MONTHYEARML1101906372011-01-14014 January 2011 Response to Request for Additional Information Regarding License Amendment Request to Relocate Specific Surveillance Frequency Requirements to a Licensee Controlled Program, License Amendment Request. Project stage: Response to RAI ML1108300462011-03-17017 March 2011 Response to Request for Additional Information on Fourth Ten Year Inservice Test Program Interaval Request for Relief No. ON-SRP-HPI-03 Project stage: Response to RAI ML1104704462011-03-21021 March 2011 Issuance of Amendments Regarding Adoption of Technical Specification Task Force (TSTF)-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk-Informed Technical Specification Task Force Project stage: Approval ML1106605882011-03-28028 March 2011 Relief Request (RR) Proposed Alternative for Certain Vibration Measurement Requirements RR (ON-SRP-HPI-03)) (TAC Nos. Me 3840, ME3841, ME3842, ME5790, ME5791, ME5792, ME5793, ME5794 and ME5795) Project stage: Other ML11257A1922011-09-15015 September 2011 Implementation of License Amendment Nos. 372, 374, and 373 Project stage: Other 2011-03-21
[Table View] |
|
---|
Category:Letter
MONTHYEARML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 ML23208A0972023-07-27027 July 2023 Subsequent License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23132A2392023-06-0101 June 2023 Summary of the April 2023 Remote Environmental Audit Related to the Review of the Subsequent License Renewal Application ML23144A0192023-05-25025 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report (O3R31) IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 ML23121A0552023-05-0303 May 2023 Acknowledgement of Withdrawal Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23075A0732023-04-0505 April 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Supplement (EPID Number L-2021-SLE-0002) ML23045A1332023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Achp Letter ML23045A1402023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Shpo Letter ML23045A1432023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - State Tribe Letter ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML23069A1102023-03-10010 March 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23061A1772023-03-0303 March 2023 Notification of Oconee Nuclear Station Comprehensive Engineering Team Inspection - NRC Inspection Report 05000269/2023011, 05000270/2023011 and 05000287/2023011 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 ML22363A3942023-01-12012 January 2023 Subsequent License Renewal Environmental Report Supplement - Proposed Review Schedule ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22321A0492022-12-0808 December 2022 Issuance of Amendment Nos. 426, 428 and 427, Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9, Increase Flexibility in Mode Restraints ML22329A1042022-11-29029 November 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report ML22321A1582022-11-22022 November 2022 Summary of Conference Call Regarding the Fall 2022 Steam Generator Tube Inspections ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 ML22301A0112022-11-0303 November 2022 Request for Withholding Information from Public Disclosure Regarding the SLR Application - September 2, 2022 ML22298A0752022-10-27027 October 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application Duke Energy Letter Dated July 25, 2022 ML22264A0322022-10-20020 October 2022 _Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Duke Energy Letter Dated July 8, 2022 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22222A0072022-09-14014 September 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi ML22234A0062022-08-30030 August 2022 SLRA - Closed Public Meeting Summary - August 18, 2022 2024-02-01
[Table view] |
Text
T. PRESTON GILLESPIE, Jr.
kDuke Vice President MEnergy Oconee Nuclear Station Duke Energy ON01 VP / 7800 Rochester Hwy.
March 17, 2011 Seneca, SC 29672 864-873-4478 U.S. Nuclear Regulatory Commission 864-873-4208 fax Attn: Document Control Desk T.Gillespie@duke-energy.com Washington, DC 20555-0001
Subject:
Duke Energy Carolinas, LLC Oconee Nuclear Station, Unit 1, 2, 3 Docket No: 50-269, -270, -287 Fourth Ten Year Inservice Test Program Interval Request for Relief No. ON-SRP-HPI-03 Request for Additional Information Response By letter dated March 11, 2010, (Agencywide Document Access and Management System (ADAMS) Accession No. ML100770431), Duke Energy Carolinas, LLC (Duke Energy) submitted Request for Relief No. ON-SRP-HPI-03 seeking relief, pursuant to 10 CFR 50.55a(f)(5)(iii), from the requirement for vibration monitoring specified by the American Society of Mechanical Engineers (ASME) Operational and Maintenance Code, 1995 Edition, 1996 Addenda.
