MONTHYEARML1023006412010-08-16016 August 2010 10 CFR 50.55a Request Number RR-12, Request for Relief from Code Case N-722 Visual Examination of the Reactor Vessel Hot Leg Nozzle to Safe End Dissimilar Metal Welds Project stage: Request ML1026500132010-09-21021 September 2010 Acceptance Review E-mail, Relief Request RR-12, from Requirements of ASME Code Case N-722 Visual Examination of Reactor Vessel Hot-Leg Nozzle to Safe End Dissimilar Metal Welds for 4th 10-Year Inservice Inspection Interval (ME4541) Project stage: Acceptance Review ML1027801882010-10-0404 October 2010 Email, Draft Request for Additional Information, Relief Request RR-12, from Requirements of ASME Code Case N-722 for Fourth 10-Year Inservice Inspection Interval (ME4541) Project stage: Draft RAI ML1027801902010-10-0404 October 2010 Draft Request for Additional Information, Relief Request RR-12, from Requirements of ASME Code Case N-722 for Fourth 10-Year Inservice Inspection Interval (ME4541) Project stage: Draft RAI ML1028600872010-10-25025 October 2010 Request for Additional Information, Relief Request RR-12 from ASME Code Case N-722 Visual Examination Requirements for 4th 10-Year Inservice Inspection Interval Project stage: RAI ML1029101312010-10-25025 October 2010 Request for Withholding Information from Public Disclosure, 7/30/10 Affidavit Executed by J. Gresham, Westinghouse Project stage: Withholding Request Acceptance LIC-10-0095, Response to Request for Additional Information (RAI) Regarding Relief from ASME Code Case N-722 Requirements for Visual Examination of Reactor Vessel Hot Leg Nozzle to Safe End Welds2010-11-0404 November 2010 Response to Request for Additional Information (RAI) Regarding Relief from ASME Code Case N-722 Requirements for Visual Examination of Reactor Vessel Hot Leg Nozzle to Safe End Welds Project stage: Response to RAI ML1102001932011-01-14014 January 2011 Withdrawal of Response to Request for Additional Information (RAI) Regarding Request for Relief from ASME Code Case N-722 Requirements for Visual Examination of Reactor Vessel Hot Leg Nozzle-to-Safe End Dissimilar Metal Butt Welds Project stage: Withdrawal ML1104705872011-02-16016 February 2011 Request for Additional Information LAR to Revise Technical Specification to Relocate Operating and Surveillance Requirements for the Power Operated Relief Valve Project stage: RAI ML1104705882011-02-16016 February 2011 Request for Additional Information Project stage: RAI ML1105404412011-02-23023 February 2011 Request for Additional Information, Round 2, Relief Request RR-12 from ASME Code Case N-722 Visual Examination Requirements for 4th 10-Year Inservice Inspection Interval Project stage: RAI ML1105404492011-02-23023 February 2011 Request for Additional Information, Round 2, Relief Request RR-12 from ASME Code Case N-722 Visual Examination Requirements for 4th 10-Year Inservice Inspection Interval Project stage: RAI ML1106102172011-03-0303 March 2011 Request for Additional Information, Round 2, Relief Request RR-12 from ASME Code Case N-722 Visual Examination Requirements for 4th 10-Year Inservice Inspection Interval Project stage: RAI LIC-11-0016, Response to Second NRC Request for Additional Information (RAI) Regarding Request for Relief from ASME Code Case N-722 Requirements for Visual Examination of Reactor Vessel Hot Leg Nozzle-to-Safe End Dissimilar Metal Butt Welds2011-03-0404 March 2011 Response to Second NRC Request for Additional Information (RAI) Regarding Request for Relief from ASME Code Case N-722 Requirements for Visual Examination of Reactor Vessel Hot Leg Nozzle-to-Safe End Dissimilar Metal Butt Welds Project stage: Request ML1109103272011-04-0505 April 2011 Verbal Authorization, Request for Relief from Code Case N-722 Visual Examination of the Reactor Vessel Hot-Leg Nozzle-to-Safe-End Dissimilar Metal Welds, 4th 10-Year Inservice Inspection Interval Project stage: Other ML1108309472011-05-17017 May 2011 Request for Withholding Information from Public Disclosure, Affidavit Dated 7/30/10, Executed by J. Gresham, Westinghouse, Report LTR-PAFM-10-123-P, Revision 0 Project stage: Withholding Request Acceptance ML1122702902011-08-18018 August 2011 Relief Request RR-12 from Code Case N-722, Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated with Alloy 600/82/182 Materials, Fourth 10-Year Inservice Inspection Interval Project stage: Other LIC-12-0004, Delay 2012 Refueling Outage and Extend In-service Inspection (ISI) and In-service Test (IST) Intervals2012-01-17017 January 2012 Delay 2012 Refueling Outage and Extend In-service Inspection (ISI) and In-service Test (IST) Intervals Project stage: Other 2011-02-16
[Table View] |
|
---|
Category:Letter type:LIC
MONTHYEARLIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0004, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2022-02-17017 February 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-21-0008, Organizational and Management Change2021-10-28028 October 2021 Organizational and Management Change LIC-21-0007, ISFSI Only Emergency Plan Update2021-09-0808 September 2021 ISFSI Only Emergency Plan Update LIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-21-0003, Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report2021-03-30030 March 2021 Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-21-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-22022 February 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0015, Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092)2020-07-29029 July 2020 Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092) LIC-20-0014, Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2020-07-15015 July 2020 Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-20-0012, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2020-05-18018 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool LIC-20-0011, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-05-0707 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0009, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2020-04-30030 April 2020 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-20-0008, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-04-13013 April 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2020-03-26026 March 2020 (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E LIC-20-0004, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-03-10010 March 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-02-27027 