ML110840197
| ML110840197 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 03/25/2011 |
| From: | Lynnea Wilkins Plant Licensing Branch IV |
| To: | Mccutchen E Nebraska Public Power District (NPPD) |
| Wilkins, L E, NRR/DORL/LPL4, 415-1377 | |
| Shared Package | |
| ML110840192 | List: |
| References | |
| TAC ME4974 | |
| Download: ML110840197 (1) | |
Text
From:
Wilkins, Lynnea Sent:
Friday, March 25, 2011 8:00 AM To:
McCutchen, Edward L.
Cc:
Lent, Susan; Burkhardt, Janet
Subject:
DRAFT RAIs for Cooper Nuclear Station LAR (ME4974)
Attachments:
ME4974 RAI.docx Ed, By letter dated October 29, 2010, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML103080079), Nebraska Public Power District requested an amendment to Facility Operating License No. DPR - 46 for Cooper Nuclear Station (CNS), and Appendix A, technical specifications (TSs), of the facility operating license. The proposed changes would revise the battery acceptance criteria in CNS TS Surveillance Requirement (SR) 3.8.4.1 and TS Table 3.8.6-1. Specifically, the proposed license amendment request (LAR) would revise the acceptance criteria in the CNS TS SR 3.8.4.1 and TS Table 3.8.6-1 by revising the battery terminal voltage while on float charge and specific gravity acceptance criteria to ensure that the Division I and II safety related batteries can perform their safety functions and will remain operable during postulated design basis events.
The NRC staff has reviewed your submittal and has determined that the information specified in the attached Request for Additional Information (RAI) is needed for the staff to complete its evaluation.
Please contact me if a clarifying teleconference is needed for the attached RAIs.
Thanks Lynnea Lynnea Wilkins, Project Manager Fort Calhoun Station, Unit 1 Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: 301-415-1377