Will Submit Combined Written Rept by 790609 Covering NRC 871 & NRC 898 Expansion Anchors Not Passing Qualification Tests
ML110820268
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 04/09/1979
From: Gilleland J
Tennessee Valley Authority
To: O'Reilly J
NRC/OI/RGN-II/FO
Shared Package
ML110820269 List:
References
NUDOCS 7904190082
Download: ML110820268 (3)


Text

<S a

ACCESSION NBRI7904190082 DOCDATE: 79/04/09 NOTARIZED: NO DOCKET #

FACIL:50-438 BELLEFONTE NUCLEAR PLANT, UNIT t# TENNESSEE VALLEY AU 05000438 50-439 BELLEFONTE NUCLEAR PLANT, UNIT 2p TENNESSEE VALLEY AU 05000439 AUTH.NAME AUTHOR AFFILIATION GILLE.LANDJ.E.

TENNESSEE VALLEY AUTHORITY RECIP.NAME RECIPIENT AFFILIATION O'REILLYJ.P.

REGION 2, ATLANTA, OFFICE OF THE DIRECTOR

SUBJECT:

WILL SUBMIT COMBINED WRITTEN REPT COVERING NRC 871 & NRC 898 RE EXPANS ON ANCHORS NOT PASSING QUALIFICATION TESTS BY 7 9 0 6 09,

'6vVL avMAA.EJL CF3 DISTRIBUTION CODE: 8019S COPIES RECEIVED:LTR ENCL L

SIZE TITLE: CONSTRUCTION DEFICIENCY REPORT (10CFR5O.55E).

NOTES:

E RECIPIENT ID CODE/NAME ACTION:

14 PM aokugA/4 20 LA 4WR '#

INTERNAL: 0 REG FILE 09 08 MPA 10 DAB 12 JORDANE/IE 16 AD FOR ENGR 17 AD REAC SFTY 22 DIR DPM COPIES LTTR 1

1 1

2 1

1 1

1 1

1 ENCL 1

1 1

2 1

1 1

1 1

1 RECIPIENT ID CODE/NAME 15 BC Zw

  1. 3.

21 AD //S955tt-~o 02 NRC PDR 07 EDO & STAFF 09 DEPY DIR 0PM 11 STANORDS DEV 13FIELD COOR/IE 17 AD PLANT SYS 19 AD SYS/PROJ 23 OELD COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 4

1 1

1.

1 1

1 1

1 1

EXTERNAL:

03 LPDR 24 ACRS 1

16 1

16 04 NSIC TOTAL NUMBER OF COPIES REQUIRED: LTTR REGULATORY INFORMATION DISTRIBUTION SYSTER (RIDS) 1 1

N 0 T E S 4 oo' gq 39 ENCL 39

TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 500C Chestnut Street Tower II APR 9 1979 Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II -

Suite 3100 101 Marietta Street Atlanta, Georgia 30303

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 -

EXPANSION ANCHORS NOT PASSING QUALIFICATION TESTS -

NCR 871 AND NCR 898 -

THIRD INTERIM REPORT On July 10, 1978, R. W. Wright, NRC-OIE Region II, was informed that NCR 871 was determined to be reportable in accordance with 10 CFR 50.55(e). This was followed by our first interim report dated August 9, 1978.

Since that time, related NCR 898 has been determined to be reportable in accordance with 10 CFR 50.55(s) and was reported in our second interim report dated January 26, 1979. We expect to submit our combined final written report covering both of these NCR's by June 8, 1979.

If you have any questions concerning this matter, please get in touch with M. R. Wisenburg at FTS 854-2581.

Very truly yours, J. E. Gilleland Assistant Manager of Power Enclosure cc: Mr. John G. Davis, Acting Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 An Equal Opoortunity Employer 790419o00Er

(0 ENCLOSURE BELLEFONTE NUCLEAR PLANT NCR 871 AND NCR 898 EXPENSION ANCHORS NOT PASSING QUALIFICATION TESTS THIRD INTERIM REPORT Description of Condition This deficiency involves self-drilling anchors used to anchor Seismic Category I supports to concrete. These anchors were installed without qualification tests as required by TVA General Construction Specification G-32.

Also-, when the anchors were tested in a test slab, they did not meet qualification testing performance specifications.

Interim Progress TVA has completed the qualification test in accordance with G-32. Two anchor installation configurations have been tested, one configuration in concrete with cutting through rebar and the second without cutting rebar. Detailed test results and data are now being evaluated by Engineering Design research and development employees for assurance.

that anchors will meet design requirements.

790419 0f e