February 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0002, Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan2020-02-27027 February 2020 Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan LIC-20-0001, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-02-0606 February 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0025, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-12-19019 December 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0007, Post-Shutdown Decommissioning Activities Report2019-12-16016 December 2019 Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-19-0022, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-11-18018 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0018, Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2019-11-14014 November 2019 Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-19-0020, Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis2019-10-17017 October 2019 Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis LIC-19-0017, Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 20042019-08-0808 August 2019 Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 An LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa2019-05-20020 May 2019 License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated LIC-19-0008, Submittal of 2018 Annual Report2019-04-0404 April 2019 Submittal of 2018 Annual Report LIC-19-0004, Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP)2019-03-28028 March 2019 Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP) LIC-19-0005, 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report2019-03-28028 March 2019 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report LIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2019-02-28028 February 2019 License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme LIC-19-0003, Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation R2019-02-28028 February 2019 Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation Requ LIC-19-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-01-0303 January 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-18-0031, Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update2018-12-17017 December 2018 Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update LIC-18-0030, Request for Partial Site Release Phase 22018-11-12012 November 2018 Request for Partial Site Release Phase 2 LIC-18-0028, Letter of Intent to Submit Request for Additional Partial Site Release2018-10-18018 October 2018 Letter of Intent to Submit Request for Additional Partial Site Release 2024-06-18
[Table view] |
Text
Omaha Public Power DlA7cd 444 South 16th Street Mall Omaha, NE 68102-2247 November 4, 2010 LIC-10-0095 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
References:
- 1. Docket No. 50-285
- 2. Letter from OPPD (H. J. Faulhaber) to NRC (Document Control Desk), "10 CFR 50.55a Request Number RR-12, Omaha Public Power District (OPPD) Request for Relief from Code Case N-722 Visual Examination (VE) of the Reactor Vessel Hot Leg Nozzle to Safe End Dissimilar Metal Welds," dated August 16, 2010 (LIC 0065) (ML102300641)
- 3. Letter from NRC (Lynnea Wilkins) to OPPD (D. J. Bannister), "Fort Calhoun Station, Unit No. 1 - Request for Additional Information Re:
Request for Relief From Code Case N-722 Visual Examination of the Reactor Vessel Hot-Leg Nozzle-to-Safe End Dissimilar Metal Welds (TAC No. ME4541)," dated October 25, 2010
SUBJECT:
Response to Request for Additional Information (RAI) Regarding Request for Relief from ASME Code Case N-722 Requirements for Visual Examination of Reactor Vessel Hot Leg Nozzle to Safe End Welds In Reference 2, pursuant to 10 CFR 50.55a(a)(3)(i), the Omaha Public Power District (OPPD) requested NRC approval of an alternative to American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section Xl, Code Case N-722 visual examination (VE) requirements.
Specifically, for two reactor vessel (RV) hot leg nozzle to safe end dissimilar metal (DM) welds at Fort Calhoun Station, Unit No. 1, OPPD proposed to credit the following measures in lieu of the VE required by Code Case N-722:
- 1. Augmented examinations performed during previous refueling outages.
- 2. Deterministic analyses of hypothetical crack growth that result in a long period of time to reach ASME maximum allowable 75% through-wall cracking.
- 3. The addition of zinc to the reactor coolant system to mitigate primary water stress corrosion cracking.
Employment with Equal Opportunity
U. S. Nuclear Regulatory Commission LIC-10-0095 Page 2 In Reference 3, the NRC requested that OPPD provide additional information in order to complete its review. Accordingly, the requested information is attached.
To provide additional support for the requested relief, Westinghouse is normalizing eddy current test (ECT) data from the 2009 examination of these two RV hot leg nozzle-to-safe end DM welds and expects to finish in the late November to mid-December timeframe. OPPD will submit the results to the NRC shortly thereafter (AR 44658).
This data was collected from the inside diameter of the two RV hot leg nozzle-to-safe end DM welds and is therefore much more definitive than a qualitative outside diameter VE. The analysis will determine if the onset of stress corrosion cracking is imminent and provide additional support for the conclusion that cracks in the RV hot leg nozzle-to-safe end DM welds do not exist. No other commitments are contained in this submittal.
As an enhancement, prior to the start of the 2011 refueling outage, OPPD is revising Surveillance Test (ST) QC-ST-MX-3003, which currently requires a visual inspection under the RV and surrounding areas for signs of leakage or boric acid accumulation.
The enhancement will require that the RV nozzles be inspected for the presence of leakage and/or boric acid accumulation on the containment floor underneath them, the bio-shield wall near them, or on the bottom of the nozzle insulation.
If you have any questions regarding this submittal, please contact Mr. Bill Hansher at (402) 533-6894.
Sincerely, Harry J aber Division Manager-Nuclear Engineering HJF/BL/mle
Attachment:
OPPD Response to NRC Request for Additional Information c: E. E. Collins, NRC Regional Administrator, Region IV (w/o Enclosures)
L. E. Wilkins, NRC Project Manager J. C. Kirkland, NRC Senior Resident Inspector (w/o Enclosures)