ML110880598
| ML110880598 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 03/29/2011 |
| From: | Pickett D Plant Licensing Branch 1 |
| To: | Furio P Constellation Energy Group |
| Pickett , NRR/DLPM, 415-1364 | |
| References | |
| TAC ME5910, TAC ME5911 | |
| Download: ML110880598 (1) | |
Text
From:
Pickett, Douglas Sent:
Tuesday, March 29, 2011 2:56 PM To:
'Furio, Patricia S' Cc:
Lingam, Siva; Hamm, Matthew; Boyle, Patrick; Salgado, Nancy
Subject:
Acceptance Review Calvert Cliffs TAC Nos. ME5910/ME5911 Ms. Furio:
By letter dated March 22, 2011, Calvert Cliffs Nuclear Power Plant, LLC submitted a license amendment for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 (TAC Nos.
ME5910/ME5911). The proposed amendment would revise the Technical Specifications consistent with TSTF-513, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation.
The purpose of this e-mail is to provide the results of the Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concludes that it provides technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Please contact me if you have any questions. A copy of this email will be made publicly available in ADAMS.
Douglas V. Pickett, Senior Project Manager Calvert Cliffs, R.E. Ginna U.S. Nuclear Regulatory Commission 301-415-1364 Email: douglas.pickett@nrc.gov