MONTHYEARPLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums PLA-8048, Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence2023-01-14014 January 2023 Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8038, Notification of Petition for Bankruptcy (PLA-8038)2022-12-14014 December 2022 Notification of Petition for Bankruptcy (PLA-8038) PLA-8036, Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-80362022-11-30030 November 2022 Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-8036 PLA-8035, Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-80352022-11-0808 November 2022 Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-8035 PLA-8031, Emergency Plan Revision 66 (PLA-8031)2022-11-0707 November 2022 Emergency Plan Revision 66 (PLA-8031) PLA-8032, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032)2022-10-28028 October 2022 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032) PLA-8026, Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026)2022-10-19019 October 2022 Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026) PLA-8015, Application for Order Approving Indirect Transfer of Control of Licenses2022-09-29029 September 2022 Application for Order Approving Indirect Transfer of Control of Licenses PLA-8030, Evacuation Time Estimate Report PLA-80302022-09-15015 September 2022 Evacuation Time Estimate Report PLA-8030 PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-8019, Nd Refueling Outage Owner'S Activity Report, PLA-80192022-07-13013 July 2022 Nd Refueling Outage Owner'S Activity Report, PLA-8019 PLA-8013, Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-80132022-06-27027 June 2022 Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-8013 PLA-8012, 10 CFR 50.46 Annual Report2022-06-10010 June 2022 10 CFR 50.46 Annual Report PLA-8005, Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005)2022-05-23023 May 2022 Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005) PLA-8001, Radiation Exposure Information and Reporting System - PLA-80012022-04-28028 April 2022 Radiation Exposure Information and Reporting System - PLA-8001 PLA-7987, Radioactive Effluent Release Report and Offsite Dose Calculation Manual - (PLA-7987)2022-04-26026 April 2022 Radioactive Effluent Release Report and Offsite Dose Calculation Manual - (PLA-7987) PLA-7986, 2021 Annual Environmental Operating Report (Nonradiological) Docket No. 50-387, PLA-79862022-04-26026 April 2022 2021 Annual Environmental Operating Report (Nonradiological) Docket No. 50-387, PLA-7986 PLA-7985, Annual Radiological Environmental Operating Report2022-04-22022 April 2022 Annual Radiological Environmental Operating Report PLA-7883, Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883)2022-03-31031 March 2022 Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883) PLA-7995, Property Insurance Program (PLA-7995)2022-03-30030 March 2022 Property Insurance Program (PLA-7995) PLA-7998, Submittal of Unit 1 Cycle 23 Core Operating Limits Report and Reload Safety Analysis Report2022-03-29029 March 2022 Submittal of Unit 1 Cycle 23 Core Operating Limits Report and Reload Safety Analysis Report PLA-7991, Proof of Financial Protection and Guarantee of Payment of Deferred Premium2022-03-24024 March 2022 Proof of Financial Protection and Guarantee of Payment of Deferred Premium PLA-7984, Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 22022-03-0808 March 2022 Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-7962, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-79622022-01-0505 January 2022 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-7962 2024-01-04
[Table view] |
Text
Timothy S. Rausch PPL Susquehanna, LLC 1:0 Sr. Vice President & Chief Nuclear Officer 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3445 Fax 570.542.1504 '.,. -
tsrausch@pplweb.com
- A, Ms. Cindy Bladey Chief- Rules, Announcements, and Directives Branch Office of Administration 71 Mail Stop TWB-05-BOIM Washington, DC 20555-0001 N9 SUSQUEHANNA STEAM ELECTRIC STATION COMMENTS ON PROPOSED GENERIC COMMUNICATION DRAFT NRC REGULATORY ISSUE
SUMMARY
2011-013 ADEQUACY OF STATION ELECTRIC DISTRIBUTION SYSTEM VOLTAGES (76 Fed. Reg. 10072) Docket Nos. 50-387 PLA-6701 and 50-388
Reference:
DraftNRC Regulator3 Issue Summnaty 2011-XX, "Adequacy ofStation Electric DistributionSysWem Voltages, "dated January 12, 2011.
PPL Susquehanna, LLC (PPL) appreciates the opportunity to comment on the proposed draft Regulatory Issue Summary (RIS) 2011-013, "Adequacy of Station Electric Distribution System Voltages," originally identified as RIS 201 I-XX. In that regard, PPL offers the following comments, which are also submitted to the Nuclear Energy Institute (NEI), by copy of this letter.
As stated in draft RIS 2011-013, the intent of the RIS is to clarify the NRC staff's technical position on existing regulatory requirements and voltage studies necessary for degraded voltage relay setting bases and Transmission Network/Offsite/Onsite station electric power system design bases. The RIS also states that it does not transmit any new requirements or staff positions.