The relief would allow Duke Energy to take exception to vibration monitoring requirements for the upper motor bearing housing on the High Pressure Injection pumps for all three Oconee Nuclear Station (ONS) units on the basis of impracticality.
On August 30, 2010, Duke Energy received a request for additional information (RAI) via e-mail from the NRC Staff concerning the request for relief Duke Energy submitted on March 11, 2010. This submittal is to address the staffs questions posed in the RAI. The following enclosure contains the reviewer's questions, and Duke's responses to each.
If there are any questions or further information is needed you may contact Corey Gray at (864) 873-6325.
Sincerely, T. Preston Gillespie, Jr.
Enclosure 1<\
www. duke-energy.corn
U. S. Nuclear Regulatory Commission March 17, 2011 Page 2 Xc w/encl: Victor McCree Region IIAdministrator U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Ga 30303-1257 John Stang Project Manager U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C. 20555 Xc(w/o encl): Andy Sabisch Senior NRC Resident Inspector Oconee Nuclear Station Susan Jenkins Division of Radioactive Waste Management Bureau of Land and Waste Management SC Dept. of Health & Environment Control 2600 Bull St.
Columbia, SC 29201
Oconee Nuclear Station (ONS)
Response to NRC Request for Additional Information Relief Request ON-SRP-HPI-03
- 1) Oconee is eight years into the fourth IST test interval. Why is Oconee asking for relief now?
Oconee Response:
Early in 2003, Oconee Nuclear Station (ONS) recognized the need to request relief to allow vibration measurements on the HPI pumps to be taken at alternative locations to those required in ASME OM Code, 1995 edition with 1996 addenda. Due to relief request quality / process weaknesses (in 2003-2006) and associated improvements, a back log developed. This relief request was given lower priority and therefore not submitted unitl 2010. The quality / process weaknesses have been addressed in Duke Energy's corrective action program.
- 2) Is Oconee currently in compliance with 50.55a concerning this relief?
Oconee Response:
Yes. Per 50.55a(f)(4), IST requirements must be met "to the extent practical within the limitations of design, geometry and materials of construction." Per 50.55a(f)(5)(iii), "the licensee shall notify the Commission and submit... information" when "conformance with certain code requirements is impractical for its facility." Per 50.55a(f)(5)(iv), "the basis for this determination must be demonstrated to the satisfaction of the Commission not later than 12 months after the expiration of... each subsequent 120-month period of operation during which the test is determined to be impractical."
- 3) Why is this now a hardship?
Oconee Response:
Reference the relief request, 50.55a(f)(5)(iii), 50.55a(f)(6)(i), and LIC-102 (rev 2) Table 5.
Duke Energy is seeking relief on the basis of impracticality, not hardship. The last line of Table 5 guidance states, "Do not mention hardship or unusual difficulty in the SE."
Duke Energy has considered this requirement to be impractical since the requirement was recognized. In the spring of 2003, it was recognized that measurements for the upper motor bearing housing were not being taken, the location was not accessible, and readings taken on the domed shell would not be meaningful, even if it could be accessed safely. Although identified in 2003, this request was not submitted until March 2010.
Once Duke Energy's internal weaknesses in the processing of relief requests were addressed, the existing requests were developed and submitted based on their relative priority.
- 4) Obtaining axial vibration data is important data. Has Oconee considered obtaining the axial data at a different location such as the bottom of the motor near the pump/motor coupling area? If it is possible to obtain axial data in another position.
Oconee Response:
Yes, it is possible to take the axial data on the lower bearing on the HPI pumps and consideration was given for taking data at this location. If the axial readings were taken on the lower bearing housing (the only accessible place for axial measurement on HPI motors), the readings would be significantly attenuated due to the distance from the thrust bearing. To be detectable at the lower motor bearing, the axial forces applied on the thrust bearing faces would be transmitted through the upper bearing housing, down the external housing around the stator, into the lower bearing housing (which is 55.5 inches away from upper housing) and finally to a vibration probe magnetically attached to the lower bearing housing. Taking readings at this location as an alternative to the code requirement would still require a request for relief from the code (OMa-1 996 Subsecton ISTB 4.7.4 b). Ultimately the additional pump vibration data proposed as an alternative was determined to add more value towards the monitoring and trending for pump degradation.