, IRA!
Terry A. Beltz, Senior Project Manager Plant licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301 cc: Distribution via ListServ DISTRIBUTION:
PUBLIC LPL3-1 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDeEicb Resource RidsNrrDirsltsb Resource RidsNrrDorlDprResource RidsNrrDorlLpl3-1 Resource RidsNrrLABTully Resource RidsNrrPMPointBeach Resource RidsOgcRp Resource RidsRgn3MailCenter Resource SWyman, NRRlDEJEICB RGrover, NRRlDIRSIITSB ADAMS Accession No.: ML110940306 OFFICE DORULPL3-1/PM DORULPL3-1/LA DORULPL3-1/BC DORULPL3-1/PM NAME l!.Beltz BTuily (JBurkhardt for) RPascarelli TBeitz DATE 4/4/11 4/5/11 4/5/11 4/5/11 OFFICIAL RECORD COpy