PPL Susquehanna Svecific Comments Contrary to the stated intent, PPL believes that the RIS does transmit new requirements and staff positions. Specific comments applicableto Susquehanna Steam Electric Station (SSES) are as follows:
0 The RIS introduces the need to consider both "starting and running" conditions during all operating configurations while maintaining the offsite power supply connected to the plant electrical distribution system. The establishment of a degraded voltage relay (DVR) to detect a "sustained" degraded voltage condition challenges the relay's basis for "protection" if its actuation (dropout) setpoint must accommodate both starting and running voltage conditions. The term "sustained 0W ©
Document Control Desk PLA-6701 degraded voltage" implies a steady state degraded voltage condition, and excludes starting voltage consideration.
RIS 201 1-XX, Page 6, Section 1. "Degraded Voltage Relaying Design Calculations" contains the statement "staff considers degraded voltage condition coincident with a postulated design basis accident to be a credible event." This statement implies a requirement to demonstrate capability of connected loads to start and run at the degraded voltage relay dropout setting. For Susquehanna, sequencing of loads from the offsite power source cannot be demonstrated at the relay dropout setpoint because operation at this voltage level would result in separation from the offsite transmission system. Furthermore, the statement on page 6 of the RIS is not in agreement with other regulatory position documents such as GSI 171, "Engineered Safety Features Failure (ESF) from a Loss of Offsite Power (LOOP) subsequent to a Loss of Coolant Accident (LOCA)," which concluded a degraded voltage condition coincident with a postulated design basis accident is not a credible event.
Additional clarification is necessary if starting transients must be included when determining the degraded voltage relay (DVR) dropout setpoint. This condition will increase the probability of separating from the offsite transmission system and increase the likelihood of a double sequencing event, which is a potential nuclear safety concern.
The RIS requires performance of analyses for an accident in the unit being analyzed and simultaneous shutdown of all other units at the station. This is not consistent with the present Susquehanna design and licensing basis, which is an accident on one unit followed by the safe shutdown of the second (non-accident) unit. The safe shutdown of the non-accident unit is considered a controlled shutdown, which follows automatic operation of the safety related loads on the accident unit. This accident response is also consistent with the NERC requirements for the design of the transmission system. The RIS should be revised to be in agreement with the current NERC requirements.
Generic Comments In addition to the specific comments above, the following generic comments are provided.
- The draft RIS attempts to clarify the requirements for setting the DVRs based on the criteria established in the following three main documents:
- 1) NRC letters to licensees dated June 2 & 3, 1977,
- 2) Branch Technical Position (BTP), PSB-1 Revision 0,
Document Control Desk PLA-6701
- 3) Generic Letter 79-36, "Adequacy of Station Electric Distribution Systems Voltages" The guidance listed in the draft RIS is not consistent with all the requirements listed in these three documents and a new interpretation is provided in some cases.
It should be generally recognized that a nuclear plant operating license may not have been issued based on the above documents. For example, the 1977 letters discussed above are not applicable to SSES.
- The lack of regulatory clarity in the RIS could result in revising the degraded voltage setpoint for a plant's DVR thus increasing the possibility of premature separation from the offsite circuit (i.e., undervoltage relay actuation). This relay operation could lead to an increase in the likelihood of a double sequencing event, which has the potential to create a nuclear safety concern.
" The RIS introduces the need for two sets of calculations, one to establish the DVR relay setpoint and one for the interface with the offsite transmission system. The RIS should not specify the number of calculations that are necessary for a plant to meet a regulatory requirement.
" The condition the DVR is required to "protect" needs to be specifically defined along with the applicable relay setting, (i.e., relay minimum dropout, maximum dropout, or reset). If the DVR is installed to provide a level of protection then the analysis must demonstrate that the safety related equipment is capable of performing its required safety function. An example of this would be the case where the DVR analysis would need to demonstrate acceptable operation at both the starting and running equipment ratings when at the DVR dropout setting.
" A clarification of the term "sustained" is needed to determine if "sustained" refers to a steady state voltage condition (i.e., no equipment starting voltage effects) for which the DVR setting is to be established.
" The guidance in the RIS is too general when referring to operating voltages. The specific voltage requirements need to be specified instead of implied by a general term. The RIS needs to clarify that the impact of the nuclear unit trip on the transmission system voltage must be considered in the plants voltage analysis.
" The time delays suggested are not consistent with PSB-l. The PSB established one time delay to allow for operator action. The RIS does not address this requirement.
Documcnt Control Desk PLA-6701 The RIS also lacks any acknowledgement of preventative measures the licensees have taken to minimize the potential for a degraded voltage condition.
Advancements in plant Ioadflow analyses and measures to increase the reliability of the offsite transmission system are industry improvements that have occurred since the degraded voltage events that occurred 35 years ago.
If you have any questions regarding the comments above, please contact Mr. Duane L. Filchner at (610) 774-7819.
T. S. Raus Copy: NRC Region I Mr. P. W. Finney, NRC Sr. Resident Inspector Mr. R. R. Janati, DEP/BRP Mr. B. K. Vaidya, NRC Project Manager Mr. G. Clefton, NEI Project Manger